CN105923982A - Graphite powder filling and squeezing device for bolt anchoring hole in bottom brick of tin bath - Google Patents

Graphite powder filling and squeezing device for bolt anchoring hole in bottom brick of tin bath Download PDF

Info

Publication number
CN105923982A
CN105923982A CN201610392586.XA CN201610392586A CN105923982A CN 105923982 A CN105923982 A CN 105923982A CN 201610392586 A CN201610392586 A CN 201610392586A CN 105923982 A CN105923982 A CN 105923982A
Authority
CN
China
Prior art keywords
graphite powder
pressing
bolt
tin bath
anchoring hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610392586.XA
Other languages
Chinese (zh)
Other versions
CN105923982B (en
Inventor
何报通
王永华
邓斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Group First Installation Engineering Co ltd
Original Assignee
Guangxi Construction Engineering Group No1 Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Construction Engineering Group No1 Installation Co Ltd filed Critical Guangxi Construction Engineering Group No1 Installation Co Ltd
Priority to CN201610392586.XA priority Critical patent/CN105923982B/en
Publication of CN105923982A publication Critical patent/CN105923982A/en
Application granted granted Critical
Publication of CN105923982B publication Critical patent/CN105923982B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B18/00Shaping glass in contact with the surface of a liquid
    • C03B18/02Forming sheets
    • C03B18/16Construction of the float tank; Use of material for the float tank; Coating or protection of the tank wall

Abstract

The invention discloses a graphite powder filling and squeezing device for a bolt anchoring hole in a bottom brick of a tin bath. The graphite powder filling and squeezing device comprises a pressing screw rod, a pressing sleeve, a filling funnel and a pressing ring, wherein an inner screw hole connected with a thread at the upper end of an anchoring bolt is formed in the lower end of the pressing screw rod; a pressing nut is arranged on the pressing screw rod; the pressing sleeve is arranged outside the pressing screw rod in a sleeving manner and is positioned below the pressing nut; the filling funnel is arranged outside the pressing sleeve in a sleeving manner; the pressing ring is arranged at the lower end of the pressing sleeve; the outer diameter of the pressing ring corresponds to the inner diameter of the lower end of the filling funnel; the inner diameter of the pressing ring corresponds to the outer diameter of the pressing screw rod. According to the graphite powder filling and squeezing device, the pressing screw rod is connected with the anchoring bolt welded on a thin bath base plate, and the pressing nut is rotated to enable the pressing sleeve and the pressing ring to move downwards to squeeze graphite powder in the filling funnel and the bolt anchoring hole until the graphite powder is compacted; the graphite powder filling and squeezing device can prevent the graphite powder from flying, so as to reduce wastes, noise and pollution; furthermore, the compactness of the graphite powder can meet and even be higher than the requirements of the design.

Description

The graphite powder in the bolt anchoring hole of a kind of bottom brick of molten tin bath fills pressurizing unit
Technical field
The present invention relates to the installing area of bottom brick of molten tin bath, particularly to the bolt anchoring hole of a kind of bottom brick of molten tin bath Graphite powder fill pressurizing unit.
Background technology
Molten tin bath is the important device that float glass process is different from other process of glass, is also floating On method glass production line, technology content is the highest and technology requires one of the highest key equipment.Float glass is raw The main production principle producing line molten tin bath is the principle utilizing the density of stannum bigger than the density of glass, at stannum Contain in the cell body of groove one layer 70~110mm thick in molten solution state with horizontal tin liquor, from glass melter The dewatered melted type vitreous humour that outlet is flowed out flows on the tin liquor face of molten tin bath, and vitreous humour fully flows on tin liquor face With diffusion and form the glassy layer of a layer thickness uniformity, then from tin bath outlet end enter annealing kiln enter Row annealing, thus ensure the flatness after glass solidification and light transmittance.
The bottom of molten tin bath is that bottom brick of molten tin bath is general by laying bottom brick of molten tin bath composition on molten tin bath box hat base plate Being to form by being mainly composed of clay brick founding, with reference to Fig. 1 and Fig. 2, bottom brick of molten tin bath is square shape, and stannum Being provided with several bolt anchoring holes on bottom land brick, bolt anchoring hole is up big and down small shoulder hole, and spiral shell The bottom of bolt anchor hole is the straight hole shape for coordinating with bolt, top be for seal filling in up-small and down-big Taper poroid.Bottom brick of molten tin bath is fixed on molten tin bath box hat base plate by bolt anchoring hole by anchor bolt, Before by nut and pad to fastening on anchor bolt, need to bolt anchoring hole filled stone powdered ink with Realize sealing.At present, to bolt anchoring hole filled stone powdered ink commonly used be the filling technique of rapping, Its work progress noise is big, and can cause flying upward of graphite dust, not only wastes graphite powder but also pollute ring Border, meanwhile, by the way of rapping, the filling degree of compaction of graphite powder also is difficult to reach to design requirement.
The information being disclosed in this background section is merely intended to increase the reason of the general background to the present invention Solve, and be not construed as recognizing or imply in any form that this information structure is for this area general technology Prior art well known to personnel.
Summary of the invention
The graphite powder in the bolt anchoring hole that it is an object of the invention to provide a kind of bottom brick of molten tin bath fills extruding dress Put, thus the work progress overcoming existing graphite powder to fill exists, and noise is big, can cause graphite dust Fly upward and graphite powder is filled degree of compaction and is difficult to reach the shortcoming that design requires.
For achieving the above object, the graphite powder in the bolt anchoring hole that the invention provides a kind of bottom brick of molten tin bath is filled out Fill pressurizing unit, wherein, including: clamping screw, its lower end is provided with the threaded upper ends with anchor bolt Carry out the inner bolt hole being connected;And it is provided with clamp nut on this clamping screw;Clamp sleeve, it is lived The dynamic outside being set in described clamping screw;This clamp sleeve is positioned at the lower section of described clamp nut;Material filling Funnel, it is movably set in the outside of described clamp sleeve;And pressure ring, it is fixedly installed on described pressure The lower end of tight sleeve, the external diameter of this pressure ring is corresponding with the internal diameter of the lower end of described material filling funnel, and this pressure ring Internal diameter corresponding with the external diameter of described clamping screw.
Preferably, in technique scheme, described clamping screw includes that upper and lower two are threaded connection The body of rod.
Preferably, in technique scheme, described clamp nut is provided with turning handle.
Preferably, in technique scheme, the lower end of described clamp nut is provided with a hold-down apertures, described The upper end of clamp sleeve is movably set in described hold-down apertures.
Preferably, in technique scheme, the bottom of described material filling funnel is straight-tube shape, and described material filling The top of funnel is up big and down small horn-like.
Preferably, in technique scheme, the lower end of described material filling funnel is convexly equipped with downwards a guiding mouth.
Preferably, in technique scheme, the lower end of described material filling funnel is provided with a thrust boss.
Compared with prior art, there is advantages that
