Method for integrally profile-controlling and water-plugging block Download PDF

Info

Publication number
CN1059010C
CN1059010C CN97115100A CN97115100A CN1059010C CN 1059010 C CN1059010 C CN 1059010C CN 97115100 A CN97115100 A CN 97115100A CN 97115100 A CN97115100 A CN 97115100A CN 1059010 C CN1059010 C CN 1059010C
Authority
CN
China
Prior art keywords
value
profile control
block
water injection
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN97115100A
Other languages
Chinese (zh)
Other versions
CN1173581A (en
Inventor
赵福麟
张贵才
周洪涛
李宜坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum East China
Original Assignee
China University of Petroleum East China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum East China filed Critical China University of Petroleum East China
Priority to CN97115100A priority Critical patent/CN1059010C/en
Publication of CN1173581A publication Critical patent/CN1173581A/en
Application granted granted Critical
Publication of CN1059010C publication Critical patent/CN1059010C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

一种用于对区块进行整体调剖堵水的方法,它主要是通过测取区块的全部注水井压力指数PI,然后再根据将压力指数PI值的大小来作为调剖堵水有关问题的决策参数。该方法可操作性强、决策面宽、决策迅速,可对区块整体调剖堵水重复施工进行多次决策。A method for overall profile control and water shutoff of the block, which mainly measures the pressure index PI of all injection wells in the block, and then uses the value of the pressure index PI as the relevant problem of profile control and water shutoff decision parameters. This method has strong operability, wide decision-making scope and rapid decision-making, and can make multiple decisions on the block's overall profile control and water plugging repeated construction.

Description

一种用于对区块进行整体调剖堵水的方法A method for overall profile control and water plugging of blocks

本发明涉及一种用于对区块进行整体调剖堵水的方法,它属于油气田开发工程中对油田调剖堵水方案的制定和实施提供一种行之有效的决策方法。它主要是采用压力指数法来确定区块整体调剖堵水有关方面的重大问题。The invention relates to a method for overall profile control and water shutoff of blocks, which belongs to an effective decision-making method for formulating and implementing oilfield profile control and water shutoff schemes in oil and gas field development projects. It mainly uses the pressure index method to determine the major issues related to the block's overall profile control and water shutoff.

在油气田开发工程中,调剖堵水技术是提高原油采收率的重要手段和措施。调剖堵水技术已由油井单井堵水阶段、水井单井调剖阶段、井组的油水井对应调剖堵水阶段逐渐发展到了区块整体调剖堵水阶段。到目前为止尚无特别有效的方来解决油田区块的整体调剖堵水的问题。为了使调剖堵水成为提高原油采收率的重要措施,必须在区块整体中进行,所以要能使调剖堵水体现出整体观念,并形成为其它综合治理的中心,就必须有决定调剖堵水重大问题的一套办法,该办法必须能够解决区块整体调剖堵水中的6个方面的问题:①判别区块调剖必要性;②决定区块上需要调剖堵水的井;③选择适合的堵剂用于调剖堵水;④计算堵剂的用量;⑤评价效果;⑥决定重复施工的时间。In oil and gas field development projects, profile control and water shutoff technology is an important means and measure to enhance oil recovery. The profile control and water shutoff technology has gradually developed from the single oil well water shutoff stage, the water well single well profile control stage, the oil and water wells of the well group corresponding to the profile control and water shutoff stage to the block overall profile control and water shutoff stage. So far, there is no particularly effective method to solve the problem of overall profile control and water shutoff in oilfield blocks. In order to make profile control and water shutoff an important measure to enhance oil recovery, it must be carried out in the block as a whole. Therefore, in order to make profile control and water shutoff reflect the overall concept and form the center of other comprehensive management, there must be a decision A set of methods for major problems of profile control and water shutoff, which must be able to solve six aspects of the overall profile control and water shutoff of the block: ① determine the necessity of profile control in the block; well; ③select the appropriate plugging agent for profile control and water shutoff; ④calculate the dosage of plugging agent; ⑤evaluate the effect; ⑥determine the time for repeated construction.

本发明的目的就在于解决现有技术中的上述6大实际问题而提供一种全新的用于对区块进行整体调剖堵水的方法,它的主要技术特点是在对区块进行整体调剖堵水时,其操作具体应包括下列步骤:(1).首先测定区块全部注水井的井口的压降曲线,并由测得的每口注水井压降The purpose of the present invention is to solve the above six practical problems in the prior art and provide a brand-new method for overall profile control and water plugging of the block. When cutting and plugging water, its operation should specifically include the following steps: (1). First, measure the pressure drop curves of the wellheads of all the water injection wells in the block, and use the measured pressure drop curves of each water injection well

曲线按下面的PI值的定义式和指定的关井时间内计算出每一口注水井的The curve is calculated according to the following definition of PI value and the specified shut-in time for each water injection well

PI值: PI = ∫ 0 t p ( t ) dt t , PI value: P.I. = ∫ 0 t p ( t ) dt t ,

式中,PI为注水井的压力指数(Mpa);p(t)为注水井关井时间t后的油管压力(Mpa);t为关井时间;(2).按两个标准对区块调剖的必要性进行判断:In the formula, PI is the pressure index of the water injection well (Mpa); p(t) is the tubing pressure (Mpa) after the water injection well shut-in time t; t is the well shut-in time; (2). Judging the necessity of profile adjustment:

①.区块平均PI值:区块平均PI值越小越需要调剖,如果区块平均PI①. Block average PI value: the smaller the block average PI value, the more profile control is needed. If the block average PI

   值低于10Mpa,则该区块需要调剖;If the value is lower than 10Mpa, the block needs profile control;

②.区块注水井的PI值极差:PI值极差是指区块注水井PI值的最大值②. PI value range of block water injection wells: PI value range refers to the maximum value of PI value of block water injection wells

   与最小值之差,其值越大越需要调剖,PI值极差超过5Mpa,则该区The difference between the minimum value and the larger the value is, the more the profile control is required. If the PI value range exceeds 5Mpa, the area

   块需要调剖;The block needs profile adjustment;

   符合上述任何一个标准或同时符合两个标准的区块均必须进行调剖;(3).按区块平均PI值和注水井PI值选择调剖井和注水井,选择低于区块平Profile control is required for blocks that meet any of the above criteria or two criteria at the same time; (3). Select profile control wells and water injection wells according to the average PI value of the block and the PI value of the water injection well.

均PI值的注水井为调剖井,选择高于区块平均PI值的注水井为增注The water injection well with average PI value is the profile control well, and the water injection well with higher than the average PI value of the block is selected as the injection well

井,在区块平均PI值附近、略高于或略低于平均PI值的注水井为不处Wells, water injection wells near the average PI value of the block, slightly higher or slightly lower than the average PI value are not located

理井;(4).选择调剖剂的类型进行调剖;(5).选择重复调剖堵水施工的时间。Well management; (4). Select the type of profile control agent for profile control; (5). Select the time for repeated profile control and water plugging construction.

在上述所说的用于对区块进行整体调剖堵水的方法中,其压力指数PI值与地层及流体的物性参数有如下关系: In the above-mentioned method for overall profile control and water plugging of the block, the pressure index PI value has the following relationship with the physical parameters of the formation and fluid:

式中,q是注水井日注量;μ是流体动力粘度;k是地层渗透率;h是地层厚度;re是注水井控制半径;是地层孔隙度;c是综合压缩系数;t是关井时间。In the formula, q is the daily injection rate of the water injection well; μ is the hydrodynamic viscosity; k is the formation permeability; h is the formation thickness; r e is the control radius of the water injection well;  is the formation porosity; Shut-in time.

所述的上述方法中,其调剖剂的用量取决于注水井压力指数值的预定提高值、用量系数和地层厚度,其调剖剂的用量系数是由试注结果按下式算出: β = W h f ΔP I ′ In the above-mentioned method described above, the consumption of its profile control agent depends on the predetermined increase value of water injection well pressure index value, the consumption coefficient and formation thickness, and the consumption coefficient of its profile control agent is to be calculated by the following formula of test injection result: β = W h f ΔP I ′

式中,β是用量系数;W是调剖剂用量;hf是注水层厚度;ΔPI′是试注调剖剂前后PI值的变化。In the formula, β is the dosage coefficient; W is the dosage of profile control agent; h f is the thickness of water injection layer; ΔPI′ is the change of PI value before and after trial injection of profile control agent.

下面将结合实施例来详叙本发明的技术特点。The technical characteristics of the present invention will be described in detail below in conjunction with the embodiments.

在实际操作和实施中,本发明的设计者是按如下步骤实现区块整体调剖堵水决策的,即:1.决策参数PI值的取得In actual operation and implementation, the designer of the present invention realizes the overall profile control and water plugging decision of the block according to the following steps, namely: 1. The acquisition of the decision parameter PI value

测定区块上全部注水井的井口压降曲线,并由此曲线按下面的PI值定义式和指定的关井时间,计算出注水井的PI值: PI = ∫ 0 t p ( t ) dt t 式中,PI为注水井的压力指数(Mpa);p(t)为注水井关井时间t后的油管压力(Mpa);t为关井时间。2.区块调剖必要性的判断Measure the wellhead pressure drop curve of all water injection wells on the block, and calculate the PI value of the water injection well according to the following PI value definition formula and the specified well shut-in time from this curve: P.I. = ∫ 0 t p ( t ) dt t In the formula, PI is the pressure index (Mpa) of the water injection well; p(t) is the tubing pressure (Mpa) after the water injection well shut-in time t; t is the well shut-in time. 2. Judgment on the necessity of block profile control

按两个标准对区块调剖的必要性进行判断①区块平均PI值:区块平均PI值越小越需要调剖,一般平均PI值低10Mpa的区块需要调剖。②区块注水井的PI值极差:PI值极差是指区块注水井PI值的最大值与最小值之差,其值越大越需要调剖,一般是PI值极差超过5Mpa的区块需要调剖。The necessity of block profile control is judged according to two criteria ①Block average PI value: the smaller the block average PI value, the more profile control is needed. Generally, the block with an average PI value lower than 10Mpa needs profile control. ②The extreme difference of PI value of water injection wells in the block: the extreme difference of PI value refers to the difference between the maximum value and the minimum value of PI value of water injection wells in the block. The block needs profile adjustment.

通常,符合其中一个或同时符合两个标准的区块均有调剖的必要。3.调剖井的选定Usually, the blocks that meet one or both standards are necessary for profile control. 3. Selection of profile control wells

按区块平均PI值和注水井PI值选定。通常是低于区块平均PI值的注水井为调剖井,高于区块平均PI值的注水井为增注井,在区块平均PI值附近、略高于或略低于平均PI值的注水井为不处理井。4.调剖剂的选择Selected according to the average PI value of the block and the PI value of the water injection well. Usually, the water injection wells lower than the average PI value of the block are profile control wells, the water injection wells higher than the average PI value of the block are injection wells, and the water injection wells are near, slightly higher or slightly lower than the average PI value of the block The water injection wells are untreated wells. 4. Selection of profile control agent

注水井调剖剂的选择是按常规的4个标准进行,即地层温度、地层水的矿化度、注水井的PI值和成本。5.调剖剂用量的计算:The selection of profile control agent for water injection wells is carried out according to four conventional standards, namely formation temperature, salinity of formation water, PI value and cost of water injection wells. 5. Calculation of profile control agent dosage:

通过下面三个步骤计算出调剖剂的用量,即①决定调剖剂的配方。②调剖剂试注算出由下式定义的用量系数: β = W h f Δ PI ′ 式中,β是用量系数;W是调剖剂用量;hf是注水层厚度;ΔPI′是试注调剖剂前后PI值的变化。③由用量系数计算调剖剂正式施工的用量:Calculate the dosage of the profile control agent through the following three steps, that is, ① determine the formula of the profile control agent. ② The dosage coefficient defined by the following formula is calculated from the profile control agent test injection: β = W h f Δ P.I. ′ In the formula, β is the dosage coefficient; W is the dosage of profile control agent; h f is the thickness of water injection layer; ΔPI′ is the change of PI value before and after trial injection of profile control agent. ③Calculate the formal construction dosage of profile control agent by the dosage coefficient:

                                  W=βhfΔPIW=βh f ΔPI

式中,ΔPI是调剖前后注水井PI值预定提高值(MPa)6.调剖效果的评价In the formula, ΔPI is the predetermined increase value (MPa) of the PI value of the water injection well before and after profile control 6. Evaluation of profile control effect

其评价的依据主要是①注水井井口压降曲线;②注水井指示曲线;③注水井吸水剖面;④水驱曲线;⑤调剖前后示踪剂的产出曲线;⑥油井和区块的采油曲线(日产液、综合含水率和日产油)。7.重复施工时间的决定The evaluation is mainly based on ① wellhead pressure drop curve of water injection well; ② indicating curve of water injection well; ③ water absorption profile of water injection well; ④ water drive curve; Curves (daily liquid production, comprehensive water cut and daily oil production). 7. Decision to repeat construction time

因为调剖剂移入地层,对近井地带的封堵作用减小,则曲线下降。曲线下降即PI值减小。当PI值减小至调剖前的PI值或某一合理的指定值时,即为重复施工的时间。8.油井堵水的决策①堵水油井的选定:堵水油井按产能、高含水、处于低PI值区域(从区Because the profile control agent moves into the formation, the plugging effect on the near-wellbore area is reduced, and the curve decreases. The curve falls, that is, the PI value decreases. When the PI value decreases to the PI value before profile control or a reasonable specified value, it is time for repeated construction. 8. Decision-making for oil well water plugging ① Selection of water plugging oil wells: Water plugging oil wells are based on production capacity, high water cut, and low PI value area (from the area

块PI值等值图找出)等条件选定。②堵水剂的选择:堵水剂按地层温度、地层水的矿化度、油井所处PI值Block PI value contour map to find out) and other conditions are selected. ②Selection of water shutoff agent: water shutoff agent according to formation temperature, salinity of formation water, PI value of oil well

的区域和成本等条件选择。③堵水剂用量的确定:由w=β′ht计算。式中β′为堵水剂用量系数,The selection of conditions such as the region and cost. ③ Determination of the amount of water blocking agent: calculated by w = β′h t . In the formula, β' is the dosage coefficient of water blocking agent,

其值在2~20m3/m(地层)的范围。具体的β′值应参照同条件的已施工Its value is in the range of 2-20m 3 /m (formation). The specific value of β' should refer to the construction under the same conditions

油井的选定。④堵水效果的评价:可由堵水前后油井的产液剖面和采油曲线的变化评Selection of oil wells. ④Evaluation of water shutoff effect: It can be evaluated by the change of fluid production profile and oil production curve of the oil well before and after water shutoff.

价。⑤重复施工时间的确定:由采油曲线的变化决定。price. ⑤ Determination of repeated construction time: determined by the change of oil production curve.

本发明所采用的决策方法已对某些油田的区块(20个)进行了实施,均取得了良好的效果。这种技术与现有技术的调剖堵水方法相比可操作性强、决策面宽、决策迅速,而且可对区块整体调剖堵水重复施工进行多次决策,因此该技术特别适用于对区块整体调剖堵水进行决策。The decision-making method adopted by the present invention has been implemented to blocks (20) in some oil fields, and all have achieved good results. Compared with the existing profile control and water plugging methods, this technology has strong operability, wide decision-making area, and rapid decision-making, and can make multiple decisions on the block’s overall profile control and water plugging repeated construction, so this technology is especially suitable for Make decisions on the overall profile control and water plugging of the block.

Claims (3)

1. method that is used for block is carried out the integral profile control water blockoff, it is characterized in that this method comprises the following steps: (1). at first measure the falloff curve of the well head of the whole water injection wells of block, and calculate the PI value of each mouthful water injection well by the every mouthful of water injection well falloff curve that records by closed-in time of the definition of following PI value and appointment: PI = ∫ 0 t p ( t ) dt t ,
In the formula, PI is the pressure index (Mpa) of water injection well; P (t) is the tubing pressure (Mpa) behind the water injection well closed-in time t; T is the closed-in time; (2). by two standards the necessity of block profile control to be judged: 1.. block mean P I value: block mean P I value is more little to need profile control more, if block mean P I value is lower than 10Mpa, then this block needs profile control; 2.. the PI value extreme difference of block water injection well: PI value extreme difference is meant the poor of the maximum value of block water injection well PI value and minimum value, the big more profile control that needs more of its value, PI value extreme difference surpasses 5Mpa, and then this block needs profile control;
The block that meets above-mentioned any one standard or meet two standards simultaneously all must carry out profile control; (3). press block mean P I value and water injection well PI value and select profile control well and water injection well, select to be lower than block
The water injection well of mean P I value is a profile control well, selects to be higher than the water injection well of block mean P I value for increasing
Annotate well, near block mean P I value, a little more than or a little less than the water injection well of mean P I value be
Do not handle well; (4). select the type of profile control agent to carry out profile control; (5). select to repeat the time of profile control and water plugging construction.
2. the method that is used for block is carried out the integral profile control water blockoff according to claim 1 is characterized in that the physical parameter of pressure index PI value and stratum and fluid has following relation:
Figure C9711510000022
In the formula, q is a water injection well day fluence; μ is a fluid dynamic viscosity; K is an in-place permeability; H is a formation thickness; r eIt is the water injection well Control Radius; is a formation porosity; C is a system compressibility; T is the closed-in time.
3. the method that is used for block is carried out the integral profile control water blockoff according to claim 1, the consumption that it is characterized in that profile control agent depends on the predetermined improvement value of water injection well pressure index value, with flow factor and formation thickness, its profile control agent be to calculate by following formula with flow factor by the injection test result: β = W h f ΔP I ′
In the formula, β uses flow factor; W is the profile control agent consumption; h fIt is the water filling layer thickness; Δ PI ' is the variation of PI value before and after the injection test profile control agent.
CN97115100A 1997-08-06 1997-08-06 Method for integrally profile-controlling and water-plugging block Expired - Fee Related CN1059010C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN97115100A CN1059010C (en) 1997-08-06 1997-08-06 Method for integrally profile-controlling and water-plugging block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN97115100A CN1059010C (en) 1997-08-06 1997-08-06 Method for integrally profile-controlling and water-plugging block

Publications (2)

Publication Number Publication Date
CN1173581A CN1173581A (en) 1998-02-18
CN1059010C true CN1059010C (en) 2000-11-29

Family

ID=5173119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN97115100A Expired - Fee Related CN1059010C (en) 1997-08-06 1997-08-06 Method for integrally profile-controlling and water-plugging block

Country Status (1)

Country Link
CN (1) CN1059010C (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1295422C (en) * 2001-08-27 2007-01-17 石油大学(华东) Edge water scheduling technique for oil field using edge water to displace oil
CN105868558A (en) * 2016-03-29 2016-08-17 中国石油天然气股份有限公司 Method for evaluating profile control injectability of water injection well
CN106874666A (en) * 2017-02-10 2017-06-20 中国石油天然气股份有限公司 Method for judging whether water injection well is acidified on line and acidification degree
CN107794285A (en) * 2016-08-30 2018-03-13 中国石油化工股份有限公司 A kind of preparation method and application of displacement of reservoir oil biopolymer

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1079484C (en) * 1999-08-19 2002-02-20 白云渡 Section regulation process for interrupted water-injection depth of water injection well
CN102606119B (en) * 2012-02-07 2014-08-06 中国石油天然气股份有限公司 Fixed-point gel-placing water-blocking profile control agent and use method thereof
CN103075142B (en) * 2013-01-14 2016-06-22 中国石油大学(华东) A kind of waterflooding oil field water blockoff oil well well choosing method
CN103244087B (en) * 2013-05-21 2016-01-20 中国石油大学(北京) A kind of low-permeability oil deposit profile control and water plugging selects well decision-making technique
CN103291265A (en) * 2013-06-24 2013-09-11 西南石油大学 Method for judging full profile control degree of water injection well
CN103643928B (en) * 2013-11-21 2016-05-11 中国海洋石油总公司 A kind of depth profile control method step by step based on pressure field and velocity field distribution
CN103867188B (en) * 2014-03-14 2017-03-22 山东石大油田技术服务股份有限公司 Decision method used for profile control of oil-field water injection well
CN106351625B (en) * 2015-07-17 2021-01-29 中国石油化工股份有限公司 Dynamic system analysis method for oilfield flooding development
CN105715238A (en) * 2015-12-01 2016-06-29 山东石大油田技术服务股份有限公司 Real time monitoring and controlling method for displacement pressure gradient of waterflooding development oil reservoir
CN106761618A (en) * 2016-12-26 2017-05-31 中国石油天然气股份有限公司 Method and device for determining profile control dosage for water injection well
CN107355200B (en) * 2017-09-08 2020-03-03 北京科技大学 Method for improving water drive well selection by nano-micron particle dispersion system
CN108590571A (en) * 2018-03-27 2018-09-28 中国石油天然气股份有限公司 Method for determining dosage of profile control agent of low-permeability fractured water-breakthrough reservoir for water injection well

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4903766A (en) * 1988-12-30 1990-02-27 Mobil Oil Corporation Selective gel system for permeability profile control
US4915170A (en) * 1989-03-10 1990-04-10 Mobil Oil Corporation Enhanced oil recovery method using crosslinked polymeric gels for profile control
US4964461A (en) * 1989-11-03 1990-10-23 Mobil Oil Corporation Programmed gelation of polymers using melamine resins
US5103909A (en) * 1991-02-19 1992-04-14 Shell Oil Company Profile control in enhanced oil recovery

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4903766A (en) * 1988-12-30 1990-02-27 Mobil Oil Corporation Selective gel system for permeability profile control
US4915170A (en) * 1989-03-10 1990-04-10 Mobil Oil Corporation Enhanced oil recovery method using crosslinked polymeric gels for profile control
US4964461A (en) * 1989-11-03 1990-10-23 Mobil Oil Corporation Programmed gelation of polymers using melamine resins
US5103909A (en) * 1991-02-19 1992-04-14 Shell Oil Company Profile control in enhanced oil recovery

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1295422C (en) * 2001-08-27 2007-01-17 石油大学(华东) Edge water scheduling technique for oil field using edge water to displace oil
CN105868558A (en) * 2016-03-29 2016-08-17 中国石油天然气股份有限公司 Method for evaluating profile control injectability of water injection well
CN107794285A (en) * 2016-08-30 2018-03-13 中国石油化工股份有限公司 A kind of preparation method and application of displacement of reservoir oil biopolymer
CN106874666A (en) * 2017-02-10 2017-06-20 中国石油天然气股份有限公司 Method for judging whether water injection well is acidified on line and acidification degree

Also Published As

Publication number Publication date
CN1173581A (en) 1998-02-18

Similar Documents

Publication Publication Date Title
CN1059010C (en) Method for integrally profile-controlling and water-plugging block
Tiab Analysis of pressure and pressure derivative without type-curve matching—Skin and wellbore storage
Patton et al. Prediction of polymer flood performance
Agarwal et al. Analyzing well production data using combined type curve and decline curve analysis concepts
CN103628850B (en) A kind of waterflooding oil field integral profile control water blockoff decision-making technique
CN102953726B (en) Method and device for water drive oilfield advantage channel recognition
CN103075142B (en) A kind of waterflooding oil field water blockoff oil well well choosing method
CN104234673A (en) Stratified injection allocation method considering interlayer interference for multilayer oil reservoir
CN111520136B (en) Calculation method of pressure after plug nozzle considering water injection start-up pressure gradient
CN111648767B (en) Natural gas hydrate reservoir compressibility evaluation method
CN100489266C (en) Method for detecting fluid-channeling channel of oil field
CN110374573A (en) A kind of yield potential appraisal procedure for typical pressure break failure well
CN1847613A (en) Acidification data monitoring method
CN115538996A (en) A three-stage visual classification evaluation method for CO2 flooding and geological storage
CN112943160B (en) Evaluation method for chemical water plugging effect of oil well
CN106503284A (en) Shale gas horizontal well horizontal segment gas-bearing formation aerogenesis evaluation method
CN109915122B (en) A method for calculating steady-state water influx in fractured-cavity reservoirs using global equations
CN111350498B (en) Method for describing weak flooding distribution characteristics of medium-high permeability oil reservoir in ultra-high water content development period
CN107247816B (en) A method for judging the farthest construction radius for chemical viscosity reduction in cold recovery in heavy oil reservoirs
CN113868975A (en) A single well controlled geological reserve prediction method for shale oil horizontal wells
CN106257463A (en) A kind of bit performance evaluation methodology and system
CN1464429A (en) Method for calculating gas reservoir recovery ratio and recoverable reserve
Stackel et al. An Example Approach to Predictive Well Management in Reservoir Simulation
CN110761755B (en) Low-permeability oilfield water flooding development effect evaluation method
CN114664387A (en) Oil well chemical water plugging performance indoor evaluation method based on cumulative effect

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee