CN105914734A - Differentiated power distribution network fault processing complementary method based on special operation mode - Google Patents

Differentiated power distribution network fault processing complementary method based on special operation mode Download PDF

Info

Publication number
CN105914734A
CN105914734A CN201610260044.7A CN201610260044A CN105914734A CN 105914734 A CN105914734 A CN 105914734A CN 201610260044 A CN201610260044 A CN 201610260044A CN 105914734 A CN105914734 A CN 105914734A
Authority
CN
China
Prior art keywords
power supply
distribution network
fault processing
user
differentiation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610260044.7A
Other languages
Chinese (zh)
Inventor
李聪利
刘钧元
赵宇营
张渭鹏
毕永健
王磊
尹鹏
吴凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610260044.7A priority Critical patent/CN105914734A/en
Publication of CN105914734A publication Critical patent/CN105914734A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/001Methods to deal with contingencies, e.g. abnormalities, faults or failures

Abstract

The invention relates to a differentiated power distribution network fault processing complementary method based on a special operation mode. Two operation modes and one power guarantee mode are analyzed so that differentiated fault processing solve strategies are obtained, wherein the two operation modes refer to a single power supply ring network mode and a double cable power supply mode, and the power guarantee mode is mainly for guaranteeing the double power supply performance of users after fault recovery for the double power supply users. Adaptability of the power distribution network fault processing function of the present stage is considered, the influence of flow of the special operation mode on a common fault processing logic algorithm and the defects of the common fault processing logic are also considered, and a power distribution network fault processing complementary technology based on the special operation mode is obtained through comprehensive consideration so that wide adaptability and practicality of power distribution network fault processing can be guaranteed, the reliability of power distribution network fault processing can be enhanced, power supply time can be shortened and user satisfaction can be enhanced.

Description

Differentiation distribution network failure based on the special method of operation processes compensation process
Technical field
The present invention relates to a kind of distribution network failure treatment technology, relate to the troubleshooting technology in electrical power distribution automatization system, specifically A kind of differentiation distribution network failure based on the special method of operation processes compensation process.
Background technology
Distribution network failure of the prior art isolation and service restoration method, be both for general distribution network shelf structure and be analyzed 's.But, owing to power distribution network powering mode is various, under the method for operation that some are special, existing distribution network failure processes Actual demand cannot be met, it is therefore desirable to provide the distribution network failure treatment technology of differentiation for the special method of operation, with full The demand of the power distribution network powering mode that foot is continually changing.
Summary of the invention
For solving the deficiencies in the prior art, it is an object of the invention to by the distribution network failure under several special methods of operation is entered Row is analyzed, thus the method having been resolved the troubleshooting under this special method of operation, and supplement skill by differentiation troubleshooting Art, is incorporated distribution network failure and is processed in functional module, met the demand of present stage distribution network failure disposal ability.
In order to realize above-mentioned target, the present invention adopts the following technical scheme that:
The positive effect of the present invention and advantage be:
A kind of differentiation distribution network failure based on the special method of operation processes compensation process, for two kinds of methods of operation and one Guarantor's power mode is analyzed, and obtains the resolution policy of differentiation troubleshooting, and wherein, two kinds of methods of operation are respectively as follows: single supply Looped network and double cable are powered two ways, a kind of protect power mode be primarily directed to dual power supply user ensure non-faulting recover after user Dual power supply.
And, differentiation troubleshooting strategy under single supply loop-net operation mode is it is important that during restoring electricity, dynamically When calculating downstream recovery, there is new power supply along with the closing operation of trip switch in detection.
And, the dual power supply of user after ensureing non-faulting recovery of powering for double cables is that the wrong report phenomenon avoiding double cable fault causes Distribution network failure location failure, by expand isolation range, will be unable to confirm false positive signal shielding, by fault zone wrap It is contained in isolation range, thus ensures the accuracy of fault location, it is to avoid owing to positioning the secondary trip unsuccessfully caused.
And, after ensureing non-faulting recovery for dual power supply user, the differentiation troubleshooting of the dual power supply of user focuses on protecting The dual power supply of card dual power supply user, i.e. before fault recovery, dynamic calculation dual power supply user, and by the confession of dual power supply user Electricity power supply and newly turn the power supply of confession and contrast, thus revise the priority level of recovery scheme.
The positive effect of the present invention and advantage be:
The present invention not only allows for present stage distribution network failure and processes the adaptability of function, it is also contemplated that for the special method of operation Trend processes the impact that logical algorithm produces to ordinary failures, and ordinary failures processes the defect of logic, considers and obtains base Distribution network failure under the special method of operation processes the technology of supplementing, it is ensured that the extensive adaptability of distribution network failure process and reality By property, thus improve distribution network failure and process reliability, shorten power-on time, it is provided that user satisfaction.
Accompanying drawing explanation
Fig. 1 is that under single supply loop-net operation mode, FA tests looped network figure;
Fig. 2 is that the FA under double cable method of operation tests looped network figure;
Fig. 3 is that after dual power supply user ensures non-faulting recovery, the FA of the dual power supply of user tests looped network figure;
Fig. 4 is troubleshooting process figure.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention made concrete introduction.
A kind of differentiation distribution network failure based on the special method of operation processes compensation process, for two kinds of methods of operation and one Guarantor's power mode is analyzed, and obtains the resolution policy of differentiation troubleshooting, and wherein, two kinds of methods of operation are respectively as follows: single supply Looped network and double cable are powered two ways, a kind of protect power mode be primarily directed to dual power supply user ensure non-faulting recover after user Dual power supply.
Embodiment 1
As shown in Figure 1, #1 line and #2 line form loop hand in hand through #1 ring main unit and #4 ring main unit, and interconnection switch is #4 Ring main unit 42 interconnection switch, #1 ring main unit, #2 ring main unit and #3 ring main unit are from becoming minor loop, and interconnection switch is #1 ring main unit 14 minor loop interconnection switches.
Such as figure, between #1 ring main unit and #2 ring main unit, cable breaks down, the isolation scheme that normal troubleshooting function is given Switching for disconnecting #1 ring main unit 12, recovery scheme is the 1# wiretap that closes, without #2 ring main unit and the recovery scheme of #3 ring main unit.
And it practice, restore electricity carrying out non-faulting region, close 1# wiretap, then the #1 ring main unit 14 minor loop connection that closes Network switchs.
Differentiation troubleshooting under single supply loop-net operation mode is during restoring electricity, when dynamic calculation downstream is recovered, There is new power supply along with the closing operation of trip switch in detection.
For this wiring, during restoring electricity, when dynamic calculation downstream is recovered, can or can not be along with the conjunction of trip switch Lock operates, and new power supply occurs, if the power supply point of restoration path comes from the power supply of trip switch, and trip switch In the case of Unisolated switch, this restoration path is effective, by this restoration path write into Databasce, and passes through boundary The restoration path in face shows.
Embodiment 2
As accompanying drawing 2, #1 line and #2 line form loop, interconnection switch hand in hand through #1 ring main unit, #2 ring main unit and #4 ring main unit For #4 ring main unit 42 interconnection switch, being paired cable between #1 ring main unit and #2 ring main unit, paired cable is all stuck on CT, other Circuit is single cable.
Such as accompanying drawing 2, having a cable to break down between #1 ring main unit and #2 ring main unit in paired cable, fault current refluxes #2 ring main unit 21 can be caused to switch also have on over-current signal sending, system is judged as #2 ring main unit bus-bar fault, the isolation side provided Case switchs for disconnecting #2 ring main unit 21 switch and #2 ring main unit 22, and recovery scheme is 1# wiretap and the #2 ring main unit 42 of closing Network switchs.Because of scheme misjudgment, trouble point is also not isolated from, when close 1# wiretap time, 1# wiretap can be caused again to trip Form second accident.
And it practice, system cable has single cable and double cable mark, can be the most appropriate as criterion amendment failure judgment method, Suitably expand isolation range also to should be all right.
Differentiation troubleshooting under double cable powered operations is the distribution network failure location avoiding the wrong report phenomenon of double cable fault to cause Failure, fundamentally walk around the distribution network failure that may bring of wrong report and position unsuccessfully.By expanding isolation range, will be unable to really The false positive signal shielding recognized, is included in fault zone in isolation range, thus ensures the accuracy of fault location, it is to avoid due to Position the secondary trip unsuccessfully caused.
For double cable faults, the processing method proposed here is to expand Fault Isolation scope.By analysis, can sum up: double Cable line fault is likely to occur the service entrance switch that the over-current signal of wrong report is the most all switch cubicle.It is contemplated that be looped network judging Bus-bar fault type in cabinet, extends forward one section by Fault Isolation scope, is isolated to the outlet switch of a ring main unit.
Dual power supply user, when troubleshooting, ensures that it remains as dual power supply as far as possible.Processing method is, it is judged that turn for negative In lotus, if still have the load (dual power supply) of non-dead electricity, for these load decision node power supplys, and do mate turning power supply source, Preferentially select non-same power supply.
Embodiment 3
Such as accompanying drawing 3, #1 line, #2 line and #3 line are three contact situations, and #1 ring main unit is powered by #1 line, #2 ring main unit and #3 Ring main unit is powered by #3 line, and #4 ring main unit is powered by #2 line, and the contact point of #1 line and #3 line is #1 ring main unit 12 interconnection switch, The contact point of #2 line and #3 line is #4 ring main unit 42 interconnection switch, and responsible consumer is dual power supply user, and two ends power supply is respectively #1 Line and #3 line, two end switch are respectively #1 ring main unit 13 switch and #2 ring main unit 23 switchs.
Such as accompanying drawing 3, between #2 ring main unit and #3 ring main unit, cable breaks down, and the isolation scheme that system is given is for disconnecting #2 Ring main unit 24 switch and #3 ring main unit 31 switch, and upstream recovery scheme is the 3# wiretap that closes, and downstream recovery scheme has 2 kinds of feelings Condition, one is #1 ring main unit 12 interconnection switch that closes, and two is #4 ring main unit 42 interconnection switch that closes.Two kinds of recovery schemes are the most former It is then excellent for load factor the lowest.
And it practice, the load factor working as the 2 kinds of recovery schemes in downstream all (is defaulted as 90%) in threshold values, preferably close #4 looped network Cabinet 42 interconnection switch, it is ensured that responsible consumer is still by multiple feed, if selecting to close #1 ring main unit 12 interconnection switch, when 1# wiretap trips, and responsible consumer will dead electricity.
After ensureing non-faulting recovery for dual power supply user, the differentiation troubleshooting of the dual power supply of user focuses on guarantee pair The dual power supply of power user, i.e. before fault recovery, dynamic calculation dual power supply user, and by the power supply electricity of dual power supply user Source and newly turn the power supply of confession and contrast, thus revise the priority level of recovery scheme.
The handling process that the differentiation distribution network failure based on the special method of operation of the present invention processes the technology of supplementing is as follows:
Fault location;
Troubleshooting strategy generating;
Differentiation troubleshooting correction;
Scheme optimization generates;
Scheme performs;
Troubleshooting software module operational flow diagram sees accompanying drawing 4.
The general principle of the present invention, principal character and advantage have more than been shown and described.Skilled person will appreciate that of the industry, Above-described embodiment limits the present invention the most in any form, the technical scheme that the mode of all employing equivalents or equivalent transformation is obtained, All fall within protection scope of the present invention.

Claims (4)

1. a differentiation distribution network failure based on the special method of operation processes compensation process, it is characterised in that: for two kinds The method of operation and a kind of power mode of protecting are analyzed, and obtain the resolution policy of differentiation troubleshooting, wherein, two kinds of operation sides Two ways that formula is respectively as follows: single supply looped network and double cable is powered, a kind of power mode of protecting is primarily directed to dual power supply user and ensures non- The dual power supply of user after fault recovery.
Differentiation distribution network failure based on the special method of operation the most according to claim 1 processes compensation process, its feature Be: differentiation troubleshooting strategy under single supply loop-net operation mode it is important that during restoring electricity, dynamic calculation When downstream is recovered, there is new power supply along with the closing operation of trip switch in detection.
Differentiation distribution network failure based on the special method of operation the most according to claim 1 processes compensation process, its feature Be: power for double cables ensure non-faulting recover after the dual power supply of user be to avoid what the wrong report phenomenon of double cable fault caused to join The failure of electric network fault location, by expanding isolation range, will be unable to the false positive signal shielding confirmed, is included in fault zone In isolation range, thus ensure the accuracy of fault location, it is to avoid owing to positioning the secondary trip unsuccessfully caused.
Differentiation distribution network failure based on the special method of operation the most according to claim 1 processes the technology of supplementing, its feature It is: after ensureing non-faulting recovery for dual power supply user, the differentiation troubleshooting of the dual power supply of user focuses on guarantee pair The dual power supply of power user, i.e. before fault recovery, dynamic calculation dual power supply user, and by the power supply electricity of dual power supply user Source and newly turn the power supply of confession and contrast, thus revise the priority level of recovery scheme.
CN201610260044.7A 2016-04-22 2016-04-22 Differentiated power distribution network fault processing complementary method based on special operation mode Pending CN105914734A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610260044.7A CN105914734A (en) 2016-04-22 2016-04-22 Differentiated power distribution network fault processing complementary method based on special operation mode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610260044.7A CN105914734A (en) 2016-04-22 2016-04-22 Differentiated power distribution network fault processing complementary method based on special operation mode

Publications (1)

Publication Number Publication Date
CN105914734A true CN105914734A (en) 2016-08-31

Family

ID=56752710

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610260044.7A Pending CN105914734A (en) 2016-04-22 2016-04-22 Differentiated power distribution network fault processing complementary method based on special operation mode

Country Status (1)

Country Link
CN (1) CN105914734A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0417526A (en) * 1990-05-08 1992-01-22 Kansai Electric Power Co Inc:The Supporting method for power system operation
CN102290798A (en) * 2011-08-11 2011-12-21 中国电力科学研究院 Quick power supply restoring rule based on distribution network wire connecting way
CN103560512A (en) * 2013-11-19 2014-02-05 国家电网公司 High-reliability closed loop wiring method of medium voltage distribution network
CN103872687A (en) * 2014-03-31 2014-06-18 国网上海市电力公司 Power distribution network rack wiring structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0417526A (en) * 1990-05-08 1992-01-22 Kansai Electric Power Co Inc:The Supporting method for power system operation
CN102290798A (en) * 2011-08-11 2011-12-21 中国电力科学研究院 Quick power supply restoring rule based on distribution network wire connecting way
CN103560512A (en) * 2013-11-19 2014-02-05 国家电网公司 High-reliability closed loop wiring method of medium voltage distribution network
CN103872687A (en) * 2014-03-31 2014-06-18 国网上海市电力公司 Power distribution network rack wiring structure

Similar Documents

Publication Publication Date Title
CN105337256B (en) A kind of residual voltage compensating element, blocking method for multiple-circuit on same tower
KR101571213B1 (en) fault clearing system and its method for microgrid
CN102870181A (en) A high voltage DC breaker apparatus
CN106066450A (en) There is the insulation monitor of voltage monitoring and method based on it
CN106159913B (en) Multi-terminal flexible direct current system direct current fault protecting method
CN106711965B (en) A kind of transmission line of electricity broken string method of discrimination based on semaphore transmitting
KR101963937B1 (en) Apparatus for protecting photovoltaic connector using rapid shutdown function
CN105591609B (en) PID processing method and system of photovoltaic system
CN102565624B (en) Fault-tolerant fault positioning method for distribution network
JP4731403B2 (en) Bus protection relay device with comprehensive rearrangement protection function
CN106771804B (en) A kind of transmission line of electricity broken string area judging method based on zero-sequence network
CN105576688A (en) Control protection method for flexible direct current power transmission system
CN105680424B (en) The guard method of the overhead transmission line temporary fault of flexible direct current power transmission system
CN106684841A (en) Flexible direct-current grid system direct-current short-circuit fault protection method and device
CN106646123B (en) A kind of transmission line of electricity broken string area judging method of relatively residual voltage
CN110100370A (en) The switching construction that switches between two input terminals, equipment, system and method
CN107732881A (en) A kind of direct current network dc circuit breaker failure protection method and apparatus
CN111856213B (en) Fault positioning method for ring network operation
CN106329499A (en) DC grounding protection method for single-rail backflow power supply system
CN109429542B (en) Power conversion device and method for determining operating state of circuit breaking device
CN103972873A (en) Method for protecting high-voltage DC three-pole power transmission line
CN109361197A (en) A kind of overcurrent protective device and method
CN110784005B (en) Uninterruptible power supply, arc extinguishing device, electric appliance and method for reducing arc energy
CN105914734A (en) Differentiated power distribution network fault processing complementary method based on special operation mode
KR20210051787A (en) System and method for anti-islanding of distributed power generation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160831

RJ01 Rejection of invention patent application after publication