1, the present invention drives clamp sleeve and pressure ring to move down and be compacted bolt anchoring hole by clamp nut In graphite powder, it can be effectively prevented flying upward of graphite dust, to reduce waste, minimizing noise with Pollute, and it is able to ensure that the degree of compaction of graphite powder reaches the requirement even above designed.
2, the clamping screw of the present invention is divided into upper and lower two bodies of rod, and it can conveniently install the filling of clamp sleeve Funnel.
3, the clamp nut of the present invention is provided with turning handle, to facilitate rotation clamp nut.
4, the material filling funnel of the present invention is provided with guiding mouth and thrust boss, to facilitate material filling funnel and bolt Anchor hole carries out aligning location, improves the stability being compacted graphite powder.
Accompanying drawing explanation
Fig. 1 is the structure of the graphite powder filling pressurizing unit in the bolt anchoring hole according to bottom brick of molten tin bath of the present invention Schematic diagram.
Fig. 2 is the structural representation of the clamping screw according to the present invention.
Fig. 3 is the structural representation of the material filling funnel according to the present invention.
Fig. 4 is the structural representation that the pressure ring according to the present invention is arranged at the lower end of clamp sleeve.
Main Reference Numerals illustrates:
1-clamping screw, 11-inner bolt hole, the 12-body of rod;2-clamp nut, 21-turning handle;3-clamping sleeve Cylinder;4-material filling funnel, 41-guiding mouth, 42-thrust boss;5-pressure ring;6-anchor bolt;At the bottom of 7-molten tin bath Brick, 71-bolt anchoring hole.
Detailed description of the invention
Below in conjunction with the accompanying drawings, the detailed description of the invention of the present invention is described in detail, it is to be understood that this The protection domain of invention is not limited by detailed description of the invention.
Explicitly indicate that unless otherwise other, otherwise in entire disclosure and claims, term " bag Include " or its conversion as " comprising " or " including " etc. will be understood to comprise stated element or Ingredient, and do not get rid of other element or other ingredient.
Fig. 1 to Fig. 4 shows the bolt anchoring of a kind of bottom brick of molten tin bath The graphite powder in hole fills the structural representation of pressurizing unit, the graphite powder in the bolt anchoring hole of this bottom brick of molten tin bath Fill pressurizing unit and include clamping screw 1, clamp nut 2, clamp sleeve 3, material filling funnel 4 and pressure Ring 5.With reference to Fig. 1, the threaded upper ends that the lower end of clamping screw 1 is provided with anchor bolt 6 coordinates The inner bolt hole 11 connected, and on clamping screw 1, it is provided with clamp nut 2, clamp nut 2 is by rotating Move up and down along clamping screw 1.Clamp sleeve 3 is movably set in the outside of clamping screw 1, pressure The internal diameter of tight sleeve 3 is more than the external diameter of clamping screw 1.Clamp sleeve 3 is positioned at the lower section of clamp nut 2, When clamp nut 2 is moved down by rotation, it is possible to clamp sleeve 3 is pressed down against.Preferably, pressure The lower end of jack panel 2 is provided with a hold-down apertures, and the upper end of clamp sleeve 3 is movably set in hold-down apertures, Clamp sleeve 3 is carried out downwards and location by clamp nut 2 by hold-down apertures, in order to straight line pressure downwards Lower clamp sleeve 3.It is further preferred that clamp nut 2 is provided with turning handle 21, to facilitate rotation Clamp nut 2.Turning handle 21 can arrange longer, it is also possible to is socketed in one end of turning handle 21 The sleeve pipe of Lengthened moment arm, can rotate clamp nut 2 the most effortlessly.
With continued reference to Fig. 1, material filling funnel 4 is movably set in the outside of clamp sleeve 3, it is preferable that reference Fig. 3, the bottom of material filling funnel 4 is straight-tube shape, and the top of material filling funnel 4 is up big and down small horn-like, The internal diameter of the bottom of material filling funnel 4 is more than the external diameter of clamp sleeve 3.Preferably, with reference to Fig. 1 and Fig. 2, Clamping screw 1 includes upper and lower two bodies of rod being threaded connection 12, and inner bolt hole 11 is arranged at and is located below The lower end of the body of rod 12, and the upper end of the body of rod 12 being located below is slightly above material filling funnel 4, bar above Body 12 is provided with outer screw, and the body of rod 12 below can be the light body of rod, and clamp nut 2 is installed on and is positioned at The bottom of the body of rod 12 above, thus when mounted, first material filling funnel 4 and clamp sleeve 3 are sheathed on The body of rod 12 above and clamp nut it is positioned at again, in order to install and fill after the body of rod 12 being located below Funnel 4 and clamp sleeve 3 and be easy to put into graphite powder in material filling funnel 4.During use, material filling is leaked The lower end of bucket 4 aligns the aperture in bolt anchoring hole, graphite powder is imported to the bolt anchor of bottom brick of molten tin bath 7 Gu in hole 71.Preferably, with reference to Fig. 3, the lower end of material filling funnel 4 is convexly equipped with downwards a guiding mouth 41, The external diameter of guiding mouth 41 is corresponding with the aperture in bolt anchoring hole, and material filling funnel 4 passes through guiding mouth when mounted 41 apertures being inserted into bolt anchoring hole, to complete to be accurately positioned, make material filling funnel 4 completely and bolt anchor Gu hole aligns completely.It is further preferred that the lower end of material filling funnel 4 is provided with a thrust boss 42, only Push away boss 42 for increasing the area of the lower end of material filling funnel 4, prevent the lower end of material filling funnel 4 from extending into In the diameter in bolt anchoring hole.Material filling funnel 4 can be made to consolidate by thrust boss 42 and guiding mouth 41 Be erected on the aperture in bolt anchoring hole, with raising stability that graphite powder is compacted.
With continued reference to Fig. 1 and Fig. 4, pressure ring 5 is fixedly installed on the lower end of clamp sleeve 3, outside pressure ring 5 Footpath is corresponding with the internal diameter of the bottom of material filling funnel 4, and the external diameter of pressure ring 5 is slightly less than the bottom of material filling funnel 4 Internal diameter so that pressure ring 5 not endoporus with the bottom of material filling funnel 4 contacts.And the internal diameter of pressure ring 5 with The external diameter of clamping screw 1 is corresponding, and the internal diameter of pressure ring 5 is slightly larger than the external diameter of clamping screw 1, so that pressure ring 5 Endoporus do not contact with clamping screw 1, so that pressure ring 5 can successfully be carried out along with clamp sleeve 3 Move up and down.
The work process of the present invention is: first, and anchor bolt 6 is fixed on molten tin bath base plate, and stannum Bottom land brick 7 installs, and makes anchor bolt 6 be positioned at the bolt anchoring hole 71 of bottom brick of molten tin bath 7.Then, Clamping screw 1 is fixed on the upper end of anchor bolt 6 by the inner bolt hole 11 of lower end.Then, material filling Funnel 4 is enclosed within the outside of clamping screw 1, and makes the lower end of material filling funnel 4 align bolt anchoring hole 71 The aperture of bottom straight hole.Followed by, in material filling funnel 4, pour into graphite powder, make graphite powder be flowed into anchor Between the bottom straight hole in fixing bolt 6 and bolt anchoring hole 71, and make graphite powder along material filling funnel 4 times Portion's straight tube exceeds the bottom straight hole a certain distance in bolt anchoring hole 71, with reserved decrement, specifically reserves Decrement need to carry out calculating obtaining according to practical situation.Followed by, clamp sleeve 3 is set to compress Outside screw rod 1, and clamp nut 2 is installed, makes the upper end of clamp sleeve 3 act against clamp nut 2 times In the hold-down apertures of end, and pressure ring 5 is made to be pressed on graphite powder.Followed by, rotate clamp nut 2, to promote Clamp sleeve 3 moves down with pressure ring 5, and pressure ring 5 is just the lower straight exceeding bolt anchoring hole 71 Graphite powder is pressed in bolt anchoring hole 71, and makes the degree of compaction of the graphite powder in bolt anchoring hole 71 reach To design requirement, can be by sheathed in one end of turning handle 21 during rotating clamp nut 2 The sleeve of Lengthened moment arm is to reach labour-saving purpose.Finally, the present invention is disassembled, and at anchoring spiral shell Packing ring is loaded onto in the upper end of bolt 6 and nut is fixed.
The present invention takes the lead in having designed and developed graphite powder screw extruding at home and fills new technology, to replace in recent years The filling technique of the wind hinge rapping going together commonly used, the present invention passes through clamp nut 2 at clamping screw 1 On rotation drive clamp sleeve 3 and pressure ring 5 to move down, so that graphite powder is compacted to bolt anchoring In hole 71, it not only can ensure that filling graphite powder degree of compaction to be fully achieved even above and designs wanting of degree of compaction Ask, and the flying upward of graphite dust can be effectively prevented, reduce waste, reduce noise and pollution, also may be used Operate with the many people of input simultaneously, be greatly enhanced efficiency of construction, accelerating construction progress.
The aforementioned description to the specific illustrative embodiment of the present invention illustrates that and the purpose of illustration. These descriptions are not wishing to limit the invention to disclosed precise forms, and it will be apparent that according to above-mentioned Teaching, can much change and change.The purpose selected exemplary embodiment and describe exists In explaining the certain principles of the present invention and actual application thereof, so that those skilled in the art can be real Now and utilize the various different exemplary of the present invention and various different selection and change. The scope of the present invention is intended to be limited by claims and equivalents thereof.

Claims (7)

1. the graphite powder in the bolt anchoring hole of a bottom brick of molten tin bath fills pressurizing unit, it is characterised in that bag Include:
Clamping screw, its lower end is provided with the inner bolt hole that the threaded upper ends with anchor bolt carries out being connected; And it is provided with clamp nut on this clamping screw;
Clamp sleeve, it is movably set in the outside of described clamping screw;This clamp sleeve is positioned at described pressure The lower section of jack panel;
Material filling funnel, it is movably set in the outside of described clamp sleeve;And
Pressure ring, it is fixedly installed on the lower end of described clamp sleeve, and the external diameter of this pressure ring leaks with described material filling The internal diameter of the lower end of bucket is corresponding, and the internal diameter of this pressure ring is corresponding with the external diameter of described clamping screw.
The graphite powder in the bolt anchoring hole of bottom brick of molten tin bath the most according to claim 1 fills extruding dress Put, it is characterised in that described clamping screw includes upper and lower two bodies of rod being threaded connection.
The graphite powder in the bolt anchoring hole of bottom brick of molten tin bath the most according to claim 1 fills extruding dress Put, it is characterised in that described clamp nut is provided with turning handle.
The graphite powder in the bolt anchoring hole of bottom brick of molten tin bath the most according to claim 1 fills extruding dress Put, it is characterised in that the lower end of described clamp nut is provided with a hold-down apertures, described clamp sleeve upper End is movably set in described hold-down apertures.
The graphite powder in the bolt anchoring hole of bottom brick of molten tin bath the most according to claim 1 fills extruding dress Put, it is characterised in that the bottom of described material filling funnel is straight-tube shape, and the top of described material filling funnel is Up big and down small is horn-like.
The graphite powder in the bolt anchoring hole of bottom brick of molten tin bath the most according to claim 5 fills extruding dress Put, it is characterised in that the lower end of described material filling funnel is convexly equipped with downwards a guiding mouth.
The graphite powder in the bolt anchoring hole of bottom brick of molten tin bath the most according to claim 6 fills extruding dress Put, it is characterised in that the lower end of described material filling funnel is provided with a thrust boss.
CN201610392586.XA 2016-06-06 2016-06-06 A kind of graphite powder filling pressurizing unit of the bolt anchor hole of bottom brick of molten tin bath Active CN105923982B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610392586.XA CN105923982B (en) 2016-06-06 2016-06-06 A kind of graphite powder filling pressurizing unit of the bolt anchor hole of bottom brick of molten tin bath

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610392586.XA CN105923982B (en) 2016-06-06 2016-06-06 A kind of graphite powder filling pressurizing unit of the bolt anchor hole of bottom brick of molten tin bath

Publications (2)

Publication Number Publication Date
CN105923982A true CN105923982A (en) 2016-09-07
CN105923982B CN105923982B (en) 2018-05-15

Family

ID=56833428

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610392586.XA Active CN105923982B (en) 2016-06-06 2016-06-06 A kind of graphite powder filling pressurizing unit of the bolt anchor hole of bottom brick of molten tin bath

Country Status (1)

Country Link
CN (1) CN105923982B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2714613Y (en) * 2004-05-08 2005-08-03 北京中航空港场道工程技术有限公司 Squeeze sealing type grouting device
CN2743344Y (en) * 2004-06-25 2005-11-30 中国洛阳浮法玻璃集团有限责任公司 Fusion glass guide device of float glass production line tin channel inlet
KR20110020160A (en) * 2009-08-21 2011-03-02 주식회사 엘지화학 Apparatus for manufacturing glass
CN203582700U (en) * 2013-11-08 2014-05-07 蚌埠玻璃工业设计研究院 Tin groove bottom brick
CN204201064U (en) * 2014-11-14 2015-03-11 哈尔滨哈锅锅炉工程技术有限公司 A kind of wall-through sealing device of exhaust heat boiler header
CN205676354U (en) * 2016-06-06 2016-11-09 广西建工集团第一安装有限公司 The graphite powder in the bolt anchoring hole of a kind of bottom brick of molten tin bath fills pressurizing unit

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2714613Y (en) * 2004-05-08 2005-08-03 北京中航空港场道工程技术有限公司 Squeeze sealing type grouting device
CN2743344Y (en) * 2004-06-25 2005-11-30 中国洛阳浮法玻璃集团有限责任公司 Fusion glass guide device of float glass production line tin channel inlet
KR20110020160A (en) * 2009-08-21 2011-03-02 주식회사 엘지화학 Apparatus for manufacturing glass
CN203582700U (en) * 2013-11-08 2014-05-07 蚌埠玻璃工业设计研究院 Tin groove bottom brick
CN204201064U (en) * 2014-11-14 2015-03-11 哈尔滨哈锅锅炉工程技术有限公司 A kind of wall-through sealing device of exhaust heat boiler header
CN205676354U (en) * 2016-06-06 2016-11-09 广西建工集团第一安装有限公司 The graphite powder in the bolt anchoring hole of a kind of bottom brick of molten tin bath fills pressurizing unit

Also Published As

Publication number Publication date
CN105923982B (en) 2018-05-15

Similar Documents

Publication Publication Date Title
CN103276728B (en) A kind of method that pile crown is repaired and reinforced
CN208457539U (en) Ventral brush hand grease is automatically injected device
CN205676354U (en) The graphite powder in the bolt anchoring hole of a kind of bottom brick of molten tin bath fills pressurizing unit
CN105923982A (en) Graphite powder filling and squeezing device for bolt anchoring hole in bottom brick of tin bath
CN101435322B (en) Well completion method of ground dipping uranium extracting process well
CN211340795U (en) Hydraulic engineering construction equipment that is in milk
CN210151705U (en) Reinforcing pile for soft soil foundation
CN114411700A (en) Steel pile body for steel pipe grouting pile construction while sinking pipe and grouting
CN202439096U (en) Improved hydraulic form die core for ceramic tile
CN209874074U (en) Porous inclined plane slip casting embedded pipe
CN209760610U (en) Grouting sleeve
CN208586615U (en) A kind of underwater casting conduit reducing concrete disintegration
CN203401571U (en) Prefabricated capping mould
CN208949893U (en) A kind of oblique suspension device of the auxiliary of foundation pit
CN203475327U (en) Anchor bearing plate
CN201588407U (en) Air exhausting device for hoisting steel pipe pillar concrete
CN206467902U (en) A kind of fiber steel pipe concrete structure with relief groove
CN206015702U (en) A kind of pile foundation
CN206655482U (en) A kind of servicing unit for outer wall template installation
CN215801631U (en) Tool for injecting sealing paste into deformation joint of pipe gallery
CN215631384U (en) Simple seam beautifying device
CN215888255U (en) Post-grouting device for pile bottom of cast-in-situ bored pile
CN203639921U (en) Obturator for underwater anchor rod grouting
CN207110276U (en) A kind of concrete wall and the flashing node at steel structure connection position
CN202925566U (en) A prefabricated assembly-type reinforced concrete inspection well chamber

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 20-23 / F, building 2, Guangxi construction engineering building, 19 Pingle Avenue, Liangqing District, Nanning City, Guangxi Zhuang Autonomous Region, 530200

Patentee after: Guangxi construction engineering group first installation engineering Co.,Ltd.

Address before: 530001 No.4 Xiu'an Road, Xixiangtang District, Nanning City, Guangxi Zhuang Autonomous Region

Patentee before: GUANGXI CONSTRUCTION ENGINEERING GROUP NO.1 INSTALLATION Co.,Ltd.

CP03 Change of name, title or address