CN1059010C - Method for integrally profile-controlling and water-plugging block - Google Patents
Method for integrally profile-controlling and water-plugging block Download PDFInfo
- Publication number
- CN1059010C CN1059010C CN97115100A CN97115100A CN1059010C CN 1059010 C CN1059010 C CN 1059010C CN 97115100 A CN97115100 A CN 97115100A CN 97115100 A CN97115100 A CN 97115100A CN 1059010 C CN1059010 C CN 1059010C
- Authority
- CN
- China
- Prior art keywords
- value
- profile control
- block
- water injection
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 17
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 91
- 238000002347 injection Methods 0.000 claims abstract description 55
- 239000007924 injection Substances 0.000 claims abstract description 55
- 238000010276 construction Methods 0.000 claims abstract description 5
- 239000003795 chemical substances by application Substances 0.000 claims description 24
- 230000015572 biosynthetic process Effects 0.000 claims description 8
- 239000012530 fluid Substances 0.000 claims description 5
- 230000035699 permeability Effects 0.000 claims description 2
- 230000000903 blocking effect Effects 0.000 abstract 2
- 230000001105 regulatory effect Effects 0.000 abstract 1
- 239000003129 oil well Substances 0.000 description 8
- 238000004519 manufacturing process Methods 0.000 description 7
- 230000000694 effects Effects 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 238000011156 evaluation Methods 0.000 description 4
- 230000003190 augmentative effect Effects 0.000 description 2
- 239000002981 blocking agent Substances 0.000 description 2
- 239000008398 formation water Substances 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 239000002131 composite material Substances 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000000700 radioactive tracer Substances 0.000 description 1
- 235000020681 well water Nutrition 0.000 description 1
- 239000002349 well water Substances 0.000 description 1
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
A method for integrally regulating profile and blocking water for a block is mainly characterized in that pressure indexes PI of all water injection wells of the block are measured, and then the pressure indexes PI are used as decision parameters of problems related to the profile control and water blocking according to the magnitude of the pressure indexes PI. The method has strong operability, wide decision-making range and quick decision-making, and can make multiple decisions on the overall profile control and water plugging repeated construction of the block.
Description
The present invention relates to a kind of method that is used for block is carried out the integral profile control water blockoff, it belongs to, and formulation and the enforcement to oil field profile control and water plugging scheme provides a kind of effective decision-making technique in the Oil-Gas Field Development Engineering.It mainly is to adopt the pressure index method to determine the significant problem of the block integral profile control water blockoff parties concerned.
In Oil-Gas Field Development Engineering, profile control and water plugging technology is important means and the measure that improves oil recovery factor.Profile control and water plugging technology has developed into the block integral profile control water blockoff stage gradually by the corresponding profile control and water plugging stage of oil-water well of oil well individual well water blockoff stage, well individual well profile control stage, well group.Up to the present still there is not the especially effectively square problem that solves the integral profile control water blockoff of oil field block.In order to make profile control and water plugging become the important measures that improve oil recovery factor, must in block integral, carry out, so want to make profile control and water plugging embody organic conception, and form the center of other comprehensive regulation, one cover way of decision profile control and water plugging significant problem just must be arranged, and this way must be able to solve the problem of 6 aspects in the block integral profile control water blockoff: 1. differentiate block profile control necessity; 2. need on the block to determine the well of profile control and water plugging; 3. the blocking agent of selecting to be fit to is used for profile control and water plugging; 4. calculate the consumption of blocking agent; 5. evaluation effect; 6. decision time of repeating to construct.
Purpose of the present invention provides a kind of brand-new method that is used for block is carried out the integral profile control water blockoff with regard to being to solve of the prior art above-mentioned 6 big practical problems, its major technique characteristics are when block is carried out the integral profile control water blockoff, its operation specifically should comprise the following steps: (1). at first measure the falloff curve of the well head of the whole water injection wells of block, and by the every mouthful of water injection well pressure drop that records
Curve calculates each mouthful water injection well in the closed-in time by the definition of following PI value and appointment
The PI value:
In the formula, PI is the pressure index (Mpa) of water injection well; P (t) is the tubing pressure (Mpa) behind the water injection well closed-in time t; T is the closed-in time; (2). by two standards the necessity of block profile control is judged:
1.. block mean P I value: block mean P I value is more little to need profile control more, if block mean P I
Value is lower than 10Mpa, and then this block needs profile control;
2.. the PI value extreme difference of block water injection well: PI value extreme difference is meant the maximum value of block water injection well PI value
Poor with minimum value, the big more profile control that needs more of its value, PI value extreme difference surpasses 5Mpa, then should the district
Piece needs profile control;
The block that meets above-mentioned any one standard or meet two standards simultaneously all must carry out profile control; (3). press block mean P I value and water injection well PI value and select profile control well and water injection well, it is flat to select to be lower than block
All the water injection well of PI value is a profile control well, and the water injection well that selection is higher than block mean P I value is augmented injection
Well, near block mean P I value, a little more than or a little less than the water injection well of mean P I value for not locating
The reason well; (4). select the type of profile control agent to carry out profile control; (5). select to repeat the time of profile control and water plugging construction.
In the above-mentioned said method that is used for block is carried out the integral profile control water blockoff, the physical parameter of its pressure index PI value and stratum and fluid has following relation:
In the formula, q is a water injection well day fluence; μ is a fluid dynamic viscosity; K is an in-place permeability; H is a formation thickness; r
eIt is the water injection well Control Radius; is a formation porosity; C is a system compressibility; T is the closed-in time.
In the described said method, the consumption of its profile control agent depends on the predetermined improvement value of water injection well pressure index value, with flow factor and formation thickness, its profile control agent be to calculate by following formula with flow factor by the injection test result:
In the formula, β uses flow factor; W is the profile control agent consumption; h
fIt is the water filling layer thickness; Δ PI ' is the variation of PI value before and after the injection test profile control agent.
Come enumeration technical characterstic of the present invention below in conjunction with embodiment.
In practical operation and implementing, designer of the present invention realizes the decision-making of block integral profile control water blockoff as follows, that is: 1. decision parameters PI values obtains
Measure the well head falloff curve of whole water injection wells on the block, and curve calculates the PI value of water injection well by the following PI value defined formula and the closed-in time of appointment thus:
In the formula, PI is the pressure index (Mpa) of water injection well; P (t) is the tubing pressure (Mpa) behind the water injection well closed-in time t; T is the closed-in time.2. the judgement of block profile control necessity
By two standards the necessity of block profile control is judged 1. block mean P I value: the more little profile control that needs more of block mean P I value, the block of the low 10Mpa of average PI value needs profile control.2. the PI value extreme difference of block water injection well: PI value extreme difference is meant the poor of the maximum value of block water injection well PI value and minimum value, and the big more profile control that needs more of its value generally is that the block that PI value extreme difference surpasses 5Mpa needs profile control.
Usually, meet necessity that one of them or the block that meets two standards simultaneously all have profile control.3. profile control well is selected
It is selected to press block mean P I value and water injection well PI value.The water injection well that normally is lower than block mean P I value is a profile control well, and the water injection well that is higher than block mean P I value is the augmented injection well, near block mean P I value, a little more than or a little less than the water injection well of mean P I value for not handling well.4. the selection of profile control agent
The selection of water injection well profile control agent is that routinely 4 standards are carried out, i.e. the PI value and the cost of the salinity of formation temperature, formation water, water injection well.5. the calculating of profile control agent consumption:
Calculate the consumption of profile control agent by following three steps, promptly 1. determine the prescription of profile control agent.2. the flow factor of using by the following formula definition is calculated in the profile control agent injection test:
In the formula, β uses flow factor; W is the profile control agent consumption; h
fIt is the water filling layer thickness; Δ PI ' is the variation of PI value before and after the injection test profile control agent.3. by the formal consumption of constructing of consumption coefficient calculations profile control agent:
W=βh
fΔPI
In the formula, Δ PI is the predetermined 6. evaluation of profile control effect of improvement value (MPa) of water injection well PI value before and after the profile control
The foundation of its evaluation mainly is a 1. water injection well well head falloff curve; 2. injection IPR curve; 3. profile-log of water injection; 4. WATER DISPLACEMENT CURVES; 5. the production curve of tracer before and after the profile control; 6. the production curve of oil well and block (day production fluid, composite water cut and day produce oil).7. repeat the decision of engineering time
Because profile control agent moves into the stratum, the plugging action of near wellbore zone is reduced, then curve descends.It is that the PI value reduces that curve descends.When PI value before the PI value is decreased to profile control or a certain rational designated value, be the time that repeats to construct.8. 1. water blockoff oil well selected of the decision-making of oilwell water shutoff: the water blockoff oil well by production capacity, high moisture, be in low PI value zone (from distinguishing
Piece PI value isopleth map is found out) etc. condition selected.2. the selection of water shutoff agent: water shutoff agent is pressed salinity, the oil well PI value of living in of formation temperature, formation water
Zone and condition such as cost select.3. the water shutoff agent consumption is definite: by w=β ' h
tCalculate.β ' is the water shutoff agent flow factor in the formula,
Its value is at 2~20m
3The scope of/m (stratum).Concrete β ' value should be with reference to the construction with condition
Selecting of oil well.4. the evaluation of water plugging effect: can comment by the production profile of oil well before and after the water blockoff and the variation of production curve
Valency.5. repeat determining of engineering time: by the variation decision of production curve.
Decision-making technique of the present invention is implemented the block (20) in some oil field, has all obtained good effect.That this technology is compared with the profile control and water shutoff method of prior art is workable, decision-making face width, decision-making rapidly, and can repeat construction to the block integral profile control water blockoff and repeatedly make a strategic decision, so this technology is specially adapted to the block integral profile control water blockoff is made a strategic decision.
Claims (3)
1. method that is used for block is carried out the integral profile control water blockoff, it is characterized in that this method comprises the following steps: (1). at first measure the falloff curve of the well head of the whole water injection wells of block, and calculate the PI value of each mouthful water injection well by the every mouthful of water injection well falloff curve that records by closed-in time of the definition of following PI value and appointment:
In the formula, PI is the pressure index (Mpa) of water injection well; P (t) is the tubing pressure (Mpa) behind the water injection well closed-in time t; T is the closed-in time; (2). by two standards the necessity of block profile control to be judged: 1.. block mean P I value: block mean P I value is more little to need profile control more, if block mean P I value is lower than 10Mpa, then this block needs profile control; 2.. the PI value extreme difference of block water injection well: PI value extreme difference is meant the poor of the maximum value of block water injection well PI value and minimum value, the big more profile control that needs more of its value, PI value extreme difference surpasses 5Mpa, and then this block needs profile control;
The block that meets above-mentioned any one standard or meet two standards simultaneously all must carry out profile control; (3). press block mean P I value and water injection well PI value and select profile control well and water injection well, select to be lower than block
The water injection well of mean P I value is a profile control well, selects to be higher than the water injection well of block mean P I value for increasing
Annotate well, near block mean P I value, a little more than or a little less than the water injection well of mean P I value be
Do not handle well; (4). select the type of profile control agent to carry out profile control; (5). select to repeat the time of profile control and water plugging construction.
2. the method that is used for block is carried out the integral profile control water blockoff according to claim 1 is characterized in that the physical parameter of pressure index PI value and stratum and fluid has following relation:
In the formula, q is a water injection well day fluence; μ is a fluid dynamic viscosity; K is an in-place permeability; H is a formation thickness; r
eIt is the water injection well Control Radius; is a formation porosity; C is a system compressibility; T is the closed-in time.
