CN105928102B - A kind of radiation top plate and replacement aeration combined air conditioning system - Google Patents

A kind of radiation top plate and replacement aeration combined air conditioning system Download PDF

Info

Publication number
CN105928102B
CN105928102B CN201610257805.3A CN201610257805A CN105928102B CN 105928102 B CN105928102 B CN 105928102B CN 201610257805 A CN201610257805 A CN 201610257805A CN 105928102 B CN105928102 B CN 105928102B
Authority
CN
China
Prior art keywords
air
top plate
vertical ventilation
valve
heat exchanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610257805.3A
Other languages
Chinese (zh)
Other versions
CN105928102A (en
Inventor
曾昭赟
程梦婕
王勤
王旻珑
廖伟涵
齐裕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
Original Assignee
Zhejiang University ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU filed Critical Zhejiang University ZJU
Priority to CN201610257805.3A priority Critical patent/CN105928102B/en
Publication of CN105928102A publication Critical patent/CN105928102A/en
Application granted granted Critical
Publication of CN105928102B publication Critical patent/CN105928102B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F5/00Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater
    • F24F5/0089Systems using radiation from walls or panels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F12/00Use of energy recovery systems in air conditioning, ventilation or screening
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/22Means for preventing condensation or evacuating condensate
    • F24F13/222Means for preventing condensation or evacuating condensate for evacuating condensate
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/28Arrangement or mounting of filters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/30Arrangement or mounting of heat-exchangers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F3/00Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems
    • F24F3/06Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the arrangements for the supply of heat-exchange fluid for the subsequent treatment of primary air in the room units
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F3/00Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems
    • F24F3/12Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the treatment of the air otherwise than by heating and cooling
    • F24F3/14Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the treatment of the air otherwise than by heating and cooling by humidification; by dehumidification
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F7/00Ventilation
    • F24F7/007Ventilation with forced flow
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F3/00Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems
    • F24F3/12Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the treatment of the air otherwise than by heating and cooling
    • F24F3/14Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the treatment of the air otherwise than by heating and cooling by humidification; by dehumidification
    • F24F2003/144Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the treatment of the air otherwise than by heating and cooling by humidification; by dehumidification by dehumidification only

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Air-Conditioning Room Units, And Self-Contained Units In General (AREA)

Abstract

The invention discloses a kind of radiation top plates and replacement aeration combined air conditioning system, including replacement aeration unit and radiation top plate with air-treatment case, it further include the vertical ventilation pipe being arranged in above the replacement aeration unit, the air inlet of vertical ventilation pipe is connected with the air-treatment case, the air outlet of vertical ventilation pipe is arranged close to the radiation top plate, air-flow after cooling is sent near the lower surface of radiation top plate.In the startup mode, the air-flow of low temperature drying forms a protective layer below radiation top plate from top air-supply air diffuser outflow to the present invention, can prevent radiation top plate from condensing and quickly reduce room rate temperature;Under equilibrium mode, replacement aeration air-flow flows out after mixing with secondary return air from lower part air-supply air diffuser, can form the air layer of cleaning low temperature in room lower part.The present invention not only solves conventional radiation top plate and replacement aeration association system, and comfort level not can guarantee, radiate the problem of top plate starting time length on startup, and have the characteristics of low energy consumption.

Description

A kind of radiation top plate and replacement aeration combined air conditioning system
Technical field
The invention belongs to Air-conditioner design technical field, especially a kind of radiation top plate and replacement aeration combined air conditioning system.
Background technique
Radiation top plate is a kind of novel air conditioning terminal, has the advantages that noiseless, low energy consumption, height are comfortable.But it Also a critical issue needs to solve when cooling supply: when the temperature for radiating top plate is lower than the dew-point temperature of room air, radiation Top plate just has the risk of moisture condensation.The temperature that control radiation top plate in use is higher than the dew-point temperature of room air, so spoke Sensible heat load can only be handled and cannot handle latent heat load by penetrating top plate.Therefore, foreign countries are usually radiation top plate and replacement aeration knot It closes and uses.Displacement ventilation system is directly blown to the region where the user of room lower part with lower wind speed, is divided into room air Completely different two parts: lower layer is the lower laminar flow clean air of temperature, and upper layer is the higher mixing foul atmosphere of temperature.It sets The air-supply wind speed for changing ventilating system cannot be too high, otherwise can destroy laminar flow.As directly blowing to the region where user, send Air temperature can not be too low, otherwise will cause cold wind sense.Therefore, the semen donors of displacement ventilation system are not very big, radiate top plate This point can just be made up.
After reaching stable state, radiation top plate/replacement aeration association system is able to satisfy the aobvious of nearly all climate type The processing requirement of thermic load and latent heat load, but opened again after system closes long period (such as a night or a weekend) When dynamic, since the water capacity of room air is very big, needs first isolated operation displacement ventilation system to reduce indoor humidity, wait interiors The chilled water supply of radiation top plate could be opened when the dew-point temperature of air is lower than the surface temperature for radiating top plate.This time is logical Often between 30 minutes and 90 minutes, change depending on the size of room initial humidity and humidity load.During this period of time user Comfort level will cannot be guaranteed.In addition, the delay time of radiation top plate starting is very long, it has not been convenient to which user uses.
Kim and Leibundgut is in its paper (Evaluation of the humidity performance of a novel radiant cooling system connected with an Airbox convector as a low exergy system adapted to hot and humid climates,Energy and Buildings,84(2014) The system that a convection recuperator, radiant panel and replacement aeration are used in combination is proposed in 224-232).Chilled water in the system Convection recuperator and radiant panel are flowed successively through, can guarantee that radiant panel does not condense and shortens in the case where higher levels of humidity infiltration capacity The time that dehumidifying needs when starting.But the convection recuperator of the system and displacement ventilation system are respectively set, and increase equipment Cost of investment, and without excluding the condensation trouble of radiant panel on startup completely, and comfort level is lower during startup.
In addition application No. is the patent document of CN200410016770.1 disclose it is a kind of by radiator and permutation ventilator The system combined, the system is mainly there are two problem: first is that the area of the radiator of the system it is too small (general radiation plate Area is all suitable with room area), therefore its cooling ability may be insufficient;Second is that radiator is sealed in high transmittance panel The efficiency of radiation heat transfer, but also the more difficult maintenance of vacuum can be not only reduced in vacuum environment, increase maintenance cost and unstability.
Summary of the invention
The present invention provides a kind of radiation top plate and replacement aeration combined air conditioning system, the air-conditioning system will radiate top plate and Replacement aeration combines, and radiation top plate wants delay start when solving conventional radiation top plate/replacement aeration association system starting Uncomfortable, inconvenient problem, further enhance radiation top plate and replacement aeration association system relative to conventional convection exchange heat The competitiveness of system, while the energy consumption of air-conditioning system operation can be reduced.
A kind of radiation top plate and replacement aeration combined air conditioning system, including with air-treatment case replacement aeration unit and Top plate is radiated, further includes the vertical ventilation pipe being arranged in above the replacement aeration unit, the air inlet of vertical ventilation pipe and institute Air-treatment case conducting is stated, the air outlet of vertical ventilation pipe is arranged close to the radiation top plate, and air-flow after cooling is sent to spoke It penetrates near the lower surface of top plate.
Preferably, the replacement aeration unit includes the air-treatment case;
Further include:
The return air unit be connected with air-treatment case;
The first blower, the first surface formula heat exchanger, second surface being successively set in air-treatment case are flowed to along air Formula heat exchanger, the first surface formula heat exchanger, second surface formula exchanger base are equipped with solidifying water pond.
Preferably, the air-treatment case includes the fresh inlet for being respectively provided with valve, primary retirn air import, secondary returning Wind inlet, vertical ventilation mouth, the outlet of lower part cold wind;The primary retirn air import is arranged close to fresh inlet, the secondary return air Import is exported close to lower part cold wind to be arranged;First blower, first surface formula heat exchanger, second surface formula heat exchanger, condensate Disk is arranged between primary retirn air import, secondary return air import;The air-treatment case by the vertical ventilation mouth with it is described The conducting of vertical ventilation pipe.
Above-mentioned each component or the arrangement of structure and effect are as follows: fresh inlet is normally at outside air-treatment case room It holds, new air-valve is equipped at fresh inlet, new air-valve is used to adjust fresh air volume, and filter screen is housed in new air-valve, can filter new Particulate matter in wind.Primary retirn air mouth is located at the side of air-treatment case outdoor end, is equipped with primary retirn air valve at primary retirn air mouth, Primary retirn air valve is used to adjust the air quantity of primary retirn air.The first blower, first are followed successively by along airflow direction beside primary retirn air valve There are solidifying water pond in surface-type heat exchanger and second surface formula heat exchanger, two surface-type heat exchangers lower sections.First blower is used to drive Air flows through two surface-type heat exchangers and to indoor air-supply.Fresh air is inhaled into air-treatment by the negative pressure of the first blower manufacture In case.Two surface-type heat exchangers are used to as air cooling-down and dehumidify.Why two surface-type heat exchangers be set be in order into One step increases the chilled water temperature for flowing into radiation top plate, prevents radiation top plate moisture condensation.Solidifying water pond is used to collect and exclude two tables The condensed water flowed down on the formula heat exchanger of face.Secondary returning air-valve is located at the side of air-treatment case indoor end, for adjusting secondary returning The air quantity of wind and the temperature for controlling air-supply.Lower part blow valve is located at air-treatment case indoor end.Under lower part air-supply air diffuser is located at After portion's blow valve, for eliminating the turbulent flow in air-supply.Vertical ventilation valve is located at the top of air-treatment case indoor end.
Preferably, the lower part cold wind exports, is equipped with air-supply air diffuser at the air outlet of vertical ventilation pipe.Lower part cold wind The corresponding air-supply air diffuser in exit is lower part air-supply air diffuser;Corresponding air-supply air diffuser is at the air outlet of vertical ventilation pipe Top air-supply air diffuser.
Preferably, being successively arranged in the vertical ventilation pipe according to air flow direction: the second blower, electric heating wire.It is described Vertical ventilation pipe is located on the upside of vertical ventilation valve.Because air needs to flow more in pipeline when flowing out from top air-supply air diffuser Long distance, and two steerings are undergone, therefore will receive bigger resistance.Second blower is located under vertical ventilation pipe Portion makes up the deficiency of the first blower power for driving air from top air-supply air diffuser outflow.Electric heating wire is used to slightly rise The temperature of high vertical ventilation air in tube, the air for going out top air-supply air diffuser to prevent fluid stopping condense on radiation top plate.
Preferably, the air outlet of the vertical ventilation pipe is located at radiation top plate side, face radiates the area of top board undersurface Domain, air-out wind direction are parallel to the radiation top plate.
Preferably, being arc structure at the top corners of the vertical ventilation pipe.It is at vertical ventilation pipe upper corner One section of circular arc, to reduce resistance when air turns to and weaken the turbulent flow in air-flow.Top air-supply air diffuser is located at vertical ventilation The indoor of pipe upper end, for eliminating the turbulent flow in air-supply.
Preferably, the air outlet of the vertical ventilation pipe is disposed in parallel multiple.Using this programme, when radiation top plate Width it is bigger when, vertical ventilation pipe upper end can connect multiple tops air-supply branches, passes through multiple tops and blows air diffuser The air of low temperature, drying is uniformly dispersed in below radiation top plate.
Preferably, further including exhaust valve, which is arranged on the wall on air outlet opposite of vertical ventilation pipe.System Work unite in equilibrium mode, the air of room upper pyrometer dirt can be discharged.
Preferably, the return air unit include backwind tube, by backwind tube respectively with the primary retirn air import, secondary returning The return air branch pipe of wind inlet conducting is arranged in backwind tube close to the third blower of backwind tube air inlet setting.Preferably, returning Scenery resource quality is in lower part air-supply air diffuser one side.Filter screen is housed, for filtering the particulate matter in return air on return air inlet.Third wind Machine driving return air flows through primary retirn air valve or secondary returning air-valve.
Preferably, the first surface formula heat exchanger, second surface formula heat exchanger and radiation top plate by chilled water into Row cooling, chilled water flow successively through second surface formula heat exchanger, first surface formula heat exchanger and radiation top plate and exchange heat;It is described Chilled water flow is arranged to air flow direction in air-treatment case for interleaved fly-back.In the present solution, the flow pipe is along water flowing side To be sequentially connected in series second surface formula heat exchanger, first surface formula heat exchanger and radiation top plate.Due to being changed in two surface-types The flow direction of water and air is freezed in hot device on the contrary, the lesser Average heat transfer temperature difference therefore may be implemented, and improves heat exchange efficiency.
Preferably, the radiation top plate is followed successively by metal plate, coiled pipe and thermal insulation layer from bottom to top.The material of metal plate It can be aluminium or copper.Chilled water flows through from coiled pipe and reduces metal sheet surface temperature.Thermal insulation layer can prevent chilled water from It radiates top plate top and obtains heat, reduce energy consumption.
In cooling supply, there are two types of operating modes by the present invention: start-up mode and equilibrium mode.
In the startup mode, secondary returning air-valve and lower part blow valve are closed, and vertical ventilation valve is opened, the first blower, second Blower and third blower are opened.At this point, the air of the low temperature handled by surface-type heat exchanger, low water capacity is by vertical ventilation Valve enters vertical ventilation pipe, by top air-supply air diffuser outflow, is radiating below top plate after electric heating wire slightly heats The air layer for forming one layer of low temperature, drying prevents radiation top board surface moisture condensation.In addition, the density due to cold air is bigger, by The Cryogenic air of top air-supply air diffuser outflow can settle gradually downward, on the one hand can prevent the hot rolling of the near heating sources such as human body Stream takes wet air near radiation top plate to, on the other hand can accelerate the temperature-fall period in entire room.
Under equilibrium mode, vertical ventilation valve is closed, and secondary returning air-valve and lower part blow valve are opened, and the second blower is closed, First blower and third blower are opened.At this point, by surface-type heat exchanger handle air with from secondary returning air-valve return By lower part air-supply air diffuser outflow after wind mixing.Since the air themperature by surface-type heat exchanger processing is lower, directly transport It is likely to result in cold wind sense to user region, therefore it is mixed with secondary return air to increase supply air temperature.Due to stable state When room in latent heat load be equal to the moisture removal of surface-type heat exchanger, the dew-point temperature of room air is lower than radiation top plate Surface temperature, radiating top plate at this time will not condense.The replacement aeration of air-supply air diffuser can be formed in room lower part from below The air layer for cleaning low temperature is conducive to provide users'comfort and energy-saving.
When cooling supply, the aperture of exhaust valve, new air-valve and primary retirn air valve is by needing fresh air volume to be offered to determine.When need more When big fresh air volume, increase new air-valve and air draft valve opening, reduces primary retirn air valve opening.
In heating, radiation top plate is relied primarily on to indoor heating, all air-valves and blower be all in closed state at this time, Fan energy consumption can be reduced in this way.When interior needs fresh air, new air-valve, lower part blow valve, secondary returning air-valve, air draft are opened Valve, the first blower, third blower.
Compared to the prior art the present invention, has the advantage that
(1) present invention solves radiation top plate and replacement aeration United system after air-conditioning system closes the long period Uncomfortable and starting time long problem when restarting.Replacement aeration and radiation top plate of the invention can start simultaneously, set Ventilating system is changed by top air-supply diffuser feeding, cooperates to radiate top plate, indoor temperature can be reduced within a short period of time Humidity, and largely improve the comfort level under start-up mode.
(2) present invention connects the water pipe of surface-type heat exchanger and radiation top plate, takes full advantage of the cold of each temperature level Energy.In surface-type heat exchanger, chilled water is air-supply cool-down dehumidification with lower temperature.Radiation top plate in, chilled water with compared with High temperature passes through radiation heat transfer to indoor cooling supply.
In conclusion the present invention is in the startup mode, the air-flow of low temperature drying is being radiated from top air-supply air diffuser outflow A protective layer is formed below top plate, can prevent radiation top plate from condensing and quickly reducing room temperature;Under equilibrium mode, set It changes after draft is mixed with secondary return air from lower part air-supply air diffuser outflow, the sky of cleaning low temperature can be formed in room lower part Gas-bearing formation.The present invention not only solve conventional radiation top plate and replacement aeration association system on startup comfort level not can guarantee, spoke The problem of top plate delay start time length is penetrated, and has the characteristics that low energy consumption is high comfortable.
Detailed description of the invention
Fig. 1 is radiation top plate and replacement aeration combined air conditioning system side view structure principle sketch of the invention.
Fig. 2 is radiation top plate and replacement aeration combined air conditioning system plan structure principle sketch of the invention.
Fig. 3 is radiation top plate and replacement aeration combined air conditioning system top air-supply branch schematic diagram of the invention.
In above-mentioned attached drawing:
1, return pipe;2, flow pipe;3, new air-valve;4, primary retirn air valve;5, air-treatment case;6, the first blower;7, One surface-type heat exchanger;8, solidifying water pond;9, secondary returning air-valve;10, vertical ventilation valve;11, second surface formula heat exchanger;12, under Portion's blow valve;13, lower part air-supply air diffuser;14, the second blower;15, vertical ventilation pipe;16, electric heating wire;17, top is blown Air diffuser;18, top plate is radiated;19, exhaust valve;20, backwind tube;21, return air inlet;22, third blower.
Specific embodiment
The present invention is described in further details with reference to the accompanying drawing.
As depicted in figs. 1 and 2, the present invention includes: air-treatment case 5, vertical ventilation pipe 15, radiation top plate 18 and backwind tube 20.Vertical ventilation pipe 15 is located on the upside of 5 indoor end of air-treatment case, is connected by vertical ventilation valve 10 with air-treatment case 5. Radiation top plate 18 is mounted below the ceiling in 17 front of top air-supply air diffuser.Backwind tube 20 is located at the side of air-treatment case 5 Side, and be connected by primary retirn air valve 4 and secondary returning air-valve 9 with air-treatment case 5.
Air-treatment case 5 includes: new air-valve 3, primary retirn air valve 4, the first blower 6, first surface formula heat exchanger 7, second Surface-type heat exchanger 11, solidifying water pond 8, secondary returning air-valve 9, lower part blow valve 12, lower part air-supply air diffuser 13, vertical ventilation valve 10, air-treatment case goes out equipped with fresh inlet, primary retirn air import, secondary return air import, vertical ventilation mouth, lower part cold wind Mouthful;New air-valve 3 is equipped at fresh inlet, primary retirn air entrance is equipped with primary retirn air valve 4, and secondary return air entrance is equipped with secondary Air returning valve 9, vertical ventilation valve 10 is equipped at vertical ventilation mouth, and lower part cold wind exit is equipped with lower part blow valve 1.
Its arrangement are as follows: new air-valve 3 is located at 5 outdoor end of air-treatment case, for adjusting fresh air volume, and in new air-valve 3 Equipped with filter screen, the particulate matter in fresh air can be filtered.Primary retirn air valve 4 is located at the side of 5 outdoor end of air-treatment case, is used to Adjust the air quantity of primary retirn air.4 side of primary retirn air valve is followed successively by the first blower 6, first surface formula heat exchanger 7 along airflow direction With second surface formula heat exchanger 11, there are solidifying water pond 8 in two surface-type heat exchangers lower sections.First blower 6 is used to that air is driven to flow through Two surface-type heat exchangers and to indoor air-supply.Fresh air is inhaled into air-treatment case 5 by the negative pressure of the first blower 6 manufacture. Two surface-type heat exchangers are used to as air cooling-down and dehumidify.It is to further rise that two surface-type heat exchangers, which why are arranged, Height flows into the chilled water temperature of radiation top plate 18, prevents radiation top plate 18 from condensing.Solidifying water pond 8 is used to collect and exclude two surfaces The condensed water flowed down on formula heat exchanger.Secondary returning air-valve 9 is located at the side of air-treatment case indoor end, for adjusting secondary return air Air quantity and control lower part cold wind outlet air-supply temperature.Lower part blow valve 12 is located at 5 indoor end of air-treatment case.Lower part air-supply Air diffuser 13 is located at after lower part blow valve 12, for eliminating the turbulent flow in air-supply.Vertical ventilation valve 10 is located at air-treatment case 5 The top of indoor end.
Vertical ventilation pipe 15 is located at 10 upside of vertical ventilation valve, comprising: the second blower 14, electric heating wire 16 and top air-supply Air diffuser 17.Because air needs to flow longer distance in pipeline when flowing out from top air-supply air diffuser 17, and will be through Two steerings are gone through, therefore will receive bigger resistance.Second blower 14 is located at the lower part of vertical ventilation pipe 15, for driving air From top, air-supply air diffuser 17 flows out, and makes up the deficiency of 6 power of the first blower.Electric heating wire 16 is used to slightly elevated vertical ventilation The temperature of air in pipe 15, the air for going out top air-supply air diffuser 17 to prevent fluid stopping condense on radiation top plate 18.Vertical ventilation It is one section of circular arc at 15 upper corner of pipe, to reduce resistance when air turns to and weaken the turbulent flow in air-flow.Top air-supply dissipates Stream device 17 is located at the indoor of 15 upper end of vertical ventilation pipe, for eliminating the turbulent flow in air-supply.
Flow pipe 2 is sequentially connected in series second surface formula heat exchanger 11,7 and of first surface formula heat exchanger along water flowing direction Radiate top plate 18.Due in two surface-type heat exchangers freeze water and air flow direction on the contrary, therefore may be implemented compared with The small Average heat transfer temperature difference improves heat exchange efficiency.
Radiation top plate 18 is followed successively by metal plate, coiled pipe and thermal insulation layer from bottom to top.The material of metal plate can for aluminium or Copper.Chilled water flows through from coiled pipe and reduces metal sheet surface temperature.Thermal insulation layer can prevent chilled water from radiation top plate Portion obtains heat, reduces energy consumption.
Backwind tube 20 is connect by primary retirn air valve 4 and secondary returning air-valve 9 with air-treatment case 5, comprising: return air inlet 21, Third blower 22.Return air inlet 21 is arranged in lower part air-supply air diffuser 13 on one side.Filter screen is housed, for filtering back on return air inlet 21 Particulate matter in wind.Third blower 22 drives return air to flow through primary retirn air valve 4, secondary returning air-valve 9.
Exhaust valve 19 is arranged at the exhaust outlet on the wall top on top air-supply 17 opposite of air diffuser.
When the width for radiating top plate 18 is bigger, 15 upper end of vertical ventilation pipe can connect multiple top air-supply branches, The air of low temperature, drying is uniformly dispersed in 18 lower section of radiation top plate by multiple tops air-supply air diffuser 17a, 17b, 17c.
A kind of typical condition of the present invention in cooling supply is as follows: the temperature of outdoor air is 35 DEG C, water capacity 20g/kg. The coolant-temperature gage that send of chilled water is 12 DEG C, after the heat exchange of second surface formula heat exchanger 11 and first surface formula heat exchanger 7, temperature Degree is upgraded to 18 DEG C, then flows into radiation top plate 18.The temperature of the chilled water (return water) of outflow radiation top plate is 24 DEG C.By surface The air of formula heat exchanger processing is the saturated moist air that temperature is 14 DEG C, water capacity is 10g/kg.
In the startup mode, it is electrically heated after silk 16 is heated to 15 DEG C by the air of surface-type heat exchanger processing from top Air diffuser 17 of blowing flows out.Temperature due to radiating top plate at this time is not less than 18 DEG C, and dew-point temperature is 18 DEG C of humid air pair The water capacity answered is 13g/kg, therefore is covered below radiation top plate 18 and can protect from the air that top air-supply air diffuser 17 flows out It is demonstrate,proved not condense.When the air humidity content in room drops to 13g/kg or less, the humidity sensor installed in the room is issued Signal drive system is changed into equilibrium mode.
Under equilibrium mode, the air handled by surface-type heat exchanger is first mixed with secondary return air, then is blown from lower part Air diffuser 13 flows out, and temperature is 20 DEG C, water capacity 11g/kg.The temperature of room air is 25 DEG C at this time, and water capacity is 12g/kg。

Claims (5)

1. a kind of radiation top plate and replacement aeration combined air conditioning system, replacement aeration unit and spoke including having air-treatment case Penetrate top plate, which is characterized in that further include the vertical ventilation pipe being arranged in above the replacement aeration unit, vertical ventilation pipe into Air port is connected with the air-treatment case, and the air outlet of vertical ventilation pipe is arranged close to the radiation top plate, by gas after cooling It streams near the lower surface of radiation top plate;
The replacement aeration unit includes the air-treatment case;Further include: the return air unit be connected with air-treatment case;Along empty Air-flow is described to the first blower, first surface formula heat exchanger, second surface formula heat exchanger being successively set in air-treatment case First surface formula heat exchanger, second surface formula exchanger base are equipped with solidifying water pond;
The air-treatment case includes the fresh inlet for being respectively provided with valve, primary retirn air import, secondary return air import, vertically send Air port, the outlet of lower part cold wind;The primary retirn air import is arranged close to fresh inlet, and the secondary return air import is cold close to lower part Wind outlet setting;First blower, first surface formula heat exchanger, second surface formula heat exchanger, solidifying water pond setting are once being returned Between wind inlet, secondary return air import;The air-treatment case is connected by the vertical ventilation mouth with the vertical ventilation pipe; The lower part cold wind exports, is equipped with air-supply air diffuser at the air outlet of vertical ventilation pipe;
It is successively arranged in the vertical ventilation pipe according to air flow direction: the second blower, electric heating wire;The vertical ventilation pipe goes out Air port is located at radiation top plate side, and face radiates the region of top board undersurface, and air-out wind direction is parallel to the radiation top plate;Described time Wind unit include backwind tube, by return air branch pipe that backwind tube is connected with the primary retirn air import, secondary return air import respectively, set It sets in backwind tube close to the third blower of backwind tube air inlet setting;
In cooling supply, there are two types of operating modes: start-up mode and equilibrium mode;
In the startup mode, secondary returning air-valve and lower part blow valve are closed, and vertical ventilation valve is opened, the first blower, the second blower With third blower open, at this point, by surface-type heat exchanger handle low temperature, low water capacity air by vertical ventilation valve into Enter vertical ventilation pipe, is being flowed out after electric heating wire slightly heats by top air-supply air diffuser;
Under equilibrium mode, vertical ventilation valve is closed, and secondary returning air-valve and lower part blow valve are opened, and the second blower is closed, and first Blower and third blower are opened, at this point, the air handled by surface-type heat exchanger is mixed with the return air from secondary returning air-valve By lower part air-supply air diffuser outflow after conjunction.
2. radiation top plate according to claim 1 and replacement aeration combined air conditioning system, which is characterized in that described vertically to send It is arc structure at the top corners of air hose.
3. radiation top plate according to claim 1 and replacement aeration combined air conditioning system, which is characterized in that described vertically to send The air outlet of air hose is disposed in parallel multiple.
4. radiation top plate according to claim 1 and replacement aeration combined air conditioning system, which is characterized in that further include air draft Valve, the exhaust valve are arranged on the wall on air outlet opposite of vertical ventilation pipe.
5. radiation top plate according to claim 1 and replacement aeration combined air conditioning system, which is characterized in that first table Face formula heat exchanger, second surface formula heat exchanger and radiation top plate are cooled down by chilled water, and chilled water flows successively through the second table Face formula heat exchanger, first surface formula heat exchanger and radiation top plate exchange heat;The chilled water flow to it is empty in air-treatment case Air-flow is arranged to for interleaved fly-back.
CN201610257805.3A 2016-04-22 2016-04-22 A kind of radiation top plate and replacement aeration combined air conditioning system Expired - Fee Related CN105928102B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610257805.3A CN105928102B (en) 2016-04-22 2016-04-22 A kind of radiation top plate and replacement aeration combined air conditioning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610257805.3A CN105928102B (en) 2016-04-22 2016-04-22 A kind of radiation top plate and replacement aeration combined air conditioning system

Publications (2)

Publication Number Publication Date
CN105928102A CN105928102A (en) 2016-09-07
CN105928102B true CN105928102B (en) 2019-01-04

Family

ID=56836840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610257805.3A Expired - Fee Related CN105928102B (en) 2016-04-22 2016-04-22 A kind of radiation top plate and replacement aeration combined air conditioning system

Country Status (1)

Country Link
CN (1) CN105928102B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107631464A (en) * 2017-09-13 2018-01-26 珠海格力电器股份有限公司 Heat exchanger assembly, design method thereof and air conditioner
CN109945355A (en) * 2019-01-30 2019-06-28 东南大学 Air-supply end and capillary network radiation tail end combined control system
CN109990415A (en) * 2019-03-12 2019-07-09 嘉兴恒瑞金属表面处理有限公司 A kind of high-efficient ventilation air-cooler
CN111854007A (en) * 2019-04-28 2020-10-30 上海科力玛数据科技有限公司 High-water-temperature and large-temperature-difference air conditioner terminal equipment
CN110793112A (en) * 2019-11-10 2020-02-14 姚仿英 Factory building aeration cooling environmental protection air conditioner
CN115379728B (en) * 2022-08-12 2024-09-24 华为数字能源技术有限公司 Environment processing unit
CN116538311A (en) * 2023-07-04 2023-08-04 西安四腾环境科技有限公司 A ventilation valve device for toilet

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08178372A (en) * 1994-12-21 1996-07-12 Ebara Corp Radiation air conditioning apparatus and operation thereof
CN100529561C (en) * 2007-11-27 2009-08-19 西安工程大学 Replacement ventilation and radiation cold/heat feeding composite air conditioner system
JP4907687B2 (en) * 2009-04-13 2012-04-04 木村工機株式会社 Heat pump type medium temperature air conditioning system
CN101825322B (en) * 2010-05-17 2012-10-10 西安工程大学 Radiation air conditioning system based on combination of evaporative cooling and mechanical refrigeration
CN102230652A (en) * 2011-06-10 2011-11-02 东南大学 Heat and humidity segmented treatment air-conditioning device and method combined with radiation cold supply
CN104534578B (en) * 2014-12-26 2017-07-07 东南大学 A kind of single handpiece Water Chilling Units induced draught and radiation integrated air-conditioning device

Also Published As

Publication number Publication date
CN105928102A (en) 2016-09-07

Similar Documents

Publication Publication Date Title
CN105928102B (en) A kind of radiation top plate and replacement aeration combined air conditioning system
JP5518812B2 (en) External air conditioner with air conditioning function
US9234666B2 (en) Heat transfer apparatus for heating and cooling a room
JP4673632B2 (en) Air conditioning system
CN105066256A (en) Air conditioner indoor unit
CN104613574B (en) Humiture independence control air conditioner system based on cascaded utilization of energy
JP7496489B2 (en) Dehumidifier
WO2012003724A1 (en) Air guide plate and indoor unit of air conditioner having the same
CN105783123A (en) Suspended ceiling device for reinforcing heat exchange of radiant cooling/heating top plate
CN101135484A (en) Copper pipe aluminum fin temperature control type forced convection low-temperature humidifying heat radiator
CN106403180A (en) Air conditioner and control method thereof
CN208475458U (en) Wall hanging machine for air conditioner
CN106123114A (en) Use the convection current radiant type wall air-conditioner device of fiber ventilation terminal
CN108758818A (en) The solid wall radiation and convection air-conditioning to be exchanged heat using air film
KR100569548B1 (en) Air conditioner
CN108800317A (en) Vertical air conditioner indoor unit, control method thereof and air conditioner
CN108488922A (en) Wall hanging machine for air conditioner
CN208536150U (en) The solid wall radiation and convection air-conditioning to be exchanged heat using air film
CN205897446U (en) Warm humidity independent control system of GLV and new trend and installation room thereof
CN208952238U (en) Air duct system and air conditioner
CN105890123A (en) GLV and fresh air independent temperature-humidity control system and mounting chamber thereof
JPH04244537A (en) Air conditioning system
JP2017116149A (en) Heat exchange-type ventilation device using heat-transfer element
CN205860220U (en) air conditioner
JP6858396B2 (en) Air conditioning system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190104