Wire arrangement device Download PDFInfo
- Publication number
- CN105896400A CN105896400A CN201610359792.0A CN201610359792A CN105896400A CN 105896400 A CN105896400 A CN 105896400A CN 201610359792 A CN201610359792 A CN 201610359792A CN 105896400 A CN105896400 A CN 105896400A
- Authority
- CN
- China
- Prior art keywords
- wire
- management device
- passing channel
- ball
- cable loom
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/06—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
- H02G1/08—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling
Landscapes
- Looms (AREA)
Abstract
The invention relates to the field of electric wire installation equipment, in particular to a wire arrangement device. The wire arrangement device comprises a wire bunching body, wherein the wire bunching body is provided with at least two wire through channels; and each wire through channel is provided with a rolling structure for enabling a wire harness and the wire bunching body to form rolling frictional contact. The rolling structure is arranged on each wire through channel of the wire arrangement device; and the wire harness and the wire bunching body form rolling frictional contact when passing through the wire through channels, so that the frictional resistance in the wire arrangement process is effectively reduced; the wire arrangement process is smooth; and the wire arrangement efficiency is improved.
Description
Technical field
The present invention relates to wire workers’ equipment field, particularly to a kind of wire-management device.
Background technology
Architectural electricity fixing link, wearing electric wire in pipe is the work needing to expend a large amount of manpower.Improve the target that threading in pipe efficiency Shi Ge unit in charge of construction is pursued.When wearing many electric wires in pipe, manage outer electric wire easily interweave, the problem such as distortion, affect work efficiency.The method of the most conventional artificial reason line is avoided managing the problems such as outer electric wire intertexture, distortion, and this method needs a people in mouth of pipe line sending, and a people increases in farther processor line, cost of labor, is the most also unfavorable for improving production efficiency.
Also some wire-management devices are occurred in that on market, such as application publication number is CN 103178472 A, Shen Qing Publication day be 2012.06.26 Chinese patent disclosed in a kind of wire arranger of power distribution auxiliary tool for box type transformer and method, this line winder includes eyelet strip, eyelet strip i.e. cable loom, eyelet strip is provided with aperture, aperture i.e. passing channel, during use, wire harness is passed one by one in the aperture of eyelet strip, then moving eyelet strip can make the wire harness interlocked be spaced from each other, complete to manage line process, wire harness is scratched for avoiding managing aperture in line process, it is provided with elastic tape at aperture edge, and manage in line process, elastic tape can make the frictional resistance between wire harness and eyelet strip become big, produce reason line process obstructed, the reason inefficient problem of line.
Summary of the invention
It is an object of the invention to provide a kind of wire-management device, the problem big to solve frictional resistance between wire harness and cable loom.
The technical scheme of the wire-management device of the present invention is: a kind of wire-management device, and including cable loom, cable loom is provided with at least two passing channel, and described passing channel is provided with for making wire harness constitute, with cable loom, the rolling structure that rolling friction contacts.
Described passing channel is provided with retainer, and described retainer is provided with ball, the described rolling structure described in ball composition.
Described retainer includes inner ring and outer ring, at least two is distributed for installing the ball bracket of ball between inner ring and outer ring, in described retainer circumference, and described ball bracket can be along described retainer radially elastic shrinkage.
Described cable loom is provided with a border circular areas, and described passing channel is distributed in described border circular areas.
Described passing channel is evenly distributed in described border circular areas.
Described cable loom is provided with for hand-held grip part.
Described cable loom is provided with annular lever, the described grip part described in annular lever composition.
Described annular lever is provided with the fit structure for coordinating with finger.
The invention have the benefit that the passing channel of the wire-management device of the present invention is provided with rolling structure, wire harness contacts through during passing channel with cable loom composition rolling friction, effectively reduce the frictional resistance in reason line process, make reason line process unobstructed, improve reason line efficiency.
Accompanying drawing explanation
Fig. 1 is the structural representation of the embodiment one of the wire-management device of the present invention;
Fig. 2 is the structural representation of ball retainer in Fig. 1;
Fig. 3 is the structural representation of upper shell in Fig. 1;
Fig. 4 is the structural representation of lower house in Fig. 1;
Fig. 5 is the structural representation of embodiments of the invention two;
Fig. 6 is the top view of Fig. 5;
Fig. 7 is the structural representation of embodiments of the invention three.
Detailed description of the invention
Below in conjunction with the accompanying drawings embodiments of the present invention are described further.
nullThe embodiment one of the wire-management device of the present invention,As shown in Figures 1 to 4,This wire-management device includes upper shell 11 and lower house 12,Bunch region is set on upper shell 11 and lower house 12,Constitute cable loom 16,Through in corresponding pipeline after actual reason line process is typically wire harness to make in order,Align with pipeline for convenience of cable loom,Cable loom 16 profile is set to circle by the present embodiment,The volume of wire-management device can also be reduced simultaneously,Save material,It is evenly equipped with passing channel 13 in the border circular areas at cable loom 16 Shang Yanqi center,Passing channel 13 is provided with ball 14,Ball 14 is arranged on passing channel 13 by retainer,Ball for reduce in wire harness passing channel 13 from cable loom 16 by time resistance,Also avoid passing channel 13 directly to contact with wire harness simultaneously,Damage is caused on wire harness surface,Retainer includes inner ring 15 and outer ring 18,Ball bracket 17 is distributed between inner ring 15 and outer ring 18,Ball bracket 17 is made up of elastomeric material,Ball bracket 17 is so made to have elasticity,Ball can be made along retainer radial contraction,To adapt to the cable of different thicknesses,When retainer assembles,First outer ring 18 and ball bracket 17 are fixed,Then ball 14 is assembled on ball bracket 17,Ball 14 is avoided to drop by limiting tool,Then inner ring 15 is snapped in the annulus that ball 14 surrounds,Owing to ball bracket 17 has certain elasticity,Ball bracket 17 just can be made to compress to outer ring during assembling inner ring 15,The circle diameter that so ball 14 surrounds becomes big,Just inner ring 15 card can be entered,On the passing channel of lower house 12, periphery is provided with annular boss 19,During for installing spacing to retainer,Cable loom 16 is provided with the lever for hand-held annular,Lever is a staight shank,Constitute grip part,It is used for gripping during reason line,Staight shank can reduce the processing cost of parts.
When the embodiment one of the wire-management device of the present invention uses, hand-held lever, wire harness is passed from passing channel, while line sending in pipe, while mobile wire-management device, it is to avoid interweaving between wire harness, distort, multiply wire harness enters in corresponding pipeline by forming the wire harness of proper alignment after passing channel.
The passing channel of the cable loom of the embodiment one of the wire-management device of the present invention is provided with ball, can effectively reduce the frictional resistance in reason line process, passing channel distributed areas on cable loom are rounded, make to be adapted on the whole the shape of corresponding pipeline by the wire harness of wire-management device, passing channel is uniformly distributed on cable loom, when wire harness can be made to pass cable loom, beam distance is equal everywhere, be easy to being interweaved, the wire harness of entanglement is separated, owing to ball rack has elasticity, it is adapted to the wire harness of different thicknesses.This apparatus structure is simple, easy to operate, decreases artificial, and the ball on passing channel can reduce the resistance in reason line process, makes reason line process unobstructed, improves work efficiency.
nullEmbodiment two,As shown in Figure 5 to Figure 6,This wire-management device includes cable loom 21,Through in corresponding pipeline after actual reason line process is typically wire harness to make in order,Align with pipeline for convenience of cable loom,Cable loom 21 profile is set to circle by the present embodiment,Cable loom 21 volume can also be reduced simultaneously,Save material,It is evenly equipped with passing channel 22 in the border circular areas at cable loom 21 Shang Yanqi center,Passing channel 22 is provided with ball,Ball is arranged on passing channel 22 by retainer,Ball for reduce in wire harness passing channel 22 from cable loom 21 by time resistance,Also avoid passing channel 22 directly to contact with wire harness simultaneously,Damage is caused on wire harness surface,Cable loom 21 is provided with the lever 23 for hand-held annular,Annular lever 23 is provided with crawl section,Crawl section is provided with for making finger firmly capture、The depressed area 24 coordinated with finger,Depressed area 24 is provided with four,Adapt to the gripping of other four fingers in addition to thumb,Other structures and function are identical with embodiment one,Repeat no more.
Embodiment three, as it is shown in fig. 7, in the present embodiment, cable loom 31 profile is square, so makes cable loom 31 easy to process, is provided with a border circular areas 33 on cable loom 31, passing channel 32 is distributed on border circular areas 33, and other structures and function are identical with embodiment one, repeat no more.
In other embodiments of the invention, ball can also is that the cylindrical roller being arranged on passing channel, now cylindrical roller is axially vertical by direction with the wire harness of passing channel, when wire harness passes through in passing channel, composition rolling friction structure is contacted with cylindrical roller, certainly, taper roller can also is that taper roller or other similar rolling structures;The shape of cable loom can also is that ellipse or other shapes, and now cable loom is provided with a border circular areas, on passing channel is distributed in described border circular areas.
Claims (8)
1. a wire-management device, including cable loom, cable loom is provided with at least two passing channel, it is characterised in that: described passing channel is provided with for making wire harness constitute, with cable loom, the rolling structure that rolling friction contacts.
Wire-management device the most according to claim 1, it is characterised in that: described passing channel is provided with retainer, and described retainer is provided with ball, the described rolling structure described in ball composition.
Wire-management device the most according to claim 2, it is characterized in that: described retainer includes inner ring and outer ring, at least two being distributed between inner ring and outer ring, in described retainer circumference for installing the ball bracket of ball, described ball bracket can be along described retainer radially elastic shrinkage.
4. according to the wire-management device described in any one of claim 1 ~ 3, it is characterised in that: described cable loom is provided with a border circular areas, and described passing channel is distributed in described border circular areas.
Wire-management device the most according to claim 4, it is characterised in that: described passing channel is evenly distributed in described border circular areas.
Wire-management device the most according to claim 5, it is characterised in that: described cable loom is provided with for hand-held grip part.
Wire-management device the most according to claim 6, it is characterised in that: described cable loom is provided with annular lever, the described grip part described in annular lever composition.
Wire-management device the most according to claim 7, it is characterised in that: described annular lever is provided with the fit structure for coordinating with finger.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610359792.0A CN105896400B (en) | 2016-05-27 | 2016-05-27 | A kind of wire-management device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610359792.0A CN105896400B (en) | 2016-05-27 | 2016-05-27 | A kind of wire-management device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105896400A true CN105896400A (en) | 2016-08-24 |
CN105896400B CN105896400B (en) | 2018-12-07 |
Family
ID=56717745
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610359792.0A Active CN105896400B (en) | 2016-05-27 | 2016-05-27 | A kind of wire-management device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105896400B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106877254A (en) * | 2017-03-08 | 2017-06-20 | 孟书芳 | A kind of collating unit for connecting line when regular zero |
CN107978397A (en) * | 2017-12-29 | 2018-05-01 | 重庆腾盛电线电缆有限公司 | A kind of buncher bunch plate for preventing harness friction |
CN108044541A (en) * | 2017-12-21 | 2018-05-18 | 株洲天自动焊接装备有限公司 | It is a kind of can the abrasion of anti-pipeline positioner |
CN109687181A (en) * | 2018-12-21 | 2019-04-26 | 苏州阿奎睿思机器人科技有限公司 | Data signal connector |
CN109742598A (en) * | 2018-12-21 | 2019-05-10 | 苏州阿奎睿思机器人科技有限公司 | Line card and signal connector |
CN113863409A (en) * | 2021-09-14 | 2021-12-31 | 南京中枢讯飞信息技术有限公司 | Intelligent stable communication optical fiber traction bionic spider robot |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2103869U (en) * | 1991-09-11 | 1992-05-06 | 马春城 | Slide-helper for cable passing through pipe |
CN201509056U (en) * | 2009-08-21 | 2010-06-16 | 顾自泉 | Cable protection tube |
US20110290951A1 (en) * | 2010-05-28 | 2011-12-01 | Airbus Operations Gmbh | Cable management device for bundles of cables in an aircraft |
CN203589618U (en) * | 2013-11-11 | 2014-05-07 | 刘永彬 | Improved network cable wrapper |
CN104377613A (en) * | 2014-11-21 | 2015-02-25 | 苏州明远冲压件厂 | Annular wire arranging device |
CN105675928A (en) * | 2016-03-25 | 2016-06-15 | 国网山东省电力公司济宁供电公司 | Device and method for measurement secondary circuit wire arrangement |
-
2016
- 2016-05-27 CN CN201610359792.0A patent/CN105896400B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2103869U (en) * | 1991-09-11 | 1992-05-06 | 马春城 | Slide-helper for cable passing through pipe |
CN201509056U (en) * | 2009-08-21 | 2010-06-16 | 顾自泉 | Cable protection tube |
US20110290951A1 (en) * | 2010-05-28 | 2011-12-01 | Airbus Operations Gmbh | Cable management device for bundles of cables in an aircraft |
CN203589618U (en) * | 2013-11-11 | 2014-05-07 | 刘永彬 | Improved network cable wrapper |
CN104377613A (en) * | 2014-11-21 | 2015-02-25 | 苏州明远冲压件厂 | Annular wire arranging device |
CN105675928A (en) * | 2016-03-25 | 2016-06-15 | 国网山东省电力公司济宁供电公司 | Device and method for measurement secondary circuit wire arrangement |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106877254A (en) * | 2017-03-08 | 2017-06-20 | 孟书芳 | A kind of collating unit for connecting line when regular zero |
CN108044541A (en) * | 2017-12-21 | 2018-05-18 | 株洲天自动焊接装备有限公司 | It is a kind of can the abrasion of anti-pipeline positioner |
CN107978397A (en) * | 2017-12-29 | 2018-05-01 | 重庆腾盛电线电缆有限公司 | A kind of buncher bunch plate for preventing harness friction |
CN109687181A (en) * | 2018-12-21 | 2019-04-26 | 苏州阿奎睿思机器人科技有限公司 | Data signal connector |
CN109742598A (en) * | 2018-12-21 | 2019-05-10 | 苏州阿奎睿思机器人科技有限公司 | Line card and signal connector |
CN109742598B (en) * | 2018-12-21 | 2021-06-04 | 苏州阿奎睿思机器人科技有限公司 | Line card and signal connector |
CN109687181B (en) * | 2018-12-21 | 2021-06-04 | 苏州阿奎睿思机器人科技有限公司 | Data signal connector |
CN113863409A (en) * | 2021-09-14 | 2021-12-31 | 南京中枢讯飞信息技术有限公司 | Intelligent stable communication optical fiber traction bionic spider robot |
Also Published As
Publication number | Publication date |
---|---|
CN105896400B (en) | 2018-12-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105896400A (en) | Wire arrangement device | |
JP2021021474A (en) | Expandable hose | |
CN201855829U (en) | Retractable dust cover | |
CN103904608B (en) | A kind of splicing sleeve protection device | |
CN104148546A (en) | Automatic steel wire fusing machine | |
CN203367939U (en) | Protective device for duct cable | |
CN205824015U (en) | A kind of new steel belt constant force spring | |
CN202555632U (en) | Plastic pinch roller for straightener | |
CN206842643U (en) | Multilayer polytetrafluoroethylarticles base band overlaps degreasing drafting machine | |
CN204271849U (en) | A kind of efficient coil die frame | |
CN206720398U (en) | A kind of geomembrane unwinding device | |
CN206211052U (en) | Graphite metal composite corrosion-proof loses flexible ground body | |
CN216975355U (en) | Steel wire rope fan net for cooling tower | |
CN203933175U (en) | The coiled iron core of bracelet riveting knot structure | |
CN205147074U (en) | A novel special terrace die for bearing stamp outer lane | |
CN203671797U (en) | Outdoor unit and air guiding ring screen assembly thereof | |
CN205666104U (en) | Wire and cable is with indulging drape utensil | |
CN207082787U (en) | A kind of security device cable bunch fixing device | |
CN208622470U (en) | A kind of enameled round copper stranded wire | |
CN212349439U (en) | Split type screen cloth | |
CN202814259U (en) | Measuring tape core connection structure | |
US11437789B2 (en) | Installation tool for tie tubes | |
CN206467400U (en) | Glove knitting machine knotting device leading-in bracket | |
CN208723113U (en) | The connection structure of pipe type cable | |
CN204000275U (en) | Plastic bobbin |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 450000 Cuizhu Street, Zhengzhou High-tech Development Zone, Henan Province Patentee after: ZHONGZHOU UNIVERSITY INFORMATION TECHNOLOGY CO., LTD. Address before: No. 50 Cultural Road, Zhengzhou City, Henan Province Patentee before: Zhengzhou Xuefu Electronic Engineering Technology Co., Ltd. |
|
CP03 | Change of name, title or address |