CN105891679A - Fault detection system and method for electric power grid - Google Patents

Fault detection system and method for electric power grid Download PDF

Info

Publication number
CN105891679A
CN105891679A CN201610408569.0A CN201610408569A CN105891679A CN 105891679 A CN105891679 A CN 105891679A CN 201610408569 A CN201610408569 A CN 201610408569A CN 105891679 A CN105891679 A CN 105891679A
Authority
CN
China
Prior art keywords
fault
line
power grid
indicator
indicators
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610408569.0A
Other languages
Chinese (zh)
Inventor
姹や寒
汤亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610408569.0A priority Critical patent/CN105891679A/en
Publication of CN105891679A publication Critical patent/CN105891679A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/086Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Locating Faults (AREA)

Abstract

本发明公开了一种电力电网故障检测系统及故障检测方法,电网连接有检测电路,所述分支线路上分别设置有多个电流互感器,所述电流互感器用于采集电网上的电流信号,所述检测线路连接到故障判断电路,所述故障判断电路上设置有光电转换单元和故障等级判断单元和信号发生器,所述故障判断电路连接有报警处理电路,所述报警处理电路还连接有监控中心。本发明的有益之处是:在检测电路上设置有电流互感器,通过电流互感器来获取电网上的电流信息,并通过多个判断单元来确定故障信号的信息,并通过报警装置以及监控中心将信息发布出去,从而能够以最快的速度排除故障,本发明结构简单,操作方便,成本较低。

The invention discloses a power grid fault detection system and a fault detection method. The power grid is connected with a detection circuit, and the branch lines are respectively provided with a plurality of current transformers, and the current transformers are used to collect current signals on the power grid. The detection circuit is connected to a fault judgment circuit, the fault judgment circuit is provided with a photoelectric conversion unit, a fault level judgment unit and a signal generator, the fault judgment circuit is connected with an alarm processing circuit, and the alarm processing circuit is also connected with a monitoring center. The advantage of the present invention is that: a current transformer is installed on the detection circuit, the current information on the power grid is obtained through the current transformer, and the information of the fault signal is determined through a plurality of judging units, and the fault signal is determined through the alarm device and the monitoring center. The information is released, so that faults can be eliminated at the fastest speed. The invention has simple structure, convenient operation and low cost.

Description

一种电力电网故障检测系统及故障检测方法 A power grid fault detection system and fault detection method

技术领域 technical field

本发明属于电力电网技术领域,具体涉及一种电力电网故障检测系统及故障检测方法。 The invention belongs to the technical field of power grids, and in particular relates to a power grid fault detection system and a fault detection method.

背景技术 Background technique

我国配电网具有线路结构复杂、环境多样多变、故障频繁复杂、维护工作量大等特 征。配电线路某一段发生故障,需要逐段排查故障发生位置,不但工作强度大,而且还会延 误抢修时间,影响供电可靠性,在实际使用中,电网电压对家用电器、工业自动化设备、医用 仪器仪表等电网终端设备的正常使用及使用寿命具有很大的影响。目前,电网电压的波动 较大,尤其是在农村,电网电压的波动更大;过高的电网电压往往会缩短电网终端设备的使 用寿命,有时甚至会使电网终端设备发生烧毁;而过低的电网电压则有可能导致电网终端 设备不能正常工作,因此,行业中需要一种能够实时监测电网的检测装置,以解决行业中面 临的问题。 my country's distribution network has the characteristics of complex line structure, diverse environment, frequent and complex faults, and heavy maintenance workload. If a fault occurs in a certain section of the distribution line, it is necessary to check the location of the fault one by one. Not only is the work intensity high, but it will also delay the repair time and affect the reliability of power supply. The normal use and service life of power grid terminal equipment such as meters have a great impact. At present, the grid voltage fluctuates greatly, especially in rural areas, the grid voltage fluctuates even more; too high grid voltage often shortens the service life of grid terminal equipment, and sometimes even burns grid terminal equipment; while too low The grid voltage may cause the grid terminal equipment to fail to work normally. Therefore, the industry needs a detection device that can monitor the grid in real time to solve the problems faced by the industry.

传统的故障定位即是利用馈线终端单元采集的数据来分析故障位置。其方法是预 先在配电主站中建立电网模型,形成电网的拓扑结构。当故障发生时,配电主站将馈线终端 单元上传的数据结合电网的拓扑结构,采用故障定位算法计算得到故障的位置。 The traditional fault location is to use the data collected by the feeder terminal unit to analyze the fault location. The method is to establish the grid model in the main power distribution station in advance to form the topology of the grid. When a fault occurs, the distribution master station combines the data uploaded by the feeder terminal unit with the topological structure of the power grid, and uses the fault location algorithm to calculate the location of the fault.

传统的故障定位方法存在以下问题: Traditional fault location methods have the following problems:

一、由于电网庞大、情况复杂,创建合适的电网模型难度大且时间长。 1. Due to the huge power grid and complex conditions, it is difficult and time-consuming to create a suitable power grid model.

二、并无统一的故障定位算法,不同的电网模型,需要采用相适应的故障定位算 法,相互之间不能通用。而且通常计算量非常大,耗费时间长。 2. There is no uniform fault location algorithm. Different power grid models need to adopt appropriate fault location algorithms, which cannot be used universally. And usually the amount of calculation is very large and takes a long time.

然而,大部分故障发生的位置单一,并且不需非常精确的定位。此时再采用馈线终 =端单元采集非常多的电网信息,然后利用复杂的故障定位算法计算,硬件成本和时间成本 都很大。 However, most faults occur in a single location and do not require very precise positioning. At this time, the feeder terminal unit is used to collect a lot of power grid information, and then the complex fault location algorithm is used for calculation, and the hardware cost and time cost are very large.

发明内容 Contents of the invention

发明目的:本发明的目的是为了解决现有技术中的不足,提供一种能够快速简单定位单一故障的低成本的电力电网故障检测系统及故障检测方法。 Purpose of the invention: The purpose of the invention is to solve the deficiencies in the prior art and provide a low-cost power grid fault detection system and fault detection method that can quickly and simply locate a single fault.

技术方案:本发明所述的一种电力电网故障检测系统,包括电网,所述电网连接有检测电路,所述检测电路上设置有设置有多个分支线路,所述分支线路上分别设置有多个电流互感器,所述电流互感器用于采集电网上的电流信号,所述检测线路连接到故障判断电路,所述故障判断电路上设置有光电转换单元和故障等级判断单元和信号发生器,所述故障判断电路连接有报警处理电路,所述报警处理电路上设置有报警装置。 Technical solution: A power grid fault detection system according to the present invention includes a power grid, the grid is connected to a detection circuit, and the detection circuit is provided with a plurality of branch lines, and the branch lines are respectively provided with multiple A current transformer, the current transformer is used to collect the current signal on the power grid, the detection line is connected to the fault judgment circuit, the fault judgment circuit is provided with a photoelectric conversion unit, a fault level judgment unit and a signal generator, so that The fault judging circuit is connected with an alarm processing circuit, and an alarm device is arranged on the alarm processing circuit.

进一步的,所述报警处理电路还连接有监控中心,所述监控中心上设置有无线信号发生器。 Further, the alarm processing circuit is also connected to a monitoring center, and the monitoring center is provided with a wireless signal generator.

进一步的,所述故障等级判断单元上设置有故障对照单元,所述故障对照单元里设置有多个故障等级标准。 Further, the failure level judging unit is provided with a failure comparison unit, and a plurality of failure level standards are set in the failure comparison unit.

一种电力电网故障检测方法包括如下步骤: A power grid fault detection method includes the steps of:

(1)在电网中设置故障指示器,所述故障指示器分布在电网的线路上,所述线路包括主干 线路和至少一级分支线路,且每条线路上设有至少一个故障指示器 ; (1) Install fault indicators in the power grid, the fault indicators are distributed on the lines of the power grid, the lines include the main line and at least one branch line, and each line is equipped with at least one fault indicator;

(2)建立以故障指示器为节点的树形模型 ;所述树形模型中 :同一线路上的故障指示器依 次连接,后一故障指示器作为前一故障指示器的子节点 ;分支线路上的第一个故障指示器 作为主干线路上的最后一个故障指示器的子节点、次一级分支线路上的第一个故障指示器 作为上一级分支线路上的最后一个故障指示器的子节点 ; (2) Establish a tree model with fault indicators as nodes; in the tree model: the fault indicators on the same line are connected sequentially, and the latter fault indicator is used as a child node of the previous fault indicator; on the branch line The first fault indicator on the main line is the child node of the last fault indicator on the main line, and the first fault indicator on the secondary branch line is the child node of the last fault indicator on the upper branch line ;

(3)对故障指示器进行标识和编号 ;同一线路上的故障指示器依次编号,分支线路上的第 一个故障指示器在主干线路上的最后一个故障指示器的编号的基础上增加 1 ;次一级分支 线路上的第一个故障指示器在上一级分支线路上的最后一个故障指示器的编号的基础上 增加 1 ; (3) Mark and number the fault indicators; the fault indicators on the same line are numbered sequentially, and the first fault indicator on the branch line is increased by 1 on the basis of the number of the last fault indicator on the main line; The first fault indicator on the secondary branch line is increased by 1 on the basis of the number of the last fault indicator on the upper branch line;

(4)遍历以故障指示器为节点的树形模型的所有路径,判断每一条路径上指示故障的故障 指示器的数量和编号最大的故障指示器的编号是否一致,若是,则将所述编号最大的故障 指示器的标识和编号作为该路径的故障坐标 ; (4) Traversing all paths of the tree model with fault indicators as nodes, judging whether the number of fault indicators indicating faults on each path is consistent with the number of the fault indicator with the largest number, and if so, put the number The identification and number of the largest fault indicator as the fault coordinates of the path;

(5)获得故障坐标的编号分量最大的故障指示器,将电路故障定位在其之后; (5) Obtain the fault indicator with the largest number component of the fault coordinates, and locate the circuit fault behind it;

(6)在检测出所述配电网发生故障的情况下,在显示屏中显示所述配电网中的故障线路,并获取所述故障线路所对应的终端 ;以及发送故障提示消息至所述终端; (6) When a fault occurs in the distribution network is detected, display the faulty line in the distribution network on the display screen, and obtain the terminal corresponding to the faulty line; and send a fault prompt message to the the terminal;

(7)从预设的关联系统中获取所述故障线路的故障信息,并在所述显示屏中显示所述故障 信息,其中,所述故障信息至少包括 :故障区间,所述故障区间为所述故障线路中发生故障 的位置所在的线路区间。 (7) Acquiring fault information of the faulty line from a preset associated system, and displaying the fault information on the display screen, wherein the fault information at least includes: a fault interval, and the fault interval is all The line section where the fault occurred in the faulty line is located.