3. the method that is used for block is carried out the integral profile control water blockoff according to claim 1, the consumption that it is characterized in that profile control agent depends on the predetermined improvement value of water injection well pressure index value, with flow factor and formation thickness, its profile control agent be to calculate by following formula with flow factor by the injection test result:
In the formula, β uses flow factor; W is the profile control agent consumption; h
fIt is the water filling layer thickness; Δ PI ' is the variation of PI value before and after the injection test profile control agent.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN97115100A CN1059010C (en) | 1997-08-06 | 1997-08-06 | Method for integrally profile-controlling and water-plugging block |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN97115100A CN1059010C (en) | 1997-08-06 | 1997-08-06 | Method for integrally profile-controlling and water-plugging block |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1173581A CN1173581A (en) | 1998-02-18 |
CN1059010C true CN1059010C (en) | 2000-11-29 |
Family
ID=5173119
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN97115100A Expired - Fee Related CN1059010C (en) | 1997-08-06 | 1997-08-06 | Method for integrally profile-controlling and water-plugging block |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1059010C (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1295422C (en) * | 2001-08-27 | 2007-01-17 | 石油大学(华东) | Edge water scheduling technique for oil field using edge water to displace oil |
CN105868558A (en) * | 2016-03-29 | 2016-08-17 | 中国石油天然气股份有限公司 | Method for evaluating profile control injectability of water injection well |
CN106874666A (en) * | 2017-02-10 | 2017-06-20 | 中国石油天然气股份有限公司 | Method for judging whether water injection well is acidified on line and acidification degree |
CN107794285A (en) * | 2016-08-30 | 2018-03-13 | 中国石油化工股份有限公司 | A kind of preparation method and application of displacement of reservoir oil biopolymer |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1079484C (en) * | 1999-08-19 | 2002-02-20 | 白云渡 | Section regulation process for interrupted water-injection depth of water injection well |
CN102606119B (en) * | 2012-02-07 | 2014-08-06 | 中国石油天然气股份有限公司 | Fixed-point gel-placing water-blocking profile control agent and use method thereof |
CN103075142B (en) * | 2013-01-14 | 2016-06-22 | 中国石油大学(华东) | A kind of waterflooding oil field water blockoff oil well well choosing method |
CN103244087B (en) * | 2013-05-21 | 2016-01-20 | 中国石油大学(北京) | A kind of low-permeability oil deposit profile control and water plugging selects well decision-making technique |
CN103291265A (en) * | 2013-06-24 | 2013-09-11 | 西南石油大学 | Method for judging full profile control degree of water injection well |
CN103643928B (en) * | 2013-11-21 | 2016-05-11 | 中国海洋石油总公司 | A kind of depth profile control method step by step based on pressure field and velocity field distribution |
CN103867188B (en) * | 2014-03-14 | 2017-03-22 | 山东石大油田技术服务股份有限公司 | Decision method used for profile control of oil-field water injection well |
CN106351625B (en) * | 2015-07-17 | 2021-01-29 | 中国石油化工股份有限公司 | Dynamic system analysis method for oilfield flooding development |
CN105715238A (en) * | 2015-12-01 | 2016-06-29 | 山东石大油田技术服务股份有限公司 | Real time monitoring and controlling method for displacement pressure gradient of waterflooding development oil reservoir |
CN106761618A (en) * | 2016-12-26 | 2017-05-31 | 中国石油天然气股份有限公司 | Method and device for determining profile control dosage for water injection well |
CN107355200B (en) * | 2017-09-08 | 2020-03-03 | 北京科技大学 | Method for improving water drive well selection by nano-micron particle dispersion system |
CN108590571A (en) * | 2018-03-27 | 2018-09-28 | 中国石油天然气股份有限公司 | Method for determining dosage of profile control agent of low-permeability fractured water-breakthrough reservoir for water injection well |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4903766A (en) * | 1988-12-30 | 1990-02-27 | Mobil Oil Corporation | Selective gel system for permeability profile control |
US4915170A (en) * | 1989-03-10 | 1990-04-10 | Mobil Oil Corporation | Enhanced oil recovery method using crosslinked polymeric gels for profile control |
US4964461A (en) * | 1989-11-03 | 1990-10-23 | Mobil Oil Corporation | Programmed gelation of polymers using melamine resins |
US5103909A (en) * | 1991-02-19 | 1992-04-14 | Shell Oil Company | Profile control in enhanced oil recovery |
-
1997
- 1997-08-06 CN CN97115100A patent/CN1059010C/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4903766A (en) * | 1988-12-30 | 1990-02-27 | Mobil Oil Corporation | Selective gel system for permeability profile control |
US4915170A (en) * | 1989-03-10 | 1990-04-10 | Mobil Oil Corporation | Enhanced oil recovery method using crosslinked polymeric gels for profile control |
US4964461A (en) * | 1989-11-03 | 1990-10-23 | Mobil Oil Corporation | Programmed gelation of polymers using melamine resins |
US5103909A (en) * | 1991-02-19 | 1992-04-14 | Shell Oil Company | Profile control in enhanced oil recovery |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1295422C (en) * | 2001-08-27 | 2007-01-17 | 石油大学(华东) | Edge water scheduling technique for oil field using edge water to displace oil |
CN105868558A (en) * | 2016-03-29 | 2016-08-17 | 中国石油天然气股份有限公司 | Method for evaluating profile control injectability of water injection well |
CN107794285A (en) * | 2016-08-30 | 2018-03-13 | 中国石油化工股份有限公司 | A kind of preparation method and application of displacement of reservoir oil biopolymer |
CN106874666A (en) * | 2017-02-10 | 2017-06-20 | 中国石油天然气股份有限公司 | Method for judging whether water injection well is acidified on line and acidification degree |
Also Published As
Publication number | Publication date |
---|---|
CN1173581A (en) | 1998-02-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1059010C (en) | Method for integrally profile-controlling and water-plugging block | |
CN110334431B (en) | Single-well control reserve calculation and residual gas analysis method for low-permeability tight gas reservoir | |
Patton et al. | Prediction of polymer flood performance | |
Bondor et al. | Mathematical simulation of polymer flooding in complex reservoirs | |
CN103628850B (en) | A kind of waterflooding oil field integral profile control water blockoff decision-making technique | |
Tiab | Analysis of pressure and pressure derivative without type-curve matching—Skin and wellbore storage | |
CN109902918B (en) | Shale fracturing self-supporting fracture network permeability calculation method | |
CN111520136A (en) | Method for calculating pressure behind blanking plug nozzle by considering water injection starting pressure gradient | |
CN109522583B (en) | Heterogeneous limit determination method for multi-layer oil reservoir development layer system combination | |
BenNaceur et al. | Mechanisms controlling fracture height growth in layered media | |
Patzek et al. | Water injection into a low-permeability rock-1 hydrofracture growth | |
CN111764890A (en) | Well testing analysis method for ultra-low permeability reservoir | |
Snyder et al. | Application of Buckley-Leverett displacement theory to noncommunicating layered systems | |
CN1464429A (en) | Method for calculating gas reservoir recovery ratio and recoverable reserve | |
Fenwick et al. | Calculating three-phase relative permeabilities using network modeling | |
Coleman et al. | The blowdown-limit model | |
CN113971528A (en) | Method for identifying dominant seepage channel | |
Yang et al. | A method for pattern recognition of WOR plots in waterflood management | |
Silin et al. | Control model of water injection into a layered formation | |
CN111322054B (en) | Three-three combined excavation and potential optimization mining method for sandstone oil reservoir in chemical flooding stage | |
Gencer et al. | Well test analysis for two-phase flow of non-Newtonian power-law and Newtonian fluids | |
Ahmed et al. | Safsaf D Oil Reservoir–Oil in Place, Reserves, and Production Performance Estimations | |
Stackel et al. | An Example Approach to Predictive Well Management in Reservoir Simulation | |
Ferrer | Commingled production wells: experiences in Lake Maracaibo, Venezuela | |
Zwahlen et al. | Linear transient flow solution for primary oil recovery with infill and conversion to water injection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C06 | Publication | ||
PB01 | Publication | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |