CN105927258B - The update method and system of bracket controller program - Google Patents

The update method and system of bracket controller program Download PDF

Info

Publication number
CN105927258B
CN105927258B CN201610257845.8A CN201610257845A CN105927258B CN 105927258 B CN105927258 B CN 105927258B CN 201610257845 A CN201610257845 A CN 201610257845A CN 105927258 B CN105927258 B CN 105927258B
Authority
CN
China
Prior art keywords
bracket controller
real
time
update
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610257845.8A
Other languages
Chinese (zh)
Other versions
CN105927258A (en
Inventor
刘明华
马鹏宇
黄金福
余佳鑫
仲兆峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Technology Guangzhou Co Ltd
Original Assignee
Hitachi Building Technology Guangzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Technology Guangzhou Co Ltd filed Critical Hitachi Building Technology Guangzhou Co Ltd
Priority to CN201610257845.8A priority Critical patent/CN105927258B/en
Publication of CN105927258A publication Critical patent/CN105927258A/en
Application granted granted Critical
Publication of CN105927258B publication Critical patent/CN105927258B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/12Control, e.g. using remote control

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of update method and system of bracket controller program, wherein, the update method of bracket controller program comprises the following steps:Obtain the real-time traffic information of coal winning technology real time information and coal mining machine in full-mechanized mining face;According to coal winning technology real time information and real-time traffic information, real-time band of position division is carried out to each bracket controller, obtains the real-time update region residing for each bracket controller;Real-time update region includes being unable to update area, needing to calculate the update area of non-security frame number and the update area that is perfectly safe;According to real-time update region, it is determined that the bracket controller to be updated of coal winning technology need not be coordinated within default renewal time, the program of bracket controller to be updated is updated.The present invention realizes bracket controller program and updated in the case where fully-mechanized mining working does not stop mining operations, it is possible to increase production efficiency, saves manual resource.

Description

The update method and system of bracket controller program
Technical field
The present invention relates to exploitation work medium-long range support monitoring system detection more frontier, more particularly to a kind of support control The update method and system of device program processed.
Background technology
Bracket controller program is built-in the program in bracket controller chip, is used to control branch in fully-mechanized mining working Frame acts, collection stent data etc..In actual recovery process, bracket controller producer be present needs to bracket controller program Upgrade renewal or ore deposit side because mining environment factors dictate is to bracket controller modification of program more news.And support control at present The update method of device program processed mainly has two kinds, and in implementation process, inventor has found at least to exist in conventional art and asked as follows Topic:
First, fully-mechanized mining working stops mining operations, treats to be further continued for operation after the completion of whole bracket controller program renewals.This Kind method can upset production program, influence productivity effect.
2nd, treat that current order of classes or grades at school production program is completed, bracket controller program renewal is carried out within the overhaul of the equipments period.This Kind of mode takes the overhaul of the equipments time, and technical staff need to wait production program always after the completion of could start to update work, Lost labor's resource.
The content of the invention
Based on this, it is necessary to for conventional stent director demon update method need to stop exploitation caused by mining operations into The problem of this height and low production efficiency, there is provided a kind of update method and system of bracket controller program.
To achieve these goals, the embodiment of technical solution of the present invention is:
On the one hand, there is provided a kind of update method of bracket controller program, comprise the following steps:
Obtain the real-time traffic information of coal winning technology real time information and coal mining machine in full-mechanized mining face;Coal winning technology real time information Including current coal winning technology segment information and current coal winning technology section technical parameter information;Real-time traffic information includes maximum operation speed Degree, traffic direction and current location information;
According to coal winning technology real time information and real-time traffic information, the real-time band of position is carried out to each bracket controller and drawn Point, obtain the real-time update region residing for each bracket controller;Real-time update region include being unable to update area, need to calculate it is non- The update area of roll-over protective structure number and the update area that is perfectly safe;
According to real-time update region, it is determined that the support to be updated of coal winning technology need not be coordinated within default renewal time Controller, the program of bracket controller to be updated is updated.
On the other hand, there is provided a kind of more new system of bracket controller program, including:
Information unit is obtained, the real time execution for obtaining coal winning technology real time information and coal mining machine in full-mechanized mining face is believed Breath;Coal winning technology real time information includes current coal winning technology segment information and current coal winning technology section technical parameter information;Fortune in real time Row information includes maximum operational speed, traffic direction and current location information;
Real-time update territory element, for according to coal winning technology real time information and real-time traffic information, controlling each support Device carries out real-time band of position division, obtains the real-time update region residing for each bracket controller;Real-time update region includes It is unable to update area, needs to calculate the update area of non-security frame number and the update area that is perfectly safe;
Program updating block, for according to real-time update region, being mined it is determined that need not coordinate within default renewal time The bracket controller to be updated of technique, is updated to the program of bracket controller to be updated.
Above-mentioned technical proposal has the advantages that:
The update method and system of bracket controller program of the present invention, detected based on long-range support monitoring system and prepare renewal Whether the bracket controller of program needs to coordinate coal winning technology, if it is not, then being updated to the program of this support control.Fully mechanized mining work Make in face, bracket controller only when needing to coordinate coal winning technology, can just control hydraulic support to carry out operation, in other times Gathered data.Whether the bracket controller that the present invention prepares more new procedures for determination needs to coordinate coal-getter in renewal section Skill, propose according to coal winning technology section, coal winning machine position and coal winning technology section technical parameter, divide all bracket controllers as three Individual region:It is unable to update area;Need to calculate the update area of non-security frame number;Be perfectly safe update area.The present invention realizes Bracket controller program updates in the case where fully-mechanized mining working does not stop mining operations, it is possible to increase production efficiency, saving Manual resource.
Brief description of the drawings
Fig. 1 is the update method of bracket controller program of the present invention and the configuration diagram of the application scenarios of system one;
Fig. 2 is the schematic flow sheet of the update method embodiment 1 of bracket controller program of the present invention;
Fig. 3 is the process of the program online updating in the specific embodiment of update method one of bracket controller program of the present invention Schematic diagram;
Fig. 4 is the structural representation of the renewal system embodiment 1 of bracket controller program of the present invention.
Embodiment
For the ease of understanding the present invention, the present invention is described more fully below with reference to relevant drawings.In accompanying drawing Give the preferred embodiment of the present invention.But the present invention can realize in many different forms, however it is not limited to this paper institutes The embodiment of description.On the contrary, the purpose for providing these embodiments is made to the disclosure more thorough and comprehensive.
Unless otherwise defined, all of technologies and scientific terms used here by the article is with belonging to technical field of the invention The implication that technical staff is generally understood that is identical.Term used in the description of the invention herein is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term as used herein " and/or " include one or more phases The arbitrary and all combination of the Listed Items of pass.
The update method and the application scenarios of system one of bracket controller program of the present invention:
Using the bracket controller more new system of the inventive method, the detection of long-range support monitoring system can be based on and prepared more Whether the bracket controller of new procedures needs to coordinate coal winning technology, if it is not, then being updated to the program of this support control.If It is then to mark and skip renewal, waits next testing result to update again.Fig. 1 is the renewal side of bracket controller program of the present invention The configuration diagram of method and the application scenarios of system one, i.e. bracket controller program online updating Organization Chart;As shown in figure 1, using The more new system of the inventive method can include long-range support monitoring system, bracket controller, hydraulic support and coal-winning machine.Every Hydraulic support installs a bracket controller, and bracket controller is connected with each other, and as coal-winning machine, eventually through data wire with Long-range support monitoring system is connected.
To realize that bracket controller program updates in the case where fully-mechanized mining working does not stop mining operations, using the present invention It can determine and detect whether the bracket controller for preparing more new procedures needs to coordinate coal winning technology based on long-range support monitoring system. In fully-mechanized mining working, bracket controller only when needing to coordinate coal winning technology, can just control hydraulic support to carry out operation, its A gathered data in his time.To calculate whether the bracket controller of preparation more new procedures needs to coordinate coal-getter in renewal section Skill, the present invention are proposed according to coal winning technology section, coal winning machine position and coal winning technology section technical parameter, divide all support controls Device is three regions:It is unable to update area;Need to calculate the update area of non-security frame number;Be perfectly safe update area.
The update method embodiment 1 of bracket controller program of the present invention:
It is high and raw in order to solve cost of winning caused by conventional stent director demon update method need to stop mining operations The problem of efficiency is low is produced, the invention provides a kind of update method embodiment 1 of bracket controller program;Fig. 2 props up for the present invention The schematic flow sheet of the update method embodiment 1 of frame director demon;As shown in Fig. 2 it may comprise steps of:
Step S210:Obtain the real-time traffic information of coal winning technology real time information and coal mining machine in full-mechanized mining face;Coal-getter Skill real time information includes current coal winning technology segment information and current coal winning technology section technical parameter information;Real-time traffic information includes Maximum operational speed, traffic direction and current location information;
Step S220:According to coal winning technology real time information and real-time traffic information, each bracket controller is carried out real-time The band of position divides, and obtains the real-time update region residing for each bracket controller;Real-time update region include be unable to update area, Need to calculate the update area of non-security frame number and the update area that is perfectly safe;
Step S230:According to real-time update region, it is determined that treating for coal winning technology need not be coordinated within default renewal time The bracket controller of renewal, the program of bracket controller to be updated is updated.
Specifically, coal-winning machine maximum operational speed and traffic direction are obtained, support can be supplied to remotely to supervise by coal-winning machine Control system;Current coal winning technology section is obtained, coal winning technology section generally comprises is supplied to being used for for remote monitoring system by coal-winning machine Form the process section of coal winning technology;Obtain current coal winning technology section technical parameter information (each colliery according to operating mode difference without Together, can be set by ore deposit root according to operating mode);Coal-winning machine current location is obtained, remote monitoring system can be supplied to by coal-winning machine;According to Current coal winning technology section, coal winning technology section technical parameter and coal winning machine position are divided into all bracket controllers and are perfectly safe Update area, need to calculate the update area of non-security frame number, unrenewable region.The division of above-mentioned update area needs root Change according to coal winning technology section, coal winning machine position and change.If prepare the renewal region-wide bracket controller of abampere, directly Renewal, if preparing to update unrenewable region bracket controller, mark and skip renewal.Need to calculate for preparing renewal The update area bracket controller of non-security frame number is, it is necessary to first calculate non-security frame number.
In a specific embodiment, the update method embodiment 1 of bracket controller program of the present invention can also include Step:
According to real-time update region, it is determined that needing the bracket controller for coordinating coal winning technology within default renewal time;
To needing to coordinate the bracket controller of coal winning technology to be marked, obtain labeled as the bracket controller not updated;
When completing program renewal to bracket controller to be updated, believed according to coal winning technology real time information and real time execution Breath, real-time band of position division, the reality residing for bracket controller not updated are carried out to the bracket controller not updated When update area;Return it is described according to real-time update region, it is determined that coal winning technology need not be coordinated within default renewal time Bracket controller to be updated, the step of being updated to the program of bracket controller to be updated.
Specifically, the update area bracket controller of non-security frame number need to be calculated for preparing renewal, it is specific at one Example in, calculation can be as follows:Non-security frame number N=RoundUp (t1*Sp/H);Wherein non-security frame number represents more Coal-winning machine can run the distance of N framves forward between new district;H represents width between two stands controller, the constant obtained through measurement;t1 Represent update the maximum duration (i.e. default renewal time) of one bracket controller program needs, generally constant, can be through Test obtains;Sp represents the maximal rate of above-mentioned coal-winning machine operation;RoundUp represents to round up.In fact, in order to obtain Non-security frame number, those skilled in the art can also use other reasonable manners or formula according to the actual conditions of mining technology To be calculated.
After a wheel support director demon is completed in renewal, it is the support control of renewal that can start to detect mark in this wheel Device, so circulation, completed until all bracket controller programs update.
In a specific embodiment, according to real-time update region, it is determined that needing to coordinate within default renewal time The step of bracket controller of coal winning technology, can include:
It is that it is default to determine bracket controller when being unable to update area in the real-time update region residing for bracket controller Renewal time in need coordinate coal winning technology bracket controller;
It is when needing to calculate the update area of non-security frame number, according to logical in the real-time update region residing for bracket controller The non-security frame number for calculating and obtaining is crossed, it is determined that needing the bracket controller for coordinating coal winning technology within default renewal time;It is non- Roll-over protective structure number is the bracket controller passed through when coal-winning machine can continue to run with along traffic direction within default renewal time Quantity.
In a specific embodiment, according to real-time update region in step S230, it is determined that in default renewal time It is interior need not coordinate coal winning technology bracket controller to be updated the step of can include:
The real-time update region residing for bracket controller for be perfectly safe update area when, determine bracket controller be The bracket controller to be updated of coal winning technology need not be coordinated in default renewal time;
It is when needing to calculate the update area of non-security frame number, according to logical in the real-time update region residing for bracket controller The non-security frame number for calculating and obtaining is crossed, it is determined that the support control to be updated of coal winning technology need not be coordinated within default renewal time Device processed;Non-security frame number is the support control passed through when coal-winning machine can continue to run with along traffic direction within default renewal time The quantity of device processed.
In a specific embodiment, current coal winning technology section technical parameter information includes any one in following parameter Kind or any combination:Receive wall supporting distance, stretch wall supporting distance, automatic distance of trying to stop people from fighting each other, pushing and sliding hysteresis frame number and pushing and sliding frame number in groups.
The specific embodiment of update method one of bracket controller program of the present invention:
It is special so that the present invention to be applied to the mistake of mining technology in order to illustrate technical scheme in more detail Exemplified by journey, illustrate the specific implementation process of the update method of bracket controller program of the present invention.Fig. 3 is bracket controller of the present invention Program renewal process schematic diagram in the specific embodiment of update method one of program;As shown in figure 3, can be real by below scheme The existing present invention:
(1) coal-winning machine maximum operational speed Sp and direction are obtained, remote monitoring system can be supplied to by coal-winning machine.
(2) current coal winning technology section is obtained, coal winning technology section typically may include that following content (is supplied to remotely by coal-winning machine Monitoring system, a complete coal winning technology may include these coal winning technology sections):
A. left end is to the normal coal cutting of right end.
B. the right side, which is turned left, cuts ground coal.
C. the right side is turned left clear float coal.
D. clear float coal from left to right.
E. the right side is turned left clear float coal.
F. left end beveling feed.
G. left end cuts Triangle Coal.
H. clear float coal from left to right.
I. the right side is turned left clear float coal.
J. right end is to the normal coal cutting of left end.
K. ground coal is cut from left to right.
L. the right side is turned left clear float coal.
M. clear float coal from left to right.
N. right end beveling feed.
O. right end cuts Triangle Coal.
P. the right side is turned left clear float coal.
Q. clear float coal from left to right.
(3) current coal winning technology section technical parameter information is obtained:Each colliery is different and different according to operating mode, by ore deposit root Set according to operating mode, by taking the technical parameter of left end beveling feed as an example, it may include following content:
The technical parameter signal of form 1- left ends beveling coal winning technology section
Automatic distance of trying to stop people from fighting each other includes drop frame away from 3 framves after coal winning machine position, try to stop people from fighting each other and rises frame
Form 1 is the technical parameter of left end beveling coal winning technology section, and other coal winning technology section technical parameters are similar therewith, Under the conditions of different actual coal mining operating modes, " distance " and the parameter of " frame number " in form 1 may differ.
(4) coal-winning machine current location P is obtained, remote monitoring system can be supplied to by coal-winning machine.
(5) all supports are controlled according to current coal winning technology section, coal winning technology section technical parameter and coal winning machine position Device is divided into the update area that is perfectly safe, needs to calculate the update area of non-security frame number, unrenewable region.
(6) as shown in figure 3, so that left end chamfers feed coal winning technology as an example, renewal #2 bracket controller programs are prepared.This When, coal winning machine position 8, traffic direction is left, with chamferring feed technical parameter according to the left end of form 1 in above-mentioned (3), calculates and works as The preceding moment need to coordinate the bracket controller scope of coal winning technology section to be 5-24 platforms, and specifically, i.e. coal winning machine position 8-3 (receives shield Help distance)=5;Coal winning machine position 8+3 (stretching wall supporting distance)+3 (pushing and sliding hysteresis frame number)+10 (pushing and sliding frame number in groups)=24, will This region, which is classified as, is unable to update area;1-4 platforms are the update area for needing to calculate non-security frame number;25 (including 25) with Afterwards to be perfectly safe update area.This region division changes and changed according to coal winning technology section, coal winning machine position.It is if accurate The standby renewal region-wide bracket controller of abampere, then directly update, if preparing to update unrenewable region support control Device, then mark and skip renewal.The update area bracket controller of non-security frame number need to be calculated for preparing renewal, in a tool In body example, calculation can be as follows:
Non-security frame number N=RoundUp (t1*Sp/H);Wherein non-security frame number represents that renewal section coal-winning machine can be forward Run the distance of N framves;H represents width between two stands controller, the constant obtained through measurement;T1 represents to have updated a support The maximum duration (i.e. default renewal time) that director demon needs, generally constant, can be obtained after tested;Sp represents above-mentioned Coal-winning machine operation maximal rate;RoundUp represents to round up.As shown in Figure 3, it is assumed that N=2, then 3,4 support control Device is non-renewable, and mark is skipped, all renewable before 3 (not including).Specifically, coal winning machine position 8-3 (receive wall supporting away from From) -2 (assuming that N=2, non-security frame number)=3, N are represented in default renewal maximum duration t1, coal-winning machine can go ahead N The distance of frame.Assuming that coal winning machine position 8, it is 2 to calculate non-security frame number N, and (wall supporting is received further according to coal winning technology section technical parameter 3 Distance), it can be deduced that within default renewal time t1, the 3rd frame needs to coordinate coal-winning machine work, so 3,4 framves can not be updated, because Having been updated for the inadequate time just needs to start coal mining activity.
A wheel support director demon is completed in renewal, then starts to detect the bracket controller that mark in this wheel is renewal, So circulation, completed until all bracket controller programs update.
Each embodiment of the update method of bracket controller program of the present invention, detected based on long-range support monitoring system accurate Whether the bracket controller of standby more new procedures needs to coordinate coal winning technology, if it is not, then being updated to the program of this support control; If it is, marking and skipping renewal, next testing result is waited to update again.In fully-mechanized mining working, bracket controller only exists When needing to coordinate coal winning technology, hydraulic support can be just controlled to carry out operation, the interior gathered data of other times.The present invention is determination Whether in renewal section need coordinate coal winning technology, propose, according to coal winning technology section, to adopt if preparing the bracket controller of more new procedures Coal seat in the plane is put and coal winning technology section technical parameter, and it is three regions to divide all bracket controllers:It is unable to update area;Need Calculate the update area of non-security frame number;Be perfectly safe update area.The present invention realizes bracket controller program in fully mechanized mining work Make face not stopping updating in the case of mining operations, it is possible to increase production efficiency, save manual resource.
The renewal system embodiment 1 of bracket controller program of the present invention:
Technical scheme based on above method, while need to stop out to solve conventional stent director demon update method The problem of cost of winning height caused by adopting operation and low production efficiency, present invention also offers a kind of bracket controller program more New system embodiment 1;Fig. 4 is the structural representation of the renewal system embodiment 1 of bracket controller program of the present invention;Such as Fig. 4 institutes Show, can include:
Information unit 410 is obtained, for obtaining the real time execution of coal winning technology real time information and coal mining machine in full-mechanized mining face Information;Coal winning technology real time information includes current coal winning technology segment information and current coal winning technology section technical parameter information;In real time Operation information includes maximum operational speed, traffic direction and current location information;
Real-time update territory element 420, for according to coal winning technology real time information and real-time traffic information, to each support control Device processed carries out real-time band of position division, obtains the real-time update region residing for each bracket controller;Wrap in real-time update region Include and be unable to update area, need to calculate the update area of non-security frame number and the update area that is perfectly safe;
Program updating block 430, for according to real-time update region, being adopted it is determined that need not coordinate within default renewal time The bracket controller to be updated of coal technique, is updated to the program of bracket controller to be updated.
In a specific embodiment, the renewal system embodiment 1 of bracket controller program of the present invention can also include:
Indexing unit 440, for according to real-time update region, it is determined that needing to coordinate coal-getter within default renewal time The bracket controller of skill;And to needing to coordinate the bracket controller of coal winning technology to be marked, obtain labeled as the branch not updated Frame controller.
In a specific embodiment, indexing unit 440 can include:
First mark module 442, for being when being unable to update area, really in the real-time update region residing for bracket controller Fixed rack controller is the bracket controller for needing to coordinate coal winning technology within default renewal time;
Second mark module 444, for needing to calculate non-security frame in the real-time update region residing for bracket controller During several update area, according to by calculating the non-security frame number obtained, it is determined that needing cooperation to adopt within default renewal time The bracket controller of coal technique;Non-security frame number is that coal-winning machine can continue to run with along traffic direction within default renewal time When the quantity of bracket controller passed through.
In a specific embodiment, program updating block 430 can include:
First update module 432, for being the update area that is perfectly safe in the real-time update region residing for bracket controller When, it is the bracket controller to be updated that need not coordinate coal winning technology within default renewal time to determine bracket controller;
Second update module 434, for needing to calculate non-security frame in the real-time update region residing for bracket controller During several update area, according to by calculating the non-security frame number obtained, it is determined that being adopted within default renewal time without coordinating The bracket controller to be updated of coal technique;Non-security frame number is coal-winning machine can be along traffic direction within default renewal time The quantity of the bracket controller passed through when continuing to run with.
In a specific embodiment, current coal winning technology section technical parameter information includes any one in following parameter Kind or any combination:Receive wall supporting distance, stretch wall supporting distance, automatic distance of trying to stop people from fighting each other, pushing and sliding hysteresis frame number and pushing and sliding frame number in groups.
The more new system of bracket controller program of the present invention, detected based on long-range support monitoring system and prepare more new procedures Whether bracket controller needs to coordinate coal winning technology, if it is not, then being updated to the program of this support control;If it is, mark Remember and skip renewal, wait next testing result to update again.In fully-mechanized mining working, bracket controller only is needing to coordinate coal mining During technique, hydraulic support can be just controlled to carry out operation, the interior gathered data of other times.The present invention prepares more new procedures for determination Bracket controller whether need to coordinate coal winning technology in renewal section, propose according to coal winning technology section, coal winning machine position and Coal winning technology section technical parameter, it is three regions to divide all bracket controllers:It is unable to update area;Need to calculate non-security frame Several update area;Be perfectly safe update area.The present invention realizes bracket controller program and not stopped out in fully-mechanized mining working Updated in the case of adopting operation, it is possible to increase production efficiency, save manual resource.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously Can not therefore it be construed as limiting the scope of the patent.It should be pointed out that come for one of ordinary skill in the art Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (10)

1. a kind of update method of bracket controller program, it is characterised in that comprise the following steps:
Obtain the real-time traffic information of coal winning technology real time information and coal mining machine in full-mechanized mining face;The coal winning technology real time information Including current coal winning technology segment information and current coal winning technology section technical parameter information;The real-time traffic information includes maximum transport Scanning frequency degree, traffic direction and current location information;
According to the coal winning technology real time information and the real-time traffic information, real-time position is carried out to current each bracket controller Region division is put, obtains the real-time update region residing for current each bracket controller;The real-time update region includes can not be more New region, need to calculate the update area of non-security frame number and the update area that is perfectly safe;
According to the real-time update region, it is determined that the support to be updated of coal winning technology need not be coordinated within default renewal time Controller, the program of the bracket controller to be updated is updated.
2. the update method of bracket controller program according to claim 1, it is characterised in that also including step:
According to the real-time update region, it is determined that needing the bracket controller for coordinating coal winning technology within default renewal time;
Need to coordinate the bracket controller of coal winning technology to be marked to described, obtain labeled as the bracket controller not updated;
When completing program renewal to the bracket controller to be updated, according to the coal winning technology real time information and the reality When operation information, real-time band of position division is carried out to the bracket controller that does not update, obtains the branch not updated Real-time update region residing for frame controller;Return it is described according to the real-time update region, it is determined that in default renewal time The interior bracket controller to be updated that need not coordinate coal winning technology, is updated to the program of the bracket controller to be updated The step of.
3. the update method of bracket controller program according to claim 2, it is characterised in that according to the real-time update Region, it is determined that needing to include the step of coordinating the bracket controller of coal winning technology within default renewal time:
It is that it is default to determine the bracket controller when being unable to update area in the real-time update region residing for bracket controller Renewal time in need coordinate coal winning technology bracket controller;
It is when needing to calculate the update area of non-security frame number in the real-time update region residing for bracket controller, is counted according to passing through The non-security frame number obtained is calculated, it is determined that needing the bracket controller for coordinating coal winning technology within default renewal time;It is described non- Roll-over protective structure number is the support passed through when coal-winning machine can continue to run with along the traffic direction within the default renewal time The quantity of controller.
4. the update method of the bracket controller program according to claims 1 to 3 any one, it is characterised in that according to The real-time update region, it is determined that the bracket controller to be updated of coal winning technology need not be coordinated within default renewal time Step includes:
The real-time update region residing for bracket controller for be perfectly safe update area when, determine the bracket controller be The bracket controller to be updated of coal winning technology need not be coordinated in default renewal time;
It is when needing to calculate the update area of non-security frame number in the real-time update region residing for bracket controller, is counted according to passing through The non-security frame number obtained is calculated, it is determined that the support control to be updated of coal winning technology need not be coordinated within default renewal time Device;The non-security frame number is to be passed through when coal-winning machine can continue to run with along the traffic direction within the default renewal time The quantity for the bracket controller crossed.
5. the update method of the bracket controller program according to claims 1 to 3 any one, it is characterised in that described Current coal winning technology section technical parameter information includes any one in following parameter or any combination:Receive wall supporting distance, stretch shield Side distance, automatic distance of trying to stop people from fighting each other, pushing and sliding lag frame number and in groups pushing and sliding frame number.
A kind of 6. more new system of bracket controller program, it is characterised in that including:
Information unit is obtained, for obtaining the real-time traffic information of coal winning technology real time information and coal mining machine in full-mechanized mining face;Institute Stating coal winning technology real time information includes current coal winning technology segment information and current coal winning technology section technical parameter information;It is described real-time Operation information includes maximum operational speed, traffic direction and current location information;
Real-time update territory element, for according to the coal winning technology real time information and the real-time traffic information, to each support Controller carries out real-time band of position division, obtains the real-time update region residing for each bracket controller;The real-time update Region includes being unable to update area, needing to calculate the update area of non-security frame number and the update area that is perfectly safe;
Program updating block, for according to the real-time update region, being mined it is determined that need not coordinate within default renewal time The bracket controller to be updated of technique, the program of the bracket controller to be updated is updated.
7. the more new system of bracket controller program according to claim 6, it is characterised in that also include:
Indexing unit, for according to the real-time update region, it is determined that needing to coordinate coal winning technology within default renewal time Bracket controller;And need to coordinate the bracket controller of coal winning technology to be marked to described, obtain being labeled as what is do not updated Bracket controller.
8. the more new system of bracket controller program according to claim 7, it is characterised in that the indexing unit bag Include:
First mark module, for being when being unable to update area, it is determined that described in the real-time update region residing for bracket controller Bracket controller is the bracket controller for needing to coordinate coal winning technology within default renewal time;
Second mark module, for being the renewal for needing to calculate non-security frame number in the real-time update region residing for bracket controller During region, according to the non-security frame number obtained by calculating, it is determined that needing to coordinate coal winning technology within default renewal time Bracket controller;The non-security frame number is that coal-winning machine can continue along the traffic direction within the default renewal time The quantity of the bracket controller passed through during operation.
9. the more new system of the bracket controller program according to claim 6 to 8 any one, it is characterised in that described Program updating block includes:
First update module, for the real-time update region residing for bracket controller for be perfectly safe update area when, it is determined that The bracket controller is the bracket controller to be updated that need not coordinate coal winning technology within default renewal time;
Second update module, for being the renewal for needing to calculate non-security frame number in the real-time update region residing for bracket controller During region, according to the non-security frame number by calculating acquisition, it is determined that coal winning technology need not be coordinated within default renewal time Bracket controller to be updated;The non-security frame number is coal-winning machine can be along the operation within the default renewal time The quantity of the bracket controller passed through when direction continues to run with.
10. the more new system of the bracket controller program according to claim 6 to 8 any one, it is characterised in that described Current coal winning technology section technical parameter information includes any one in following parameter or any combination:Receive wall supporting distance, stretch shield Side distance, automatic distance of trying to stop people from fighting each other, pushing and sliding lag frame number and in groups pushing and sliding frame number.
CN201610257845.8A 2016-04-22 2016-04-22 The update method and system of bracket controller program Active CN105927258B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610257845.8A CN105927258B (en) 2016-04-22 2016-04-22 The update method and system of bracket controller program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610257845.8A CN105927258B (en) 2016-04-22 2016-04-22 The update method and system of bracket controller program

Publications (2)

Publication Number Publication Date
CN105927258A CN105927258A (en) 2016-09-07
CN105927258B true CN105927258B (en) 2018-04-03

Family

ID=56836770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610257845.8A Active CN105927258B (en) 2016-04-22 2016-04-22 The update method and system of bracket controller program

Country Status (1)

Country Link
CN (1) CN105927258B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202306209U (en) * 2011-10-26 2012-07-04 成都力拓电控技术有限公司 Software updating system of hydraulic support controller
CN103670457B (en) * 2013-12-05 2015-12-09 四川航天电液控制有限公司 Coal mine fully-mechanized mining working hydraulic support real-time monitoring system
CN104834513B (en) * 2015-03-26 2018-12-07 北京煤科天玛自动化科技有限公司 A kind of method and system that fully-mechanized mining working surface hydraulic support controller software automatically generates
CN105298495B (en) * 2015-11-06 2017-05-17 广州日滨科技发展有限公司 Coal mining technology debugging method and device
CN105468404B (en) * 2015-11-16 2019-01-08 日立楼宇技术(广州)有限公司 A kind of bracket controller program method for remote updating and device

Also Published As

Publication number Publication date
CN105927258A (en) 2016-09-07

Similar Documents

Publication Publication Date Title
EP2881829A3 (en) Method for automatically controlling a vehicle, device for generating control signals for a vehicle and vehicle
CN112302720B (en) Method and system for judging initial supporting force and cycle end resistance of working surface hydraulic support
CN105334534A (en) Low order fault interpretation method based on construction mode guidance
CN105683850A (en) Program creating device, program creating method, and program
CN110748365B (en) Method and system for automatically identifying coal mining cycle number based on support load change
CN102720496A (en) Method and system for automatically identifying coal rock interface of coal cutter, and automatically heightening roller
WO2020036818A8 (en) System and method for forecasting industrial machine failures
CN104912581B (en) Hydraulic support collecting method and system, hydraulic support centralized control system
CN105927258B (en) The update method and system of bracket controller program
EP3035281A1 (en) Energy efficiency analysis of a technical installation comprising simulation and consumption
CN104564117A (en) Key point and following stage based automatic control method of working face hydraulic bracket of triangular coal area at working face end head
CN106717462B (en) Intelligent mower and working method thereof
CN105298495B (en) Coal mining technology debugging method and device
CN105404306B (en) The manipulation ranking method and equipment of a kind of unmanned vehicle
CN105279598A (en) Brother procedure grouping integrated dispatching method based on dynamic critical path method
CN106640168B (en) A kind of control method of coal-mine integrated-mining equipment, device and coal-mine integrated-mining equipment
CN102828763B (en) Hydraulic support automatic control system with memory function on fully mechanized coal face
CN104423368A (en) Control unit for centralizing control by grouping a plurality of paths
CN110702874A (en) Experimental system for simulating automatic excavation of coal seam
CN104021312B (en) Flood process similarity analytic method and system based on process linear centroid
CN109709908B (en) Electric shovel production control method and system based on electric shovel data analysis
CN203487353U (en) Industrial sewing machine control system based on visible light detection
CN107457334A (en) Fluid pressure type wire rod automatic gauging cutting mechanism
Heizinger et al. Algorithmic Efficiency Analysis of Harvest and Transport of Biomass
CN105676830B (en) The tracking of process data in circulation producing line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: Nanxiang three road, Science City high tech Industrial Development Zone, Guangzhou city of Guangdong Province, No. 2 510660

Applicant after: Hitachi building technologies (Guangzhou) Co. Ltd.

Address before: Nanxiang Road three Guangzhou Science City 510660 high tech Industrial Development Zone, Guangdong city of Guangzhou province No. 2

Applicant before: Guangzhou Ropente Science and Technology Development Co., Ltd.

GR01 Patent grant
GR01 Patent grant