CN105909034B - Air hermetic preserved contact net tubular steel post and preparation method thereof - Google Patents

Air hermetic preserved contact net tubular steel post and preparation method thereof Download PDF

Info

Publication number
CN105909034B
CN105909034B CN201610425613.9A CN201610425613A CN105909034B CN 105909034 B CN105909034 B CN 105909034B CN 201610425613 A CN201610425613 A CN 201610425613A CN 105909034 B CN105909034 B CN 105909034B
Authority
CN
China
Prior art keywords
tubular steel
steel post
air
sealing
zinc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610425613.9A
Other languages
Chinese (zh)
Other versions
CN105909034A (en
Inventor
李春林
汪吉健
魏宏伟
戴贤兴
于素芬
王爱竟
李建东
皮春凯
商顺超
胡会良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Electrical Baoding Products Co Ltd
China State Railway Group Co Ltd
China Railway Engineering Consulting Group Co Ltd
Original Assignee
China Railway Electrical Baoding Products Co Ltd
China Railway Corp
China Railway Engineering Consulting Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Electrical Baoding Products Co Ltd, China Railway Corp, China Railway Engineering Consulting Group Co Ltd filed Critical China Railway Electrical Baoding Products Co Ltd
Priority to CN201610425613.9A priority Critical patent/CN105909034B/en
Publication of CN105909034A publication Critical patent/CN105909034A/en
Application granted granted Critical
Publication of CN105909034B publication Critical patent/CN105909034B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Coating With Molten Metal (AREA)

Abstract

The present invention relates to electric railway technologies, in particular to air hermetic preserved contact net tubular steel post and preparation method thereof.The end sealing of the tubular steel post cylinder is fixed with first flange disk, and first flange disk detachable-type sealed connects sealing cover, two gas nozzles are arranged on sealing cover, sealed valve is arranged on gas nozzle;The bottom end seal of cylinder is fixed with galvanized sheet, and drainage hole is arranged on galvanized sheet, and drainage hole is less than the cross sectional inner diameter of tubular steel post, and drainage hole is furnished with sealing plate.Sealing cover, sealing plate is arranged in both ends to zinc-plated tubular steel post by the present invention, after the completion of galvanizing by dipping, by the way that inner air to be extracted out to and is filled with nitrogen or the gas of oxidation reaction does not occur with zinc, iron, internal oxygen and moisture content are reduced to reach, greatly reduces the purpose of its internal oxidation speed.

Description

Air hermetic preserved contact net tubular steel post and preparation method thereof
Technical field
The present invention relates to electric railway technologies, in particular to air hermetic preserved contact net tubular steel post and its system Preparation Method.
Background technique
Existing steel pipe support for contact network uses inside and outside galvanizing by dipping anti-corrosion, and pillar is integrally placed at galvanized bath, in pillar two sides If zinc-plated gas vent, it is ensured that galvanizing flux and gas can be smoothly discharged inside pillar, after the completion of zinc-plated, capital gas vent without It blocks, with outside atmosphere connection inside pillar, seriously corroded local be easy to cause corrosion, and can not observe.
Summary of the invention
The purpose of the present invention is to provide a kind of air hermetic preserved contact net tubular steel posts and preparation method thereof, to solve to limit The problem of internal corrosion of system, isolation etchant gas.
The present invention relates to a kind of air hermetic preserved contact net tubular steel post, the end sealing of cylinder is fixed with first flange Disk, the first flange disk detachable-type sealed connect sealing cover, two gas nozzles are arranged on the sealing cover, set on the gas nozzle Set sealed valve;The bottom end seal of the cylinder is fixed with galvanized sheet, and drainage hole is arranged on the galvanized sheet, and the drainage hole is small In the cross sectional inner diameter of the tubular steel post, the drainage hole is furnished with sealing plate.
In some embodiments, preferably, second flange disk is arranged in the lid mouth of the sealing cover, is arranged two on the base A gas nozzle.
In some embodiments, preferably, tetrafluoro washer is set between the first flange disk and the second flange disk.
In some embodiments, preferably, the valve is right-angle valve.
In some embodiments, preferably, filled with non-oxidized gas in the inner tube of the tubular steel post.
In some embodiments, preferably, the non-oxidized gas is preferably nitrogen.
The present invention also provides a kind of preparation methods of air hermetic preserved contact net tubular steel post comprising:
Step 1, both ends of the sealing to zinc-plated tubular steel post;
Step 2, it is inflated by the gas nozzle to zinc-plated tubular steel post end sealing lid into zinc-plated tubular steel post, detection weldering Air-tightness at seam and sealing;
Step 3, it if air-tightness is qualified, dismantles to the sealing cover on zinc-plated tubular steel post top and the sealing plate of bottom end, Then galvanizing by dipping is carried out to cylinder;If air-tightness is unqualified, unqualified place is repaired, step 1 and 2 are repeated;
Step 4, after galvanizing by dipping, the both ends of tubular steel post are again sealed off, and are vacuumized;
Step 5, it is filled with nitrogen into the sealed steel pipe pillar of vacuum to the first atmospheric pressure value, and observes air pressure change;
Step 6, if air pressure is unchanged, then into sealed steel pipe pillar nitrogen is filled with to the second atmospheric pressure value;To obtain the final product.
In some embodiments, preferably, the both ends of the sealed steel pipe pillar include:
Pass through the ring flange at the top of joint seal of flanges lid and cylinder;
Close two valves on sealing cover;
Using the drainage hole on sealing plate closing cylinder bottom galvanized sheet.
In some embodiments, preferably, the gas nozzle by zinc-plated tubular steel post end sealing lid is to zinc-plated Inflation in tubular steel post, detecting the air-tightness at weld seam and sealing includes:
One of gas nozzle of sealing cover is connected into gas tube, another gas nozzle connects air gauge;
It is inflated by the gas nozzle into tubular steel post, and observes air pressure and reach preset value, close valve;
To zinc-plated tubular steel post weld seam and sealing at smear suds;
If suds are blown out bubble, determine that the air-tightness at bubble is unqualified;
If suds are not blown out bubble, determine that the air-tightness of tubular steel post is qualified.
In some embodiments, preferably, the preset value is 4 atmospheric pressure.
In some embodiments, preferably, first atmospheric pressure value is 0.05 atmospheric pressure;Second atmospheric pressure value is 1 A atmospheric pressure.
Air hermetic preserved contact net tubular steel post provided in an embodiment of the present invention and preparation method thereof, with prior art phase Than sealing cover, sealing plate being arranged in the both ends to zinc-plated tubular steel post, after the completion of galvanizing by dipping, by extracting inner air out And be filled with nitrogen or the gas of oxidation reaction does not occur with zinc, iron, internal oxygen and moisture content are reduced to reach, is greatly reduced The purpose of its internal oxidation speed.
Detailed description of the invention
The structural representation of air hermetic preserved contact net tubular steel post when Fig. 1 is in one embodiment of the invention from angle Figure;
The structure of air hermetic preserved contact net tubular steel post when Fig. 2 is in one embodiment of the invention from another angle Schematic diagram;
Fig. 3 is the preparation method step schematic diagram of air hermetic preserved contact net tubular steel post in one embodiment of the invention.
Note: 1 first flange disk;2 cylinders;3 second flange disks;4 bases;5 sealed valves;6 galvanized sheets;7 drainage holes.
Specific embodiment
The present invention is described in further detail below by specific embodiment combination attached drawing.
In view of existing steel pipe support for contact network is using in inside and outside galvanizing by dipping anti-corrosion, join inside pillar with outside atmosphere It is logical, cause seriously corroded inside pillar, the problem of durability difference, the present invention provides air hermetic preserved contact net tubular steel post and Preparation method.
A kind of air hermetic preserved contact net tubular steel post, the end sealing of cylinder are fixed with first flange disk, the first method Blue disk is tightly connected sealing cover, and two gas nozzles are arranged on sealing cover, sealed valve, first flange disk and sealing cover is arranged on gas nozzle It is connected by flange seal;The bottom end seal of cylinder is fixed with galvanized sheet, drainage hole is arranged on galvanized sheet, drainage hole is equipped with sealing Plate.
A kind of preparation method of air hermetic preserved contact net tubular steel post comprising:
Step 1, both ends of the sealing to zinc-plated tubular steel post;
Step 2, it is inflated by the gas nozzle to zinc-plated tubular steel post end sealing lid into zinc-plated tubular steel post, detection weldering Air-tightness at seam and sealing;
Step 3, it if air-tightness is qualified, dismantles to the sealing cover on zinc-plated tubular steel post top and the sealing plate of bottom end, Then galvanizing by dipping is carried out to cylinder;If air-tightness is unqualified, unqualified place is repaired, step 1 and 2 are repeated;
Step 4, after galvanizing by dipping, the both ends of tubular steel post are again sealed off, and are vacuumized;
Step 5, it is filled with nitrogen into the sealed steel pipe pillar of vacuum to the first atmospheric pressure value, and observes air pressure change;
Step 6, if air pressure is unchanged, then into sealed steel pipe pillar nitrogen is filled with to the second atmospheric pressure value;To obtain the final product.
Sealing cover, sealing plate is arranged in both ends to zinc-plated tubular steel post, after the completion of galvanizing by dipping, by by inner air It extracts and is filled with nitrogen out or the gas of oxidation reaction does not occur with zinc, iron, reduce internal oxygen and moisture content to reach, greatly Reduce the purpose of its internal oxidation speed.
Next, technology is described in detail by some specific embodiments:
A kind of air hermetic preserved contact net tubular steel post, as shown in Figs. 1-2, fix in the end sealing of cylinder 2 (for example weld Connect, be integrally machined) first flange disk 1, the sealed connection sealing cover of first flange disk 1, the lid mouth setting second flange of sealing cover Disk 3 is connected by screw bolts with first flange disk 1.Sealing cover energy first flange disk 1 disassembles, and closing is used as after zinc-plated.It is close Two gas nozzles are set in capping, and two gas nozzles are arranged on base 4, one of them is another for connecting air inlet (or pumping) pipe It is a to be used to connect air gauge.Space in the pipe for needing to close tubular steel post after inflation or pumping, therefore be all provided on each gas nozzle Sealed valve 5 is set, which is right-angle valve.Traditional 2 low side of cylinder is not provided with any sealing structure, promotes in pipe always It is exposed in air, is easily corroded, it is improved in the present invention, the bottom end seal of cylinder 2 is fixed with zinc-plated in pipe Plate 6, drainage hole 7 is arranged on galvanized sheet 6, and the aperture of drainage hole 7 is less than the cross sectional inner diameter of tubular steel post.Drainage hole 7 is equipped with close Sealing plate is sealed drainage hole 7 using sealing plate after galvanizing by dipping.
In order to improve the sealing effect between first flange disk 1 and second flange disk 3, tetrafluoro can be set between Washer.It is the air-tightness of washer, compressibility, creep resistance, resist chemical, high resilience, anti-glutinous when selecting tetrafluoro washer Connecing property, non-corrosive, resistance to temperature are intended to reach certain requirement, to guarantee that strut seal flange is long-term under extraneous corrosive environment Airtight effect.
After galvanizing by dipping, by sealing cover and sealing plate, closure airtight to tubular steel post inside is controlled respectively, avoids pillar Inside is corroded, and realizes that steel construction bracket pillar is handled in external anti-corrosion reinforcement on coastal rainy, heavily contaminated district railway bridge Afterwards, the internal and external anti-corrosive time limit is at least up to 50 years;It avoids since corrosion causes pillar discarded inside pillar.
Moreover, in order to further avoid being aoxidized inside tubular steel post, also filled with non-oxide gas in the inner tube of tubular steel post Body, preferably nitrogen.Non-oxide inert gas is contacted with tubular steel post does not occur oxidation reaction, is that a kind of preferable anti-corrosion is arranged It applies.
In order to prepare above-mentioned air hermetic preserved contact net tubular steel post, as shown in figure 3, its method includes the following steps:
Step 101, both ends of the sealing to zinc-plated tubular steel post;
The step is to detect the air-tightness at weld seam and sealing in next step and prepare.Because in tubular steel post finished product It can be filled with inert non-oxidizing gases, to improve anti-corrosion effect, in order to avoid inert non-oxidizing gases spilling, so needing in inner tube Air-tightness is detected in advance, once poor air-tightness, needs to be repaired in advance.
Pass through the ring flange at the top of joint seal of flanges lid and cylinder first;Two valves being then shut off on sealing cover; Using the drainage hole on sealing plate closing cylinder bottom galvanized sheet.
Step 102, it is inflated by the gas nozzle to zinc-plated tubular steel post end sealing lid to the inner tube to zinc-plated tubular steel post, Detect the air-tightness at weld seam and sealing;
The mode of detection air-tightness has very much, the principle that blows bubbles is borrowed in the present embodiment, in the inner tube of tubular steel post Inflatable body, if poor air-tightness, the gas run out of can blow out the bubble of suds.Specifically:
It is inflated with air compressor machine, (atmospheric pressure value is not fixed in actual operation, is frothed as long as can reach for air pressure to 4.0 The purpose of bubble, and do not damage tubular steel post) when, suds are applied at weld seam and sealing, check weld seam and sealing matter Amount.If there is gas leak phenomenon, weld seam is resealed or repaired, carries out removing capping if intact and gas nozzle carries out hot-dip Zinc.
One of gas nozzle of sealing cover is connected into gas tube, another gas nozzle connects air gauge;By gas nozzle to steel pipe Inflation in pillar, and observe air pressure and reach preset value, close valve;Suds are smeared at the weld seam of tubular steel post and sealing; If suds are blown out bubble, determine that the air-tightness at bubble is unqualified;If suds are not blown out bubble, steel pipe is determined The air-tightness of pillar is qualified.
Step 101 and step 102 belong to the zinc-plated preceding air tightness test of zinc-plated tubular steel post.
Step 103, it if air-tightness is qualified, dismantles to the sealing cover on zinc-plated tubular steel post top and the sealing of bottom end Then plate carries out galvanizing by dipping to cylinder;If air-tightness is unqualified, after resealing or repairing weld seam, step 101 is repeated With 102;
Step 104, after galvanizing by dipping, the both ends of tubular steel post are again sealed off, and are vacuumized;
The step is and to prevent its gas leakage from preparing in order to then to filling inert non-oxidizing gas in tubular steel post.By air pressure Table accesses a gas nozzle, and the exhaust tube of air exhauster contacts another gas nozzle, is evacuated on one side, observes the variation of atmospheric pressure value on one side.
Step 105, it is filled with nitrogen into the sealed steel pipe pillar of vacuum to the first atmospheric pressure value, and observes air pressure change;
This step be in order to detect it is zinc-plated after tubular steel post air-tightness.Specifically: nitrogen is packed into tubular steel post To 0.05 atmospheric pressure, stop state into quiet, after stopping at least through 24 hours quiet, reexamines air pressure inside.Air pressure without (temperature effect is considered) when variation, confirmation products air tightness is qualified, otherwise steel column structure weld seam is examined again using ultrasonic wave, and It repairs.
Step 106,
Step 106, if air pressure is unchanged, then into sealed steel pipe pillar nitrogen is filled with to the second atmospheric pressure value;It closes straight Angle valve, remove air gauge and gas tube to get.
After air pressure inside No leakage and variation, continue to be filled with 1 when the inert non-oxidizing gases such as nitrogen to room temperature Standard pressure.Air pressure is according to temperature when inflation when specific inflation, according to its equation of The Ideal-Gas Equation, i.e. pV=nRT, really Determine inner gas pressure under relevant temperature.
Pillar is processed into enclosed construction, passes through column by this project product pillar using tubular steel post to the special processing of pillar Top and column bottom installation sealing air valve, pillar inside and outside wall uses galvanizing by dipping preservative treatment, after the completion of galvanizing by dipping, by will be internal Air is extracted and is filled with nitrogen out or the gas of oxidation reaction do not occur with zinc, iron, and carries out air tight test, to reach in reduction Portion's oxygen and moisture content greatly reduce the purpose of its internal oxidation speed, realize and carry out long-effective corrosion inside pillar.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (8)

1. a kind of air hermetic preserved contact net tubular steel post, which is characterized in that the end sealing of its cylinder is fixed with first flange Disk, the first flange disk detachable-type sealed connect sealing cover, two gas nozzles are arranged on the sealing cover, set on the gas nozzle Set sealed valve;The bottom end seal of the cylinder is fixed with galvanized sheet, and drainage hole is arranged on the galvanized sheet, and the drainage hole is small In the cross sectional inner diameter of the tubular steel post, the drainage hole is furnished with sealing plate;The tubular steel post is zinc-plated pillar;The steel Tube support inner sealing nitrogen;
The preparation method of the tubular steel post includes:
Step 1, both ends of the sealing to zinc-plated tubular steel post;
Step 2, it is inflated by the gas nozzle to zinc-plated tubular steel post end sealing lid into zinc-plated tubular steel post,
Detect the air-tightness at weld seam and sealing;
Step 3, it if air-tightness is qualified, dismantles to the sealing cover on zinc-plated tubular steel post top and the sealing plate of bottom end, then Galvanizing by dipping is carried out to cylinder;If air-tightness is unqualified, unqualified place is repaired, step 1 and 2 are repeated;
Step 4, after galvanizing by dipping, the both ends of tubular steel post are again sealed off, and are vacuumized;
Step 5, it is filled with nitrogen into the sealed steel pipe pillar of vacuum to the first atmospheric pressure value, and observes air pressure change;
Step 6, if air pressure is unchanged, then into sealed steel pipe pillar nitrogen is filled with to the second atmospheric pressure value;To obtain the final product.
2. air hermetic preserved contact net tubular steel post as described in claim 1, which is characterized in that the lid mouth of the sealing cover is set Second flange disk is set, two gas nozzles are set on base.
3. air hermetic preserved contact net tubular steel post as claimed in claim 2, which is characterized in that the first flange disk and institute State setting tetrafluoro washer between second flange disk.
4. air hermetic preserved contact net tubular steel post as described in claim 1, which is characterized in that the valve is right-angle valve.
5. a kind of preparation method of any one of claim 1-4 air hermetic preserved contact net tubular steel post, which is characterized in that Include:
Step 1, both ends of the sealing to zinc-plated tubular steel post;
Step 2, it is inflated by the gas nozzle to zinc-plated tubular steel post end sealing lid into zinc-plated tubular steel post,
Detect the air-tightness at weld seam and sealing;
Step 3, it if air-tightness is qualified, dismantles to the sealing cover on zinc-plated tubular steel post top and the sealing plate of bottom end, then Galvanizing by dipping is carried out to cylinder;If air-tightness is unqualified, unqualified place is repaired, step 1 and 2 are repeated;
Step 4, after galvanizing by dipping, the both ends of tubular steel post are again sealed off, and are vacuumized;
Step 5, it is filled with nitrogen into the sealed steel pipe pillar of vacuum to the first atmospheric pressure value, and observes air pressure change;
Step 6, if air pressure is unchanged, then into sealed steel pipe pillar nitrogen is filled with to the second atmospheric pressure value;To obtain the final product.
6. preparation method as claimed in claim 5, which is characterized in that the both ends of the sealed steel pipe pillar
It include: by the ring flange at the top of joint seal of flanges lid and cylinder;Close two valves on sealing cover;Using sealing Plate closes the drainage hole on the galvanized sheet of cylinder bottom.
7. such as preparation method described in claim 5 or 6, which is characterized in that described by zinc-plated tubular steel post end sealing The gas nozzle of lid is inflated into zinc-plated tubular steel post, is detected the air-tightness at weld seam and sealing and is included:
One of gas nozzle of sealing cover is connected into gas tube, another gas nozzle connects air gauge;By the gas nozzle to steel pipe Inflation in pillar, and observe air pressure and reach preset value, close valve;To zinc-plated tubular steel post weld seam and sealing at smear fertilizer Soap water;If suds are blown out bubble, determine that the air-tightness at bubble is unqualified;If suds are not blown out bubble, sentence The air-tightness for determining tubular steel post is qualified.
8. preparation method as claimed in claim 7, which is characterized in that the preset value is 4 atmospheric pressure;And/or described One atmospheric pressure value is 0.05 atmospheric pressure;Second atmospheric pressure value is 1 atmospheric pressure.
CN201610425613.9A 2016-06-15 2016-06-15 Air hermetic preserved contact net tubular steel post and preparation method thereof Active CN105909034B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610425613.9A CN105909034B (en) 2016-06-15 2016-06-15 Air hermetic preserved contact net tubular steel post and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610425613.9A CN105909034B (en) 2016-06-15 2016-06-15 Air hermetic preserved contact net tubular steel post and preparation method thereof

Publications (2)

Publication Number Publication Date
CN105909034A CN105909034A (en) 2016-08-31
CN105909034B true CN105909034B (en) 2019-02-15

Family

ID=56750130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610425613.9A Active CN105909034B (en) 2016-06-15 2016-06-15 Air hermetic preserved contact net tubular steel post and preparation method thereof

Country Status (1)

Country Link
CN (1) CN105909034B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108945515A (en) * 2018-07-18 2018-12-07 中国人民解放军总参谋部第六十研究所 A kind of helicopter fuselage frame and its application method with monitoring device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09112072A (en) * 1995-10-20 1997-04-28 Nippon Chikou Kk Electrocorrosion preventive device of steel pipe electric pole and its construction method
CN201162370Y (en) * 2008-01-24 2008-12-10 中铁十局集团有限公司 Contact net steel column
CN202000725U (en) * 2011-04-26 2011-10-05 山东中铁华盛机械有限公司 Steel pipe support for contact network
CN202194424U (en) * 2011-07-22 2012-04-18 中铁第一勘察设计院集团有限公司 Aeolation-prevention thin-wall centrifugal concrete steel pipe support for electric railway catenary
CN202658947U (en) * 2012-06-26 2013-01-09 中国铁建电气化局集团第五工程有限公司 Annular concrete-filled steel tube strut for catenary
CN202831759U (en) * 2012-09-25 2013-03-27 中国电力工程顾问集团东北电力设计院 Air inflation steel tube constructional element
CN204098027U (en) * 2014-09-24 2015-01-14 安徽省交通建设有限责任公司 A kind of freezing process guard aperture shaped pile structure
CN205805100U (en) * 2016-06-15 2016-12-14 中铁工程设计咨询集团有限公司 Air hermetic preserved contact net tubular steel post

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09112072A (en) * 1995-10-20 1997-04-28 Nippon Chikou Kk Electrocorrosion preventive device of steel pipe electric pole and its construction method
CN201162370Y (en) * 2008-01-24 2008-12-10 中铁十局集团有限公司 Contact net steel column
CN202000725U (en) * 2011-04-26 2011-10-05 山东中铁华盛机械有限公司 Steel pipe support for contact network
CN202194424U (en) * 2011-07-22 2012-04-18 中铁第一勘察设计院集团有限公司 Aeolation-prevention thin-wall centrifugal concrete steel pipe support for electric railway catenary
CN202658947U (en) * 2012-06-26 2013-01-09 中国铁建电气化局集团第五工程有限公司 Annular concrete-filled steel tube strut for catenary
CN202831759U (en) * 2012-09-25 2013-03-27 中国电力工程顾问集团东北电力设计院 Air inflation steel tube constructional element
CN204098027U (en) * 2014-09-24 2015-01-14 安徽省交通建设有限责任公司 A kind of freezing process guard aperture shaped pile structure
CN205805100U (en) * 2016-06-15 2016-12-14 中铁工程设计咨询集团有限公司 Air hermetic preserved contact net tubular steel post

Also Published As

Publication number Publication date
CN105909034A (en) 2016-08-31

Similar Documents

Publication Publication Date Title
CN103471780B (en) Airtight container end cap weld inspection system and detection method
CN108758325B (en) Vacuumizing degassing process
CN111811809B (en) Quality control method for valve seat assembly
CN105909034B (en) Air hermetic preserved contact net tubular steel post and preparation method thereof
CN111693222A (en) Helium mass spectrum leak detection method for detecting sealing performance of printed plate heat exchanger
CN109470426B (en) Door and window air tightness detection equipment
CN205805100U (en) Air hermetic preserved contact net tubular steel post
CN103630305A (en) Aluminium casting air tightness detector
CN206292012U (en) A kind of lithium-ion-power cell device for detecting sealability
CN108760159A (en) It is a kind of to use SF6Gas carries out the device and method of shell leak detection
CN203672574U (en) Aluminium casting airtightness detection apparatus
CN1690676A (en) Method for air tightness detection of sewage conduit
CN206583581U (en) A kind of pressure differential method explosion-proof valve air-leakage test device
CN107543660A (en) Storage tank bottom plate weld joint vacuum experimental rig
CN115219108A (en) Leakage detection device for generator hydrogen cooler and test method
CN204637624U (en) Novel distillation tower
CN207866438U (en) Storage tank bottom plate weld joint vacuum experimental rig
CN210603769U (en) Ammonia leakage test device
CN107796746A (en) A kind of material permeability coefficient detection means
CN115248094A (en) Off-line air tightness detection system and detection method for RH vacuum tank
CN106595981A (en) Aluminum alloy hub air-tightness detection method
CN213336678U (en) Defoaming tank bottom valve sealing performance detection device for polyimide film production
CN205538118U (en) Ship sewage well air -tight test frock
CN216925973U (en) Airtightness valve detection equipment
CN201535725U (en) Sealed sampling device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant