CN105911965A - Method for realizing data analysis in data monitoring system - Google Patents
Method for realizing data analysis in data monitoring system Download PDFInfo
- Publication number
- CN105911965A CN105911965A CN201610143713.2A CN201610143713A CN105911965A CN 105911965 A CN105911965 A CN 105911965A CN 201610143713 A CN201610143713 A CN 201610143713A CN 105911965 A CN105911965 A CN 105911965A
- Authority
- CN
- China
- Prior art keywords
- data
- monitoring system
- data monitoring
- analysis
- industrial equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 64
- 238000000034 method Methods 0.000 title claims abstract description 29
- 238000007405 data analysis Methods 0.000 title claims abstract description 20
- 238000004458 analytical method Methods 0.000 claims abstract description 37
- 238000013178 mathematical model Methods 0.000 claims description 7
- 238000013450 outlier detection Methods 0.000 claims description 6
- 238000004422 calculation algorithm Methods 0.000 claims description 5
- 238000003062 neural network model Methods 0.000 claims description 2
- 230000007547 defect Effects 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000000205 computational method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000007935 neutral effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a method for realizing data analysis in a data monitoring system, and is applied to monitoring industrial equipment. The data monitoring system is connected with one database and stores operation data of the industrial equipment, acquired by the data monitoring system. The method comprises the following steps: providing a form control; loading the form control to the data monitoring system through modifying a configuration file of the data monitoring system; providing a first data interface so as to obtain the operation data of the industrial equipment, stored in the database, and displaying the data on a display interface of the form control; and providing an analysis module associated with the data monitoring system, for analyzing the operation data of the industrial equipment, acquired by the data monitoring system so as to form an analysis result. The method provided by the technical scheme has the following advantages: the operation data of the industrial equipment, acquired by the data monitoring system can be analyzed timely, the corresponding analysis result can be formed for a user to check, and thus the user can accurately know the work state of the industrial equipment.
Description
Technical field
The present invention relates to monitoring industrial equipment field, particularly relate to one in data monitoring system, realize number
According to the method analyzed.
Background technology
In industrial equipment field, for the real-time operation conditions recognizing industrial equipment, generally employing group
The service data of state software collection industrial equipment, is divided by data by the service data user collected
Analysis can obtain the operation conditions of related industries equipment, and then judges the stability that industrial equipment runs, and
In existing configuration software, generally it is confined to the data acquisition aspect to industrial equipment, does not relate to
To the service data gathered being further analyzed process, thus give user analytical industry equipment
Service data is brought when understanding the stability of industrial equipment and is processed the defect that data are relatively complicated, and right
The service data of industrial equipment derives in link, needs especially by third party's instrument and then causes deriving number
According to inefficient defect.
Summary of the invention
For the problems referred to above in prior art, the Operational Data Analysis of the industrial equipment gathered existed, existing
There is provided a kind of industrial equipment service data being intended to gathering to make analysis, industrial equipment work can be understood in time
Make the method realizing data analysis in data monitoring system of situation.
Concrete technical scheme is as follows:
A kind of method realizing data analysis in data monitoring system, is applied to supervise industrial equipment
Surveying, described data monitoring system is at least connected with a data base in order to preserve described data monitoring system collection
The service data of described industrial equipment, wherein, comprise the following steps:
Step S1, provide a report controls;
Step S2, by revise described data monitoring system configuration file described report controls is loaded onto
Described data monitoring system;
Step S3, the described industry providing one first data-interface to be stored in described data base with acquisition set
Standby described service data, and be shown on the display interface of described report controls;
Step S4, offer one analysis module associate with described data monitoring system, in order to supervise described data
The service data of the described industrial equipment that examining system collects is analyzed, to form analysis result.
Preferably, described report controls is based on windows system user interface frame.
Preferably, in described step S2, the configuration file of data monitoring system, with the form of library file
Load described report controls.
Preferably, in described step S4, it is provided that one second data-interface, described analysis mould is connected respectively
Block and described data monitoring system, described analysis module obtains described data by described second data-interface
The described service data that monitoring system acquisition arrives, to obtain analysis result.
Preferably, described analysis module is mainly formed by Matlab system;Described second data-interface is main
Formed by the script file of described Matlab system.
Preferably, in described step S4, described analysis module includes:
One parameter value prediction module, in order to carry out the service data of described industrial equipment according to mathematical model
Prediction, predicts the outcome to be formed;
One outlier detection module, deviates, in order to calculate, the information point that normal value is bigger in described service data.
Preferably, described mathematical model includes time series models and/or neural network model.
Preferably, described outlier detection module calculates described fortune by distance algorithm and/or density algorithm
Row data deviate the information point that normal value is bigger.
Preferably, it is provided that an electronic table unit, connect described analysis module, in order to show described analysis
The analysis result that module is formed.
Preferably, described data monitoring system is configuration software.
Technique scheme has the advantage that or beneficial effect: can be to the industry of data monitoring system acquisition
The service data of equipment makes analysis timely, checks for user with the analysis result that formation is corresponding, side
Just user recognizes the duty of industrial equipment accurately, overcomes data in prior art and surveys system
The service data to the industrial equipment gathered of uniting lacks the defect of the function of the data analysis of correspondence.
Accompanying drawing explanation
With reference to appended accompanying drawing, more fully to describe embodiments of the invention.But, appended accompanying drawing is only
For illustrating and illustrating, it is not intended that limitation of the scope of the invention.
Fig. 1 is the flow process of a kind of embodiment of the method realizing data analysis in data monitoring system of the present invention
Schematic diagram.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the present invention, and
It is not all, of embodiment.Based on the embodiment in the present invention, those of ordinary skill in the art are not making
The every other embodiment obtained on the premise of going out creative work, broadly falls into the scope of protection of the invention.
It should be noted that in the case of not conflicting, the embodiment in the present invention and the spy in embodiment
Levy and can be mutually combined.
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings, but not as the present invention's
Limit.
The present invention includes a kind of method realizing data analysis in data monitoring system.
As it is shown in figure 1, the embodiment of a kind of method realizing data analysis in data monitoring system, should
For being monitored industrial equipment, data monitoring system is at least connected with a data base in order to preserve data
The service data of the industrial equipment of monitoring system acquisition, comprises the following steps:
Step S1, provide a report controls;
Step S2, by amendment data monitoring system configuration file report controls is loaded onto data monitoring
System;
Step S3, offer one first data-interface are to obtain the operation of the industrial equipment being stored in data base
Data, and be shown on the display interface of report controls;
Step S4, offer one analysis module associate with data monitoring system, in order to adopt data monitoring system
Collect to the service data of industrial equipment be analyzed, to form analysis result.
In technique scheme, the service data gathering industrial equipment that data monitoring system is real-time, and store up
Deposit to data base, be loaded into the report controls of data monitoring system by real-time the showing of the first data-interface
Show the change of the operational factor of the industrial equipment stored in data base, when needing the industrial equipment collected
Service data when being analyzed, can by analyze module can work to data monitoring system acquisition timely
The operational factor of industry equipment is analyzed forming analysis result, facilitates user to grasp according to analysis result
The duty of industrial equipment.
In a particular embodiment, the industrial equipment being stored in data base by the first data-interface acquisition
The concrete methods of realizing of service data is as follows, to the different industrial equipment needing monitoring in report controls
Set up corresponding data object, such as class, and the number of the parameter definition correspondence according to corresponding industrial equipment
According to object's property value, and the property value of corresponding class is associated with the parameter of industrial equipment, is stepped on by backstage
Record data base, carries out assignment and renewal with query statement to data object's property value, passes through report controls
Display interface directly operate these data objects, with the real-time service data of the corresponding industrial equipment of display.
