CN105927801B - Glass composite air duct fabrication and installation technique - Google Patents

Glass composite air duct fabrication and installation technique Download PDF

Info

Publication number
CN105927801B
CN105927801B CN201610405205.7A CN201610405205A CN105927801B CN 105927801 B CN105927801 B CN 105927801B CN 201610405205 A CN201610405205 A CN 201610405205A CN 105927801 B CN105927801 B CN 105927801B
Authority
CN
China
Prior art keywords
airduct
air duct
pipe
reinforcement
composite air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610405205.7A
Other languages
Chinese (zh)
Other versions
CN105927801A (en
Inventor
王海洁
王晓超
张友波
马克晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Haichuan Construction Group Co Ltd
Original Assignee
Qingdao Haichuan Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Haichuan Construction Group Co Ltd filed Critical Qingdao Haichuan Construction Group Co Ltd
Priority to CN201610405205.7A priority Critical patent/CN105927801B/en
Publication of CN105927801A publication Critical patent/CN105927801A/en
Application granted granted Critical
Publication of CN105927801B publication Critical patent/CN105927801B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L9/00Rigid pipes
    • F16L9/14Compound tubes, i.e. made of materials not wholly covered by any one of the preceding groups
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Duct Arrangements (AREA)

Abstract

The invention discloses a kind of glass composite air duct fabrication and installation technique, comprise the following steps:(One)Airduct makes;(Two)The installation of airduct.Beneficial effects of the present invention:1st, in terms of quality:This engineering method uses glass composite air duct board, batch production processing and fabricating, and quality safety is reliable.2nd, secure context:This engineering method is only with small-sized machine, it is not necessary to big security capital.3rd, technical elements:The connection of this engineering method composite air duct is UL181P pressure sensitive adhesive tapes using special seal gum product.Air leak rate of air curtain is small, technically more secure.4th, economic aspect:This engineering method has the effect of heat preservation energy-saving compared with other materials airduct, it is not necessary to which secondary insulation substantially reduces construction period, reduces construction costs, long working life, maintenance is relatively simple, reduces the expense of later period maintenance.

Description

Glass composite air duct fabrication and installation technique
Technical field
The present invention relates to a kind of glass composite air duct fabrication and installation technique, belong to technical field of building construction.
Background technology
Glass fiber composite air duct is in order to be applicable new technology, new material and a kind of novel wind tube developed, with ultra-fine fibre Based on plate, it is combined through special processing.Collect insulation, noise elimination, damp-proof and fireproof, anti-corrosion, (being adapted to bright dress) outer layer intensity attractive in appearance The multiple function such as height, internal layer surface antimildew and antibacterial has in light weight in one, and inleakage is small, fabrication and installation are fast, space-consuming It is small, divulge information, the advantages that performance and price is more reasonable.Especially its excellent insulation and acoustic attenuation performance are had a preference for by users. Compared with traditional handicraft airduct, it can also be that user saves pipe-line system investment 20% or so.
Glass fiber composite air duct composite glass wool board cuts through cutter, bonded, sealant tape sealing and reinforcing form.It is multiple The double sheaths for closing block of glass wool are glass fabric clad aluminum foil or sheath is block of glass wool.Block of glass wool uses centrifugal process shape Into glass fibre add resin glue through hot pressing, curing molding.The conventional lattice of plate:70~75kg of density m2, thickness 25mm.Due to Composite glass wool board interlayer is porous light-weight material, thermal conductivity factor is low, and acoustic absorptivity is big, thus glass composite air duct has well Insulation and acoustic attenuation performance;Meanwhile airduct have material light, short construction period, fire prevention, protection against the tide, without unwanted volatile, beautiful outline form The features such as sight, service life length, low cost.Compared with composite glassfibre air duct adds insulation with galvanized steel plain sheet airduct, engineering cost can be saved With more than 30%, do not include the field device expense that disappears saved still, be low, middle pressure air conditioner ventilating system is the most economical, be applicable one Kind ventilation shaft.
The content of the invention
The technical problems to be solved by the invention are:A kind of glass composite air duct fabrication and installation technique is provided.
In order to solve the above technical problems, the technical solution adopted by the present invention is:
Glass composite air duct fabrication and installation technique provided by the invention, comprises the following steps:
(1) airduct makes
1) standard-sized pipeline flat board is made using overlap joint or pipeline fluting apparatus or grooving tool, then answers glass Close airduct folding forming, it is then with binding rifle that nail is parallel or slightly angled binding is good, then outside lap belt centered on, With pressure sensitive adhesive tape, with nylon include piece adhesive tape included it is flat;
Side, round flange blanking, edge rolling connects with anti-corrosion iron sheet short tube, in case being connected with airduct equipment and valve, glass Composite air duct supplied shim, is tightened with self-tapping screw;
2) airduct is reinforced:
Pipeline section and joint are listed as follows in the pressure that needs reinforcement, spacing range:
(1) reinforcement uses the zinc-plated harness cords of 4-6mm, and ASHI pads use the galvanized steel plain sheet of the 64*64MM with bevel;
The length of reinforcement=airduct external diameter+15MM
(2) the basic placement of reinforcement:
In the place of any required reinforcement, first row (positive pressure ventilation pipe) should be put at the female side 100MM of horizontal contact, Thereafter reinforcement puts the starting point for measurement with this, according to the maximum longitudinal pitch for reinforcing table requirement, makes its position, malleation wind Effective zinc-plated harness cord and 4 ASHI pads (outside is placed in airduct), to prevent general road outward-dipping, negative-pressure air duct is led to zinc-plated Silk, 4 pads (outside in the airduct that is placed in), to prevent pipeline from sloping inwardly;
Internal diameter exceedes 1209MM airduct, in order to prevent it from being naturally drooped when not having pressure, using the reinforcing of negative-pressure air duct Method carries out bending resistance assembling;
(3) for H>610MM airduct, when reinforcement can not be reinforced through airduct, encircled and added using lightgage steel joist Gu;
(4) when there are some special angles, it is necessary to by the levelling alignment of interface when can not carry out male and female mouth pipe lap, use After adhesive cements blend compounds band bonding firmly, then it is aided with metal reinforcing reinforcing;
(2) installation of airduct
(1) cross bar of suspension bracket makes of the angle steel of 50 type lightgage steel joists or L30 × 30 × 2.5, and length is the ㎜ of Guan Kuanjia 130, Support spacing is between 1200~1800 ㎜;
(2) when the big length of side of airduct is more than or equal to 630 ㎜, its spacing is no more than 1200 ㎜;
(3) when the big side of airduct is less than 630 ㎜, its spacing is no more than 1800 ㎜;
(4) suspension rod application diameter is more than or equal to the ㎜ of ф 6.0 round steel;
(5) cross bar of suspension rod makes of the ㎜ lightgage steel joists of 50 ㎜ × 38 × 10, and length is the ㎜ of Guan Kuanjia 130, support spacing Between 1200~1800 ㎜;
(6) when airduct width is more than 1219 ㎜, 900 elbow both sides away from the ㎜ of tube edge 300 plus two supports and one tiltedly Support;
(7) when branch pipe more than the wide supervisors of 1219 ㎜ with connecting, branch pipe upper bracket is no more than 300 ㎜, T with supervisor outside size Type pipe branch pipe upper bracket position is same as above;
After airduct, which hangs support, to be installed, airduct starts to lift, and a lifting or two lift together, then by suspension bracket Cap nut is tightened, and airduct is tuned into level, and airflow direction is with the male first side of female head flow direction of overlapped points;
Prepare the airduct of installation, need female vertical storage upside down in arid region in order to avoid making moist;Air main, Heavenly Stems and Earthly Branches pipe are referring to Determine to be carried to scene after processing site processes, to ensure the flatness of its otch, joint will such as be changed at the scene, with straight knife edge One straight flange is cut, to obtain a straight and smooth otch;Specific practice is as follows:
When air main opening connects with branch pipe, if, opening is high on the downside of branch pipe with supervisor downside in the same horizontal line Add 38 ㎜ for branch pipe is high, a width of branch pipe is wide to add 25 ㎜, if opening, in the middle part of pipe, the wide and high of opening adds 25 ㎜;
It should check outside whether there is breakage in glass composite air duct in a pre-installation, if airduct crust has the ground of tear and perforation Side should be respectively adopted according to its size pressing sensitive tape or again borehole repairing on;Internal exergy dissipation harm application product is specified ISOVER repair sheets coat.
Preferably, Large Diameter Pipeline assembling airduct 3-4 sections, the airduct 5-8 sections of pipe with small pipe diameter.
When preferably, by two sections of airduct horizontal connections, the bottom of this two sections of airducts should be made to put down in same level, then will In the male head insertion female mouth of glass composite air duct, the glass composite air duct crust of male first side is overlapped on female one end, with special With bookbinding rifle, binding is stamped, binding is parallel with seam or in 3-10 degree angle, spacing 5cm, is placed on special pressure sensitive adhesive tape is parallel Overlap on crust, overlap joint skin outer edge is placed in adhesive tape center, then is cemented adhesive tape with rubbing board.
Beneficial effects of the present invention:
1st, in terms of quality:This engineering method uses glass composite air duct board, batch production processing and fabricating, and quality safety is reliable.
2nd, secure context:This engineering method is only with small-sized machine, it is not necessary to big security capital.
3rd, technical elements:The connection of this engineering method composite air duct is UL181P pressure sensitive adhesive tapes using special seal gum product.Leakage Wind rate is small, technically more secure.
4th, economic aspect:This engineering method has the effect of heat preservation energy-saving, it is not necessary to secondary guarantor compared with other materials airduct Temperature substantially reduces construction period, reduces construction costs, long working life, maintenance is relatively simple, reduces later period maintenance Expense.
Embodiment
Embodiment 1
The glass composite air duct fabrication and installation technique that the present embodiment provides, comprises the following steps:
(1) airduct makes
1) standard-sized pipeline flat board is made using overlap joint or pipeline fluting apparatus or grooving tool, then answers glass Close airduct folding forming, it is then with binding rifle that nail is parallel or slightly angled binding is good, then outside lap belt centered on, With pressure sensitive adhesive tape, with nylon include piece adhesive tape included it is flat;
Side, round flange blanking, edge rolling connects with anti-corrosion iron sheet short tube, in case being connected with airduct equipment and valve, glass Composite air duct supplied shim, is tightened with self-tapping screw;
3) airduct is reinforced:
Pipeline section and joint are listed as follows in the pressure that needs reinforcement, spacing range:
(1) reinforcement uses the zinc-plated harness cords of 4-6mm, and ASHI pads use the galvanized steel plain sheet of the 64*64MM with bevel;
The length of reinforcement=airduct external diameter+15MM
(2) the basic placement of reinforcement:
In the place of any required reinforcement, first row (positive pressure ventilation pipe) should be put at the female side 100MM of horizontal contact, Thereafter reinforcement puts the starting point for measurement with this, according to the maximum longitudinal pitch for reinforcing table requirement, makes its position, malleation wind Effective zinc-plated harness cord and 4 ASHI pads (outside is placed in airduct), to prevent general road outward-dipping, negative-pressure air duct is led to zinc-plated Silk, 4 pads (outside in the airduct that is placed in), to prevent pipeline from sloping inwardly;
Internal diameter exceedes 1209MM airduct, in order to prevent it from being naturally drooped when not having pressure, using the reinforcing of negative-pressure air duct Method carries out bending resistance assembling;
(3) for H>610MM airduct, when reinforcement can not be reinforced through airduct, encircled and added using lightgage steel joist Gu;
(4) when there are some special angles, it is necessary to by the levelling alignment of interface when can not carry out male and female mouth pipe lap, use After adhesive cements blend compounds band bonding firmly, then it is aided with metal reinforcing reinforcing;
(2) installation of airduct
(1) cross bar of suspension bracket makes of the angle steel of 50 type lightgage steel joists or L30 × 30 × 2.5, and length is the ㎜ of Guan Kuanjia 130, Support spacing is between 1200~1800 ㎜;
(2) when the big length of side of airduct is more than or equal to 630 ㎜, its spacing is no more than 1200 ㎜;
(3) when the big side of airduct is less than 630 ㎜, its spacing is no more than 1800 ㎜;
(4) suspension rod application diameter is more than or equal to the ㎜ of ф 6.0 round steel;
(5) cross bar of suspension rod makes of the ㎜ lightgage steel joists of 50 ㎜ × 38 × 10, and length is the ㎜ of Guan Kuanjia 130, support spacing Between 1200~1800 ㎜;
(6) when airduct width is more than 1219 ㎜, 900 elbow both sides away from the ㎜ of tube edge 300 plus two supports and one tiltedly Support;
(7) when branch pipe more than the wide supervisors of 1219 ㎜ with connecting, branch pipe upper bracket is no more than 300 ㎜, T with supervisor outside size Type pipe branch pipe upper bracket position is same as above;
After airduct, which hangs support, to be installed, airduct starts to lift, and a lifting or two lift together, then by suspension bracket Cap nut is tightened, and airduct is tuned into level, and airflow direction is with the male first side of female head flow direction of overlapped points;
Prepare the airduct of installation, need female vertical storage upside down in arid region in order to avoid making moist;Air main, Heavenly Stems and Earthly Branches pipe are referring to Determine to be carried to scene after processing site processes, to ensure the flatness of its otch, joint will such as be changed at the scene, with straight knife edge One straight flange is cut, to obtain a straight and smooth otch;Specific practice is as follows:
When air main opening connects with branch pipe, if, opening is high on the downside of branch pipe with supervisor downside in the same horizontal line Add 38 ㎜ for branch pipe is high, a width of branch pipe is wide to add 25 ㎜, if opening, in the middle part of pipe, the wide and high of opening adds 25 ㎜;
It should check outside whether there is breakage in glass composite air duct in a pre-installation, if airduct crust has the ground of tear and perforation Side should be respectively adopted according to its size pressing sensitive tape or again borehole repairing on;Internal exergy dissipation harm application product is specified ISOVER repair sheets coat.
Large Diameter Pipeline assembling airduct 3-4 sections, the airduct 5-8 sections of pipe with small pipe diameter.
During by two sections of airduct horizontal connections, the bottom of this two sections of airducts should be made to put down in same level, then answer glass In the male head insertion female mouth for closing airduct, the glass composite air duct crust of male first side is overlapped on female one end, with special bookbinding Rifle, binding is stamped, binding is parallel with seam or in 3-10 degree angle, spacing 5cm, is placed on special pressure sensitive adhesive tape is parallel outside overlap joint Pi Shang, overlap joint skin outer edge is placed in adhesive tape center, then is cemented adhesive tape with rubbing board.

Claims (3)

1. glass composite air duct fabrication and installation technique, it is characterised in that comprise the following steps:
(1) airduct makes
1) standard-sized pipeline flat board is made using overlap joint or pipeline fluting apparatus or grooving tool, then by the compound wind of glass Pipe folding forming, it is then with binding rifle that nail is parallel or slightly angled binding is good, then outside lap belt centered on, with pressure Sensitive tape is encapsulated, with nylon include piece adhesive tape included it is flat;
Side, round flange blanking, edge rolling connect with anti-corrosion iron sheet short tube, in case being connected with airduct equipment and valve, glass is compound Airduct supplied shim, is tightened with self-tapping screw;
2) airduct is reinforced:
Pressure, airduct caliber, reinforcement quantity and the longitudinal pitch to need reinforcement is listed as follows:
(1) reinforcement uses the zinc-plated harness cords of 4-6mm, and pad uses the galvanized steel plain sheet of the 64*64mm with bevel;
The length of reinforcement=airduct external diameter+15mm
(2) the basic placement of reinforcement:
In the place of any required reinforcement, the positive pressure ventilation pipe of first row should be put at the female side 100mm of horizontal contact, thereafter Reinforcement starting point for measurement is put with this, according to the maximum longitudinal pitch for reinforcing table requirement, make its position, positive pressure ventilation pipe is used The pad that outside is placed in zinc-plated harness cord and 4 airducts, to prevent that pipeline is outward-dipping, the zinc-plated harness cord of negative-pressure air duct, 4 pads Piece is placed in outside in airduct, to prevent pipeline from sloping inwardly;
Internal diameter exceedes 1209mm airduct, in order to prevent it from being naturally drooped when not having pressure, using the reinforcement means of negative-pressure air duct Carry out bending resistance assembling;
(3) for height>610mm airduct, when reinforcement can not be reinforced through airduct, encircled and added using lightgage steel joist Gu;
(4) when there are some special angles, it is necessary to by the levelling alignment of interface when can not carry out male and female mouth pipe lap, viscose glue is used After agent cements blend compounds band bonding firmly, then it is aided with metal reinforcing reinforcing;
(2) installation of airduct
(1) cross bar of suspension bracket makes of 50 type lightgage steel joists or L30 × 30 × 2.5mm angle steel, and length is Guan Kuanjia 130mm, branch Frame spacing is between 1200~1800mm;
(2) when the big length of side of airduct is more than or equal to 630mm, its spacing is no more than 1200mm;
(3) when the big side of airduct is less than 630mm, its spacing is no more than 1800mm;
(4) suspension rod application diameter is more than or equal to φ 6.0mm round steel;
(5) cross bar of suspension rod makes of 50mm × 38 × 10mm lightgage steel joists, and length is Guan Kuanjia 130mm, and support spacing is Between 1200~1800mm;
(6) when airduct width is more than 1219mm, 90 degree of elbow both sides are away from tube edge 300mm plus the oblique branch of two supports and one Frame;
(7) when branch pipe more than the wide supervisors of 1219mm with connecting, branch pipe upper bracket is no more than 300mm with supervisor outside size, T-shaped Pipe branch pipe upper bracket position is same as above;
After airduct, which hangs support, to be installed, airduct starts to lift, and a lifting or two lift together, then by the screw of suspension bracket Cap is tightened, and airduct is tuned into level, and airflow direction is with the male first side of female head flow direction of overlapped points;
Prepare the airduct of installation, need female vertical storage upside down in arid region in order to avoid making moist;Air main, Heavenly Stems and Earthly Branches pipe add specified Scene is carried to after processing to workshop, to ensure the flatness of its otch, joint will such as be changed at the scene, with straight knife along one Straight flange is cut, to obtain a straight and smooth otch;Specific practice is as follows:
When air main opening connects with branch pipe, if, be open a height of on the downside of branch pipe with supervisor downside in the same horizontal line Guan Gaojia 38mm, a width of branch pipe is wide to add 25mm, if opening, in the middle part of pipe, the width and height of opening add 25mm;
It should check outside whether there is breakage in glass composite air duct in a pre-installation, if airduct crust has the place of tear and perforation should According to its size be respectively adopted pressing sensitive tape or again borehole repairing on;The repair sheets that internal exergy dissipation harm application product is specified apply It is good.
2. glass composite air duct fabrication and installation technique according to claim 1, it is characterised in that Large Diameter Pipeline assembling airduct 3- 4 sections, the airduct 5-8 sections of pipe with small pipe diameter.
3. glass composite air duct fabrication and installation technique according to claim 1, it is characterised in that two sections of airducts are horizontal even When connecing, the baseplane of this two sections of airducts should be made in same level, then insert the male head of glass composite air duct in female mouth, The glass composite air duct crust of male first side is overlapped on female one end, with special bookbinding rifle, stamps binding, binding is put down with seam Go or in 3-10 degree angle, spacing 5cm, be placed on special pressure sensitive adhesive tape is parallel on overlap joint crust, overlap joint skin outer edge is placed in glue Band center, then cemented adhesive tape with rubbing board.
CN201610405205.7A 2016-06-07 2016-06-07 Glass composite air duct fabrication and installation technique Active CN105927801B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610405205.7A CN105927801B (en) 2016-06-07 2016-06-07 Glass composite air duct fabrication and installation technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610405205.7A CN105927801B (en) 2016-06-07 2016-06-07 Glass composite air duct fabrication and installation technique

Publications (2)

Publication Number Publication Date
CN105927801A CN105927801A (en) 2016-09-07
CN105927801B true CN105927801B (en) 2018-03-02

Family

ID=56833753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610405205.7A Active CN105927801B (en) 2016-06-07 2016-06-07 Glass composite air duct fabrication and installation technique

Country Status (1)

Country Link
CN (1) CN105927801B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107965624A (en) * 2017-11-22 2018-04-27 广州正德工业工程技术有限公司 Lithium battery film applicator air hose prepares and mounting process
CN109140066A (en) * 2018-10-23 2019-01-04 筑梦高科建筑有限公司 Inside holding metal bellows construction technology
CN111379906A (en) * 2019-09-30 2020-07-07 天津奥特浦斯机电设备有限公司 BIM-based production management system for glass fiber composite air pipe product
CN111664295A (en) * 2020-06-12 2020-09-15 杜肯新材料(武汉)集团股份有限公司 Rubber-plastic composite air pipe system and field installation method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103604007A (en) * 2013-11-26 2014-02-26 中国建筑第八工程局有限公司 Composite blast pipe construction method
CN203656390U (en) * 2013-11-21 2014-06-18 中建三局东方装饰设计工程有限公司 Glass fiber and magnesium compound air pipe
CN204084759U (en) * 2014-08-20 2015-01-07 江苏扬安集团有限公司 A kind of thermal-insulating type fiberglass composite air duct construction and installation system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3524013B2 (en) * 1999-05-06 2004-04-26 ニチアス株式会社 Heat insulation cover for pipe support, heat insulation structure for pipe support, and method of construction

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203656390U (en) * 2013-11-21 2014-06-18 中建三局东方装饰设计工程有限公司 Glass fiber and magnesium compound air pipe
CN103604007A (en) * 2013-11-26 2014-02-26 中国建筑第八工程局有限公司 Composite blast pipe construction method
CN204084759U (en) * 2014-08-20 2015-01-07 江苏扬安集团有限公司 A kind of thermal-insulating type fiberglass composite air duct construction and installation system

Also Published As

Publication number Publication date
CN105927801A (en) 2016-09-07

Similar Documents

Publication Publication Date Title
CN105927801B (en) Glass composite air duct fabrication and installation technique
CN103604007B (en) A kind of method of construction of composite air duct
CN101275704B (en) Steel face type phenolic aldehyde heat preserving composite board and manufacturing method and application thereof
CN108980488A (en) Flange and construction for air hose connection
CN101329008B (en) Steel surface type composite air duct and manufacturing method thereof
CN108591634B (en) Machine-made glass magnesium composite board air duct construction method
CN111139996A (en) Integrated fireproof heat-insulation assembled smoke-proof and smoke-discharging air pipe and preparation method thereof
CN103866934B (en) Basalt fibre plate composite rock wool A level fireproof heat preservation decorative board
CN218000855U (en) Composite heat-insulation board with enhanced structural strength
CN209196351U (en) A kind of flange for air hose connection
CN204919842U (en) A level fire prevention heat preservation system and fire prevention heat preservation intergral template for outer wall
CN208221837U (en) A kind of honeycomb type double thermal insulation broken-bridge aluminum alloy air duct flange
CN203532992U (en) Novel air pipe mounting connecting structure
CN203176564U (en) Energy-saving and environment-friendly double-faced color steel plate composite air pipe
CN213712091U (en) Air pipe heat-insulating pipe bracket structure of finished product support hanger
CN207944611U (en) A kind of thermal insulation foam plate for house furred ceiling
CN2510573Y (en) Ventilating pipeline using foam heat-insulating plate as carrier
CN204435756U (en) A kind of novel smoke controlling fire resistant air-duct
CN204533923U (en) A kind of dismountable flange air pipe device
CN215568975U (en) Flame-retardant PERTII type spiral galvanized air-conditioning heat-insulating pipe
CN113524873A (en) Processing technology of integrated fireproof smoke-discharging air pipe special plate
CN205806747U (en) A kind of lined flange composite glass wool board air duct
CN110185233A (en) A kind of insulation construction and its construction method of rectangular air duct
CN214368184U (en) Air pipe heat-insulation pipe support structure of angle steel support hanger
CN220581892U (en) Novel fireproof durable heat-insulating hose

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant