CN105896394A - Well edge cable laying rack - Google Patents

Well edge cable laying rack Download PDF

Info

Publication number
CN105896394A
CN105896394A CN201410587322.0A CN201410587322A CN105896394A CN 105896394 A CN105896394 A CN 105896394A CN 201410587322 A CN201410587322 A CN 201410587322A CN 105896394 A CN105896394 A CN 105896394A
Authority
CN
China
Prior art keywords
well
cable laying
cable
bracer
rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410587322.0A
Other languages
Chinese (zh)
Inventor
阙其奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi City Supernatural Power Communication Engineering Co Ltd
Original Assignee
Wuxi City Supernatural Power Communication Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi City Supernatural Power Communication Engineering Co Ltd filed Critical Wuxi City Supernatural Power Communication Engineering Co Ltd
Priority to CN201410587322.0A priority Critical patent/CN105896394A/en
Publication of CN105896394A publication Critical patent/CN105896394A/en
Pending legal-status Critical Current

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The invention relates to a well edge cable laying rack. The rack comprises a rack body. The rack body comprises two support blocks which are symmetrically arranged. Each support block is a strip structure. One end portion of each support block is an arc holding and clamping block. The two opposite arc holding and clamping blocks form a holding well space. An upper surface of the other end of each support block is fixedly connected to an installation plate. A guide pillar is arranged between the two opposite installation plates. The structure is simple. The arc holding and clamping blocks are arranged to clamp a well portion. Through a guiding effect of the guide pillars, a cable is conveyed from an upper portion of a well into a lower portion of the well. Operation is convenient, labor intensity is greatly reduced and engineering efficiency is increased.

Description

Well limit cable laying frame
Technical field
The present invention relates to technical field of electricity, the auxiliary device that especially cable lays.
Background technology
In laid processes, cable includes that open procedure put from turning rolls to good use by cable and cable is fed forward process, Cable is fed forward needs front end to carry out tractive, and the tractive of current cable relies on multiple workmans to lift with hands the most defeated Sending, although this mode of movement can reduce cable and be worn and torn by ground, but its labor intensive is big, causes fortune Defeated cost is high, especially for the process by cable transfer to down-hole, carries increasingly difficult.
Summary of the invention
The applicant for existing cable carry present in disadvantages mentioned above, it is provided that a kind of well limit cable laying Frame, it has simple in construction, carries conveniently, carry the feature of low cost.
The technical solution adopted in the present invention is as follows:
A kind of well limit cable laying frame, including support body, described support body includes symmetrically arranged two bracers, institute Stating a bracer is list structure, and the one end arc of a bracer embraces fixture block, and two relative arcs are embraced between fixture block Form Bao Jing space;The other end upper surface of described bracer is fixed with installing plate, between two relative installing plates Device guide pillar.
Beneficial effects of the present invention is as follows:
Present configuration is simple, arranges arc and embraces fixture block and clamp well portion, by the guide effect of guide pillar by electricity Cable is delivered to down-hole from aboveground, and it is easy to operate, greatly reduces labor intensity, improves engineering efficiency.
Accompanying drawing explanation
Fig. 1 is the three-dimensional structure diagram of the present invention.
In figure: 1, prop up bracer;2, arc embraces fixture block;3, guide pillar;4, installing plate;5, Bao Jing space.
Detailed description of the invention
Below in conjunction with the accompanying drawings, the detailed description of the invention of the present invention is described.
As it is shown in figure 1, the well limit cable laying frame of the present embodiment, including support body, support body includes being symmetrical arranged Two bracers 1, bracer 1 be list structure, and the one end arc propping up bracer 1 embraces fixture block 2, relatively Two arcs embrace between fixture block 2 formation Bao Jing space 5;The other end upper surface propping up bracer 1 is fixed with installation Plate 4, relative 4 device guide pillars 3 of two installing plates.
When the present invention uses, two arcs are embraced fixture block 2 and are placed in the periphery of well, and the guide pillar 3 on a bracer 1 is placed in Aboveground, cable is slid into down-hole from guide pillar 3.
Above description is explanation of the invention, is not the restriction to invention, and limited range of the present invention is joined Seeing claim, in the case of the spirit of the present invention, the present invention can make any type of amendment.

Claims (1)

1. a well limit cable laying frame, including support body, it is characterised in that: described support body includes that symmetry sets Two bracers (1) put, described bracer (1) is list structure, the one end arc of a bracer (1) Embracing fixture block (2), two relative arcs are embraced and are formed Bao Jing space (5) between fixture block (2);Described bracer (1) other end upper surface is fixed with installing plate (4), device guide pillar (3) between relative two installing plates (4).
CN201410587322.0A 2014-10-27 2014-10-27 Well edge cable laying rack Pending CN105896394A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410587322.0A CN105896394A (en) 2014-10-27 2014-10-27 Well edge cable laying rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410587322.0A CN105896394A (en) 2014-10-27 2014-10-27 Well edge cable laying rack

Publications (1)

Publication Number Publication Date
CN105896394A true CN105896394A (en) 2016-08-24

Family

ID=57000625

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410587322.0A Pending CN105896394A (en) 2014-10-27 2014-10-27 Well edge cable laying rack

Country Status (1)

Country Link
CN (1) CN105896394A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5558465A (en) * 1994-06-06 1996-09-24 France Telecom Method and device for laying an underground telecommunications cable
CN201360119Y (en) * 2009-02-18 2009-12-09 中建八局第一建设有限公司 Guiding support for laying cables
CN202217970U (en) * 2011-08-31 2012-05-09 广东威恒输变电工程有限公司 Cable pavement guide device
CN202602232U (en) * 2012-05-17 2012-12-12 西安供电局 Cable well head unreeling pulley block
CN202772501U (en) * 2012-09-25 2013-03-06 宁夏天净元光电力有限公司 Cable wellhead supporting arm pulley
CN202978124U (en) * 2012-10-24 2013-06-05 四川省电力公司绵阳电业局 Cable wellhead pulley
CN103730866A (en) * 2014-01-26 2014-04-16 宁波甬城配电网建设有限公司 Cable laying device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5558465A (en) * 1994-06-06 1996-09-24 France Telecom Method and device for laying an underground telecommunications cable
CN201360119Y (en) * 2009-02-18 2009-12-09 中建八局第一建设有限公司 Guiding support for laying cables
CN202217970U (en) * 2011-08-31 2012-05-09 广东威恒输变电工程有限公司 Cable pavement guide device
CN202602232U (en) * 2012-05-17 2012-12-12 西安供电局 Cable well head unreeling pulley block
CN202772501U (en) * 2012-09-25 2013-03-06 宁夏天净元光电力有限公司 Cable wellhead supporting arm pulley
CN202978124U (en) * 2012-10-24 2013-06-05 四川省电力公司绵阳电业局 Cable wellhead pulley
CN103730866A (en) * 2014-01-26 2014-04-16 宁波甬城配电网建设有限公司 Cable laying device

Similar Documents

Publication Publication Date Title
EP4349637A3 (en) A robotic work tool system and a charging connector arrangement for a robotic work tool system
PH12017500428A1 (en) Robot and method for hot line washing of low-altitude insulators at substation
MX369732B (en) Deflector assembly for a lateral wellbore.
MY172399A (en) Cable clamp
CN103515867A (en) Corner guide device for laying cable
MX365680B (en) Cable suspension clamp.
CN103515868A (en) Sliding device for laying cable
CN105896394A (en) Well edge cable laying rack
CN203553779U (en) Sliding device for cable laying
PE20160351A1 (en) DEVICE FOR THE REPLACEMENT OF PULLEY BATTERIES
MX2015013651A (en) Method and equipment for the symmetrical perforation of a tube.
CN103552960B (en) A kind of steel rope straight line draw gear
PH12016500036B1 (en) Vehicle assembly line
MY189766A (en) Clamp with a device connecting structure
CN105896395A (en) Dragging rack of cable laying
CN204297933U (en) A kind of tire hoisting clamp
CN105529654A (en) Dragging bracket for laying cable
CN204702323U (en) A kind of electric wire anti-off device
CN204646276U (en) A kind of supplemental support seat of hydraulic prop
CN205315848U (en) Cable clamp holds device
CN205172470U (en) Portable wire rope checkpost
CN203558832U (en) Steel wire rope linear traction device
CN204481156U (en) A kind of earth connection
CN103515865A (en) Guide conveying device in cable laying
CN204108393U (en) A kind of device for fixing screen on headrest of rig work high above the ground

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Wang Fang

Document name: Notification of Passing Examination on Formalities

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160824