In one preferably embodiment, data base can use ORACLE data base or SQL number
According to storehouse.
In one preferably embodiment, report controls can be based on windows system user interface frame WPF
(Windows Presentation Foundation, Microsoft's user interface frame) is designed.
In one preferably embodiment, in step S4, it is provided that one second data-interface, connect respectively
Meet analysis module and data base, analyze module and collected by the second data-interface acquisition data monitoring system
Service data, to obtain analysis result.Further, analyze module mainly to be formed by Matlab system;
Second data-interface is mainly formed by the script file i.e. M file of Matlab system.
In the particular embodiment, obtain, by the second data-interface, the industry that data monitoring system collects
The service data concrete implementation method of equipment is as follows, by by the ginseng in the M file of Matlab system
Numerical value is associated with the service data of data acquisition system, transmits with parameter in time performing M file
The form service data of industrial equipment that data monitoring system is gathered be transferred to M literary composition as parameter
Part, thus realize data acquisition.
In one preferably embodiment, in step S2, the configuration file of data monitoring system, with
The form of the i.e. dll file of library file loads report controls.
In one preferably embodiment, in step S4, analyze module and include:
One parameter value prediction module, in order to the service data of industrial equipment is predicted according to mathematical model,
Predict the outcome to be formed;
One outlier detection module, deviates, in order to calculate, the information point that normal value is bigger in service data.
In one preferably embodiment, mathematical model includes time series models and/or neutral net mould
Type.Further, mathematical model can be worked out in the script file of Matlab system, corresponding by performing
Script file obtain corresponding predicting the outcome.
In one preferably embodiment, outlier detection module is calculated by distance algorithm and/or density
Method calculates and deviates the information point that normal value is bigger in service data.Further, above-mentioned computational methods can be compiled
It is formed in the script file of Matlab system, obtains corresponding calculating knot by performing corresponding script file
Really.
In one preferably embodiment, above-mentioned analysis can be shown in a graphical form by report controls
Result.
In one preferably embodiment, it is provided that an electronic table unit, electronic table unit connects and divides
Analysis module, analyzes, in order to show, the analysis result that module is formed.Further, electronic table unit can be adopted
Use EXCEL.
In one preferably embodiment, data monitoring system is configuration software.
Technique scheme has the advantage that or beneficial effect: can be to the industry of data monitoring system acquisition
The service data of equipment carries out real-time graphic software platform and is analyzed timely, to form correspondence
Analysis result is checked for user, facilitates user to recognize the duty of industrial equipment accurately, gram
Take the service data of the data survey examining system industrial equipment to gathering in prior art and lack the data of correspondence
The defect of the function analyzed.
The foregoing is only preferred embodiment of the present invention, not thereby limit embodiments of the present invention and
Protection domain, to those skilled in the art, it should can appreciate that all utilization description of the invention
And the equivalent done by diagramatic content and the scheme obtained by obvious change, all should comprise
Within the scope of the present invention.
Claims (10)
1. the method realizing data analysis in data monitoring system, it is applied to industrial equipment is monitored, described data monitoring system is at least connected with a data base in order to preserve the service data of the described industrial equipment that described data monitoring system gathers, it is characterised in that comprise the following steps:
Step S1, provide a report controls;
Step S2, by revise described data monitoring system configuration file described report controls is loaded onto described data monitoring system;
The described service data of the described industrial equipment that step S3, offer one first data-interface are stored in described data base with acquisition, and be shown on the display interface of described report controls;
Step S4, offer one analysis module associate with described data monitoring system, and the service data of the described industrial equipment in order to collect described data monitoring system is analyzed, to form analysis result.
The method realizing data analysis in data monitoring system the most according to claim 1, it is characterised in that described report controls is based on windows system user interface frame.
The method realizing data analysis in data monitoring system the most according to claim 1, it is characterised in that in described step S2, the configuration file of data monitoring system, load described report controls with the form of library file.
The method realizing data analysis in data monitoring system the most according to claim 1, it is characterized in that, in described step S4, one second data-interface is provided, connect described analysis module and described data monitoring system respectively, described analysis module obtains the described service data that described data monitoring system collects, to obtain analysis result by described second data-interface.
The method realizing data analysis in data monitoring system the most according to claim 1, it is characterised in that described analysis module is mainly formed by Matlab system;Described second data-interface is mainly formed by the script file of described Matlab system.
The method realizing data analysis in data monitoring system the most according to claim 1, it is characterised in that in described step S4, described analysis module includes:
One parameter value prediction module, in order to be predicted the service data of described industrial equipment according to mathematical model, predicts the outcome to be formed;
One outlier detection module, deviates, in order to calculate, the information point that normal value is bigger in described service data.
The method realizing data analysis in data monitoring system the most according to claim 6, it is characterised in that described mathematical model includes time series models and/or neural network model.
The method realizing data analysis in data monitoring system the most according to claim 6, it is characterised in that described outlier detection module is calculated by distance algorithm and/or density algorithm and deviates the information point that normal value is bigger in described service data.
The method realizing data analysis in data monitoring system the most according to claim 1, it is characterised in that provide an electronic table unit, connects described analysis module, in order to show the analysis result that described analysis module is formed.
10. according to the method realizing data analysis in described data monitoring system arbitrary in claim 1-9, it is characterised in that described data monitoring system is configuration software.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610143713.2A CN105911965B (en) | 2016-03-14 | 2016-03-14 | A method of realizing data analysis in data monitoring system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610143713.2A CN105911965B (en) | 2016-03-14 | 2016-03-14 | A method of realizing data analysis in data monitoring system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105911965A true CN105911965A (en) | 2016-08-31 |
CN105911965B CN105911965B (en) | 2019-11-05 |
Family
ID=56744424
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610143713.2A Active CN105911965B (en) | 2016-03-14 | 2016-03-14 | A method of realizing data analysis in data monitoring system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105911965B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108256589A (en) * | 2018-02-14 | 2018-07-06 | 北京火花日志科技有限公司 | A kind of industrial equipment data application reading/writing method and device |
CN109145000A (en) * | 2018-08-13 | 2019-01-04 | 上海电气集团股份有限公司 | A kind of RTDB in Industry Control OPC UA data-interface implementation method |
CN109426302A (en) * | 2017-08-30 | 2019-03-05 | 西门子(中国)有限公司 | A kind of data analysis equipment and method |
CN109643240A (en) * | 2016-09-27 | 2019-04-16 | 西门子股份公司 | Automatically generate the industrial control unit (ICU) and method of user interface |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001236115A (en) * | 2000-02-24 | 2001-08-31 | Fanuc Ltd | Remote diagnostic system and method |
CN1801131A (en) * | 2005-11-11 | 2006-07-12 | 南京科远控制工程有限公司 | Setup method for real-time database system of thermal power plant |
CN102323806A (en) * | 2011-07-08 | 2012-01-18 | 中冶南方(武汉)自动化有限公司 | Inverter monitoring platform and monitoring method thereof |
CN103107601A (en) * | 2013-02-26 | 2013-05-15 | 合肥未来计算机技术开发有限公司 | Web of Things smart power grid operation and maintenance system |
CN104808650A (en) * | 2015-04-03 | 2015-07-29 | 沈阳化工大学 | Fault diagnosis system of oil delivery process |
-
2016
- 2016-03-14 CN CN201610143713.2A patent/CN105911965B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001236115A (en) * | 2000-02-24 | 2001-08-31 | Fanuc Ltd | Remote diagnostic system and method |
CN1801131A (en) * | 2005-11-11 | 2006-07-12 | 南京科远控制工程有限公司 | Setup method for real-time database system of thermal power plant |
CN102323806A (en) * | 2011-07-08 | 2012-01-18 | 中冶南方(武汉)自动化有限公司 | Inverter monitoring platform and monitoring method thereof |
CN103107601A (en) * | 2013-02-26 | 2013-05-15 | 合肥未来计算机技术开发有限公司 | Web of Things smart power grid operation and maintenance system |
CN104808650A (en) * | 2015-04-03 | 2015-07-29 | 沈阳化工大学 | Fault diagnosis system of oil delivery process |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109643240A (en) * | 2016-09-27 | 2019-04-16 | 西门子股份公司 | Automatically generate the industrial control unit (ICU) and method of user interface |
CN109643240B (en) * | 2016-09-27 | 2022-05-06 | 西门子股份公司 | Industrial controller and method for automatically generating user interface |
CN109426302A (en) * | 2017-08-30 | 2019-03-05 | 西门子(中国)有限公司 | A kind of data analysis equipment and method |
CN109426302B (en) * | 2017-08-30 | 2022-05-20 | 西门子(中国)有限公司 | Data analysis equipment and method |
CN108256589A (en) * | 2018-02-14 | 2018-07-06 | 北京火花日志科技有限公司 | A kind of industrial equipment data application reading/writing method and device |
CN108256589B (en) * | 2018-02-14 | 2022-01-28 | 北京火花日志科技有限公司 | Industrial equipment data application reading and writing method and device |
CN109145000A (en) * | 2018-08-13 | 2019-01-04 | 上海电气集团股份有限公司 | A kind of RTDB in Industry Control OPC UA data-interface implementation method |
Also Published As
Publication number | Publication date |
---|---|
CN105911965B (en) | 2019-11-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111324639B (en) | Data monitoring method, device and computer readable storage medium | |
CN107086944A (en) | A kind of method for detecting abnormality and device | |
CN101620691A (en) | Automatic data mining platform in telecommunications industry | |
US20080243912A1 (en) | Method of providing business intelligence | |
CN114118224B (en) | Neural network-based full-system telemetry parameter anomaly detection system | |
CN106934720A (en) | Equipment insurance intelligent pricing method and system based on Internet of Things | |
CN107818227A (en) | A kind of bridge machinery approaches to IM and system based on BIM | |
CN105911965A (en) | Method for realizing data analysis in data monitoring system | |
WO2022199179A1 (en) | Remaining life prediction model modeling system and method for equipment, and prediction system | |
CN110751725A (en) | Disaster occurrence tracing method based on BIM + GIS fusion technology | |
US11481413B2 (en) | Systems and methods for evaluating petroleum data for automated processes | |
CN111401827A (en) | Digital collection system of bridge disease | |
CN106293891A (en) | Multidimensional investment target measure of supervision | |
CN115328068A (en) | Digital twinning system applied to industrial production | |
CN113850475A (en) | Production equipment performance evaluation system based on big data | |
TW202046034A (en) | Production design assistance device, production design assistance method and production design assistance program | |
CN114693114A (en) | Monitoring method and device for underground space structure, computer equipment and storage medium | |
CN115494801B (en) | Plate production line building method and terminal | |
CN103268329B (en) | Plasma panel manufacturing process data digging system | |
CN117217020A (en) | Industrial model construction method and system based on digital twin | |
CN104065510A (en) | PetriNet-based system operation and maintenance monitoring method and PetriNet-based system operation and maintenance monitoring system | |
CN113610575B (en) | Product sales prediction method and prediction system | |
Zangl et al. | Predictive data mining techniques for production optimization | |
Li et al. | Challenges in developing a computational platform to integrate data analytics with simulation-based optimization | |
CN117952323B (en) | Product creation system, method, equipment and medium based on digital twin |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20160831 Assignee: Shanghai Electric Huicheng Intelligent System Co., Ltd Assignor: Shanghai Electrical Group Co., Ltd. Contract record no.: X2019310000022 Denomination of invention: Method for realizing data analysis in data monitoring system Granted publication date: 20191105 License type: Common License Record date: 20191126 |