CN105909276A - Multifunctional construction trolley for emergency repair of operating railway tunnel trunk collapse - Google Patents

Multifunctional construction trolley for emergency repair of operating railway tunnel trunk collapse Download PDF

Info

Publication number
CN105909276A
CN105909276A CN201610377467.7A CN201610377467A CN105909276A CN 105909276 A CN105909276 A CN 105909276A CN 201610377467 A CN201610377467 A CN 201610377467A CN 105909276 A CN105909276 A CN 105909276A
Authority
CN
China
Prior art keywords
vehicle body
trolley
chassis
trolley body
described chassis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610377467.7A
Other languages
Chinese (zh)
Inventor
刘均红
高占军
杨永强
谢爱华
李璐
张俊英
蒋中明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Fifth Survey and Design Institute Group Co Ltd
Original Assignee
China Railway Fifth Survey and Design Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Fifth Survey and Design Institute Group Co Ltd filed Critical China Railway Fifth Survey and Design Institute Group Co Ltd
Priority to CN201610377467.7A priority Critical patent/CN105909276A/en
Publication of CN105909276A publication Critical patent/CN105909276A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/003Linings or provisions thereon, specially adapted for traffic tunnels, e.g. with built-in cleaning devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/12Temporary supports for use during building; Accessories
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a multifunctional construction trolley for emergency repair of operating railway tunnel trunk collapse. The multifunctional construction trolley comprises a trolley body, rail wheels are arranged on the lower portion of the trolley body, and a central control room is arranged in the middle of the front end of the trolley body. Temporary extending supporting systems are arranged on the front portion and the two sides of the front portion of the trolley body. An advanced support system is arranged at the top end of the middle of the trolley body. A crushing system, a mounting and erecting system and a drossing system are sequentially arranged at the front end of the trolley body. A conveying system is arranged in the abdomen of the trolley body. Connecting systems are arranged on the two sides of the trolley body. A power system is arranged on the tail of the trolley body, and a riding system is arranged on the power system. Scattered machines for multiple emergency repair procedures are ingeniously integrated on the trolley, so that the mechanical emergency repair level is greatly improved, and construction safety is guaranteed.

Description

A kind of railway in operation tunnel trunk caves in the multi-functional construction trolley of emergency first-aid repair
Technical field
The present invention relates to the device of a kind of emergency dealing, particularly relate to a kind of railway in operation tunnel trunk emergency first-aid repair that caves in many Function construction trolley.
Background technology
Currently, for railway in operation tunnel because of calamity destroy emergency first-aid repair many prediction schemes in, the emergency first-aid repair machine that barrel caves in Tool is substantially gathers materials on the spot, and utilizes small-sized expedient material, not only operation dispersion, poor-performing, and Mechanization Level Lowly, repairing step sequence is complicated, prevents secondary measure of caving in not in place, causes robbing logical overlong time, be unfavorable for emergent logical Car.
It addition, affected by uncertain factors such as engineering geological condition, sectional form and lining styles, scattered expedient material Repairing expends substantial amounts of manpower, and totally unfavorable to railway tunnel first-aid repair construction safety.
Summary of the invention
It is an object of the invention to provide a kind of Mechanization Level height, the railway in operation tunnel trunk of construction safety caves in emergent robbing Repair multi-functional construction trolley.
It is an object of the invention to be achieved through the following technical solutions:
The railway in operation tunnel trunk of the present invention caves in the multi-functional construction trolley of emergency first-aid repair, including chassis vehicle body, and described The bottom of car vehicle body arranges rail wheel, and the front center of described chassis vehicle body is provided with OPS of central authorities, before described chassis vehicle body Portion and front part sides overhanging temporary support system respectively, the top, middle part of described chassis vehicle body is provided with advance support system, institute The front end stating chassis vehicle body is sequentially provided with crushing system, installs construction system and take off slag system, and described chassis vehicle body abdominal part sets Putting transportation system, the both sides of described chassis vehicle body are provided with connection system, and described chassis tail of the body arranges dynamical system, institute State and be provided with, on chassis tail of the body dynamical system, the system of taking.
As seen from the above technical solution provided by the invention, the railway in operation tunnel trunk that the embodiment of the present invention provides collapses The multi-functional construction trolley of the emergency first-aid repair that collapses, is integrated into a platform by the dispersion machinery implementing first-aid repair construction multiple step sequence dexterously Che Shang, is greatly improved repairing Mechanization Level, ensures construction safety.
Accompanying drawing explanation
Fig. 1 shows for the cave in structure of the multi-functional construction trolley of emergency first-aid repair of the railway in operation tunnel trunk that the embodiment of the present invention provides It is intended to;
Fig. 2 is the A-A profile of Fig. 1;
Fig. 3 is the B-B profile of Fig. 1;
In figure:
1 rail wheel;2 chassis vehicle bodies;3 OPSs of central authorities;4 hydraulic jack;5 jumbolters;6 slip castings Device;7 quartering hammers;8 scraper bowls;9 scalable installation arm and operating platforms;10 conveyer belts;11 transports Car;12 connection systems;13 dynamical systems;14 take system.
Detailed description of the invention
The embodiment of the present invention will be described in further detail below.
The railway in operation tunnel trunk of the present invention caves in the multi-functional construction trolley of emergency first-aid repair, its preferably detailed description of the invention It is:
Including chassis vehicle body, the bottom of described chassis vehicle body arranges rail wheel, and the front center of described chassis vehicle body is provided with central authorities OPS, the front portion of described chassis vehicle body and front part sides overhanging temporary support system, the middle part of described chassis vehicle body respectively Top is provided with advance support system, and the front end of described chassis vehicle body is sequentially provided with crushing system, installs construction system and skim System, described chassis vehicle body abdominal part is provided with transportation system, and the both sides of described chassis vehicle body are provided with connection system, described chassis Tail of the body arranges dynamical system, is provided with, on described chassis tail of the body dynamical system, the system of taking.
Described temporary support system includes that four groups of hydraulic jack, described advance support system include jumbolter and slip casting dress Putting, described crushing system is made up of quartering hammer, and described installation construction system includes that four joints scalable installation arm and operation are flat Platform, described in take off slag system and be made up of scraper bowl, described transportation system includes the conveyer belt being located at chassis vehicle body abdominal part and is connected to The transport vehicle of chassis body rear end, described connection system is made up of one group of pump line, can externally connect concrete pump machine.
Overall structure profile length × width × height a size of 12.0m × 2.8m × 3.3m (without transport vehicle), complete vehicle weight is 20t.This repairing chassis overall dimensions meets railway tunnel repairing track clearance requirement, and the act distance of stretching of this repairing chassis meets Railway tunnel fundamental construction clearan ce requirement.
The railway in operation tunnel trunk of the present invention caves in the multi-functional construction trolley of emergency first-aid repair, in line with " first lead to be apt to afterwards, first letter Rear solid, allotment transition, progressively recover " principle and theory with preliminary bracing as primary load bearing structure, it is achieved repairing is executed The mechanized operation of work, with the fewest manpower and as soon as possible the time complete tunnel and rob logical.
The present invention is utilized track drawing to advance by rail wheel, and repairing chassis includes OPS of central authorities, hangs the rear that caves in and do not collapse Or have temporary support system that the possible liner structure that continues to cave in is supported, to caving in rear country rock and the body that caves in is carried out Reinforce advance support system, the crushing system that the bulk Rock And Soil caved in is crushed, to taking off that the slag that collapses is cleared up Slag system and transportation system, the installation construction system that country rock preliminary bracing is applied, externally it is connected with concrete pump machine Connection system, provide and run the dynamical system of power and blower fan the most interim to some small instruments and tools and construction material is carried out Carry takes system.
Described rail wheel is placed in chassis bottom;OPS of described central authorities is positioned at chassis front center;Described temporary support system by Four groups of hydraulic jack composition, during work wherein two groups stretched out by chassis front end telescopic arm and to stand on chassis dead ahead, separately Outer two groups are stretched out by both sides, chassis front telescopic arm and to stand on chassis both sides;Described advance support system by jumbolter and Grouting device forms, and by hinged, is placed in top in the middle part of chassis;Described crushing system is made up of quartering hammer, is placed in chassis On the left of front end;Described slag system of taking off is placed on the right side of chassis body structure;Described transportation system is by conveyer belt and transport trainset Becoming, conveyer belt is placed in chassis abdominal part, and transport vehicle is drawn by chassis;Described installation construction system is saved flexible machinery by one group four Arm forms, and is placed on the left of chassis front end, and operating platform is taken in arm front end, and operating platform a size of 1.6m × 1.0m × 1.0m (length × width × height), for manually carrying out steel arch-shelf adjustment;Described connection system is made up of, externally one group of pump line Connect concrete pump machine, be placed in chassis vehicle body both sides;The described system of taking is positioned at chassis tail of the body.
Overall structure overall dimensions of the present invention is 12.0m × 2.8m × 3.3m (length × width × height) (without transport vehicle), Complete vehicle weight is 20t, meets railway tunnel repairing track clearance requirement, stretches act distance and meets railway tunnel fundamental construction clearan ce Requirement.
The present invention by mechanical integrated to one chassis implementing first-aid repair construction multiple step sequence, is greatly improved repairing machine dexterously Tool level, ensures construction safety.
Specific embodiment:
As shown in Figure 1, Figure 2, Figure 3 shows, the present invention is when railway in operation tunnel trunk caves in, by road or railroad track Traffic is transported to rapidly tunnel portal and completes to assemble.The face rear that caves in is marched to, at the scene via unbroken track After connecting interim wind, water, electricity, OPS of central authorities operate, implement first-aid repair construction.
Job step sequence is as follows:
Temporary support: utilize the anterior four groups of hydraulic jack stretched out with front part sides telescopic arm of chassis, withstand to close on and collapse Location, side hangs and the liner structure that do not collapses, and prevents continuation of caving in.Two groups of jack stands that wherein chassis is anterior are supported on Processed caves on face temporarily, and two groups of jack stands of chassis front part sides are placed in ditch lid plate top surface. Jack bottom need to keep level.
Face is closed: landslide face arranges wall for grouting ,~60 ° slopes at 45 ° with rail level shape utilize connection system Concrete ejection hands face is carried out spray 20cm thickness C25 concrete enclosing.Before closing face, pre-buried 2 Delivery pump pipe, 1 as pumping line, 1 as observing tube, the mouth of pipe is higher than tunnel vault 2~3m.
Cave in rear reinforce: according to present situation of caving in, carry out grouting and reinforcing, slip casting pipe range in the range of the rear 5~10m that caves in Degree and spacing determine according to field condition.
Advance support: use advanced tubule to coordinate self-feeding anchor pile that the body front that caves in carries out advance support, form country rock Fixing collar.
Collapse chamber backfill: containment vessel is done in the pumping C20 concrete backfill chamber that collapses, be pumped to observing tube toward till backflow slurry, it is ensured that mix Solidifying soil thickness is not less than 1m.
Monitoring measurement: face certain distance backward arranges monitoring parameter measuring point from caving in, and carries out restraining and settlement observation, really Protect country rock gib system safety and temporary support structure consolidates.
The body that caves in excavates: carries out the Rock And Soil that caves in broken and skims, and is transported to chassis afterbody by chassis abdominal part conveyer belt and transports Defeated car.Excavation uses short benching tunnelling method.
Gunite concrete: by the concrete ejection hands of connection system free face carried out concrete ejection after excavation levelling, And lay precast reinforced net.
Steel arch-shelf is installed: installing construction system by chassis front end and carry out steel arch-shelf installation, steel arch-shelf spacing is suitably encrypted. Steel arch-shelf with do not destroy steel arch-shelf at existing abutment wall or corner and weld.Gap gunite concrete between steelframe and country rock Fill closely knit.
If tunnel trunk collapse range is long, first-aid repair construction can be carried out by tunnel's entrance and exit two ends simultaneously.
If tunnel cross-section is relatively big, can be used parallel by two repairing chassis.
The above, the only present invention preferably detailed description of the invention, but protection scope of the present invention is not limited thereto, Any those familiar with the art in the technical scope of present disclosure, the change that can readily occur in or replace Change, all should contain within protection scope of the present invention.Therefore, protection scope of the present invention should be with claims Protection domain is as the criterion.

Claims (3)

1. a railway in operation tunnel trunk caves in the multi-functional construction trolley of emergency first-aid repair, it is characterised in that include chassis car Body, the bottom of described chassis vehicle body arrange rail wheel, the front center of described chassis vehicle body be provided with central authorities OPS, described The front portion of car vehicle body and front part sides overhanging temporary support system respectively, the top, middle part of described chassis vehicle body is provided with advanced Protecting system, the front end of described chassis vehicle body is sequentially provided with crushing system, installs construction system and take off slag system, described chassis Vehicle body abdominal part is provided with transportation system, and the both sides of described chassis vehicle body are provided with connection system, and described chassis tail of the body arranges dynamic Force system, is provided with, on described chassis tail of the body dynamical system, the system of taking.
Railway in operation tunnel trunk the most according to claim 1 caves in the multi-functional construction trolley of emergency first-aid repair, its feature Being, described temporary support system includes that four groups of hydraulic jack, described advance support system include jumbolter and slip casting Device, described crushing system is made up of quartering hammer, and described installation construction system includes four joint scalable installation arm and operations Platform, described in take off slag system and be made up of scraper bowl, described transportation system includes conveyer belt and the connection being located at chassis vehicle body abdominal part In the transport vehicle of body rear end, described connection system is made up of one group of pump line, externally connects concrete pump machine.
Railway in operation tunnel trunk the most according to claim 1 and 2 caves in the multi-functional construction trolley of emergency first-aid repair, and it is special Levy and be, the overall structure profile length × width × height a size of 12.0m × 2.8m × 3.3m without transport vehicle, complete vehicle weight For 20t.
CN201610377467.7A 2016-05-31 2016-05-31 Multifunctional construction trolley for emergency repair of operating railway tunnel trunk collapse Pending CN105909276A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610377467.7A CN105909276A (en) 2016-05-31 2016-05-31 Multifunctional construction trolley for emergency repair of operating railway tunnel trunk collapse

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610377467.7A CN105909276A (en) 2016-05-31 2016-05-31 Multifunctional construction trolley for emergency repair of operating railway tunnel trunk collapse

Publications (1)

Publication Number Publication Date
CN105909276A true CN105909276A (en) 2016-08-31

Family

ID=56741873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610377467.7A Pending CN105909276A (en) 2016-05-31 2016-05-31 Multifunctional construction trolley for emergency repair of operating railway tunnel trunk collapse

Country Status (1)

Country Link
CN (1) CN105909276A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107829751A (en) * 2017-10-24 2018-03-23 中铁十六局集团北京轨道交通工程建设有限公司 A kind of supporting trolley device of shield machine for handling the interim dangerous situation of shield-tunneling construction
CN113699900A (en) * 2021-09-10 2021-11-26 中铁第五勘察设计院集团有限公司 Beam pier structure for bridge emergency repair and application thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1072845A (en) * 1996-08-29 1998-03-17 Osaka City Effective use of surplus soil in construction site
JP2001115657A (en) * 1999-10-14 2001-04-24 Yuaazu:Kk Method for repairing concrete structure
CN101982618A (en) * 2010-09-17 2011-03-02 山东理工大学 Manual control and remote control integrated electric fork lift truck
CN201784625U (en) * 2010-07-22 2011-04-06 南车长江车辆有限公司 Universal railway open wagon
CN104564090A (en) * 2014-12-13 2015-04-29 中国煤炭科工集团太原研究院有限公司 Multifunctional tunnel repairing integrated machine
CN205778919U (en) * 2016-05-31 2016-12-07 中铁第五勘察设计院集团有限公司 A kind of railway in operation tunnel trunk caves in the multi-functional construction trolley of emergency first-aid repair

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1072845A (en) * 1996-08-29 1998-03-17 Osaka City Effective use of surplus soil in construction site
JP2001115657A (en) * 1999-10-14 2001-04-24 Yuaazu:Kk Method for repairing concrete structure
CN201784625U (en) * 2010-07-22 2011-04-06 南车长江车辆有限公司 Universal railway open wagon
CN101982618A (en) * 2010-09-17 2011-03-02 山东理工大学 Manual control and remote control integrated electric fork lift truck
CN104564090A (en) * 2014-12-13 2015-04-29 中国煤炭科工集团太原研究院有限公司 Multifunctional tunnel repairing integrated machine
CN205778919U (en) * 2016-05-31 2016-12-07 中铁第五勘察设计院集团有限公司 A kind of railway in operation tunnel trunk caves in the multi-functional construction trolley of emergency first-aid repair

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107829751A (en) * 2017-10-24 2018-03-23 中铁十六局集团北京轨道交通工程建设有限公司 A kind of supporting trolley device of shield machine for handling the interim dangerous situation of shield-tunneling construction
CN113699900A (en) * 2021-09-10 2021-11-26 中铁第五勘察设计院集团有限公司 Beam pier structure for bridge emergency repair and application thereof

Similar Documents

Publication Publication Date Title
CN101403305B (en) Construction method for tunnel continuous mucking, lining and excavation synchronization
CN105756702B (en) A kind of lane side cylinder mould filling and support gob-side entry retaining method
ES2902703T3 (en) underground mining
CN108412501A (en) Under wear oil pipeline shallow depth loess tunnels construction method
CN208236413U (en) A kind of shaft construction device
CN107060795A (en) A kind of underground mine TBM assembly construction methods
CN108286442A (en) Excavation method suitable for a Support System in Soft Rock Tunnels quick closure cyclization of two steps
CN110924958B (en) Method for treating main tunnel door closing collapse by using service tunnel
CN108533268A (en) A kind of shaft construction device and its application method
CN109629576A (en) Cross foundation pit feed pipe suspension protection system and construction method
CN109488347A (en) A kind of excavation construction method for special formation chamber
CN105909276A (en) Multifunctional construction trolley for emergency repair of operating railway tunnel trunk collapse
CN205778919U (en) A kind of railway in operation tunnel trunk caves in the multi-functional construction trolley of emergency first-aid repair
CN104088646A (en) Construction method of U-shaped open-type shield machine
Tonon Methods for enlarging transportation tunnels while keeping tunnels fully operational
US3590590A (en) Tunnel building
CN110821508A (en) Rock mining device and method for penetrating through surrounding rock of broken zone
CN105937400A (en) One-time tunneling two-roadway-retained excavating operation production line
EP0989285A1 (en) Tunneling device
CN113605903B (en) Quick, simple and easy-to-operate new excavation and lining method for tunnel or arch base chamber of special anchorage
CN211115999U (en) Rock mining device for penetrating through surrounding rock of broken zone
CN108952729B (en) Rapid hole entering method for mountain tunnel construction
CN107268681A (en) Piping lane apparatus for work
CN209444332U (en) A kind of constructing structure reinforced for boulder group outstanding on shield section
CN207278269U (en) A kind of combination moving type construction operation platform for mining sectbn

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160831