CN105930661A - Equipment performance value adjusting method and device - Google Patents

Equipment performance value adjusting method and device Download PDF

Info

Publication number
CN105930661A
CN105930661A CN201610264918.6A CN201610264918A CN105930661A CN 105930661 A CN105930661 A CN 105930661A CN 201610264918 A CN201610264918 A CN 201610264918A CN 105930661 A CN105930661 A CN 105930661A
Authority
CN
China
Prior art keywords
value
disposal ability
task
estimate
final evaluation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610264918.6A
Other languages
Chinese (zh)
Other versions
CN105930661B (en
Inventor
丁长长
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Canaan Jiesi Information Technology Co ltd
Original Assignee
Hangzhou Canaan Creative Information Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Canaan Creative Information Technology Ltd filed Critical Hangzhou Canaan Creative Information Technology Ltd
Priority to CN201610264918.6A priority Critical patent/CN105930661B/en
Publication of CN105930661A publication Critical patent/CN105930661A/en
Application granted granted Critical
Publication of CN105930661B publication Critical patent/CN105930661B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16ZINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
    • G16Z99/00Subject matter not provided for in other main groups of this subclass

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The invention discloses a method and a device for adjusting a performance value of equipment, which can maximize an evaluation value obtained by completing a task on the basis of considering power consumption. The method comprises the following steps: acquiring characteristic parameters used for obtaining evaluation factors in a target task; obtaining an evaluation factor according to the characteristic parameters; determining the product of the evaluation factor and the processing capacity of the equipment executing the target task as the total evaluation value of the task; determining a difference formula between the total evaluation value and the power consumption coefficient for completing the target task as a final evaluation value formula of the target task; solving the target processing capacity when the final evaluation value reaches the maximum value and the maximum value is a positive value according to a final evaluation value formula; and adjusting the processing capacity of the equipment completing the target task to the target processing capacity. By adopting the method provided by the invention, the task evaluation value of subtracting the power consumption coefficient can be maximized by adjusting the processing capacity of the equipment.

Description

A kind of equipment performance value adjustment method and device
Technical field
The present invention relates to Internet technical field, particularly to a kind of equipment performance value adjustment method and device.
Background technology
Along with the development of science and technology, the disposal ability of each class of electronic devices is more and more higher, accordingly, and electronics Equipment task to be dealt with also becomes increasingly complex, and this allows for the power that electronic equipment consumed and increases therewith, In this case, occurring in that some can manually or automatically regulate the equipment of self performance, user can basis Need manual adjustment device performance, or system automatically adjusts according to the significance level of task.
Such as, when task is urgent when, evaluation of estimate obtained when task completes is the highest, now, and user Equipment performance value can be heightened, to accelerate the process progress of task, when task is not urgent, when task completes Obtained evaluation of estimate is the lowest, and now, equipment performance value can be turned down by user, to reduce equipment power dissipation;Again Such as, when task publisher's release tasks, the significance level of task can be done respective identification, significance level The highest, the evaluation of estimate obtained when completing of this task is the highest, when the equipment of the task of process receives this task, Significance level according to this task adjusts the performance number of self, such as when task significance level is higher, by self Performance number heighten, to accelerate task processing speed, when the significance level of task is relatively low, turn down self Performance number, to reduce power consumption.When task has processed, according to equipment performance value, task difficulty, task Significance level, the factor such as probability completing task determine that the general comment of task is worth, but, such mode, The not power consumption of consideration equipment, for the task that some difficulty are bigger, when equipment performance value being turned down, needs During the process wanted, compole is long, the power of consumption may than by more than high-performance treatments task, so, no Consider that the evaluation of estimate obtained by power consumption is irrational.
Therefore, the most reasonably adjust equipment performance value, on the basis of considering power consumption, made to appoint Evaluation of estimate obtained by business reaches maximum, is a problem demanding prompt solution.
Summary of the invention
The present invention provides a kind of equipment performance value adjustment method and device, in order on the basis considering power consumption On, make the evaluation of estimate obtained by task reach maximum.
The present invention provides a kind of equipment performance value adjustment method, including:
Obtaining for obtaining the characteristic parameter of assessment coefficients in goal task, described characteristic parameter includes described mesh The intractability of mark task, the probability completing described goal task and the significance level of described goal task;
Described assessment coefficients is obtained according to described characteristic parameter;
Determine that described assessment coefficients is described with the product of the disposal ability of the equipment performing described goal task The general comment of task is worth;
Determining that described general comment is worth the poor formula of asking with the power consumption factor completing described goal task is described mesh The final evaluation of estimate formula of mark task;
Make final evaluation of estimate reach maximum according to described final evaluation of estimate equations and described maximum is On the occasion of time target disposal ability;
The disposal ability completing the equipment of described goal task is adjusted to described target disposal ability.
The beneficial effects of the present invention is: ask poor formula as finally general comment value and the task power consumption factor Evaluation of estimate formula, is adjusted to the disposal ability of equipment and makes final evaluation of estimate reach the process of equipment during maximum Ability, thus, the task-based appraisal value deducting power consumption factor can be made to reach by adjusting the disposal ability of equipment Maximum.
In one embodiment, described assessment coefficients obtains according to below equation:
a = A × B D ;
Wherein, described a represents that assessment coefficients, described A have represented the probability of described goal task, described B represents that the significance level of described goal task, described D represent the intractability of described goal task.
Having the beneficial effects that of the present embodiment: using the probability completing task and significance level as with assessment coefficients The index being directly proportional, using the intractability of task as the index being inversely proportional to assessment coefficients, thus, it is considered to The impact on assessment coefficients of the intractability many index of task significance level, the probability completing task and task, So that the result of calculation that task general comment is worth is more objective and accurate.
In one embodiment, described final evaluation of estimate formula is following form:
E=a × u-b × w;
Wherein, described E represents that final evaluation of estimate, described a represent that assessment coefficients, described u represent execution institute State the disposal ability of the equipment of goal task, described b × w represent power consumption factor, described b represent power consumption because of Number, described w is power consumption number.
The having the beneficial effects that of the present embodiment: after the general comment being calculated task is worth, it is also contemplated that merit The consumption of the rate impact on task-based appraisal value, thus using the difference of general comment value and power consumption as final review Being worth, the determination making task-based appraisal value is more objective.
In one embodiment, when the disposal ability adjustable extent of described equipment is any range, described Target disposal ability when making final evaluation of estimate reach maximum according to described final evaluation of estimate equations, including:
Limit u of E is sought according to below equation0:
E '=a-bw ' (u0)=0;
Determine limit u solving the described E obtained0Value mesh when being to make final evaluation of estimate reach maximum Mark disposal ability.
Having the beneficial effects that of the present embodiment: obtain when final evaluation of estimate reaches according to simple derivative operation Disposal ability during big value, thus, it is provided that a kind of mode simply determining target disposal ability, simplify The determination mode of target disposal ability.
In one embodiment, it is 0 <u when the adjustable extent of described equipment disposal ability u1≤u≤u2Time, Described target when making final evaluation of estimate reach maximum according to described final evaluation of estimate equations processes energy Power, including:
Limit u by described E0Value, described u1Value and described u2Value substitute into described final evaluation respectively Value formula tries to achieve E (u0)、E(u1) and E (u2);
Contrast described E (u0)、E(u1) and E (u2) value of three;
Determine described E (u0)、E(u1) and E (u2) disposal ability corresponding to maximum in three For target disposal ability.
Having the beneficial effects that of the present embodiment: when the disposal ability adjustable extent of equipment is at a fixed interval Time, respectively the pole value of disposal ability, maximum and minima are substituted into final evaluation of estimate formula, will be final The disposal ability that in evaluation of estimate, maximum is corresponding as target disposal ability, thus, it is contemplated that target process energy Institute's likely value of power, the determination making target disposal ability is more accurate.
In one embodiment, when the disposal ability adjustable extent of described equipment is fixed number of preset value, Described target when making final evaluation of estimate reach maximum according to described final evaluation of estimate equations processes energy Power, including:
Described in power consumption factor corresponding to described fixed number of preset value and described preset value is brought into respectively Final review is worth in formula and solves the final evaluation that all preset values in described disposal ability adjustable extent are corresponding Value;
Contrast the size of multiple final evaluation of estimate corresponding to all preset values;
Determine that the preset value that the maximum in the plurality of final evaluation of estimate is corresponding is target disposal ability.
Having the beneficial effects that of the present embodiment: when the disposal ability adjustable extent of equipment is fixed number of presetting During value, only by all preset values final evaluation of estimate formula of substitution i.e. be can determine that the maximum in final evaluation of estimate The preset value of value correspondence is target disposal ability, simplifies the determination mode of target disposal ability.
The present invention also provides for a kind of equipment performance value adjuster, including:
First acquisition module, for obtaining for obtaining the characteristic parameter of assessment coefficients in goal task, described Characteristic parameter includes the intractability of described goal task, the probability completing described goal task and described target The significance level of task;
Second acquisition module, for obtaining described assessment coefficients according to described characteristic parameter;
First determines module, for determining the process of described assessment coefficients and the equipment performing described goal task The product of ability is that the general comment of described task is worth;
Second determines module, for determining that described general comment is worth and the power consumption factor completing described goal task The final evaluation of estimate formula asking poor formula to be described goal task;
Solve module, for according to described final evaluation of estimate equations make final evaluation of estimate reach maximum and Described maximum be on the occasion of time target disposal ability;
Adjusting module, for being adjusted to the disposal ability of the equipment completing described goal task at described target Reason ability.
In one embodiment, described in solve module, including:
Solve submodule, for when the disposal ability adjustable extent of described equipment is any range, according to Lower formula seeks limit u of E0:
E '=a-bw ' (u0)=0;
First determines submodule, for determining limit u solving the described E obtained0Value for making finally to evaluate Value reaches target disposal ability during maximum.
In one embodiment, described in solve module, including:
First substitutes into submodule, is used for when the adjustable extent of described equipment disposal ability u is 0 <u1≤u≤ u2Time, by limit u of described E0Value, described u1Value and described u2Value substitute into respectively described in final review It is worth formula and tries to achieve E (u0)、E(u1) and E (u2);
First contrast submodule, is used for contrasting described E (u0)、E(u1) and E (u2) value of three;
Second determines submodule, is used for determining described E (u0)、E(u1) and E (u2) in three Big disposal ability corresponding to value is target disposal ability.
In one embodiment, described in solve module, including:
Second substitutes into submodule, is used for when the disposal ability adjustable extent of described equipment is fixed number of presetting During value, power consumption factor corresponding to described fixed number of preset value and described preset value is brought into respectively described in Final review is worth in formula and solves the final evaluation that all preset values in described disposal ability adjustable extent are corresponding Value;
Second contrast submodule, for contrasting the size of multiple final evaluation of estimate corresponding to all preset values;
3rd determines submodule, for determining the preset value that the maximum in the plurality of final evaluation of estimate is corresponding For target disposal ability.
Other features and advantages of the present invention will illustrate in the following description, and, partly from explanation Book becomes apparent, or understands by implementing the present invention.The purpose of the present invention and other advantages can Realize by structure specifically noted in the description write, claims and accompanying drawing and obtain ?.
Below by drawings and Examples, technical scheme is described in further detail.
Accompanying drawing explanation
Accompanying drawing is for providing a further understanding of the present invention, and constitutes a part for description, with this Bright embodiment is used for explaining the present invention together, is not intended that limitation of the present invention.In the accompanying drawings:
Fig. 1 is the flow chart of a kind of equipment performance value adjustment method in one embodiment of the invention;
Fig. 2 is the flow chart of a kind of equipment performance value adjustment method in one embodiment of the invention;
Fig. 3 is the flow chart of a kind of equipment performance value adjustment method in one embodiment of the invention;
Fig. 4 is the block diagram of a kind of equipment performance value adjuster in one embodiment of the invention;
Fig. 5 is the block diagram of a kind of equipment performance value adjuster in one embodiment of the invention;
Fig. 6 is the block diagram of a kind of equipment performance value adjuster in one embodiment of the invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the preferred embodiments of the present invention are illustrated, it will be appreciated that described herein Preferred embodiment is merely to illustrate and explains the present invention, is not intended to limit the present invention.
Fig. 1 is the flow chart of a kind of equipment performance value adjustment method in one embodiment of the invention, as it is shown in figure 1, In the present invention, equipment performance value adjustment method can be used for being automatically adjusted the equipment of performance number, and the method can be by reality Execute as following steps S11-S16:
In step s 11, obtain in goal task for obtaining the characteristic parameter of assessment coefficients, characteristic parameter Including goal task intractability, complete the probability of goal task and the significance level of goal task;
In step s 12, assessment coefficients is obtained according to characteristic parameter;
In step s 13, determine that assessment coefficients with the product of the disposal ability of the equipment of performance objective task is The general comment of task is worth;
In step S14, determining that general comment is worth the poor formula of asking with the power consumption factor completing goal task is mesh The final evaluation of estimate formula of mark task;
In step S15, final evaluation of estimate is made to reach maximum and maximum according to final evaluation of estimate equations Value on the occasion of time target disposal ability;
In step s 16, the disposal ability completing the equipment of goal task is adjusted to target disposal ability.
In the present embodiment, obtain in goal task for obtaining the characteristic parameter of assessment coefficients, this goal task Can be the task of each generic task delivery system issue, the characteristic parameter in this goal task can be this target The intractability of task, obtain the probability of this goal task and the significance level of this goal task, when this task During for paid task, it is generally the case that the task that significance level is the highest, the award that task delivery system is given The highest, therefore the significance level that can reflect task is rewarded by task, thus, task can be rewarded as target The reference frame of the significance level of task, such as, directly by complete this getable money of task, prize, The reward quantity of the forms such as integration identifies the significance level of goal task, comments according to features described above parameter acquiring Valency factor, and using the product of this assessment coefficients and the disposal ability of the equipment of performance objective task as task General comment is worth.And the poor formula of asking that this general comment is worth with the power consumption factor completing goal task is appointed as target The evaluation of estimate formula of business, when making final evaluation of estimate reach maximum according to this final evaluation of estimate equations, if Standby target disposal ability.After obtaining target disposal ability, value corresponding for target disposal ability is substituted into Final review is worth formula, it is judged that the maximum of final evaluation of estimate now is on the occasion of still negative value, evaluates when final Value maximum be on the occasion of time, the disposal ability completing the equipment of this goal task is adjusted to target process energy Power, when the maximum of final evaluation of estimate is negative value, equipment is automatically stopped operation.
It should be noted that for the equipment of scalable disposal ability, it is generally the case that disposal ability That adjusts is the highest, and the power consumption consumed is the biggest, i.e. disposal ability and power consumption number positive correlation, and the relationship of the two is by such as Lower formula is indicated:
W=w (u);Formula 1
And in actual applications, the regulation of disposal ability is to be realized by the adjustment of equipment performance value.
Secondly, when the award of above-mentioned paid task is money, the weight of paid task is identified by monetary amount Wanting degree, such as, the money obtained by task can be multiplied by predefinable factor, gained product is the weight of this task Want degree, when this predefinable factor is 1, directly monetary amount can be considered as the significance level of task, can retain The measurement unit of money, and on the basis of the measurement unit retaining money, the unit that general comment is worth i.e. becomes The measurement unit of money, now, power consumption factor to be worth with general comment subtract each other, then need and general comment is worth tool Having identical measurement unit, now, power consumption factor can be the product of power consumption and electricity price.So, can lead to The target disposal ability of toning finishing equipment, it is achieved the maximum maximum return to this task.
In above-mentioned example, although weighed the significance level of task by money, but, in essence, still Being so the load in order to equalize whole electric power system, reduce power consumption, reason is as follows: electric service business is in order to all The load of weighing apparatus electric power system, in peak times of power consumption, electricity price is higher, and in the low power consumption phase, electricity price is relatively low, As can be seen here, the equipment that runs when the low power consumption phase performs task, and the income obtained is above peak of power consumption The income of phase, it is assumed that the income performing task during peak times of power consumption is negative, and the low power consumption phase when It is possible to be just, in this programme, only final evaluation of estimate maximum on the occasion of time just equipment is processed energy Power is adjusted to target disposal ability, and i.e. when peak times of power consumption, equipment does not runs, thus, work as equipment When receiving task, if peak times of power consumption, owing to electricity price is higher, thus, power consumption factor is higher, so The maximum of the final evaluation of estimate that may result in task is on the low side, even negative value, when the maximum of final evaluation of estimate When value is for negative value, equipment does not runs, and when the low power consumption phase, power consumption factor is relatively low, thus, appoint The maximum of the final evaluation of estimate of business is higher.It is to say, for each task received by equipment, When running during peak times of power consumption, income is that the probability of negative value is higher, and now, equipment can be automatically stopped operation, And arrived the low power consumption phase, the income of these tasks would generally become on the occasion of, thus, it is generally the case that set The standby number of times in low power consumption phase execution task and the time of operation all can be higher than peak times of power consumption, thus, equipment Do not run in peak times of power consumption, and the scheme run in the low power consumption phase, equalize the negative of whole electric power system Carry, secondly, equipment disposal ability is adjusted to the disposal ability that maximum return is corresponding, if power consumption is excessive, Maximum return cannot be ensured, thus, this programme to a certain extent, also reduces power consumption.
The beneficial effects of the present invention is: ask poor formula as finally general comment value and the task power consumption factor Evaluation of estimate formula, is adjusted to the disposal ability of equipment and makes final evaluation of estimate reach the process of equipment during maximum Ability, thus, the task-based appraisal value deducting power consumption factor can be made to reach by adjusting the disposal ability of equipment Maximum.
In one embodiment, the assessment coefficients in above-mentioned steps S12 obtains according to below equation:
a = A &times; B D ;
Wherein, a represents that assessment coefficients, A have represented the probability of goal task, and B represents goal task Significance level, D represents the intractability of goal task.
In the present embodiment, for Calculation Estimation factor, the process of probability A and task owing to completing task is difficult Degree D does not has measurement unit, and when significance level B of task is monetary reward, this assessment coefficients Measurement unit is the measurement unit of money, and now, this assessment coefficients a concrete meaning is: unit capacity Obtained task is rewarded, and in the present embodiment, the probability A completing task is the biggest, unit capacity institute The monetary reward obtained is the highest, secondly as significance level B of paid task is the highest, important for identifying The monetary reward of degree B is inevitable the highest, thus, task significance level B is the highest, unit capacity Obtained by monetary reward the highest, say, that complete the probability A of task and significance level B and list Monetary reward obtained by the disposal ability of position is directly proportional, and is i.e. directly proportional to assessment coefficients a, and the process of task Difficulty D is the highest, it is generally the case that required for the operand that carries out the biggest, the disposal ability i.e. consumed is more Many, thus, the monetary reward obtained by the intractability D of task and unit capacity is inversely proportional to, i.e. with Factor of evaluation a is inversely proportional to, in the present embodiment, and the difficulty that the difficulty of task can be given according to task delivery system Index determines, or is simulated evaluating and testing task difficulty according to the equipment completing this goal task, And represent task difficulty by Arabic numerals, such as, minimum difficulty is 1, and the most highly difficult is 10.
Having the beneficial effects that of the present embodiment: using the probability completing task and significance level as with assessment coefficients The index being directly proportional, using the intractability of task as the index being inversely proportional to assessment coefficients, thus, it is considered to The impact on assessment coefficients of the intractability many index of task significance level, the probability completing task and task, So that the result of calculation that task general comment is worth is more objective and accurate.
In one embodiment, the final evaluation of estimate formula in above-mentioned steps S14 is following form:
E=a × u-b × w;
Wherein, E represents final evaluation of estimate, and a represents that assessment coefficients, u represent the equipment of performance objective task Disposal ability, b × w represents that power consumption factor, b represent dissipation facot, and w is power consumption number.
In the present embodiment, the product of assessment coefficients and disposal ability is worth as general comment, by dissipation facot and The product of power consumption number is as power consumption factor, when task is rewarded as monetary reward, when dissipation facot is electricity price, a Reward for the task obtained by unit disposal ability, and u is processing ability value, thus, the product of a Yu u For completing the total revenue of goal task gained, and dissipation facot is by completing total electricity price that goal task is paid, I.e. when task is rewarded as monetary reward, above-mentioned letter b representation unit electricity price, and above-mentioned letter w has represented Becoming this task institute power consumption, above-mentioned E is that the difference of total revenue and total expenditure, i.e. E are for completing this goal task Obtained net profit.
The having the beneficial effects that of the present embodiment: after the general comment being calculated task is worth, it is also contemplated that merit The consumption of the rate impact on task-based appraisal value, thus using the difference of general comment value and power consumption as final review Being worth, the determination making task-based appraisal value is more objective.
In one embodiment, when the disposal ability adjustable extent of equipment is any range, above-mentioned steps S15 Can be implemented as following steps A1-A2:
In step A1, seek limit u of E according to below equation0:
E '=a-bw ' (u0)=0;Formula 2
In step A2, determine limit u solving the E obtained0Value for making final evaluation of estimate reach maximum Target disposal ability during value.
The first order derivative making final judgement schematics is 0, and now, above-mentioned formula 2 can be deformed into equation below:
And above-mentioned w ' (u0) it is the first order derivative of formula 1, and a and b is known quantity, say, that on State in formula 3, only one of which independent variable u0, solve this independent variable u0Value, this value is final judgement schematics Pole value, in this programme, the disposal ability adjustable extent of equipment is any range, now, limit u0Must So fall in the adjustable extent of equipment disposal ability, owing to limit is probably the point making functional value obtain maximum, Be also likely to be make functional value obtain minimizing point, thus, when pole value is one, by this pole value with Arbitrary target value in disposal ability adjustable range brings final evaluation of estimate formula respectively into, and to result of calculation Compare, when the result of calculation that the result of calculation that this pole value is corresponding is corresponding more than desired value, determine this Pole value is the target disposal ability making final judgement schematics value reach maximum, i.e. the target capabilities value of equipment.
Having the beneficial effects that of the present embodiment: obtain when final evaluation of estimate reaches according to simple derivative operation Disposal ability during big value, thus, it is provided that a kind of mode simply determining target disposal ability, simplify The determination mode of target disposal ability.
In one embodiment, it is 0 <u when the adjustable extent of equipment disposal ability u1≤u≤u2Time, As in figure 2 it is shown, above-mentioned steps S15 can be implemented as following steps S21-S23:
In the step s 21, by limit u of E0Value, u1Value and u2Value substitute into final evaluation of estimate respectively Formula tries to achieve E (u0)、E(u1) and E (u2);
In step S22, contrast E (u0)、E(u1) and E (u2) value of three;
In step S23, determine E (u0)、E(u1) and E (u2) corresponding to maximum in three Disposal ability be target disposal ability.
In the present embodiment, when the disposal ability adjustable extent of equipment is 0 <u1≤u≤u2Time, by E's Limit u0Value, minima u of disposal ability1Maximum u with disposal ability2Bring into respectively and finally evaluate public affairs Formula, tries to achieve E (u0)、E(u1) and E (u2), contrast above-mentioned E (u0)、E(u1) and E (u2) The value of three, and using disposal ability corresponding for the maximum in three as target disposal ability, such as, three The comparing result of person is E (u0)>E(u1)>E(u2), then E (u0) it is maximum, by E (u0) Corresponding disposal ability u0As target disposal ability.
Having the beneficial effects that of the present embodiment: when the disposal ability adjustable extent of equipment is at a fixed interval Time, respectively the pole value of disposal ability, maximum and minima are substituted into final evaluation of estimate formula, will be final The disposal ability that in evaluation of estimate, maximum is corresponding as target disposal ability, thus, it is contemplated that target process energy Institute's likely value of power, the determination making target disposal ability is more accurate.
In one embodiment, when the disposal ability adjustable extent of equipment is fixed number of preset value, as Shown in Fig. 3, above-mentioned steps S15 can be implemented as following steps S31-S33:
In step S31, power consumption factor corresponding to fixed number of preset value and preset value is brought into the most respectively Final review is worth in formula and solves the final evaluation of estimate that all preset values in disposal ability adjustable extent are corresponding;
In step s 32, the size of multiple final evaluation of estimate corresponding to all preset values is contrasted;
In step S33, determine that the preset value that the maximum in multiple final evaluation of estimate is corresponding is that target processes Ability.
In the present embodiment, the disposal ability adjustable extent of equipment is fixing multiple gears, such as, this equipment In have five disposal abilities to adjust gear value u1、u2、u3、u4And u5, then above-mentioned five disposal abilities are adjusted Whole gear value is brought in final judgement schematics respectively, solves above-mentioned five disposal abilities adjustment gear value corresponding Final evaluation of estimate E (u1)、E(u2)、E(u3)、E(u4) and E (u5), contrast at above-mentioned five Five final evaluation of estimate E (u that reason capacity adjusting gear value is corresponding1)、E(u2)、E(u3)、E(u4) With E (u5) size, the disposal ability of equipment is adjusted to maximum pair in above-mentioned five final evaluations of estimate The disposal ability answered adjusts gear value.
Having the beneficial effects that of the present embodiment: when the disposal ability adjustable extent of equipment is fixed number of presetting During value, only by all preset values final evaluation of estimate formula of substitution i.e. be can determine that the maximum in final evaluation of estimate The preset value of value correspondence is target disposal ability, simplifies the determination mode of target disposal ability.
Fig. 4 is the block diagram of a kind of equipment performance value adjuster in one embodiment of the invention, as shown in Figure 4, In the present invention, equipment performance value adjuster can be used for being automatically adjusted the equipment of performance number, and this device can include Such as lower module:
First acquisition module 41, for obtaining for obtaining the characteristic parameter of assessment coefficients in goal task, special Levy parameter to include the intractability of goal task, complete the probability of goal task and the significance level of goal task;
Second acquisition module 42, for obtaining assessment coefficients according to characteristic parameter;
First determines module 43, for determining the assessment coefficients disposal ability with the equipment of performance objective task Product is that the general comment of task is worth;
Second determines module 44, poor public with asking of the power consumption factor completing goal task for determining that general comment is worth Formula is the final evaluation of estimate formula of goal task;
Solve module 45, for making final evaluation of estimate reach maximum and according to final evaluation of estimate equations Big value on the occasion of time target disposal ability;
Adjusting module 46, for being adjusted to target disposal ability by the disposal ability of the equipment completing goal task.
In one embodiment, solve module 45, including:
Solve submodule, for when the disposal ability adjustable extent of equipment is any range, according to following public affairs Formula seeks limit u of E0:
E '=a-bw ' (u0)=0;
First determines submodule, for determining limit u solving the E obtained0Value for making final evaluation of estimate reach To target disposal ability during maximum.
In one embodiment, as it is shown in figure 5, solve module 45, including:
First substitutes into submodule 51, is used for when the adjustable extent of equipment disposal ability u is 0 <u1≤u≤ u2Time, by limit u of E0Value, u1Value and u2Value substitute into final evaluation of estimate formula respectively and try to achieve E (u0)、 E(u1) and E (u2);
First contrast submodule 52, is used for contrasting E (u0)、E(u1) and E (u2) value of three;
Second determines submodule 53, is used for determining E (u0)、E(u1) and E (u2) maximum in three Disposal ability corresponding to value is target disposal ability.
In one embodiment, as shown in Figure 6, module 45 is solved, including:
Second substitutes into submodule 61, is used for when the disposal ability adjustable extent of equipment is fixed number of preset value Time, power consumption factor corresponding to fixed number of preset value and preset value is brought in final evaluation of estimate formula respectively Solve the final evaluation of estimate that all preset values in disposal ability adjustable extent are corresponding;
Second contrast submodule 62, for contrasting the size of multiple final evaluation of estimate corresponding to all preset values;
3rd determines submodule 63, for determining that the preset value that the maximum in multiple final evaluation of estimate is corresponding is Target disposal ability.
Those skilled in the art are it should be appreciated that embodiments of the invention can be provided as method, system or meter Calculation machine program product.Therefore, the present invention can use complete hardware embodiment, complete software implementation or knot The form of the embodiment in terms of conjunction software and hardware.And, the present invention can use and wherein wrap one or more Computer-usable storage medium containing computer usable program code (include but not limited to disk memory and Optical memory etc.) form of the upper computer program implemented.
The present invention is with reference to method, equipment (system) and computer program product according to embodiments of the present invention The flow chart of product and/or block diagram describe.It should be understood that can by computer program instructions flowchart and / or block diagram in each flow process and/or flow process in square frame and flow chart and/or block diagram and/ Or the combination of square frame.These computer program instructions can be provided to general purpose computer, special-purpose computer, embedding The processor of formula datatron or other programmable data processing device is to produce a machine so that by calculating The instruction that the processor of machine or other programmable data processing device performs produces for realizing at flow chart one The device of the function specified in individual flow process or multiple flow process and/or one square frame of block diagram or multiple square frame.
These computer program instructions may be alternatively stored in and computer or the process of other programmable datas can be guided to set In the standby computer-readable memory worked in a specific way so that be stored in this computer-readable memory Instruction produce and include the manufacture of command device, this command device realizes in one flow process or multiple of flow chart The function specified in flow process and/or one square frame of block diagram or multiple square frame.
These computer program instructions also can be loaded in computer or other programmable data processing device, makes Sequence of operations step must be performed to produce computer implemented place on computer or other programmable devices Reason, thus the instruction performed on computer or other programmable devices provides for realizing flow chart one The step of the function specified in flow process or multiple flow process and/or one square frame of block diagram or multiple square frame.
Obviously, those skilled in the art can carry out various change and modification without deviating from this to the present invention Bright spirit and scope.So, if the present invention these amendment and modification belong to the claims in the present invention and Within the scope of its equivalent technologies, then the present invention is also intended to comprise these change and modification.

Claims (10)

1. an equipment performance value adjustment method, it is characterised in that including:
Obtaining for obtaining the characteristic parameter of assessment coefficients in goal task, described characteristic parameter includes described mesh The intractability of mark task, the probability completing described goal task and the significance level of described goal task;
Described assessment coefficients is obtained according to described characteristic parameter;
Determine that described assessment coefficients is described with the product of the disposal ability of the equipment performing described goal task The general comment of task is worth;
Determining that described general comment is worth the poor formula of asking with the power consumption factor completing described goal task is described mesh The final evaluation of estimate formula of mark task;
Make final evaluation of estimate reach maximum according to described final evaluation of estimate equations and described maximum is On the occasion of time target disposal ability;
The disposal ability completing the equipment of described goal task is adjusted to described target disposal ability.
2. the method for claim 1, it is characterised in that described assessment coefficients is according to below equation Obtain:
a = A &times; B D ;
Wherein, described a represents that assessment coefficients, described A have represented the probability of described goal task, described B represents that the significance level of described goal task, described D represent the intractability of described goal task.
3. the method for claim 1, it is characterised in that described final evaluation of estimate formula is as follows Form:
E=a × u-b × w;
Wherein, described E represents that final evaluation of estimate, described a represent that assessment coefficients, described u represent execution institute State the disposal ability of the equipment of goal task, described b × w represent power consumption factor, described b represent power consumption because of Number, described w is power consumption number.
4. method as claimed in claim 3, it is characterised in that when the disposal ability of described equipment is adjustable When scope is any range, described final evaluation of estimate is made to reach maximum according to described final evaluation of estimate equations Target disposal ability during value, including:
Limit u of E is sought according to below equation0:
E '=a-bw ' (u0)=0;
Determine limit u solving the described E obtained0Value mesh when being to make final evaluation of estimate reach maximum Mark disposal ability.
5. method as claimed in claim 3, it is characterised in that when described equipment disposal ability u can Tune scope is 0 <u1≤u≤u2Time, described make finally to evaluate according to described final evaluation of estimate equations Value reaches target disposal ability during maximum, including:
Limit u by described E0Value, described u1Value and described u2Value substitute into described final evaluation respectively Value formula tries to achieve E (u0)、E(u1) and E (u2);
Contrast described E (u0)、E(u1) and E (u2) value of three;
Determine described E (u0)、E(u1) and E (u2) disposal ability corresponding to maximum in three For target disposal ability.
6. method as claimed in claim 3, it is characterised in that when the disposal ability of described equipment is adjustable When scope is fixed number of preset value, described make final evaluation of estimate according to described final evaluation of estimate equations Reach target disposal ability during maximum, including:
Described in power consumption factor corresponding to described fixed number of preset value and described preset value is brought into respectively Final review is worth in formula and solves the final evaluation that all preset values in described disposal ability adjustable extent are corresponding Value;
Contrast the size of multiple final evaluation of estimate corresponding to all preset values;
Determine that the preset value that the maximum in the plurality of final evaluation of estimate is corresponding is target disposal ability.
7. an equipment performance value adjuster, it is characterised in that including:
First acquisition module, for obtaining for obtaining the characteristic parameter of assessment coefficients in goal task, described Characteristic parameter includes the intractability of described goal task, the probability completing described goal task and described target The significance level of task;
Second acquisition module, for obtaining described assessment coefficients according to described characteristic parameter;
First determines module, for determining the process of described assessment coefficients and the equipment performing described goal task The product of ability is that the general comment of described task is worth;
Second determines module, for determining that described general comment is worth and the power consumption factor completing described goal task The final evaluation of estimate formula asking poor formula to be described goal task;
Solve module, for according to described final evaluation of estimate equations make final evaluation of estimate reach maximum and Described maximum be on the occasion of time target disposal ability;
Adjusting module, for being adjusted to the disposal ability of the equipment completing described goal task at described target Reason ability.
8. device as claimed in claim 7, it is characterised in that described in solve module, including:
Solve submodule, for when the disposal ability adjustable extent of described equipment is any range, according to Lower formula seeks limit u of E0:
E '=a-bw ' (u0)=0;
First determines submodule, for determining limit u solving the described E obtained0Value for making finally to evaluate Value reaches target disposal ability during maximum.
9. device as claimed in claim 7, it is characterised in that described in solve module, including:
First substitutes into submodule, is used for when the adjustable extent of described equipment disposal ability u is 0 <u1≤u≤ u2Time, by limit u of described E0Value, described u1Value and described u2Value substitute into respectively described in final review It is worth formula and tries to achieve E (u0)、E(u1) and E (u2);
First contrast submodule, is used for contrasting described E (u0)、E(u1) and E (u2) value of three;
Second determines submodule, is used for determining described E (u0)、E(u1) and E (u2) in three Big disposal ability corresponding to value is target disposal ability.
10. device as claimed in claim 7, it is characterised in that described in solve module, including:
Second substitutes into submodule, is used for when the disposal ability adjustable extent of described equipment is fixed number of presetting During value, power consumption factor corresponding to described fixed number of preset value and described preset value is brought into respectively described in Final review is worth in formula and solves the final evaluation that all preset values in described disposal ability adjustable extent are corresponding Value;
Second contrast submodule, for contrasting the size of multiple final evaluation of estimate corresponding to all preset values;
3rd determines submodule, for determining the preset value that the maximum in the plurality of final evaluation of estimate is corresponding For target disposal ability.
CN201610264918.6A 2016-04-25 2016-04-25 Equipment performance value adjusting method and device Active CN105930661B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610264918.6A CN105930661B (en) 2016-04-25 2016-04-25 Equipment performance value adjusting method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610264918.6A CN105930661B (en) 2016-04-25 2016-04-25 Equipment performance value adjusting method and device

Publications (2)

Publication Number Publication Date
CN105930661A true CN105930661A (en) 2016-09-07
CN105930661B CN105930661B (en) 2018-08-28

Family

ID=56837170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610264918.6A Active CN105930661B (en) 2016-04-25 2016-04-25 Equipment performance value adjusting method and device

Country Status (1)

Country Link
CN (1) CN105930661B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111487875A (en) * 2019-01-28 2020-08-04 珠海格力电器股份有限公司 Method for controlling intelligent household appliance, intelligent household appliance and storage medium
CN114754598A (en) * 2022-06-14 2022-07-15 深圳中宝新材科技有限公司 Method and device for reducing power consumption of gold bonding wire production line imaging system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101539882A (en) * 2009-05-05 2009-09-23 曙光信息产业(北京)有限公司 Application-oriented relative efficiency evaluation method
CN101980223A (en) * 2010-11-04 2011-02-23 浙江大学 Power consumption and performance optimization method for processor structure and circuit design
US20120029957A1 (en) * 2010-08-02 2012-02-02 National Tsing Hua University Factor analysis system and analysis method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101539882A (en) * 2009-05-05 2009-09-23 曙光信息产业(北京)有限公司 Application-oriented relative efficiency evaluation method
US20120029957A1 (en) * 2010-08-02 2012-02-02 National Tsing Hua University Factor analysis system and analysis method thereof
CN101980223A (en) * 2010-11-04 2011-02-23 浙江大学 Power consumption and performance optimization method for processor structure and circuit design

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
邵杰等: "基于海量数据自动计算装载、分配的方法与装置", 《科协论坛》 *
金玉梨等: "一种远程设备系统动态调度模型", 《计算机仿真》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111487875A (en) * 2019-01-28 2020-08-04 珠海格力电器股份有限公司 Method for controlling intelligent household appliance, intelligent household appliance and storage medium
CN111487875B (en) * 2019-01-28 2021-07-23 珠海格力电器股份有限公司 Method for controlling intelligent household appliance, intelligent household appliance and storage medium
CN114754598A (en) * 2022-06-14 2022-07-15 深圳中宝新材科技有限公司 Method and device for reducing power consumption of gold bonding wire production line imaging system

Also Published As

Publication number Publication date
CN105930661B (en) 2018-08-28

Similar Documents

Publication Publication Date Title
Yadav et al. Integrated supply chain model for deteriorating items with linear stock dependent demand under imprecise and inflationary environment
CN110533343B (en) Data processing method and device of intelligent customer service system and electronic equipment
CN110322169B (en) Task issuing method and device
CN106485415B (en) A kind of mobile intelligent perception motivational techniques with budget based on relation between supply and demand
CN110060068A (en) Trade company&#39;s appraisal procedure, device, electronic equipment and readable storage medium storing program for executing
Beer et al. Benefits quantification in IT projects
CN109472586A (en) Strategy determines method and device, storage medium, electronic device
CN110175905A (en) Loan risk evaluation method and device, terminal and computer readable storage medium
CN105930661A (en) Equipment performance value adjusting method and device
CN111415027A (en) Method and device for constructing component prediction model
US20090192836A1 (en) Automated test system project management
CN110322127A (en) A kind of project scheduling method, equipment, server and computer readable storage medium
Walker et al. The emergence of data analytics in auditing: Perspectives from internal and external auditors through the lens of institutional theory
CN110348981A (en) Loan air control method and device, electronic equipment and computer readable storage medium
CN110517142B (en) Method and device for outputting policy evaluation information
Dertwinkel-Kalt et al. A first test of focusing theory
CN109325810A (en) Supplement improvement method, electronic equipment and the computer storage medium of conversion with money
CN112650583B (en) Resource allocation method and device, readable medium and electronic equipment
US20150073859A1 (en) System and method for assessing total regulatory risk to health care facilities
CN110276501A (en) The prediction technique and device of the electricity price of short term power trade market
JP5902731B2 (en) Repayment simulation system
Fue et al. Experts’ assignment algorithm for Cloud-based Agro-advisory Service Information System (CASIS) using weighted sum model: piloting CASIS
CN111985974A (en) Target user determination method, computer system and storage medium
KR20090087359A (en) Method and apparatus for estimating the value of stocks
Angelini et al. Misspecification and Expectations Correction in New Keynesian DSGE Models

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211015

Address after: 200436 room 138, No. 5 and 6, Lane 1188, Wanrong Road, Jing'an District, Shanghai

Patentee after: Shanghai Canaan Jiesi Information Technology Co.,Ltd.

Address before: 310000 Room 1203, 12/F, Building 4, No. 9, Jiuhuan Road, Jianggan District, Hangzhou City, Zhejiang Province

Patentee before: Hangzhou Canaan Creative Information Technology Ltd.