进一步的,若一条路径上指示故障的 故障指示器的数量和编号最大的故障指示器的编号不一致,则判断指示故障的故障指示器 的数量和编号最大的故障指示器的编号的比值是否大于设定阈值,若是,则将编号最大的 故障指示器的编号作为该路径的故障坐标,并将所述故障坐标用于故障定位 ;否则,认为该 条路径不存在故障。 Further, if the number of fault indicators indicating a fault on a path is inconsistent with the number of the fault indicator with the largest number, it is judged whether the ratio of the number of fault indicators indicating a fault to the number of the fault indicator with the largest number is greater than the set value Determine the threshold, if so, use the number of the fault indicator with the largest number as the fault coordinates of the path, and use the fault coordinates for fault location; otherwise, consider that there is no fault in this path.

进一步的,所述设定阈值为 60%。 Further, the set threshold is 60%.

进一步的,在显示所述配电网中的故障线路之后,所述方法还包括:将所述故障线路的运行状态修改为异常;以及发送工单至所述故障线路对应的手持端,其中,所述工单中至少包含抢修任务。 Further, after displaying the faulty line in the distribution network, the method further includes: modifying the operation status of the faulty line to be abnormal; and sending a work order to the handheld terminal corresponding to the faulty line, wherein, The work order includes at least a rush repair task.

进一步的,在发送工单至所述故障线路对应的手持 端之后,所述方法还包括:建立所述手持端跟指挥中心之间的通信连接 ; 通过所述指挥中心的摄像设备获取所述指挥中心中指挥者的视频信息,并将所述视频 信息通过所述通信连接发送至所述手持端。 Further, after sending the work order to the hand-held terminal corresponding to the faulty line, the method further includes: establishing a communication connection between the hand-held terminal and the command center; The video information of the commander in the center is sent to the handheld terminal through the communication connection.

进一步的,在发送工单至所述故障线路对应的手持 端之后,所述方法还包括:在接收到所述手持端发送的完成指令后,将所述故障线路的运行状态恢复为正常,其 中,所述完成指令用于指示所述配电网发生的故障已消除。 Further, after sending the work order to the handheld terminal corresponding to the faulty line, the method further includes: after receiving the completion instruction sent by the handheld terminal, restoring the operation status of the faulty line to normal, wherein , the completion instruction is used to indicate that the fault occurred in the distribution network has been eliminated.

进一步的,基于接收到的配电网的运行参数,检测所 述配电网是否发生故障包括;检测所述配电网中正在配电的线路上是否出现异物,其中,在检测出所述正在配电的 线路上出现异物的情况下,确定所述配电网发生故障;或者检测所述配电网中正在配电的线路上的电流是否发生突变,其中,在检测出所述电流 发生突变的情况下,确定所述配电网发生故障。 Further, based on the received operating parameters of the distribution network, detecting whether a fault occurs in the distribution network includes: detecting whether a foreign object appears on a line that is distributing power in the distribution network, wherein, after detecting that the In the case of a foreign object appearing on the power distribution line, it is determined that the distribution network has a fault; or detecting whether the current on the power distribution line in the distribution network has a sudden change, wherein, after detecting that the current has a sudden change In the case of , it is determined that the distribution network fails.

有益效果:与现有技术相比,本发明的有益之处是:设置有检测电路、故障判断电路、报警处 理电路和监控中心,在检测电路上设置有电流互感器,通过电流互感器来获取电网上的电 流信息,并通过多个判断单元来确定故障信号的信息,从而来确定电网是否有故障,并通过 报警装置以及监控中心将信息发布出去,从而能够以最快的速度排除故障,本发明结构简 单,操作方便,成本较低。 Beneficial effects: Compared with the prior art, the present invention has the advantages that: a detection circuit, a fault judgment circuit, an alarm processing circuit and a monitoring center are provided, a current transformer is provided on the detection circuit, and the current transformer is used to obtain The current information on the power grid, and determine the information of the fault signal through multiple judgment units, so as to determine whether there is a fault in the power grid, and release the information through the alarm device and the monitoring center, so that the fault can be eliminated at the fastest speed. The invention has simple structure, convenient operation and low cost.

本发明故障检测方法采用基于接收到的配电网的运行参数,检测所述配电网是否 发生故障 ;在检测出所述配电网发生故障的情况下,在显示屏中显示所述配电网中的故障 线路 ;获取所述故障线路所对应的终端 ;发送故障提示消息至所述终端的方式,通过在检 测出配电网发生故障的情况下,在显示屏中显示发生故障的故障线路,并发送故障提示消 息给故障线路对应的终端,从而使得终端的持有者如抢修人员等能够迅速知晓配电网出现 了故障,达到了快速抢修故障线路的目的,从而实现了提高配电网故障维修效率的技术效果,进而解决了现有技术中配电网故障维修效率低的技术问题。 The fault detection method of the present invention detects whether a fault occurs in the distribution network based on the received operating parameters of the distribution network; The faulty line in the network; obtain the terminal corresponding to the faulty line; send a fault prompt message to the terminal, and display the faulty faulty line on the display screen when a fault occurs in the distribution network is detected , and send a fault prompt message to the terminal corresponding to the faulty line, so that the holders of the terminal, such as emergency repair personnel, can quickly know that there is a fault in the distribution network, and achieve the purpose of quickly repairing the faulty line, thereby realizing the improvement of the distribution network. The technical effect of fault maintenance efficiency further solves the technical problem of low fault maintenance efficiency of distribution network in the prior art.

