CN105911965A - Method for realizing data analysis in data monitoring system - Google Patents

Method for realizing data analysis in data monitoring system Download PDF

Info

Publication number
CN105911965A
CN105911965A CN201610143713.2A CN201610143713A CN105911965A CN 105911965 A CN105911965 A CN 105911965A CN 201610143713 A CN201610143713 A CN 201610143713A CN 105911965 A CN105911965 A CN 105911965A
Authority
CN
China
Prior art keywords
data
monitoring system
data monitoring
analysis
industrial equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610143713.2A
Other languages
Chinese (zh)
Other versions
CN105911965B (en
Inventor
陈瑞峰
沈玉玲
韩滨旭
庞海亮
谢君
孙云云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Electric Group Corp
Original Assignee
Shanghai Electric Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Electric Group Corp filed Critical Shanghai Electric Group Corp
Priority to CN201610143713.2A priority Critical patent/CN105911965B/en
Publication of CN105911965A publication Critical patent/CN105911965A/en
Application granted granted Critical
Publication of CN105911965B publication Critical patent/CN105911965B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a method for realizing data analysis in a data monitoring system, and is applied to monitoring industrial equipment. The data monitoring system is connected with one database and stores operation data of the industrial equipment, acquired by the data monitoring system. The method comprises the following steps: providing a form control; loading the form control to the data monitoring system through modifying a configuration file of the data monitoring system; providing a first data interface so as to obtain the operation data of the industrial equipment, stored in the database, and displaying the data on a display interface of the form control; and providing an analysis module associated with the data monitoring system, for analyzing the operation data of the industrial equipment, acquired by the data monitoring system so as to form an analysis result. The method provided by the technical scheme has the following advantages: the operation data of the industrial equipment, acquired by the data monitoring system can be analyzed timely, the corresponding analysis result can be formed for a user to check, and thus the user can accurately know the work state of the industrial equipment.

Description

A kind of method realizing data analysis in data monitoring system
Technical field
The present invention relates to monitoring industrial equipment field, particularly relate to one in data monitoring system, realize number According to the method analyzed.
Background technology
In industrial equipment field, for the real-time operation conditions recognizing industrial equipment, generally employing group The service data of state software collection industrial equipment, is divided by data by the service data user collected Analysis can obtain the operation conditions of related industries equipment, and then judges the stability that industrial equipment runs, and In existing configuration software, generally it is confined to the data acquisition aspect to industrial equipment, does not relate to To the service data gathered being further analyzed process, thus give user analytical industry equipment Service data is brought when understanding the stability of industrial equipment and is processed the defect that data are relatively complicated, and right The service data of industrial equipment derives in link, needs especially by third party's instrument and then causes deriving number According to inefficient defect.
Summary of the invention
For the problems referred to above in prior art, the Operational Data Analysis of the industrial equipment gathered existed, existing There is provided a kind of industrial equipment service data being intended to gathering to make analysis, industrial equipment work can be understood in time Make the method realizing data analysis in data monitoring system of situation.
Concrete technical scheme is as follows:
A kind of method realizing data analysis in data monitoring system, is applied to supervise industrial equipment Surveying, described data monitoring system is at least connected with a data base in order to preserve described data monitoring system collection The service data of described industrial equipment, wherein, comprise the following steps:
Step S1, provide a report controls;
Step S2, by revise described data monitoring system configuration file described report controls is loaded onto Described data monitoring system;
Step S3, the described industry providing one first data-interface to be stored in described data base with acquisition set Standby described service data, and be shown on the display interface of described report controls;
Step S4, offer one analysis module associate with described data monitoring system, in order to supervise described data The service data of the described industrial equipment that examining system collects is analyzed, to form analysis result.
Preferably, described report controls is based on windows system user interface frame.
Preferably, in described step S2, the configuration file of data monitoring system, with the form of library file Load described report controls.
Preferably, in described step S4, it is provided that one second data-interface, described analysis mould is connected respectively Block and described data monitoring system, described analysis module obtains described data by described second data-interface The described service data that monitoring system acquisition arrives, to obtain analysis result.
Preferably, described analysis module is mainly formed by Matlab system;Described second data-interface is main Formed by the script file of described Matlab system.
Preferably, in described step S4, described analysis module includes:
One parameter value prediction module, in order to carry out the service data of described industrial equipment according to mathematical model Prediction, predicts the outcome to be formed;
One outlier detection module, deviates, in order to calculate, the information point that normal value is bigger in described service data.
Preferably, described mathematical model includes time series models and/or neural network model.
Preferably, described outlier detection module calculates described fortune by distance algorithm and/or density algorithm Row data deviate the information point that normal value is bigger.
Preferably, it is provided that an electronic table unit, connect described analysis module, in order to show described analysis The analysis result that module is formed.
Preferably, described data monitoring system is configuration software.
Technique scheme has the advantage that or beneficial effect: can be to the industry of data monitoring system acquisition The service data of equipment makes analysis timely, checks for user with the analysis result that formation is corresponding, side Just user recognizes the duty of industrial equipment accurately, overcomes data in prior art and surveys system The service data to the industrial equipment gathered of uniting lacks the defect of the function of the data analysis of correspondence.
Accompanying drawing explanation
With reference to appended accompanying drawing, more fully to describe embodiments of the invention.But, appended accompanying drawing is only For illustrating and illustrating, it is not intended that limitation of the scope of the invention.
Fig. 1 is the flow process of a kind of embodiment of the method realizing data analysis in data monitoring system of the present invention Schematic diagram.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the present invention, and It is not all, of embodiment.Based on the embodiment in the present invention, those of ordinary skill in the art are not making The every other embodiment obtained on the premise of going out creative work, broadly falls into the scope of protection of the invention.
It should be noted that in the case of not conflicting, the embodiment in the present invention and the spy in embodiment Levy and can be mutually combined.
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings, but not as the present invention's Limit.
The present invention includes a kind of method realizing data analysis in data monitoring system.
As it is shown in figure 1, the embodiment of a kind of method realizing data analysis in data monitoring system, should For being monitored industrial equipment, data monitoring system is at least connected with a data base in order to preserve data The service data of the industrial equipment of monitoring system acquisition, comprises the following steps:
Step S1, provide a report controls;
Step S2, by amendment data monitoring system configuration file report controls is loaded onto data monitoring System;
Step S3, offer one first data-interface are to obtain the operation of the industrial equipment being stored in data base Data, and be shown on the display interface of report controls;
Step S4, offer one analysis module associate with data monitoring system, in order to adopt data monitoring system Collect to the service data of industrial equipment be analyzed, to form analysis result.
In technique scheme, the service data gathering industrial equipment that data monitoring system is real-time, and store up Deposit to data base, be loaded into the report controls of data monitoring system by real-time the showing of the first data-interface Show the change of the operational factor of the industrial equipment stored in data base, when needing the industrial equipment collected Service data when being analyzed, can by analyze module can work to data monitoring system acquisition timely The operational factor of industry equipment is analyzed forming analysis result, facilitates user to grasp according to analysis result The duty of industrial equipment.
In a particular embodiment, the industrial equipment being stored in data base by the first data-interface acquisition The concrete methods of realizing of service data is as follows, to the different industrial equipment needing monitoring in report controls Set up corresponding data object, such as class, and the number of the parameter definition correspondence according to corresponding industrial equipment According to object's property value, and the property value of corresponding class is associated with the parameter of industrial equipment, is stepped on by backstage Record data base, carries out assignment and renewal with query statement to data object's property value, passes through report controls Display interface directly operate these data objects, with the real-time service data of the corresponding industrial equipment of display.
In one preferably embodiment, data base can use ORACLE data base or SQL number According to storehouse.
In one preferably embodiment, report controls can be based on windows system user interface frame WPF (Windows Presentation Foundation, Microsoft's user interface frame) is designed.
In one preferably embodiment, in step S4, it is provided that one second data-interface, connect respectively Meet analysis module and data base, analyze module and collected by the second data-interface acquisition data monitoring system Service data, to obtain analysis result.Further, analyze module mainly to be formed by Matlab system; Second data-interface is mainly formed by the script file i.e. M file of Matlab system.
In the particular embodiment, obtain, by the second data-interface, the industry that data monitoring system collects The service data concrete implementation method of equipment is as follows, by by the ginseng in the M file of Matlab system Numerical value is associated with the service data of data acquisition system, transmits with parameter in time performing M file The form service data of industrial equipment that data monitoring system is gathered be transferred to M literary composition as parameter Part, thus realize data acquisition.
In one preferably embodiment, in step S2, the configuration file of data monitoring system, with The form of the i.e. dll file of library file loads report controls.
In one preferably embodiment, in step S4, analyze module and include:
One parameter value prediction module, in order to the service data of industrial equipment is predicted according to mathematical model, Predict the outcome to be formed;
One outlier detection module, deviates, in order to calculate, the information point that normal value is bigger in service data.
In one preferably embodiment, mathematical model includes time series models and/or neutral net mould Type.Further, mathematical model can be worked out in the script file of Matlab system, corresponding by performing Script file obtain corresponding predicting the outcome.
In one preferably embodiment, outlier detection module is calculated by distance algorithm and/or density Method calculates and deviates the information point that normal value is bigger in service data.Further, above-mentioned computational methods can be compiled It is formed in the script file of Matlab system, obtains corresponding calculating knot by performing corresponding script file Really.
In one preferably embodiment, above-mentioned analysis can be shown in a graphical form by report controls Result.
In one preferably embodiment, it is provided that an electronic table unit, electronic table unit connects and divides Analysis module, analyzes, in order to show, the analysis result that module is formed.Further, electronic table unit can be adopted Use EXCEL.
In one preferably embodiment, data monitoring system is configuration software.
Technique scheme has the advantage that or beneficial effect: can be to the industry of data monitoring system acquisition The service data of equipment carries out real-time graphic software platform and is analyzed timely, to form correspondence Analysis result is checked for user, facilitates user to recognize the duty of industrial equipment accurately, gram Take the service data of the data survey examining system industrial equipment to gathering in prior art and lack the data of correspondence The defect of the function analyzed.
The foregoing is only preferred embodiment of the present invention, not thereby limit embodiments of the present invention and Protection domain, to those skilled in the art, it should can appreciate that all utilization description of the invention And the equivalent done by diagramatic content and the scheme obtained by obvious change, all should comprise Within the scope of the present invention.

Claims (10)

1. the method realizing data analysis in data monitoring system, it is applied to industrial equipment is monitored, described data monitoring system is at least connected with a data base in order to preserve the service data of the described industrial equipment that described data monitoring system gathers, it is characterised in that comprise the following steps:
Step S1, provide a report controls;
Step S2, by revise described data monitoring system configuration file described report controls is loaded onto described data monitoring system;
The described service data of the described industrial equipment that step S3, offer one first data-interface are stored in described data base with acquisition, and be shown on the display interface of described report controls;
Step S4, offer one analysis module associate with described data monitoring system, and the service data of the described industrial equipment in order to collect described data monitoring system is analyzed, to form analysis result.
The method realizing data analysis in data monitoring system the most according to claim 1, it is characterised in that described report controls is based on windows system user interface frame.
The method realizing data analysis in data monitoring system the most according to claim 1, it is characterised in that in described step S2, the configuration file of data monitoring system, load described report controls with the form of library file.
The method realizing data analysis in data monitoring system the most according to claim 1, it is characterized in that, in described step S4, one second data-interface is provided, connect described analysis module and described data monitoring system respectively, described analysis module obtains the described service data that described data monitoring system collects, to obtain analysis result by described second data-interface.
The method realizing data analysis in data monitoring system the most according to claim 1, it is characterised in that described analysis module is mainly formed by Matlab system;Described second data-interface is mainly formed by the script file of described Matlab system.
The method realizing data analysis in data monitoring system the most according to claim 1, it is characterised in that in described step S4, described analysis module includes:
One parameter value prediction module, in order to be predicted the service data of described industrial equipment according to mathematical model, predicts the outcome to be formed;
One outlier detection module, deviates, in order to calculate, the information point that normal value is bigger in described service data.
The method realizing data analysis in data monitoring system the most according to claim 6, it is characterised in that described mathematical model includes time series models and/or neural network model.
The method realizing data analysis in data monitoring system the most according to claim 6, it is characterised in that described outlier detection module is calculated by distance algorithm and/or density algorithm and deviates the information point that normal value is bigger in described service data.
The method realizing data analysis in data monitoring system the most according to claim 1, it is characterised in that provide an electronic table unit, connects described analysis module, in order to show the analysis result that described analysis module is formed.
10. according to the method realizing data analysis in described data monitoring system arbitrary in claim 1-9, it is characterised in that described data monitoring system is configuration software.
CN201610143713.2A 2016-03-14 2016-03-14 A method of realizing data analysis in data monitoring system Active CN105911965B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610143713.2A CN105911965B (en) 2016-03-14 2016-03-14 A method of realizing data analysis in data monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610143713.2A CN105911965B (en) 2016-03-14 2016-03-14 A method of realizing data analysis in data monitoring system

Publications (2)

Publication Number Publication Date
CN105911965A true CN105911965A (en) 2016-08-31
CN105911965B CN105911965B (en) 2019-11-05

Family

ID=56744424

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610143713.2A Active CN105911965B (en) 2016-03-14 2016-03-14 A method of realizing data analysis in data monitoring system

Country Status (1)

Country Link
CN (1) CN105911965B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108256589A (en) * 2018-02-14 2018-07-06 北京火花日志科技有限公司 A kind of industrial equipment data application reading/writing method and device
CN109145000A (en) * 2018-08-13 2019-01-04 上海电气集团股份有限公司 A kind of RTDB in Industry Control OPC UA data-interface implementation method
CN109426302A (en) * 2017-08-30 2019-03-05 西门子(中国)有限公司 A kind of data analysis equipment and method
CN109643240A (en) * 2016-09-27 2019-04-16 西门子股份公司 Automatically generate the industrial control unit (ICU) and method of user interface

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001236115A (en) * 2000-02-24 2001-08-31 Fanuc Ltd Remote diagnostic system and method
CN1801131A (en) * 2005-11-11 2006-07-12 南京科远控制工程有限公司 Setup method for real-time database system of thermal power plant
CN102323806A (en) * 2011-07-08 2012-01-18 中冶南方(武汉)自动化有限公司 Inverter monitoring platform and monitoring method thereof
CN103107601A (en) * 2013-02-26 2013-05-15 合肥未来计算机技术开发有限公司 Web of Things smart power grid operation and maintenance system
CN104808650A (en) * 2015-04-03 2015-07-29 沈阳化工大学 Fault diagnosis system of oil delivery process

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001236115A (en) * 2000-02-24 2001-08-31 Fanuc Ltd Remote diagnostic system and method
CN1801131A (en) * 2005-11-11 2006-07-12 南京科远控制工程有限公司 Setup method for real-time database system of thermal power plant
CN102323806A (en) * 2011-07-08 2012-01-18 中冶南方(武汉)自动化有限公司 Inverter monitoring platform and monitoring method thereof
CN103107601A (en) * 2013-02-26 2013-05-15 合肥未来计算机技术开发有限公司 Web of Things smart power grid operation and maintenance system
CN104808650A (en) * 2015-04-03 2015-07-29 沈阳化工大学 Fault diagnosis system of oil delivery process

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109643240A (en) * 2016-09-27 2019-04-16 西门子股份公司 Automatically generate the industrial control unit (ICU) and method of user interface
CN109643240B (en) * 2016-09-27 2022-05-06 西门子股份公司 Industrial controller and method for automatically generating user interface
CN109426302A (en) * 2017-08-30 2019-03-05 西门子(中国)有限公司 A kind of data analysis equipment and method
CN109426302B (en) * 2017-08-30 2022-05-20 西门子(中国)有限公司 Data analysis equipment and method
CN108256589A (en) * 2018-02-14 2018-07-06 北京火花日志科技有限公司 A kind of industrial equipment data application reading/writing method and device
CN108256589B (en) * 2018-02-14 2022-01-28 北京火花日志科技有限公司 Industrial equipment data application reading and writing method and device
CN109145000A (en) * 2018-08-13 2019-01-04 上海电气集团股份有限公司 A kind of RTDB in Industry Control OPC UA data-interface implementation method

Also Published As

Publication number Publication date
CN105911965B (en) 2019-11-05

Similar Documents

Publication Publication Date Title
CN111324639B (en) Data monitoring method, device and computer readable storage medium
CN107086944A (en) A kind of method for detecting abnormality and device
CN101620691A (en) Automatic data mining platform in telecommunications industry
US20080243912A1 (en) Method of providing business intelligence
CN114118224B (en) Neural network-based full-system telemetry parameter anomaly detection system
CN106934720A (en) Equipment insurance intelligent pricing method and system based on Internet of Things
CN107818227A (en) A kind of bridge machinery approaches to IM and system based on BIM
CN105911965A (en) Method for realizing data analysis in data monitoring system
WO2022199179A1 (en) Remaining life prediction model modeling system and method for equipment, and prediction system
CN110751725A (en) Disaster occurrence tracing method based on BIM + GIS fusion technology
US11481413B2 (en) Systems and methods for evaluating petroleum data for automated processes
CN111401827A (en) Digital collection system of bridge disease
CN106293891A (en) Multidimensional investment target measure of supervision
CN115328068A (en) Digital twinning system applied to industrial production
CN113850475A (en) Production equipment performance evaluation system based on big data
TW202046034A (en) Production design assistance device, production design assistance method and production design assistance program
CN114693114A (en) Monitoring method and device for underground space structure, computer equipment and storage medium
CN115494801B (en) Plate production line building method and terminal
CN103268329B (en) Plasma panel manufacturing process data digging system
CN117217020A (en) Industrial model construction method and system based on digital twin
CN104065510A (en) PetriNet-based system operation and maintenance monitoring method and PetriNet-based system operation and maintenance monitoring system
CN113610575B (en) Product sales prediction method and prediction system
Zangl et al. Predictive data mining techniques for production optimization
Li et al. Challenges in developing a computational platform to integrate data analytics with simulation-based optimization
CN117952323B (en) Product creation system, method, equipment and medium based on digital twin

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20160831

Assignee: Shanghai Electric Huicheng Intelligent System Co., Ltd

Assignor: Shanghai Electrical Group Co., Ltd.

Contract record no.: X2019310000022

Denomination of invention: Method for realizing data analysis in data monitoring system

Granted publication date: 20191105

License type: Common License

Record date: 20191126