CN105937441B - Internal combustion engine - Google Patents

Internal combustion engine Download PDF

Info

Publication number
CN105937441B
CN105937441B CN201610096561.5A CN201610096561A CN105937441B CN 105937441 B CN105937441 B CN 105937441B CN 201610096561 A CN201610096561 A CN 201610096561A CN 105937441 B CN105937441 B CN 105937441B
Authority
CN
China
Prior art keywords
flange
boss
chain guard
cylinder head
cam shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610096561.5A
Other languages
Chinese (zh)
Other versions
CN105937441A (en
Inventor
塚原猛
山本宪乡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Motor Corp
Original Assignee
Toyota Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Motor Corp filed Critical Toyota Motor Corp
Publication of CN105937441A publication Critical patent/CN105937441A/en
Application granted granted Critical
Publication of CN105937441B publication Critical patent/CN105937441B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01LCYCLICALLY OPERATING VALVES FOR MACHINES OR ENGINES
    • F01L1/00Valve-gear or valve arrangements, e.g. lift-valve gear
    • F01L1/02Valve drive
    • F01L1/022Chain drive
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01LCYCLICALLY OPERATING VALVES FOR MACHINES OR ENGINES
    • F01L1/00Valve-gear or valve arrangements, e.g. lift-valve gear
    • F01L1/02Valve drive
    • F01L1/04Valve drive by means of cams, camshafts, cam discs, eccentrics or the like
    • F01L1/047Camshafts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02FCYLINDERS, PISTONS OR CASINGS, FOR COMBUSTION ENGINES; ARRANGEMENTS OF SEALINGS IN COMBUSTION ENGINES
    • F02F7/00Casings, e.g. crankcases or frames
    • F02F7/0065Shape of casings for other machine parts and purposes, e.g. utilisation purposes, safety
    • F02F7/0073Adaptations for fitting the engine, e.g. front-plates or bell-housings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16JPISTONS; CYLINDERS; SEALINGS
    • F16J15/00Sealings
    • F16J15/02Sealings between relatively-stationary surfaces
    • F16J15/14Sealings between relatively-stationary surfaces by means of granular or plastic material, or fluid
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01LCYCLICALLY OPERATING VALVES FOR MACHINES OR ENGINES
    • F01L1/00Valve-gear or valve arrangements, e.g. lift-valve gear
    • F01L1/02Valve drive
    • F01L1/04Valve drive by means of cams, camshafts, cam discs, eccentrics or the like
    • F01L1/047Camshafts
    • F01L1/053Camshafts overhead type
    • F01L2001/0537Double overhead camshafts [DOHC]
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02FCYLINDERS, PISTONS OR CASINGS, FOR COMBUSTION ENGINES; ARRANGEMENTS OF SEALINGS IN COMBUSTION ENGINES
    • F02F7/00Casings, e.g. crankcases or frames
    • F02F7/0065Shape of casings for other machine parts and purposes, e.g. utilisation purposes, safety
    • F02F7/0073Adaptations for fitting the engine, e.g. front-plates or bell-housings
    • F02F2007/0075Front covers

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Cylinder Crankcases Of Internal Combustion Engines (AREA)
  • Devices For Conveying Motion By Means Of Endless Flexible Members (AREA)

Abstract

The present invention provides a kind of internal combustion engines comprising cylinder head, bent axle, admission cam shaft and exhaust cam shaft, the first chain guard and the second chain guard, chain and fastening bolt.The first chain guard with notch includes the first flange and first boss, and the first flange is located at the certain edges thereof edge between bent axle and camshaft of notch, and the axle portion of fastening bolt passes through first boss.Cylinder head includes the second flange and second boss, and second boss is coaxially disposed with first boss, and the axle portion is inserted into second boss.Liquid gasket is maintained between the second flange and the first flange.It is provided with slot at least one of position between the first flange and first boss of the first chain guard and the position between the second flange and second boss of cylinder head.

Description

Internal combustion engine
Technical field
The present invention relates to the internal combustion engines that chain guard is fastened to cylinder head by fastening bolt.
Background technology
Japanese Patent Application No.2012-137044 (JP 2012-137044A) describes one kind and passing through fastening bolt Chain guard is fastened to the example of the internal combustion engine of cylinder head.In this internal combustion engine, the rotation of bent axle is transferred to convex The chain of wheel shaft is arranged in the space being defined between cylinder head and chain guard.
In certain internal combustion engines, the first chain guard and the second chain guard are fastened to by cylinder head by fastening bolt.For example, First chain guard is attached to cylinder head, and the second chain guard is attached to the first chain guard.Chain setting is being defined in the first chain guard and second In space between chain guard.
In this internal combustion engine, such as formed-in-place gasket can be set between the first chain guard and cylinder head (FIPG) etc liquid gasket.
It is contacted to avoid with camshaft more specifically, the first chain guard is provided with notch, camshaft is along its axial direction from gas Cylinder cap protrudes.Due to the notch disposed as described above in the first chain guard, a part for the periphery of the first chain guard is located in song Between axis and camshaft.The part of the periphery of first chain guard --- that is, being located in the portion between bent axle and camshaft Point --- " certain edges thereof edge " will be referred to as.It is provided with flange at the certain edges thereof edge of the first chain guard.In addition, in cylinder head A part of --- that is, part towards the certain edges thereof edge --- place is provided with flange.It is plugged with liquid between these flanges Gasket.Liquid gasket is in close contact with these flanges.Therefore, the sealing performance in the region between these flanges is increased By force.
When chain guard is fastened to cylinder head by fastening bolt, the periphery of the first chain guard is removed because being set in the first chain guard Edge part other than setting notch and the edge part that is formed is pressed by the periphery of the second chain guard towards cylinder head, but the first chain guard Certain edges thereof edge is not pressed by the second chain guard towards cylinder head.Therefore, it is not that keep the power of liquid gasket by flange It is big.This makes it difficult to the degree of the close contact between enhancing flange and liquid gasket.Accordingly, it is difficult to enhance these flanges Between region sealing performance.
In order to enhance the sealing performance in the region between flange, it is desirable to boss be arranged near each flange, make tight The axle portion of fixing bolt passes through the boss.Therefore, the axial force generated by tightening fastening bolt is passed to liquid airproof Pad.Which increase the power that liquid gasket is kept by flange.Therefore, the degree of intimate contact between liquid gasket and flange It is enhanced, so as to cause the sealing performance for enhancing the region between flange.
Next, will be to each chain guard is fastened to cylinder head the step of, is described.In the first step, to the first chain At least one of the flange of cover and the flange of cylinder head apply uncured liquid gasket and are attached to the first chain guard Cylinder head.In the second step, chain link is sleeved on bent axle and camshaft.In third step, the second chain guard is attached to One chain guard.In four steps, chain guard is fastened to cylinder head by tightening fastening bolt.
Invention content
In the case where chain guard is fastened to cylinder head by multiple steps as described above, certainly at least one of which Flange applies liquid airproof and paves after specific a period of time, and chain guard is fastened to cylinder head by fastening bolt.It changes Sentence is talked about, and in some cases, is that the liquid gasket that at least one of which flange is applied in first step starts to cure Later, chain guard is fastened to by cylinder head by fastening bolt in four steps.In this case, above-mentioned axial force is passed To hard liquid gasket.When being provided with boss near each flange, being transferred to the axial force of hydraulic seal pad became Greatly, so as to causing the durability of liquid gasket to reduce.
The liquid for being transferred to and being kept by flange can be reduced by reducing the tightening force generated because tightening fastening bolt The axial force of gasket.However, in this case, although inhibiting the reduction of the durability of liquid gasket, by chain The power that cover is fixed to cylinder head is also reduced.
The present invention provides a kind of internal combustion engine, which is configured so as to reduce by tightening The reduction of the durability of liquid gasket is inhibited in the case of the tightening force that fastening bolt generates.
Internal combustion engine according to an aspect of the present invention include cylinder head, bent axle, admission cam shaft, exhaust cam shaft, First chain guard, the second chain guard, chain and fastening bolt.The admission cam shaft and the exhaust cam shaft are arranged in the cylinder head In.First chain guard is arranged to contact with the cylinder head.Second chain guard is arranged to contact with first chain guard.Institute Chain link is stated to be sleeved on the bent axle, the admission cam shaft and the exhaust cam shaft.The chain is arranged by first chain In the space that cover and second chain guard limit.First chain guard and second chain guard are fastened to institute by the fastening bolt State cylinder head.First chain guard includes edge part, and the edge part limits notch so that the admission cam shaft and the row Gas camshaft is located in the space in the notch.A part for the peripheral part of the notch is is located in the bent axle and institute State the certain edges thereof edge between admission cam shaft and the exhaust cam shaft.First chain guard includes that the first flange and first are convex Platform, first flange are located at the certain edges thereof edge, and the axle portion of the fastening bolt passes through the first boss.It is described First boss is arranged adjacent to first flange, and the first boss is located at crankshaft side relative to first flange On.The cylinder head includes the second flange and second boss, and second flange is cooperateed with first flange with liquid is close The mode that packing is maintained between second flange and first flange keeps the liquid gasket, the fastening bolt The axle portion be inserted into the second boss.The second boss is coaxially disposed with the first boss.Described Second flange of position and the cylinder head between first flange of one chain guard and the first boss and institute It states at least one of position between second boss and is provided with slot.
According to the above, during the first chain guard, chain and the second chain guard are attached to cylinder head, first, to At least one of one flange and the second flange apply also uncured liquid gasket and the first chain guard are attached to cylinder head. Even if in the case where the first chain guard is attached to cylinder head by this method, the notch in the first chain guard, which is arranged, still prevents from gas Cylinder cap camshaft outstanding is contacted with the first chain guard.In addition, being applied to the liquid of at least one of the first flange and the second flange State gasket is maintained between the first flange and the second flange.Then, chain link is sleeved on bent axle and camshaft.In this situation Under, the second chain guard is attached to the first chain guard.Then, chain guard is fastened to by cylinder head by fastening bolt.
In this case, the stage before chain guard is fastened to cylinder head by fastening bolt, be plugged on flange it Between liquid gasket may have begun to cure.When fastening bolt is tightened in this condition, if being applied to hard liquid The axial force of state gasket is excessive, then the durability of liquid gasket may reduce.
In consideration of it, according to the above, although first boss is positioned very close to the first flange and second boss is leaned on very much Nearly second flange positioning, but between the position and the second flange and second boss between the first flange and first boss At least one of position place is provided with slot.Therefore, it or even is inserted into boss in the axle portion of fastening bolt and therefore generates When axial force, transmission of the axial force to liquid gasket is limited still through slot.In other words, it prevents from being transferred to liquid airproof The axial force of pad is excessive, and therefore, and liquid gasket is less likely damage.Therefore, need not reduce by tightening fastening In the case of the tightening force that bolt generates, it is suppressed that the reduction of the durability of liquid gasket.
In the internal combustion engine according to the above, the first boss and the second boss can be in the air inlets Be located on the direction that camshaft and the exhaust cam shaft are arranged side by side the admission cam shaft and the exhaust cam shaft it Between.According to this aspect, the axial force by tightening fastening bolt generation be passed to be located in the first flange and the second flange it Between wholly liquid state gasket.Therefore, it is easy to ensure that the sealing performance provided by flange and liquid gasket.
In the internal combustion engine according to the above, the width of the slot can be less than the peripheral wall of the first boss with And the width of each of peripheral wall of the second boss.According to this aspect, pass through the axis generated because tightening fastening bolt The degree of intimate contact between flange and liquid gasket is set to be enhanced to power.
Description of the drawings
It anticipates below with reference to accompanying drawings to the feature, advantage of exemplary embodiments of the present invention and technical meaning and industry Justice is described, and in the accompanying drawings, identical reference numeral indicates identical element, and in the accompanying drawings:
Fig. 1 is the side view for schematically showing the internal combustion engine according to embodiment;
Fig. 2 is the front view of internal combustion engine;
Fig. 3 A are the plan view for schematically showing the first chain guard;
Fig. 3 B are the sectional view along the line 3B-3B interceptions of the first chain guard;
Fig. 4 A are the plan view on the attaching surface for the first chain guard of attaching for schematically showing cylinder head;
Fig. 4 B are the partial enlarged view of cylinder head;
Fig. 5 is the plan view for schematically showing the second chain guard;
The schematic diagram of internal combustion engine when Fig. 6 is viewed from above, wherein housing is omitted;And
Fig. 7 is to show that the part for the state that chain guard is fastened to in internal combustion engine by fastening bolt cylinder head is cut Face figure.
Specific implementation mode
It hereafter, will be referring to Figure 1 to Figure 7 to being described according to the internal combustion engine of embodiment.Such as institute in Fig. 1 and Fig. 2 Show, internal combustion engine 10 includes cylinder block 11, cylinder head 12 and valve mechanism cover 13, wherein cylinder head 12 is fastened to cylinder block 11 Upper part (in fig. 1 and 2), valve mechanism cover 13 cover cylinder head 12 upper part (in fig. 1 and 2).Internal combustion Engine 10 is provided with the bent axle 14 supported in a rotatable way by cylinder block 11 and by cylinder head 12 with rotatable side The admission cam shaft 15 and exhaust cam shaft 16 of formula bearing.Loop chain 17 is relative to cylinder block 11 at right side (in Fig. 1) position Ring set is on bent axle 14 and camshaft 15,16.By this configuration, the rotation of bent axle 14 by chain 17 be transferred to camshaft 15, 16。
Internal combustion engine 10 is provided with the first chain guard 18 for being attached to cylinder head 12 and cylinder block 11 and is attached to first Second chain guard 19 of chain guard 18.Chain guard 18,19 is fastened to cylinder head 12 by fastening bolt 20.Chain 17 setting by chain guard 18, In 19 spaces limited.
It is provided with mounting bracket 21 on the side opposite with the first chain guard 18 of chain guard 19.Fastening bolt 20 passes through peace The slightly end for filling the axle portion 201 of holder 21 extends to cylinder head 12, and chain guard 18,19 is thus fastened to cylinder head 12.In this shape Under state, the head 202 of fastening bolt 20 is engaged with mounting bracket 21.By means of the tension for tightening the generation of fastening bolt 20 Power, the second chain guard 19 is pressed against the first chain guard 18, and the first chain guard 18 is pressed against cylinder head 12.
Next, will be described with reference to the first chain guards of Fig. 3 A and Fig. 3 B couple 18.Fig. 3 A show the interior of the first chain guard 18 Surface 31.Inner surface 31 is towards cylinder block 11 and cylinder head 12.
As shown in fig. 3, the low portion (in figure 3 a) of the first chain guard 18 has through-hole 32, bent axle 14 logical across this Hole 32.The low portion of first chain guard 18 is the part for being attached to cylinder block 11.In addition, under the inner surface 31 of the first chain guard 18 The flange 33 for cylinder block is provided in portion part (in Fig. 3 A).Flange 33 has closed loop shape.In the slightly end of flange 33 Place is provided with the exemplary formed-in-place gasket (FIPG) as liquid gasket.When the first chain guard 18 is attached to cylinder block 11 When with cylinder head 12, the flange 33 for being applied with FIPG is pressed against cylinder block 11.
In addition, the upper part of the first chain guard 18 is provided with restriction for avoiding the first chain guard 18 and cam (in figure 3 a) The edge part 35 for the notch 34 that axis 15,16 contacts.The upper part of first chain guard 18 is to be attached to the part of cylinder head 12.It limits The edge part 35 of notch 34 is located in the center of the upper part (in figure 3 a) of the first chain guard 18.When the first chain guard 18 is attached to When cylinder block 11 and cylinder head 12, camshaft 15,16 is located in the space 341 within the edge part 35 for limiting notch 34 In.
Since notch 34, a part for the periphery of the first chain guard 18 are provided in the first chain guard 18 as described above It is located between bent axle 14 and camshaft 15,16.In the periphery of the first chain guard 18, since notch is arranged in the first chain guard 18 34 and the edge part that is formed in the first chain guard 18 will be often simply referred to as " edge part 35 " in this specification.In such case Under, a part for edge part 35 --- that is, the portion extended transversely at position between bent axle 14 and camshaft 15,16 Point --- correspond to " certain edges thereof edge 35A ".
On the inner surface 31 of the first chain guard 18, it is convex at the edge part 35 including certain edges thereof edge 35A to be provided with first Edge 36.First flange 36 is different from flange 33, does not have closed loop shape.
As shown in figures 3 a and 3b, the multiple insertion sections 37 being inserted through for positioning bolt 22 are provided with, it is multiple to insert Enter portion 37 to be arranged to protrude from the inner surface 31 of the first chain guard 18.Insertion section 37 to make the first chain guard 18 with cylinder head 12 each other Alignment.Insertion section 37 and the first flange 36 are integral, and the slightly end for slightly holding end face and the first flange 36 of each insertion section 37 Surface flushes.
As shown in figures 3 a and 3b, the inner surface 31 of the first chain guard 18 is provided with first boss 38, fastening bolt 20 Axle portion 201 passes through first boss 38.The slightly end end face for slightly holding end face and the first flange 36 of first boss 38.When by air inlet When the direction that camshaft 15 is arranged side by side with exhaust cam shaft 16 is limited to prescribed direction, first boss 38 is fixed in the prescribed direction Position between admission cam shaft 15 and exhaust cam shaft 16, and first boss 38 adjacent to the first flange 36 setting in certain edges thereof Part at the 35A of edge.First boss 38 is located in relative to certain edges thereof edge 35A on 14 side of bent axle (downside in Fig. 3 A). The first slot 39 is defined between the first flange 36 and first boss 38.The width H1 of first slot 39 is very small and is less than first The width H2 of the peripheral wall 381 of boss 38.In other words, first boss 38 is positioned close to the first flange 36.
Apply still during the first chain guard 18 is attached to cylinder head 12, such as to the slightly end end face of the first flange 36 Uncured FIPG 23.FIPG 23 is used as the example of " liquid gasket ".FIPG be apply when in liquid form and from Cured material as time goes by after application.Due to the application of FIPG, one can be bonded in by being applied with the part of FIPG It rises and intimate contact with one another.
Next, by the attaching surface 51 for the first chain guard of attaching 18 for describing cylinder head 12 with reference to Fig. 4 A and Fig. 4 B.Such as figure Shown in 4A, the attaching surface 51 of cylinder head 12 is disposed an outwardly facing the second flange 52 of the first flange 36 of the first chain guard 18.It changes Sentence is talked about, and when the first chain guard 18 is attached to cylinder head 12, the second flange 52 cooperates with the first flange 36 keeps FIPG 23, makes FIPG 23 is obtained to be maintained between the second flange 52 and the first flange 36.In addition, attaching surface 51 is provided with and the first chain guard 18 The insertion section 53 that is coaxially disposed of insertion section 37.Insertion section 53 and the second flange 52 are integral, and each insertion section 53 Slightly hold the slightly end end face of end face and the second flange 52.The slightly end of positioning bolt 22 is inserted into the insertion section on attaching surface 51 In 53.
As shown in Figure 4 A and 4 B, it is provided with second boss 54 near second flange 52 on attaching surface 51.Second Boss 54 is adjacent to the second flange 52, and second boss 54 and the first boss 38 of the first chain guard 18 are coaxially disposed.Fasten spiral shell The axle portion 201 of bolt 20 is inserted into second boss 54.The width H3 of the peripheral wall 541 of second boss 54 is equal to the week of first boss 38 The width H2 of wall 381.
In the present embodiment, the second slot 55 is provided between the second flange 52 and second boss 54.Second slot 55 Width H4 is substantially equal to the width H1 of the first slot 39.When the first chain guard 18 is attached to cylinder head 12, the inside of the second slot 55 with The inside of first slot 39 communicates with each other.
Next, will be described with reference to Fig. 5 pairs of the second chain guard 19.Fig. 5 shows the inner surface 61 of the second chain guard 19.It is interior Surface 61 is towards the first chain guard 18.
As shown in Figure 5, the second chain guard 19 has the through-hole 62 passed through for bent axle 14, for the through-hole of admission cam shaft 15 63 and for exhaust cam shaft 16 through-hole 64.In addition, the inner surface 61 of the second chain guard 19 is provided with third flange 65.Third Flange 65 is arranged at the edge part in addition to upper edge (in Figure 5) of the periphery of the second chain guard 19.When the second chain guard 19 When being attached to the first chain guard 18, third flange 65 is contacted with the edge part in addition to edge part 35 of the periphery of chain guard 18.Change sentence It talks about, the second chain guard 19 is not provided with the flange contacted with the edge part 35 of the first chain guard 18.
In addition, the inner surface 61 of the second chain guard 19 is provided with third boss 66, the axle portion 201 of aforementioned fastening bolt 20 passes through Third boss 66.Third boss 66 and the first boss 38 of the first chain guard 18 are coaxially disposed.
Next, by being carried out referring to figure 6 and figure 7 to the operation that chain guard 18, each of 19 is fastened to cylinder head 12 Description.First, apply still at least one of the first flange 36 of the first chain guard 18 and the second flange 52 of cylinder head 12 Uncured FIPG 23.In this state, the first chain guard 18 is attached to cylinder head 12.At this point, positioning bolt 22 is inserted into Into the insertion section 37 of the first chain guard 18 and the insertion section 53 of cylinder head 12.In this case, it is maintained at the first flange 36 FIPG 23 between the second flange 52 is still uncured.Therefore, or even in the case where positioning bolt 22 is tightened, FIPG 23 Also it is almost not corrupted.
Then, by 17 ring set of chain on bent axle 14 and camshaft 15,16.Next, the second chain guard 19 is attached to first Chain guard 18 is so that chain 17 is covered by the first chain guard 18 and the second chain guard 19.
Then, as shown in Figure 6, chain guard 18,19 is fastened to by cylinder head 12 by fastening bolt 20.In such case Under, the head 202 of fastening bolt 20 is engaged with mounting bracket 21, and therefore, by mounting bracket 21 by 19 court of the second chain guard It is pressed to the first chain guard 18.In this state, by the periphery of the second chain guard 19 by the main portion of the periphery of the first chain guard 18 --- that is, part in addition to edge part 35 of the periphery of the first chain guard 18 --- is divided to be pressed towards cylinder head 12.
As shown in Figure 7, the inner surface 31 of the edge part 35 of the first chain guard 18 is provided with the first flange 36, and first is convex Edge 36 faces the second flange 52 of cylinder head 12 across FIPG 23.The axle portion 201 of fastening bolt 20 is inserted into respectively close to first In flange 36 and the first boss 38 and second boss 54 of the setting of the second flange 52.Therefore, it is generated by tightening fastening bolt 20 Axial force be passed to the FIPG 23 being maintained between the first flange 36 and the second flange 52.
FIPG has starts cured characteristic as time goes by.Therefore, it when fastening bolt 20 is tightened, is located in The solidification of FIPG 23 between first flange 36 and the second flange 52 may have begun.When in FIPG 23 just in cured feelings When tightening fastening bolt 20 under condition, if the axial force for being transferred to FIPG 23 is excessive, because to be maintained at first convex by FIPG 23 Become larger between edge 36 and the second flange 52 and to damage caused by FIPG 23, this may cause the durability of FIPG 23 to reduce.
In consideration of it, in the present embodiment, the first slot 39 is provided between the first flange 36 and second boss 38, and The second slot 55 is provided between the second flange 52 and second boss 54.Therefore, the first chain guard 18 be located at the first flange 36 with The rigidity of part between first boss 38 and the part between the second flange 52 and second boss 54 of cylinder head 12 Rigidity all reduce.Therefore, even if tightening fastening bolt 20 in the case of FIPG 23 is curing, by tightening fastening spiral shell The axial force that bolt 20 generates also is less likely to be transmitted to FIPG 23.It is therefore prevented that the axial force for being transferred to FIPG 23 is excessive, And therefore FIPG 23 is less likely to be damaged.
Above-mentioned configuration and operation produce following advantageous effects.(1) or even in the axle portion 201 because of fastening bolt 20 it is inserted into When generating axial force in boss 38,54, the transmission of the axial force to FIPG 23 is also limited by slot 39,55.Therefore, it is suppressed that Excessive axial force is transmitted to FIPG 23.In other words, or even when boss 38,54 is arranged respectively close to flange 36,52, still So axial force appropriate is transmitted to FIPG 23 and FIPG 23 is therefore made to be in close contact with flange 36,52.It therefore, can be true The reduction for inhibiting the durability of FIPG 23 while the sealing performance provided by 36,52 and FIPG of flange 23 is provided, without Reduce by tightening tightening force caused by fastening bolt 20.
(2) when the direction that camshaft 15,16 is arranged side by side is limited to prescribed direction, first boss 38 and second boss 54 are arranged close to the center in the prescribed direction of the first flange 36.Therefore, the axial force generated by tightening fastening bolt 20 It is passed to the entire FIPG 23 being located between the first flange 36 and the second flange 52.Therefore, it is easy to ensure that by flange 36, The sealing performance that 52 and FIPG 23 is provided.
The above embodiment can be changed as follows.As long as being provided between the first flange 36 and first boss 38 As soon as slot 39, then the second slot 55 need not be arranged between the second flange 52 and second boss 54.Equally, it compares in the first flange The case where being not provided with slot between 36 and first boss 38 and being not provided with slot between the second flange 52 and second boss 54, In this case, the possibility of axial force transmission to FIPG 23 are lower.Therefore, can ensure by 36,52 and FIPG of flange The reduction of the durability of FIPG 23 is provided while the sealing performance of 23 offers.
As long as being provided with the second slot 55 between the second flange 52 and second boss 54, then need not be in the first flange 36 First slot 39 is set between first boss 38.Equally, it is not provided with slot compared between the first flange 36 and first boss 38 And the case where being not provided with slot between the second flange 52 and second boss 54, in this case, axial force transmission to FIPG 23 possibility smaller.Therefore, can inhibit while the sealing performance provided by 36,52 and FIPG of flange 23 is provided The reduction of the durability of FIPG 23.
In the above-described embodiment, FIPG is used as liquid gasket.However, liquid gasket is not limited to FIPG, and The other materials in addition to FIPG may be used in it, if these materials apply when in the form of liquid and from apply after with The passage of time cure and these materials so that the part for being applied with these materials is bonded together and make these parts that This is in close contact.

Claims (3)

1. a kind of internal combustion engine, including:
Cylinder head;
Bent axle;
Admission cam shaft and exhaust cam shaft, the admission cam shaft and the exhaust cam shaft are arranged in the cylinder head;
First chain guard, first chain guard are arranged to contact with the cylinder head;
Second chain guard, second chain guard are arranged to contact with first chain guard;
Chain, the chain link are sleeved on the bent axle, the admission cam shaft and the exhaust cam shaft, and the chain is arranged by institute It states in the space that the first chain guard and second chain guard limit;And
First chain guard and second chain guard are fastened to the cylinder head by fastening bolt, the fastening bolt, wherein
First chain guard includes edge part, and the edge part limits notch so that the admission cam shaft and the exhaust are convex Wheel shaft is located in the space in the notch,
A part for the peripheral part of the notch is to be located in the bent axle and the admission cam shaft and the exhaust cam shaft Between certain edges thereof edge,
First chain guard includes the first flange and first boss, and first flange is located at the certain edges thereof edge, institute The axle portion for stating fastening bolt passes through the first boss, the first boss to be arranged adjacent to first flange, and described First boss is located at relative to first flange in crankshaft side,
The cylinder head includes the second flange and second boss, and second flange is cooperateed with first flange with liquid is close The mode that packing is maintained between second flange and first flange keeps the liquid gasket, the fastening bolt The axle portion be inserted into the second boss, the second boss is coaxially disposed with the first boss, and
Described in position and the cylinder head between first flange of first chain guard and the first boss It is provided with slot at least one of position between second flange and the second boss.
2. internal combustion engine according to claim 1, wherein the first boss and the second boss are in the air inlet Be located on the direction that camshaft and the exhaust cam shaft are arranged side by side the admission cam shaft and the exhaust cam shaft it Between.
3. internal combustion engine according to claim 1 or 2, wherein the width of the slot is less than the week of the first boss The width of each of wall and the peripheral wall of the second boss.
CN201610096561.5A 2015-03-02 2016-02-22 Internal combustion engine Expired - Fee Related CN105937441B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015040424A JP6156412B2 (en) 2015-03-02 2015-03-02 Internal combustion engine
JP2015-040424 2015-03-02

Publications (2)

Publication Number Publication Date
CN105937441A CN105937441A (en) 2016-09-14
CN105937441B true CN105937441B (en) 2018-09-04

Family

ID=56846576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610096561.5A Expired - Fee Related CN105937441B (en) 2015-03-02 2016-02-22 Internal combustion engine

Country Status (3)

Country Link
US (1) US9771836B2 (en)
JP (1) JP6156412B2 (en)
CN (1) CN105937441B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3619415A4 (en) 2017-05-15 2020-12-16 Cummins Inc. Cylinder head bolt boss cutouts
JP6939485B2 (en) * 2017-12-04 2021-09-22 トヨタ自動車株式会社 cylinder head
DE102018113977A1 (en) * 2018-06-12 2019-12-12 ECO Holding 1 GmbH Camshaft unit and method for producing a camshaft unit
JP7480682B2 (en) * 2020-11-17 2024-05-10 トヨタ紡織株式会社 Internal combustion engine cover
JP7312209B2 (en) * 2021-03-31 2023-07-20 本田技研工業株式会社 internal combustion engine

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61179351U (en) * 1985-04-30 1986-11-08
JPS61183445U (en) * 1985-05-08 1986-11-15
JPH0672548B2 (en) * 1986-04-23 1994-09-14 マツダ株式会社 V-type engine cylinder head structure
JPH1047158A (en) * 1996-07-31 1998-02-17 Suzuki Motor Corp Chain cover structure of internal combustion engine
JP4122109B2 (en) * 1999-05-31 2008-07-23 本田技研工業株式会社 Parts mounting structure
JP2001090840A (en) * 1999-09-24 2001-04-03 Honda Motor Co Ltd Sealing device
JP2009293378A (en) * 2008-06-02 2009-12-17 Toyota Motor Corp Seal structure of chain case joining surface
JP2012137044A (en) 2010-12-27 2012-07-19 Suzuki Motor Corp Fixing structure of chain case for engine
JP5592866B2 (en) * 2011-11-25 2014-09-17 本田技研工業株式会社 Cover structure of internal combustion engine
JP5940002B2 (en) * 2013-02-14 2016-06-29 日立オートモティブシステムズ株式会社 Valve timing control system for internal combustion engine

Also Published As

Publication number Publication date
US9771836B2 (en) 2017-09-26
US20160258328A1 (en) 2016-09-08
JP6156412B2 (en) 2017-07-05
CN105937441A (en) 2016-09-14
JP2016160833A (en) 2016-09-05

Similar Documents

Publication Publication Date Title
CN105937441B (en) Internal combustion engine
US20100102519A1 (en) Sealing Structure And Gasket
JP6651778B2 (en) Internal combustion engine cover structure
US20180252229A1 (en) Housing for turbocharger and method for manufacturing the same
US20150167557A1 (en) Seal for gas turbine engines
JP6575606B2 (en) Valve stem seal
JP2007113411A (en) Fastening structure of engine mount bracket
US9528400B2 (en) Valve timing control apparatus
CN114508444B (en) Cover for an internal combustion engine
JP2013130136A (en) Fastening part structure of turbocharger
EP2818662B1 (en) Engine
US20150144084A1 (en) Valve timing adjusting apparatus
US11982354B2 (en) Gasket for a timing chain tensioner
JP2009299735A (en) Sealing device
JP5488822B2 (en) Lubricating oil inlet structure
US20180058399A1 (en) Intake Device
JP5163458B2 (en) Internal combustion engine
WO2017038817A1 (en) Positioning structure for cylinder head cover
JP2017193990A (en) Internal combustion engine
JP2017115950A (en) Fixing structure of flange
JP2017207005A (en) Internal combustion engine
JP7239422B2 (en) Seal structure
JP2005155713A (en) Metallic gasket
JP7363698B2 (en) internal combustion engine cover
JP7521463B2 (en) Internal combustion engine cover

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180904

CF01 Termination of patent right due to non-payment of annual fee