附图说明 Description of drawings

图1为本发明的故障检测系统结构示意图; Fig. 1 is the fault detection system structural representation of the present invention;

图2为本发明的一个实施例的故障检测方法流程图; Fig. 2 is a flowchart of a fault detection method according to an embodiment of the present invention;

图3为本发明的故障指示器的安装位置和本身结构的示意图。 Fig. 3 is a schematic diagram of the installation position and the structure of the fault indicator of the present invention.

具体实施方式 detailed description

下面结合附图及具体实施方式对本发明进行详细描述: The present invention is described in detail below in conjunction with accompanying drawing and specific embodiment:

根据图1所示的一种电网故障检测系统,设置有电网1,所述电网1连接有检测电路2,所述检测电路2上设置有设置有 多个分支线路201。 According to a power grid fault detection system shown in FIG. 1 , a power grid 1 is provided, the power grid 1 is connected to a detection circuit 2 , and a plurality of branch lines 201 are arranged on the detection circuit 2 .

进一步地,所述分支线路201上分别设置有多个电流互感器202,所述电流互感器 202用于采集电网1上的电流信号。 Further, a plurality of current transformers 202 are respectively arranged on the branch lines 201, and the current transformers 202 are used to collect current signals on the grid 1.

再进一步地,所述检测线路2连接到故障判断电路3,所述故障判断电路3上设置有 光电转换单元301和故障等级判断单元302和信号发生器303。 Still further, the detection line 2 is connected to the fault judgment circuit 3, and the fault judgment circuit 3 is provided with a photoelectric conversion unit 301, a fault level judgment unit 302 and a signal generator 303.

又进一步地,所述故障判断电路3连接有报警处理电路4,所述报警处理电路4上设 置有报警装置401。 Still further, the fault judgment circuit 3 is connected with an alarm processing circuit 4, and the alarm processing circuit 4 is provided with an alarm device 401.

更进一步地,所述报警处理电路4还连接有监控中心5,所述监控中心5上设置有无 线信号发生器。 Furthermore, the alarm processing circuit 4 is also connected with a monitoring center 5, and the monitoring center 5 is provided with a wireless signal generator.

又进一步地,所述故障等级判断单元302上设置有故障对照单元304,所述故障对 照单元304里设置有多个故障等级标准。 Still further, the failure level judging unit 302 is provided with a failure comparison unit 304, and a plurality of failure level standards are set in the failure comparison unit 304.

使用时,设置有电网1,在电网1上设置有检测电路2,由于检测电路2设置有多个电 流互感器202,通过电流互感器202从电网1上获取电流的信息,将获取的电流信号传给故障 判断电路3,电流信号首先传送给光电转换单元301,光电转换单元301将电流信号转换成光 信号,然后将光信号传给故障等级判断单元302,由于在故障等级判断单元302上设置有故 障对照单元304,所以故障等级判断单元302就会将接收到的光信号与故障对照单元304相 比较,找到一个与之相符合或者接近的数值,从而得出光信号所对应的故障等级,并将故障 等级传送给信号发生器303,信号发生器303根据故障等级来判断是否触发报警装置401,并 通过报警装置401将故障等级传送给监控中心5,由监控中心5中的值班人员对故障做进一 步的分析,以判断是否对本次故障进行进一步的处理。 When in use, a power grid 1 is provided, and a detection circuit 2 is arranged on the power grid 1. Since the detection circuit 2 is provided with a plurality of current transformers 202, the information of the current is obtained from the power grid 1 through the current transformers 202, and the obtained current signal Pass to the fault judgment circuit 3, the current signal is first transmitted to the photoelectric conversion unit 301, the photoelectric conversion unit 301 converts the current signal into an optical signal, and then transmits the optical signal to the fault level judgment unit 302, because the fault level judgment unit 302 is set There is a fault comparison unit 304, so the fault level judging unit 302 will compare the received optical signal with the fault comparison unit 304, and find a value that matches or is close to it, so as to obtain the fault level corresponding to the optical signal, and The fault level is transmitted to the signal generator 303, and the signal generator 303 judges whether to trigger the alarm device 401 according to the fault level, and the fault level is transmitted to the monitoring center 5 by the alarm device 401, and the personnel on duty in the monitoring center 5 do a fault check. Further analysis to determine whether to further deal with this fault.

如图2所示的一种故障检测方法,包括如下步骤: A kind of fault detection method as shown in Figure 2, comprises the following steps:

(1)在电网中设置故障指示器,所述故障指示器分布在电网的线路上,所述线路包括主干 线路和至少一级分支线路,且每条线路上设有至少一个故障指示器 ; (1) Install fault indicators in the power grid, the fault indicators are distributed on the lines of the power grid, the lines include the main line and at least one branch line, and each line is equipped with at least one fault indicator;

(2)建立以故障指示器为节点的树形模型 ;所述树形模型中 :同一线路上的故障指示器依 次连接,后一故障指示器作为前一故障指示器的子节点 ;分支线路上的第一个故障指示器 作为主干线路上的最后一个故障指示器的子节点、次一级分支线路上的第一个故障指示器 作为上一级分支线路上的最后一个故障指示器的子节点 ; (2) Establish a tree model with fault indicators as nodes; in the tree model: the fault indicators on the same line are connected sequentially, and the latter fault indicator is used as a child node of the previous fault indicator; on the branch line The first fault indicator on the main line is the child node of the last fault indicator on the main line, and the first fault indicator on the secondary branch line is the child node of the last fault indicator on the upper branch line ;

(3)对故障指示器进行标识和编号 ;同一线路上的故障指示器依次编号,分支线路上的第 一个故障指示器在主干线路上的最后一个故障指示器的编号的基础上增加 1 ;次一级分支 线路上的第一个故障指示器在上一级分支线路上的最后一个故障指示器的编号的基础上 增加 1 ; (3) Mark and number the fault indicators; the fault indicators on the same line are numbered sequentially, and the first fault indicator on the branch line is increased by 1 on the basis of the number of the last fault indicator on the main line; The first fault indicator on the secondary branch line is increased by 1 on the basis of the number of the last fault indicator on the upper branch line;

(4)遍历以故障指示器为节点的树形模型的所有路径,判断每一条路径上指示故障的故障 指示器的数量和编号最大的故障指示器的编号是否一致,若是,则将所述编号最大的故障 指示器的标识和编号作为该路径的故障坐标 ; (4) Traversing all paths of the tree model with fault indicators as nodes, judging whether the number of fault indicators indicating faults on each path is consistent with the number of the fault indicator with the largest number, and if so, put the number The identification and number of the largest fault indicator as the fault coordinates of the path;

(5)获得故障坐标的编号分量最大的故障指示器,将电路故障定位在其之后; (5) Obtain the fault indicator with the largest number component of the fault coordinates, and locate the circuit fault behind it;

(6)在检测出所述配电网发生故障的情况下,在显示屏中显示所述配电网中的故障线路,并获取所述故障线路所对应的终端 ;以及发送故障提示消息至所述终端; (6) When a fault occurs in the distribution network is detected, display the faulty line in the distribution network on the display screen, and obtain the terminal corresponding to the faulty line; and send a fault prompt message to the the terminal;

(7)从预设的关联系统中获取所述故障线路的故障信息,并在所述显示屏中显示所述故障 信息,其中,所述故障信息至少包括 :故障区间,所述故障区间为所述故障线路中发生故障 的位置所在的线路区间。 (7) Acquiring fault information of the faulty line from a preset associated system, and displaying the fault information on the display screen, wherein the fault information at least includes: a fault interval, and the fault interval is all The line section where the fault occurred in the faulty line is located.

进一步的,若一条路径上指示故障的 故障指示器的数量和编号最大的故障指示器的编号不一致,则判断指示故障的故障指示器 的数量和编号最大的故障指示器的编号的比值是否大于设定阈值,若是,则将编号最大的 故障指示器的编号作为该路径的故障坐标,并将所述故障坐标用于故障定位 ;否则,认为该 条路径不存在故障。 Further, if the number of fault indicators indicating a fault on a path is inconsistent with the number of the fault indicator with the largest number, it is judged whether the ratio of the number of fault indicators indicating a fault to the number of the fault indicator with the largest number is greater than the set value Determine the threshold, if so, use the number of the fault indicator with the largest number as the fault coordinates of the path, and use the fault coordinates for fault location; otherwise, consider that there is no fault in this path.

进一步的,所述设定阈值为 60%。 Further, the set threshold is 60%.

进一步的,在显示所述配电网中的故障线路之后,所述方法还包括:将所述故障线路的运行状态修改为异常;以及发送工单至所述故障线路对应的手持端,其中,所述工单中至少包含抢修任务。 Further, after displaying the faulty line in the distribution network, the method further includes: modifying the operation status of the faulty line to be abnormal; and sending a work order to the handheld terminal corresponding to the faulty line, wherein, The work order includes at least a rush repair task.

进一步的,在发送工单至所述故障线路对应的手持 端之后,所述方法还包括:建立所述手持端跟指挥中心之间的通信连接 ; 通过所述指挥中心的摄像设备获取所述指挥中心中指挥者的视频信息,并将所述视频 信息通过所述通信连接发送至所述手持端。 Further, after sending the work order to the hand-held terminal corresponding to the faulty line, the method further includes: establishing a communication connection between the hand-held terminal and the command center; The video information of the commander in the center is sent to the handheld terminal through the communication connection.

进一步的,在发送工单至所述故障线路对应的手持 端之后,所述方法还包括:在接收到所述手持端发送的完成指令后,将所述故障线路的运行状态恢复为正常,其 中,所述完成指令用于指示所述配电网发生的故障已消除。 Further, after sending the work order to the handheld terminal corresponding to the faulty line, the method further includes: after receiving the completion instruction sent by the handheld terminal, restoring the operation status of the faulty line to normal, wherein , the completion instruction is used to indicate that the fault occurred in the distribution network has been eliminated.

进一步的,基于接收到的配电网的运行参数,检测所 述配电网是否发生故障包括;检测所述配电网中正在配电的线路上是否出现异物,其中,在检测出所述正在配电的 线路上出现异物的情况下,确定所述配电网发生故障;或者检测所述配电网中正在配电的线路上的电流是否发生突变,其中,在检测出所述电流 发生突变的情况下,确定所述配电网发生故障。 Further, based on the received operating parameters of the distribution network, detecting whether a fault occurs in the distribution network includes: detecting whether a foreign object appears on a line that is distributing power in the distribution network, wherein, after detecting that the In the case of a foreign object appearing on the power distribution line, it is determined that the distribution network has a fault; or detecting whether the current on the power distribution line in the distribution network has a sudden change, wherein, after detecting that the current has a sudden change In the case of , it is determined that the distribution network fails.

参考图3,故障指示器可安 装在架空线、电力线缆、箱柜、环网柜以及电缆分支箱等位置,用于指示电网短路或单相接 地等故障。故障指示器主要包括两个部分:感应部分,包括接地故障传感器和短路故障传感器;主机部分,把传感器的信号进行处理,给出相关的指示和警报,同时还可通过 GPRS 通信 模块把相关的报警信息发送给监控中心。当线路发生短路或接地故障后,从变电站出口到故障点的所有故障指示器均翻牌 或闪光指示。 Referring to Figure 3, fault indicators can be installed on overhead lines, power cables, cabinets, ring network cabinets, and cable branch boxes to indicate faults such as grid short circuit or single-phase grounding. The fault indicator mainly includes two parts: the sensing part, including the ground fault sensor and the short circuit fault sensor; The communication module sends relevant alarm information to the monitoring center. When a short circuit or ground fault occurs in the line, all fault indicators from the substation outlet to the fault point will flip or flash.

以上所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,虽然本发明已以较佳实施例揭露如上,然而并非用以限定本发明,任何熟悉本专业的技术人员,在不脱离本发明技术方案范围内,当可利用上述揭示的技术内容作出些许更动或修饰为等同变化的等效实施例,但凡是未脱离本发明技术方案的内容,依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。 The above description is only a preferred embodiment of the present invention, and does not limit the present invention in any form. Although the present invention has been disclosed as above with preferred embodiments, it is not intended to limit the present invention. Anyone familiar with this field Those skilled in the art, without departing from the scope of the technical solution of the present invention, can use the technical content disclosed above to make some changes or modify equivalent embodiments with equivalent changes, but all the content that does not depart from the technical solution of the present invention, according to the present invention Any simple modifications, equivalent changes and modifications made to the above embodiments by the technical essence still belong to the scope of the technical solution of the present invention.

Claims (10)

1.一种电力电网故障检测系统,其特征在于:包括电网(1),所述电网(1)连接有检测电路(2),所述检测电路(2)上设置有设置有多个分支线路(201),所述分支线路(201)上分别设 置有多个电流互感器(202),所述电流互感器(202)用于采集电网(1)上的电流信号,所述检测线路(2)连接到故障判断电路(3),所述故障判断电路(3)上设置有光电转换单元(301)和故障等级判断单元(302)和信号发生器(303),所述故障判断电路(3)连接有报警处理电路(4),所述报警处理电路(4)上设置有报警装置(401)。 1. A power grid fault detection system, characterized in that: comprising a grid (1), the grid (1) is connected to a detection circuit (2), and the detection circuit (2) is provided with a plurality of branch lines (201), the branch lines (201) are respectively provided with a plurality of current transformers (202), the current transformers (202) are used to collect current signals on the power grid (1), and the detection line (2 ) is connected to the fault judgment circuit (3), and the fault judgment circuit (3) is provided with a photoelectric conversion unit (301) and a fault level judgment unit (302) and a signal generator (303), and the fault judgment circuit (3) ) is connected with an alarm processing circuit (4), and the alarm processing circuit (4) is provided with an alarm device (401). 2.根据权利要求1所述的一种电力电网故障检测系统,其特征在于:所述报警处理电路(4)还连接有监控中心(5),所述监控中心(5)上设置有无线信号发生器。 2. A kind of power grid fault detection system according to claim 1, characterized in that: the alarm processing circuit (4) is also connected to a monitoring center (5), and the monitoring center (5) is provided with a wireless signal generator. 3.根据权利要求1所述的一种电力电网故障检测系统,其特征在于:所述故障等级判断单元 (302)上设置有故障对照单元(304),所述故障对照单元(304)里设置有多个故障等级标准。 3. A power grid fault detection system according to claim 1, characterized in that: said fault level judging unit (302) is provided with a failure comparison unit (304), and a plurality of failure level standards are set in the failure comparison unit (304). 4.一种电力电网故障检测方法,其特征在于:包括如下步骤: 4. A power grid fault detection method, characterized in that: comprising the steps of: (1)在电网中设置故障指示器,所述故障指示器分布在电网的线路上,所述线路包括主干 线路和至少一级分支线路,且每条线路上设有至少一个故障指示器 ; (1) Install fault indicators in the power grid, the fault indicators are distributed on the lines of the power grid, the lines include the main line and at least one branch line, and each line is equipped with at least one fault indicator; (2)建立以故障指示器为节点的树形模型 ;所述树形模型中 :同一线路上的故障指示器依 次连接,后一故障指示器作为前一故障指示器的子节点 ;分支线路上的第一个故障指示器 作为主干线路上的最后一个故障指示器的子节点、次一级分支线路上的第一个故障指示器 作为上一级分支线路上的最后一个故障指示器的子节点 ; (2) Establish a tree model with fault indicators as nodes; in the tree model : The fault indicators on the same line are connected sequentially, and the latter fault indicator is the child node of the previous fault indicator ;First FI on a branch line As a child of the last FI on the main line, the first FI on a secondary branch line As a child node of the last fault indicator on the branch line of the upper level; (3)对故障指示器进行标识和编号 ;同一线路上的故障指示器依次编号,分支线路上的第 一个故障指示器在主干线路上的最后一个故障指示器的编号的基础上增加 1 ;次一级分支 线路上的第一个故障指示器在上一级分支线路上的最后一个故障指示器的编号的基础上 增加 1 ; (3) Identify and number the fault indicators; the fault indicators on the same line are numbered sequentially, and the fault indicators on the branch line A fault indicator is increased by 1 based on the number of the last fault indicator on the trunk line; the first fault indicator on the secondary branch line is the number of the last fault indicator on the upper branch line on the basis of increase by 1; (4)遍历以故障指示器为节点的树形模型的所有路径,判断每一条路径上指示故障的故障 指示器的数量和编号最大的故障指示器的编号是否一致,若是,则将所述编号最大的故障 指示器的标识和编号作为该路径的故障坐标 ; (4) Traversing all paths of the tree model with fault indicators as nodes, judging whether the number of fault indicators indicating faults on each path is consistent with the number of the fault indicator with the largest number, and if so, put the number The identification and number of the largest fault indicator as the fault coordinates of the path; (5)获得故障坐标的编号分量最大的故障指示器,将电路故障定位在其之后; (5) Obtain the fault indicator with the largest number component of the fault coordinates, and locate the circuit fault behind it; (6)在检测出所述配电网发生故障的情况下,在显示屏中显示所述配电网中的故障线路,并获取所述故障线路所对应的终端 ;以及发送故障提示消息至所述终端; (6) When a fault occurs in the distribution network, display the faulty line in the distribution network on the display screen, and obtain the terminal corresponding to the faulty line ; and sending a fault prompt message to the terminal; (7)从预设的关联系统中获取所述故障线路的故障信息,并在所述显示屏中显示所述故障 信息,其中,所述故障信息至少包括 :故障区间,所述故障区间为所述故障线路中发生故障 的位置所在的线路区间。 (7) Acquiring fault information of the faulty line from a preset associated system, and displaying the fault information on the display screen, wherein the fault information at least includes: a fault interval, and the fault interval is all A fault occurred in the faulty line The line interval where the position is located. 5.根据权利要求4所述的一种电力电网故障检测方法,其特征在于:若一条路径上指示故障的 故障指示器的数量和编号最大的故障指示器的编号不一致,则判断指示故障的故障指示器 的数量和编号最大的故障指示器的编号的比值是否大于设定阈值,若是,则将编号最大的 故障指示器的编号作为该路径的故障坐标,并将所述故障坐标用于故障定位 ;否则,认为该 条路径不存在故障。 5. A kind of electric power grid fault detection method according to claim 4, is characterized in that: if the quantity of the fault indicator indicating fault on a path is inconsistent with the serial number of the fault indicator with the largest number, then judge the fault indicating fault Whether the ratio of the number of indicators to the number of the fault indicator with the largest number is greater than the set threshold, if so, the number of the fault indicator with the largest number is used as the fault coordinates of the path, and the fault coordinates are used for fault location ; Otherwise, it is considered that there is no fault in this path. 6.根据权利要求5所述的一种电力电网故障检测方法,其特征在于:所述设定阈值为 60%。 6. A kind of power grid fault detection method according to claim 5, is characterized in that: described setting threshold is 60%. 7.根据权利要求4所述的一种电力电网故障检测方法,其特征在于:在显示所述配电网中的故障线路之后,所述方法还包括:将所述故障线路的运行状态修改为异常;以及发送工单至所述故障线路对应的手持端,其中,所述工单中至少包含抢修任务。 7. A kind of power grid fault detection method according to claim 4, is characterized in that: after displaying the fault line in the distribution network, the method further comprises: modifying the operating state of the fault line to Abnormal; and sending a work order to the hand-held terminal corresponding to the faulty line, wherein the work order at least includes a repair task. 8.根据权利要求7所述的一种电力电网故障检测方法,其特征在于:在发送工单至所述故障线路对应的手持 端之后,所述方法还包括:建立所述手持端跟指挥中心之间的通信连接 ; 通过所述指挥中心的摄像设备获取所述指挥中心中指挥者的视频信息,并将所述视频 信息通过所述通信连接发送至所述手持端。 8. A power grid fault detection method according to claim 7, characterized in that: after sending the work order to the hand-held terminal corresponding to the faulty line, the method further comprises: establishing the hand-held terminal with the command center The communication connection between; Obtain the video information of the commander in the command center through the camera equipment of the command center, and send the video Information is sent to the handheld terminal through the communication connection. 9.根据权利要求7所述的一种电力电网故障检测方法,其特征在于:在发送工单至所述故障线路对应的手持 端之后,所述方法还包括:在接收到所述手持端发送的完成指令后,将所述故障线路的运行状态恢复为正常,其 中,所述完成指令用于指示所述配电网发生的故障已消除。 9. A power grid fault detection method according to claim 7, characterized in that: after sending the work order to the hand-held terminal corresponding to the faulty line, the method further comprises: after receiving the hand-held terminal sending After completing the instruction, restore the operation state of the faulty line to normal, wherein the completion instruction is used to indicate that the fault occurred in the distribution network has been eliminated. 10.根据权利要求4所述的一种电力电网故障检测方法,其特征在于:基于接收到的配电网的运行参数,检测所 述配电网是否发生故障包括;检测所述配电网中正在配电的线路上是否出现异物,其中,在检测出所述正在配电的 线路上出现异物的情况下,确定所述配电网发生故障;或者检测所述配电网中正在配电的线路上的电流是否发生突变,其中,在检测出所述电流 发生突变的情况下,确定所述配电网发生故障。 10. A power grid fault detection method according to claim 4, characterized in that: based on the received operating parameters of the distribution network, detecting whether a fault occurs in the distribution network comprises; Whether there is a foreign object on the line that is distributing power, wherein, in the case that a foreign object is detected on the line that is distributing power, it is determined that a fault occurs in the distribution network; Whether there is a sudden change in the current on the line, wherein, when the current is detected In the case of a sudden change, it is determined that the distribution network is faulty.
CN201610408569.0A 2016-06-13 2016-06-13 Fault detection system and method for electric power grid Pending CN105891679A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610408569.0A CN105891679A (en) 2016-06-13 2016-06-13 Fault detection system and method for electric power grid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610408569.0A CN105891679A (en) 2016-06-13 2016-06-13 Fault detection system and method for electric power grid

Publications (1)

Publication Number Publication Date
CN105891679A true CN105891679A (en) 2016-08-24

Family

ID=56729219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610408569.0A Pending CN105891679A (en) 2016-06-13 2016-06-13 Fault detection system and method for electric power grid

Country Status (1)

Country Link
CN (1) CN105891679A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106443362A (en) * 2016-11-16 2017-02-22 合肥普望电子有限责任公司 Power distribution network fault detection system
CN106546875A (en) * 2016-10-13 2017-03-29 华北科技学院 Power circuit alarm method
CN106646116A (en) * 2016-11-16 2017-05-10 合肥普望电子有限责任公司 Trouble shooting and locating method for power distribution network
CN108828288A (en) * 2018-04-10 2018-11-16 曲阜师范大学 A kind of intelligence Active Power Filter-APF referential current detection system
CN110532343A (en) * 2019-09-04 2019-12-03 广东电网有限责任公司 Comprehensive analysis of fault and information presentation system are pressed in a kind of power distribution network

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040164743A1 (en) * 1997-12-09 2004-08-26 Parsons Antony Cozart System and method for locating a disturbance in a power system based upon disturbance power and energy
CN104777401A (en) * 2015-03-18 2015-07-15 航天科工深圳(集团)有限公司 Power grid fault positioning method
CN105322542A (en) * 2015-11-26 2016-02-10 国网北京市电力公司 Processing method and device for distribution network fault
WO2016028274A1 (en) * 2014-08-19 2016-02-25 Southern States, Llc Corona avoidance electric power line monitoring and response system
CN105445594A (en) * 2016-01-25 2016-03-30 国网山东省电力公司高唐县供电公司 Power grid fault detection system
EP3157111A1 (en) * 2014-06-13 2017-04-19 Mitsubishi Electric Corporation Power grid protection control system test device, test method, and program

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040164743A1 (en) * 1997-12-09 2004-08-26 Parsons Antony Cozart System and method for locating a disturbance in a power system based upon disturbance power and energy
EP3157111A1 (en) * 2014-06-13 2017-04-19 Mitsubishi Electric Corporation Power grid protection control system test device, test method, and program
WO2016028274A1 (en) * 2014-08-19 2016-02-25 Southern States, Llc Corona avoidance electric power line monitoring and response system
CN104777401A (en) * 2015-03-18 2015-07-15 航天科工深圳(集团)有限公司 Power grid fault positioning method
CN105322542A (en) * 2015-11-26 2016-02-10 国网北京市电力公司 Processing method and device for distribution network fault
CN105445594A (en) * 2016-01-25 2016-03-30 国网山东省电力公司高唐县供电公司 Power grid fault detection system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106546875A (en) * 2016-10-13 2017-03-29 华北科技学院 Power circuit alarm method
CN106443362A (en) * 2016-11-16 2017-02-22 合肥普望电子有限责任公司 Power distribution network fault detection system
CN106646116A (en) * 2016-11-16 2017-05-10 合肥普望电子有限责任公司 Trouble shooting and locating method for power distribution network
CN108828288A (en) * 2018-04-10 2018-11-16 曲阜师范大学 A kind of intelligence Active Power Filter-APF referential current detection system
CN110532343A (en) * 2019-09-04 2019-12-03 广东电网有限责任公司 Comprehensive analysis of fault and information presentation system are pressed in a kind of power distribution network

Similar Documents

Publication Publication Date Title
CN103441794B (en) Transformer station's optical fiber failure positioning system and method
CN106124935A (en) Middle and low voltage network Fault Locating Method
CN105891679A (en) Fault detection system and method for electric power grid
CN204389628U (en) A kind of electric network fault automatic positioning equipment based on Multi-information acquisition
CN105606957A (en) Grid fault research and judge method based on fault indicator and public/specific transformer
CN103872640B (en) A kind of distribution power automation terminal unit off-line fault rapidly self-healing control method
CN205263227U (en) Leakage detection equipment
CN103730894B (en) EMS image checking mehtod and device
CN105763248A (en) Optical cable fiber core network monitoring system
CN110568275B (en) Open-phase fault studying and judging method and system based on public and private power distribution network variable data
CN102998596A (en) System for detecting faults of overhead line and detection method thereof
CN105445594B (en) Power grid fault detection system
CN105955159A (en) Regulation operation anti-misoperation checking method based on anti-misoperation rule source side maintenance
CN105067959A (en) Fault positioning method under ring network power supply condition
CN110174583A (en) Low-voltage power line electric leakage monitoring system and method based on NB-IOT
CN103605047B (en) A kind of telegram in reply monitoring system and method
CN106680659A (en) Distribution network fault indication system
CN106646116A (en) Trouble shooting and locating method for power distribution network
CN109240265A (en) A kind of railway signal system and intelligent failure diagnosis method
CN112486304A (en) Real-time state monitoring and automatic defect processing system for secondary equipment of power transformation part
CN117406012A (en) Abnormal operation state monitoring device for power distribution equipment
CN206281937U (en) Low-voltage distribution network running state analysis and early warning system
CN111308266A (en) Power transmission line fault detection system and method
CN204597635U (en) Based on the fault quick examination device of EMS system transformer station communication
CN204330948U (en) A kind of transmission line malfunction instruction and alarm device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160824