CN105927849A - Remote well natural gas recovery device - Google Patents

Remote well natural gas recovery device Download PDF

Info

Publication number
CN105927849A
CN105927849A CN201610329809.8A CN201610329809A CN105927849A CN 105927849 A CN105927849 A CN 105927849A CN 201610329809 A CN201610329809 A CN 201610329809A CN 105927849 A CN105927849 A CN 105927849A
Authority
CN
China
Prior art keywords
gas
valve
well
natural gas
sled block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610329809.8A
Other languages
Chinese (zh)
Other versions
CN105927849B (en
Inventor
岑康
贾敏
姚婷
李薇
黄金明
郑昕
张优
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Petroleum University
Original Assignee
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Petroleum University filed Critical Southwest Petroleum University
Priority to CN201610329809.8A priority Critical patent/CN105927849B/en
Publication of CN105927849A publication Critical patent/CN105927849A/en
Application granted granted Critical
Publication of CN105927849B publication Critical patent/CN105927849B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C5/00Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures
    • F17C5/02Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures for filling with liquefied gases
    • F17C5/04Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures for filling with liquefied gases requiring the use of refrigeration, e.g. filling with helium or hydrogen
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/02Special adaptations of indicating, measuring, or monitoring equipment
    • F17C13/025Special adaptations of indicating, measuring, or monitoring equipment having the pressure as the parameter
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/02Special adaptations of indicating, measuring, or monitoring equipment
    • F17C13/026Special adaptations of indicating, measuring, or monitoring equipment having the temperature as the parameter
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/04Arrangement or mounting of valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/08Mounting arrangements for vessels
    • F17C13/084Mounting arrangements for vessels for small-sized storage vessels, e.g. compressed gas cylinders or bottles, disposable gas vessels, vessels adapted for automotive use
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C7/00Methods or apparatus for discharging liquefied, solidified, or compressed gases from pressure vessels, not covered by another subclass
    • F17C7/02Discharging liquefied gases
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/03Mixtures
    • F17C2221/032Hydrocarbons
    • F17C2221/033Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/01Applications for fluid transport or storage
    • F17C2270/0165Applications for fluid transport or storage on the road
    • F17C2270/0168Applications for fluid transport or storage on the road by vehicles

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Pipeline Systems (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention provides a remote well natural gas recovery device which mainly comprises a water jacket heater, a gas-liquid separator, a filter, a dehydration device, a reciprocating compressor, a gas charging pillar, a gas generating set and the like, and is characterized in that gas generated from a remote well is heated by a heating furnace, the heated gas enters the gas-liquid separator and the filter for separation and filtering to remove a liquid phase and a solid phase via separation and filtration, the filtered product is dehydrated by a molecular sieve, the dehydrated product enters the reciprocating compressor, the compressed product is pumped into a CNG trailer after being measured by the gas charging pillar to serve as CNG commercial gas for sale; when the CNG trailer containing the recovered gas is driven to a gas gathering station of a gas field, and the recovered gas is pumped into a pipe network again, charged gas enters a by-pass of the dehydration device directly; when the pressure in a well mouth is equal to or higher than 20 MPa, the charged gas enters a by-pass of the compressor directly; fuel gas of the gas generating set and the water jacket heater is supplied through a rear process pipeline of the dehydration device; and the whole set of the remote well natural gas recovery device is mounted on two semi-trailers, and fixedly erected on a well field via a hydraulic jack. The remote well natural gas recovery device is suitable for recovery of scattered natural gas in high-yield or intermittent-production remote wells of different well mouth pressures; the moving, transportation and mounting are convenient and fast; the adaptive capacity is high; and the recovery cost is low.

Description

A kind of outlying well natural gas recycling device
Technical field
The present invention relates to a kind of by remote location, use the defeated mode of pipeline collection without the retail natural gas of economic benefit, shale gas, oil field Associated gases etc. carry out device safe efficient, that low cost reclaims and be filled into CNG long-tube trailer, are specifically related to a kind of outlying well Natural gas recycling device, belongs to gas gathering and transportation engineering field.
Background technology
The Unconventional forage gas fields such as conventional gas gas field and shale gas are during exploration and development, owing to needs drill well, evaluation The reasons such as well, inevitably produce some yield relatively low, away from gas gathering station scattered outlying individual well the most farther out.Additionally, oil field On stream, can produce part associated gas from crude oil, its main component is also CH4, but yield is relatively low.Above-mentioned These natural gas resources owing to yielding poorly, away from gas gathering station farther out, according to conventional construction collecting pipe mode of movement, it is clear that will Do not have business development to be worth.For associated gas, if it not being reclaimed, the most typically can only use and continuing Emptying burn processing, had both wasted resource, also surrounding will have been produced substantial pollution.
At present, the domestic exploitation way of recycling for retail natural gas, mainly there are CNG, LNG, natural gas to generate electricity on the spot, natural gas The modes such as adsorption storage, gas hydrates solidification storage.What domestic application was more is CNG recovery technology, and its main technique is Natural gas via cross separation, voltage-regulation voltage-stabilization, desulfurization, be dehydrated, de-hydrocarbon, then with injecting CNG length after compressor boost to 20MPa Pipe trailer, then sold as CNG commodity gas by CNG long-tube trailer roping CNG gas station, or roping is to natural gas collecting Stand, the internal yard in the gas field such as outer defeated station is injected and is collected defeated or outer defeated pipe network, thus realizes natural without the limit of any commercial value to this Gas is carried out efficiently, low cost reclaims.
But current existing retail natural gas CNG retracting device has the disadvantage that 1) heat, separate, filter, be dehydrated, compress, The sled blocks such as metering are separately provided, and do not carry out integrated, after each sled block is by truck transport to well site, hang respectively on basis, well site On, the connecting line between each sled block all uses steel pipe to connect, and the movement of package unit, installs, dismantles time and effort consuming, It is only applicable to carry the recovery of the relatively low outlying well of high pressure stable yields of the frequency, is not suitable for that yield is relatively low, needs to open between frequently resettlement The recovery of well retail natural gas;2) the dehydration device of existing retracting device is not provided with bypass, reclaims gas and only considered as CNG Commodity gas sell or roping to natural gas collecting station, outer defeated station etc. the internal yard ascending pipe net in gas field, it is impossible to meet part Gas field requires that retracting device can not only be used for CNG commodity gas and sells, also can inject inside gas field the actual demand of pipe network.
Summary of the invention
Present invention aim to overcome that above-mentioned technological deficiency, it is provided that a kind of retail natural gas retracting device.This device recovery process is simple, It is applicable to the outlying well of quantity-produced stable yields and is interrupted the recovery opening outlying well between production, well head pressure attenuation change is adapted to energy Power is strong, reclaims gas and can not only be used for the sale of CNG commodity gas, it is possible to injects pipe network, applied range inside gas field.
For achieving the above object, the present invention uses technical scheme as follows:
A kind of outlying well natural gas recycling device, the device used mainly includes water batch heater, gas-liquid separator, filter, takes off Water device, reciprocating compressor, add gas column, gas electricity generator;Christmas tree outlet conduit installs quick action emergency valve, emergency cut-off Valve is connected by pipeline with water batch heater, installs thermometer before water batch heater;Water batch heater and gas-liquid separator are by pipe Road connects, and water batch heater export pipeline is sequentially installed with Pressure gauge, thermometer, choke valve;Gas-liquid separator, filter, Dehydration device, reciprocating compressor, add gas column pass sequentially through pipeline connect;Dehydration device and reciprocating compressor are designed with bypass Pipeline, realizes opening or closing of dehydration device bypass line by three ball valves;Reciprocating pressure is realized by three ball valves of ball valve Opening or closing of contracting machine bypass line;Aerating column outlet is provided with anti-Pull breaking ualve, by high-pressure hose with CNG long-tube trailer even Connecing, well head carrys out gas and fills into CNG long-tube trailer after adding gas column metering.
Water batch heater and gas electricity generator fuel gas pick out with reciprocating compressor connecting line from dehydration device, are filtered Laggard water batch heater carries out heating, more again enter after pressure regulator blood pressure lowering water batch heater for the first time and carries out heating for the second time;The Post bake post fuel edema caused by disorder of QI becomes two-way, and a road is as water batch heater fuel gas after pressure regulator blood pressure lowering, and another road is through pressure regulator Combustion gas surge tank is entered, as gas electricity generator fuel gas after blood pressure lowering;It is mounted on second time heating exit pipeline for the first time Pressure gauge and thermometer.
Water batch heater, gas-liquid separator, filter and dehydration bottom of device are respectively provided with sewage draining exit, by blowoff valve by sewage discharge extremely Water Tank stores, and uses the regular roping of water-tank lorry to process;Gas-liquid separator, filter, dehydration device, add gas column and be mounted on Safety relief valve, concentrates through exhausting pipeline and diffuses.
Package unit is divided into two and prizes greatly block, is respectively mounted and is fixed on two semitrailers;First sled block includes heating unit, power supply unit; Second sled block includes separating and filtering unit, dewatering unit, compress cell, fills unit;Heating unit mainly includes emergency cut-off Valve, water batch heater, choke valve, filter, blowoff valve;Power supply unit mainly includes pressure regulator valve, fuel surge tank, combustion gas Electromotor;Separating and filtering unit mainly includes gas-liquid separator, filter, blowoff valve, Safety relief valve;Dewatering unit is main Including three ball valves, dehydration device, blowoff valve, Safety relief valve;Compress cell mainly includes three ball valves, reciprocating compression Machine;Fill unit mainly to include adding gas column, Safety relief valve, anti-Pull breaking ualve;The first, second internal distinct device unit of sled block Between connecting line be steel pipe, two greatly fuel gas pipelines between sled blocks are high-pressure hose, and two ends connect by pulling out soon respectively Head is connected to the first sled block and the second sled block.
When well outlying to high pressure stable yields reclaims for a long time, the first sled block and the second sled block can be hung to well respectively from semitrailer On the basis of Ground, start natural gas after assembly and connection and reclaim operation;When pair between drive a well recovery natural gas time, two greatly sled blocks without Unload, be directly fixed on ground, well site and regulate level by the hydraulic jack on chassis of semi-trailer, after assembly and connection Start natural gas and reclaim operation.
Due to the fact that the above technical scheme of employing, have the advantage that
By heating, separate, filter, be dehydrated, compress, the unit such as metering be integrated into two independent sled blocks, be respectively mounted fixing On two semitrailers, two sled block inside are connected by steel pipe, and are connected by high-pressure hose between two sled blocks.Whole The movement of covering device, installation, convenient disassembly fast, are not only suitable for carrying the recovery of the relatively low outlying well of high pressure stable yields of the frequency, also It is applicable to the recovery that yield is relatively low, needs drive a well retail natural gas between frequently moving.
Being respectively provided with bypass line at dehydration device and reciprocating compressor, deep natural gas dehydration both can have been solved CNG long tube by dehydration device In trailer transportation in the winter time, because of natural gas bleed, issuable ice blocks up problem, and natural gas can be made again to reach as CNG business The dew point standard that product gas is directly sold;Well head can be carried out gas supercharging by reciprocating compressor, and in making gas well, residual air is less, it is achieved natural The significantly more efficient recycling of gas resource.
Recovery gas can not only be used for CNG commodity gas and sells, it is possible to the gas fields such as roping to natural gas collecting station, outer defeated station internal yard note Enter to collect gas line network, the different demands of all types of user can be met.
Accompanying drawing explanation
Fig. 1 is a kind of outlying well natural gas recycling device structure flow chart of the present invention;
Fig. 2 is a kind of outlying well natural gas recycling device of the present invention site plan in well site;
In figure: 1, christmas tree;2, quick action emergency valve;3, thermometer (TI-101);4, water batch heater;5, Pressure gauge (PI-101); 6, thermometer (TI-102);7, choke valve;8, gas-liquid separator;9, filter;10, ball valve (Q1);11, dehydration Device;12, ball valve (Q2);13, ball valve (Q3);14, ball valve (Q4);15, reciprocating compressor;16, ball valve (Q5); 17, ball valve (Q6);18, gas column is added;19, anti-Pull breaking ualve;20, CNG long-tube trailer;21, filter;22, pressure Table (PI-102);23, thermometer (TI-103);24, pressure regulator valve;25, Pressure gauge (PI-103);26, thermometer (TI-104); 27, pressure regulator valve;28, ball valve (Q7);29, Pressure gauge (PI-104);30, pressure regulator valve;31, Pressure gauge (PI-105); 32, combustion gas surge tank;33, Pressure gauge (PI-106);34, gas electricity generator;35, blowoff valve;36, Water Tank;37、 Cesspoolage truck;38, Safety relief valve.
In figure: I, the first sled block;II, the second sled block;A, heating unit;B, power supply unit;C, separating and filtering unit;d、 Dewatering unit;E, compress cell;F, fill unit.
Detailed description of the invention
The present invention is further described with embodiment below in conjunction with the accompanying drawings.
As it is shown in figure 1, the present invention is a kind of outlying well natural gas recycling device, the device used mainly include water batch heater (4), Gas-liquid separator (8), filter (9), dehydration device (11), reciprocating compressor (15), add gas column (18), combustion gas is sent out Motor (34);It is characterized in that: christmas tree (1) outlet conduit installs quick action emergency valve (2), described quick action emergency valve (2) It is automatically switched off in emergency circumstances;Quick action emergency valve (2) is connected by pipeline with water batch heater (4), water batch heater (4) front installation thermometer (3);Water batch heater (4) is connected by pipeline with gas-liquid separator (8), water batch heater (4) Pressure gauge (5), thermometer (6), choke valve (7) it is sequentially installed with on export pipeline;Described water batch heater (4) can be to sky So gas heats, it is ensured that will not form Hydrate Plugging because of temperature decrease when natural gas via crosses choke valve (7) reducing pressure by regulating flow Pipeline;Gas-liquid separator (8), filter (9), dehydration device (11), reciprocating compressor (15), add gas column (18) Pass sequentially through pipeline to connect;Dehydration device (11) and reciprocating compressor (15) be designed with bypass line, by ball valve (10), Ball valve (12), ball valve (13) realize opening or closing of dehydration device bypass line;By ball valve (14), ball valve (16), Ball valve (17) realizes opening or closing of reciprocating compressor bypass line;Add gas column (18) outlet and anti-Pull breaking ualve (19) be installed, Being connected with CNG long-tube trailer (20) by high-pressure hose, well head carrys out gas and fills into CNG length after adding gas column (18) metering Pipe trailer (20).
Embodiment one:
As it is shown in figure 1, the CNG reclaimed when this retracting device sells directly as commodity gas and well head pressure is less than 20MPa or use When the retail natural gas under the low temperature environments such as winter reclaims: christmas tree (1) carrys out gas and enters after water batch heater (4) heats Gas-liquid separator (8) separates, then filters through filter (9), and the ball valve (10,12) at dehydration device (11) two ends is opened, Ball valve (13) on its bypass line is then closed, and carrys out gas and enters to be dehydrated the moisture in device (11) removing natural gas, makes natural gas Water dew point lower than the local lowest temperature more than 5 DEG C under 20MPa, the ball valve (14,16) at reciprocating compressor (15) two ends Opening, the ball valve (17) on its bypass line is closed, and after dehydration, natural gas via reciprocating compressor (15) supercharging, makes natural Atmospheric pressure reaches 20MPa, fills into CNG long-tube trailer after adding gas column (18) metering.
Embodiment two:
As it is shown in figure 1, the CNG roping reclaimed when this retracting device refills pipe network to gas field gas gathering station and well head pressure is less than During 20MPa: christmas tree (1) carrys out gas and enters gas-liquid separator (8) separation after water batch heater (4) heats, then through filtering Device (9) filters, and the ball valve (10,12) at dehydration device (11) two ends is closed, and the ball valve (13) on its bypass line is opened, Carrying out gas and do not enter to be dehydrated the process of device (11) deep dehydration, the ball valve (14,16) at reciprocating compressor (15) two ends is opened, Ball valve (17) on its bypass line is closed, and carrys out gas and is pressurized to through dehydration device bypass line entrance reciprocating compressor (15) 20MPa, fills into CNG long-tube trailer after adding gas column (18) metering.
Embodiment three:
As it is shown in figure 1, when the CNG that this retracting device is reclaimed directly does the sale of commodity gas and well head pressure higher than 20MPa: adopt Gas tree (1) carrys out gas and enters gas-liquid separator (8) separation after water batch heater (4) heats, then filters through filter (9), The ball valve (10,12) at dehydration device (11) two ends is opened, and the ball valve (13) on its bypass line is then closed, and carrys out gas and enters de- Moisture in water device (11) removing natural gas, make the water dew point of natural gas under 20MPa lower than the local lowest temperature 5 DEG C with On, the ball valve (14,16) at reciprocating compressor (15) two ends is closed, and the ball valve (17) on its bypass line is opened, and comes Gas, without reciprocating compressor (15) supercharging, directly fills after reciprocating compressor bypass line enters and adds gas column (18) metering Load CNG long-tube trailer.
Embodiment four:
As it is shown in figure 1, the CNG roping reclaimed when this retracting device refills pipe network to gas field gas gathering station and well head pressure is higher than During 20MPa: christmas tree (1) carrys out gas and enters gas-liquid separator (8) separation after water batch heater (4) heats, then through filtering Device (9) filters, and the ball valve (10,12) at dehydration device (11) two ends is closed, and the ball valve (13) on its bypass line is opened, Carry out gas and do not enter to be dehydrated the process of device (11) deep dehydration, also without reciprocating compressor (15) pressurized treatment, directly through dehydration Device bypass line and reciprocating compressor bypass line enter after adding gas column (18) metering and fill into CNG long-tube trailer.
The internal personal gas technological process of apparatus of the present invention is illustrated in conjunction with Fig. 1:
Water batch heater (4) and gas electricity generator (34) fuel gas are from dehydration device (11) and reciprocating compressor (15) connecting tube Pick out on road, filter laggard water batch heater (4) through filter (21) and carry out heating for the first time, then drop through pressure regulator (24) Again enter water batch heater (4) after pressure to carry out heating for the second time;Thermal afterburning material edema caused by disorder of QI becomes two-way for the second time, and a road is through pressure regulator (27) as the fuel gas of water batch heater (4) after blood pressure lowering, another road enters combustion gas surge tank after pressure regulator (30) blood pressure lowering (32), as the fuel gas of gas electricity generator (34);The heating of described first time is for balancing pressure regulator valve (24) pressure drop institute subsequently The temperature caused reduces, and second time heating is for balancing the temperature reduction caused by pressure regulator valve (27,30) pressure drop subsequently;First Pressure gauge (22) and thermometer (23) are installed on secondary heating exit pipeline, on heating exit pipeline, Pressure gauge are installed for the second time And thermometer (26) (25).
The on-the-spot display instrument such as multiple thermometer, Pressure gauge is installed on the process pipe of this device, described thermometer (3,6,23, 26) real time temperature in pipeline can be measured, in order to control corresponding water batch heater (4) heating-up temperature;Described Pressure gauge (5, 22,25,29,31,33) real-time pressure in pipeline can be measured, in order to control corresponding choke valve (7), pressure regulator valve (24, 27,30) aperture.
Water batch heater (4), gas-liquid separator (8), filter (9) and dehydration device (11) bottom are respectively provided with sewage draining exit, pass through Blowoff valve (35) is emitted into Water Tank (36) and stores, and uses water-tank lorry (37) periodically roping to process;Gas-liquid separator (8), Filter (9), dehydration device (11), add gas column (18) and be mounted on Safety relief valve (38), concentrate through exhausting pipeline and put Dissipate.
Apparatus of the present invention skid horizontal layout and installation method thereof is illustrated in conjunction with Fig. 2:
This device is divided into sled block (I), sled block (II) two sled block, is respectively mounted and is fixed on two semitrailers;Sled block (I) bag Include heating unit (a), power supply unit (b);Sled block (II) includes separating and filtering unit (c), dewatering unit (d), supercharging Unit (e), fill unit (f);Heating unit (a) mainly include quick action emergency valve (2), thermometer (3,6,23,26), Water batch heater (4), Pressure gauge (5,22,25), choke valve (7), filter (21), pressure regulator valve (24,27), ball Valve (28), blowoff valve (35);Power supply unit (b) mainly includes Pressure gauge (29,31,33), pressure regulator valve (30), fuel Surge tank (32), gas electricity generator (34);Separating and filtering unit (c) mainly include gas-liquid separator (8), filter (9), Blowoff valve (35), Safety relief valve (38);Dewatering unit (d) mainly include ball valve (10,12,13), dehydration device (11), Blowoff valve (35), Safety relief valve (38);Compress cell (e) mainly includes ball valve (14,16,17), reciprocating compression Machine (15);Fill unit (f) mainly to include adding gas column (18), anti-Pull breaking ualve (19), Safety relief valve (38);Sled block (I), Connecting line between the internal distinct device unit of sled block (II) is steel pipe, between sled block (I) and sled block (II) Fuel gas pipeline is high-pressure hose, and two ends are passed through to pull out joint soon respectively and are connected to prize block (I) and sled block (II).
Described natural gas recycling device had not only been applicable to can the stable yields well of getter but also be applicable to can only be interrupted between getter and drive a well continuously;When right When the outlying well of high pressure stable yields reclaims for a long time, sled block (I) and sled block (II) can be hung to well respectively from semitrailer On the basis of Ground, start natural gas after assembly and connection and reclaim operation;When pair between drive a well recovery natural gas time, two greatly sled blocks without Unload, be directly fixed on ground, well site and regulate level by the hydraulic jack on chassis of semi-trailer, after assembly and connection Start natural gas and reclaim operation.

Claims (5)

1. an outlying well natural gas recycling device, the device used mainly include water batch heater (4), gas-liquid separator (8), Filter (9), dehydration device (11), reciprocating compressor (15), add gas column (18), gas electricity generator (34);It is special Levying and be: quick action emergency valve (2) installed by christmas tree (1) outlet conduit, quick action emergency valve (2) leads to water batch heater (4) Piping connects, water batch heater (4) front installation thermometer (3);Water batch heater (4) passes through with gas-liquid separator (8) Pipeline connects, and water batch heater (4) export pipeline is sequentially installed with Pressure gauge (5), thermometer (6), choke valve (7); Described gas-liquid separator (8), filter (9), dehydration device (11), reciprocating compressor (15), add gas column (18) and depend on Secondary connected by pipeline;Described dehydration device (11) and reciprocating compressor (15) are designed with bypass line, by ball valve (10), Ball valve (12), ball valve (13) realize opening or closing of dehydration device bypass line;By ball valve (14), ball valve (16), Ball valve (17) realizes opening or closing of reciprocating compressor bypass line;Described add gas column (18) outlet anti-breaking is installed Valve (19), is connected with CNG long-tube trailer (20) by high-pressure hose, and well head carrys out gas and fills after adding gas column (18) metering Enter CNG long-tube trailer (20).
2. according to the outlying well natural gas recycling device described in claims 1, it is characterised in that: described water batch heater (4) and Gas electricity generator (34) fuel gas picks out with reciprocating compressor (15) connecting line from dehydration device (11), through filtering Device (21) filters laggard water batch heater (4) to carry out heating for the first time, then set of again intaking after pressure regulator (24) blood pressure lowering adds Hot stove (4) carries out second time and heats;Thermal afterburning material edema caused by disorder of QI becomes two-way for the second time, road conduct after pressure regulator (27) blood pressure lowering Water batch heater (4) fuel gas, another road enters gas electricity generator surge tank (32) after pressure regulator (30) blood pressure lowering, as Gas electricity generator (34) fuel gas;Pressure gauge (22) and thermometer (23) be installed on heating exit pipeline for the first time, second Pressure gauge (25) and thermometer (26) are installed on secondary heating exit pipeline.
3. according to the outlying well natural gas recycling device described in claims 1, it is characterised in that: described water batch heater (4), gas Liquid/gas separator (8), filter (9) and dehydration device (11) bottom are respectively provided with sewage draining exit, are emitted into by blowoff valve (35) Water Tank (36) stores, and uses water-tank lorry (37) periodically roping to process;Described gas-liquid separator (8), filter (9), Dehydration device (11), add gas column (18) and be mounted on Safety relief valve (38), concentrate through exhausting pipeline and diffuse.
4. according to the outlying well natural gas recycling device described in claims 1, it is characterised in that: package unit be divided into sled block (I), Sled block (II) two sled block, is respectively mounted and is fixed on two semitrailers;Sled block (I) includes heating unit (a), power supply Unit (b);Sled block (II) includes separating and filtering unit (c), dewatering unit (d), compress cell (e), fills unit (f); Heating unit (a) mainly includes quick action emergency valve (2), water batch heater (4), choke valve (7), filter (21), row Dirty valve (35);Power supply unit (b) mainly includes pressure regulator valve (30), fuel surge tank (32), gas electricity generator (34);Point Gas-liquid separator (8), filter (9), blowoff valve (35), Safety relief valve (38) is mainly included from filter element (c); Dewatering unit (d) mainly includes ball valve (10,12,13), dehydration device (11), blowoff valve (35), Safety relief valve (38); Compress cell (e) mainly includes ball valve (14,16,17), reciprocating compressor (15);Fill unit (f) mainly to include Add gas column (18), anti-Pull breaking ualve (19), Safety relief valve1(38);The internal distinct device of sled block (I), sled block (II) Connecting line between unit is steel pipe, and the fuel gas pipeline between sled block (I) and sled block (II) is high-pressure hose, Two ends are passed through to pull out joint soon respectively and are connected to prize block (I) and sled block (II).
5. according to the outlying well natural gas recycling device described in claims 1, it is characterised in that: when well outlying to high pressure stable yields is carried out When reclaiming for a long time, sled block (I) and sled block (II) can be hung respectively from semitrailer to the ground base of well site, assemble Start natural gas after connection and reclaim operation;When pair between drive a well recovery natural gas time, two greatly sled blocks, without unloading, directly pass through semi-mounted Hydraulic jack on chassis is fixed on ground, well site and regulates level, can start natural gas and reclaim operation after assembly and connection.
CN201610329809.8A 2016-05-18 2016-05-18 A kind of outlying well natural gas recycling device Active CN105927849B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610329809.8A CN105927849B (en) 2016-05-18 2016-05-18 A kind of outlying well natural gas recycling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610329809.8A CN105927849B (en) 2016-05-18 2016-05-18 A kind of outlying well natural gas recycling device

Publications (2)

Publication Number Publication Date
CN105927849A true CN105927849A (en) 2016-09-07
CN105927849B CN105927849B (en) 2018-07-17

Family

ID=56841644

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610329809.8A Active CN105927849B (en) 2016-05-18 2016-05-18 A kind of outlying well natural gas recycling device

Country Status (1)

Country Link
CN (1) CN105927849B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108980614A (en) * 2018-08-20 2018-12-11 克拉玛依市富城天然气有限责任公司 Integrated natural gas processing system is recycled in a kind of formation testing, gas testing
CN109097124A (en) * 2018-10-16 2018-12-28 淄博瑞特石油技术有限公司 A kind of natural gas and carbon dioxide gas collection system
CN109681780A (en) * 2019-02-21 2019-04-26 中国石油工程建设有限公司 A kind of complete gas well pressure charging system and operation method based on reciprocating compressor
CN109681151A (en) * 2019-01-29 2019-04-26 重庆欣雨压力容器制造有限责任公司 A kind of shale gas well head gas high-pressure treatment apparatus
CN110159922A (en) * 2019-05-13 2019-08-23 安瑞科(蚌埠)压缩机有限公司 Well head gas recovery system
CN110317650A (en) * 2019-07-26 2019-10-11 合肥哈工新能源科技有限公司 A kind of vehicular well head gas recovery system
CN110331961A (en) * 2018-03-30 2019-10-15 中国石油化工股份有限公司 Natural gas skid gas collecting apparatus
CN110331012A (en) * 2019-07-26 2019-10-15 合肥哈工新能源科技有限公司 A kind of skid integration gas testing reclaimer
CN110454116A (en) * 2019-08-21 2019-11-15 西安长庆科技工程有限责任公司 A kind of the heating and anti-freezing device and its application method of well site natural gas
CN110882975A (en) * 2018-09-07 2020-03-17 中国石油化工股份有限公司 Method for cleaning pipeline before production stop, inspection and maintenance of high-sulfur-content station
CN116927735A (en) * 2023-09-12 2023-10-24 陕西斯锐明天智能设备有限公司 Multi-point oil extraction process and gas injection device for stratum block of oil field

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1959217A2 (en) * 2007-02-13 2008-08-20 Daewoo Shipbuilding & Marine Engineering Co., Ltd Apparatus and method for reliquefying boil-off gas capable of operating with variable refrigeration load
CN201120238Y (en) * 2007-10-15 2008-09-24 辽河石油勘探局 Fixed form hydrogen sulphide removing apparatus
CN103075805A (en) * 2013-02-01 2013-05-01 胜利油田胜利勘察设计研究院有限公司 System for heating crude oil under joint action of heat pump for recovering oil field sewage residual heat and water jacket furnace
CN203905913U (en) * 2014-06-23 2014-10-29 江汉石油钻头股份有限公司 Natural gas recovery system for gas testing pilot production
CN203907209U (en) * 2014-05-05 2014-10-29 中国寰球工程公司 Energy-saving low-temperature liquid ethylene gasification process system with gas and liquid phase separated recovering function
CN104359001A (en) * 2014-09-24 2015-02-18 新疆新捷燃气有限责任公司 Residual gas recovery technology
CN105154159A (en) * 2015-09-23 2015-12-16 天津市振津石油天然气工程有限公司 Small-size movable type skid-mounted device and method for recycling CNG from well head gas

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1959217A2 (en) * 2007-02-13 2008-08-20 Daewoo Shipbuilding & Marine Engineering Co., Ltd Apparatus and method for reliquefying boil-off gas capable of operating with variable refrigeration load
CN201120238Y (en) * 2007-10-15 2008-09-24 辽河石油勘探局 Fixed form hydrogen sulphide removing apparatus
CN103075805A (en) * 2013-02-01 2013-05-01 胜利油田胜利勘察设计研究院有限公司 System for heating crude oil under joint action of heat pump for recovering oil field sewage residual heat and water jacket furnace
CN203907209U (en) * 2014-05-05 2014-10-29 中国寰球工程公司 Energy-saving low-temperature liquid ethylene gasification process system with gas and liquid phase separated recovering function
CN203905913U (en) * 2014-06-23 2014-10-29 江汉石油钻头股份有限公司 Natural gas recovery system for gas testing pilot production
CN104359001A (en) * 2014-09-24 2015-02-18 新疆新捷燃气有限责任公司 Residual gas recovery technology
CN105154159A (en) * 2015-09-23 2015-12-16 天津市振津石油天然气工程有限公司 Small-size movable type skid-mounted device and method for recycling CNG from well head gas

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331961A (en) * 2018-03-30 2019-10-15 中国石油化工股份有限公司 Natural gas skid gas collecting apparatus
CN108980614B (en) * 2018-08-20 2024-04-09 克拉玛依市富城天然气有限责任公司 Oil testing, gas testing and recycling integrated natural gas treatment system
CN108980614A (en) * 2018-08-20 2018-12-11 克拉玛依市富城天然气有限责任公司 Integrated natural gas processing system is recycled in a kind of formation testing, gas testing
CN110882975A (en) * 2018-09-07 2020-03-17 中国石油化工股份有限公司 Method for cleaning pipeline before production stop, inspection and maintenance of high-sulfur-content station
CN109097124A (en) * 2018-10-16 2018-12-28 淄博瑞特石油技术有限公司 A kind of natural gas and carbon dioxide gas collection system
CN109681151A (en) * 2019-01-29 2019-04-26 重庆欣雨压力容器制造有限责任公司 A kind of shale gas well head gas high-pressure treatment apparatus
CN109681780A (en) * 2019-02-21 2019-04-26 中国石油工程建设有限公司 A kind of complete gas well pressure charging system and operation method based on reciprocating compressor
CN109681780B (en) * 2019-02-21 2023-10-31 中国石油工程建设有限公司 Complete gas well supercharging system based on reciprocating compressor and operation method
CN110159922A (en) * 2019-05-13 2019-08-23 安瑞科(蚌埠)压缩机有限公司 Well head gas recovery system
CN110317650A (en) * 2019-07-26 2019-10-11 合肥哈工新能源科技有限公司 A kind of vehicular well head gas recovery system
CN110331012A (en) * 2019-07-26 2019-10-15 合肥哈工新能源科技有限公司 A kind of skid integration gas testing reclaimer
CN110454116A (en) * 2019-08-21 2019-11-15 西安长庆科技工程有限责任公司 A kind of the heating and anti-freezing device and its application method of well site natural gas
CN116927735A (en) * 2023-09-12 2023-10-24 陕西斯锐明天智能设备有限公司 Multi-point oil extraction process and gas injection device for stratum block of oil field

Also Published As

Publication number Publication date
CN105927849B (en) 2018-07-17

Similar Documents

Publication Publication Date Title
CN105927849A (en) Remote well natural gas recovery device
US9091160B2 (en) Flowback separation system
WO2023082481A1 (en) System and method for supplying combustion gas, device equipped with turbine engine, and fracturing system
CN103912253B (en) Gas well single well gas recovery system and low-pressure recovery method thereof
CN108374655B (en) Liquid carbon dioxide dry sand fracturing system and technological process
CN104528625B (en) A kind of mobile lubricating oil oil injection cart
RU2689452C2 (en) Modular installation for processing flow of composition of reverse inflow and methods for processing it
CN105114039B (en) Recovery device and recovery method for casing gas of oil field well site
CN110451745B (en) Oil-based drilling waste supercritical treatment system
CN102504859A (en) Method and equipment for recovery of oilfield associated gas hydrocarbon mixture
CN116025322B (en) Multistage carbon dioxide pre-fracturing system and method
CN106223877A (en) The automatic well washing apparatus of coal bed gas well
US11286762B1 (en) Water hydration system
CN105065908B (en) A kind of sulfur-containing gas gas collection integrated device
CN205383426U (en) Natural gas filling station's interior cold type hydraulic compressor arrangement
CN205154128U (en) Product system is asked to natural gas open flow
CN202109210U (en) Device for reducing gathering resistance of low-water-content oil well by utilizing produced liquid of high-water-content oil well
CN207245680U (en) Removable oil gas field well head recycling gas integral device
CN206111115U (en) Coiled tubing underbalance sand washing device
RU112642U1 (en) MOBILE OIL SEPARATION AND PUMPING COMPLEX
CN202297494U (en) Device for recycling mixed hydrocarbon from oil associated gas
RU2616038C1 (en) Mobile system for year-round survey of oil and gas wells
CN105019871A (en) Flue gas recovery and reinjection process and device
CN109519160A (en) A kind of gas concentration unit
CN109424352A (en) Crude oil separation device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant