CN105888295A - Construction riding track shim plate and construction method thereof - Google Patents

Construction riding track shim plate and construction method thereof Download PDF

Info

Publication number
CN105888295A
CN105888295A CN201610227866.5A CN201610227866A CN105888295A CN 105888295 A CN105888295 A CN 105888295A CN 201610227866 A CN201610227866 A CN 201610227866A CN 105888295 A CN105888295 A CN 105888295A
Authority
CN
China
Prior art keywords
threaded rod
construction
packway
parallels
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610227866.5A
Other languages
Chinese (zh)
Other versions
CN105888295B (en
Inventor
陈�光
沈禹光
郭亮亮
周志健
崔爱珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Construction Engineering Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201610227866.5A priority Critical patent/CN105888295B/en
Publication of CN105888295A publication Critical patent/CN105888295A/en
Application granted granted Critical
Publication of CN105888295B publication Critical patent/CN105888295B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic
    • E04G25/06Shores or struts; Chocks telescopic with parts held together by positive means
    • E04G25/065Shores or struts; Chocks telescopic with parts held together by positive means by a threaded nut

Abstract

The invention relates to a construction riding track shim plate and a construction method thereof. The construction riding track shim plate comprises a threaded rod a height regulation part and an embedded rod, wherein the height regulation part is movably arranged on the threaded rod; one end of the embedded rod is used for being embedded in a foundation; the other end of the embedded rod is connected to the bottom end of the threaded rod by a threaded sleeve. The construction riding track shim plate disclosed by the invention can be simply disassembled; the part of the embedded rod, which is exposed out of the foundation, can be subjected coverage processing in later construction without being cut. The embedded rod is left inside a concrete bottom plate so as to avoid frequent disassembling and assembling of a construction riding track in the concreting process of the bottom plate. The height regulation part is arranged on the threaded rod, so that the bottom level of the height regulation part can be freely regulated and erecting and disassembling times are reduced.

Description

Construction packway parallels and construction method thereof
Technical field
The present invention relates to the realm of building construction, espespecially a kind of construction packway parallels and construction method thereof.
Background technology
During the realm of building construction is based on main structure construction, need erection construction packway, due to Packway vertical rod need to be positioned over the tops, position such as base soil, blinding layer, structure construction template, under the influence of meeting The construction of procedure, such as construction of waterproof layer, concreting etc., needs repeatedly to set up and Demolition Construction Packway, efficiency of construction is low, and engineering cost is big.
Summary of the invention
It is an object of the invention to overcome the defect of prior art, it is provided that a kind of construction packway parallels, solve Certainly the problems of the prior art.
The technical scheme realizing above-mentioned purpose is: provide construction packway parallels, including:
Threaded rod;
It is movably arranged at the height adjusting part of described threaded rod;And
Pre-buried bar, one end of described pre-buried bar is for being embedded in basis in advance, and the other end of described pre-buried bar passes through Screw shell is connected to the bottom of described threaded rod.
The present invention constructs further improvement is that of packway parallels, described height adjusting part includes:
It is screwed together in the adjustable member of described threaded rod;And
It is sheathed on described threaded rod and the hollow loop bar being placed in described adjustable member.
The present invention constructs further improvement is that of packway parallels, described adjustable member is adjustable apical ring, institute The two ends stating adjustable apical ring are extended with handle.
The present invention constructs further improvement is that of packway parallels, described threaded rod is screw mandrel, described can Adjusting part is the nut adaptive with described screw mandrel.
The present invention constructs further improvement is that of packway parallels, described screw shell is straight thread set Cylinder, described pre-buried bar is the reinforcing bar adaptive with described straight screw sleeve.
The present invention also provides for the construction method of construction packway parallels, including:
One threaded rod and a height adjusting part are provided, described height adjusting part is movably arranged at described screw thread Bar;And
One pre-buried bar is provided, one end of described pre-buried bar is embedded in basis in advance, another by described pre-buried bar One end is connected to the bottom of described threaded rod by screw shell.
The present invention construct packway parallels further improvement is that of construction method, it is provided that described height Regulating part includes:
One adjustable member is provided, described adjustable member is screwed together in described threaded rod;And
One hollow loop bar is provided, described hollow loop bar is sheathed on described threaded rod and be placed in described can Adjust on part.
The present invention construct packway parallels further improvement is that of construction method, described adjustable member is Adjustable apical ring, the two ends of described adjustable apical ring are extended with handle.
The present invention construct packway parallels further improvement is that of construction method, described threaded rod is Screw mandrel, described adjustable member is the nut adaptive with described screw mandrel.
The present invention construct packway parallels further improvement is that of construction method, described screw shell For straight screw sleeve, described pre-buried bar is the reinforcing bar adaptive with described straight screw sleeve.
The present invention constructs the beneficial effect of packway parallels:
The present invention constructs packway parallels by setting screw shell in the bottom of threaded rod and pre-buried bar makes Construction packway parallels can be removed simply, and pre-buried bar exposes the part on basis and can enter when construction in later period Row covering treatment, it is not necessary to carry out cutting process, stays concrete bottom intralaminar part by pre-buried bar, it is to avoid Construction packway is frequently dismounted during bottom slab concreting.Threaded rod sets height adjusting part, thus can be certainly By the elevation of bottom of regulation height adjusting part, reduce to take and tear number of times, one-shot forming open, reduce cost, Improve Construction Quality simultaneously.
Accompanying drawing explanation
Fig. 1 is that the present invention constructs the structural representation of packway parallels.
Fig. 2 is the structural representation after taking off hollow loop bar in Fig. 1.
Fig. 3 is the profile of Fig. 1 interior joint A.
Detailed description of the invention
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
The present invention provides a kind of construction packway parallels, and the present invention will be described below in conjunction with the accompanying drawings.
Refering to Fig. 1, it is shown that the present invention constructs the structural representation of packway parallels.Refering to Fig. 2, aobvious Show the structural representation after taking off hollow loop bar in Fig. 1.Shown in Fig. 1 and Fig. 2, the present invention Construction packway parallels includes: threaded rod 1, height adjusting part 2, screw shell 3 and pre-buried bar 4, Wherein height adjusting part 2 is movably arranged at threaded rod 1, and one end of pre-buried bar 4 is for being embedded in basis in advance, in advance The other end burying bar 4 is connected to the bottom of threaded rod 1 by screw shell 3.Thus whole is sent out Bright construction packway parallels is fixed on basis.Present invention packway parallels of constructing is set by the bottom at threaded rod Screw shell and pre-buried bar make construction packway parallels to remove simply, and pre-buried bar exposes basis Part can carry out covering treatment when construction in later period, it is not necessary to carries out cutting process.Pre-buried bar is stayed mixed Solidifying soil base plate interior, it is to avoid frequently dismount construction packway during bottom slab concreting.Threaded rod sets Height adjusting part, thus the elevation of bottom of freely adjustable height adjusting part, reduce take tear open number of times, one Secondary molding, reduces cost, improves Construction Quality simultaneously.
Shown in Fig. 1 and Fig. 2, threaded rod 1 is provided with screw thread.Height adjusting part 2 includes adjustable Part 20 and hollow loop bar 21, wherein adjustable member 20 is screwed together on threaded rod 1, hollow loop bar 21 It is sheathed on threaded rod 1 and is placed in adjustable member 20.In the present embodiment, take one a diameter of The standard oil torr of 500mm 38mm, a length of, and excise oil jacking portion steel plate and make material, remaining Screwed bar and the adjustable apical ring being screwed together on bar, as threaded rod 1 and adjustable member 20. Adjustable apical ring is provided with the female thread of the threaded adapter hung oneself with threaded rod 1, and the two ends of adjustable apical ring extend Having handle, adjustable apical ring can move up and down along threaded rod 1, thus is sheathed on threaded rod 1 Hollow loop bar 21 can followed by adjustable apical ring and move up and down, and changes the elevation of bottom of hollow loop bar 21.
In another kind of embodiment, using screw mandrel as threaded rod 1, adjustable member 20 is adaptive with screw mandrel Nut.Nut can move up and down along screw mandrel, thus the hollow loop bar 21 being sheathed on screw mandrel Nut can be followed by move up and down, change the elevation of bottom of hollow loop bar 21.
Refering to Fig. 3, it is shown that the profile of Fig. 1 interior joint A.Shown in Fig. 1 and Fig. 3, in advance The one end burying bar 4 supplies to be embedded in basis in advance, and the other end of pre-buried bar 4 is connected to spiral shell by screw shell 3 The bottom of rasp bar 1.In the present embodiment, screw shell 3 is the straight screw sleeve of a diameter of 25mm, Pre-buried bar 4 is the reinforcing bar adaptive with straight screw sleeve.A diameter of 25mm of reinforcing bar, a length of 100 To 150mm.One end of straight screw sleeve is connected with the bottom butt welding of threaded rod 1.Specifically, straight spiral shell Stricture of vagina sleeve and threaded rod 1 use 5 ° of groove weldings to weld.By reinforcing bar from the bottom of straight screw sleeve It is screwed into the inside of straight screw sleeve.
The present invention also provides for the construction method of construction packway parallels, including:
One threaded rod and a height adjusting part are provided, height adjusting part is movably arranged at threaded rod;Wherein Height adjusting part includes: adjustable member and hollow loop bar, and adjustable member is screwed together in threaded rod;By hollow sleeve Bar is sheathed on threaded rod and is placed in adjustable member.In one embodiment, adjustable member is adjustable apical ring, The two ends of adjustable apical ring are extended with handle.In another kind of embodiment, threaded rod is screw mandrel, adjustable member For the nut adaptive with screw mandrel.
One pre-buried bar is provided, one end of pre-buried bar is embedded in basis in advance, the other end of pre-buried bar is passed through Screw shell is connected to the bottom of threaded rod.In the present embodiment, screw shell is straight screw sleeve, Pre-buried bar is the reinforcing bar adaptive with straight screw sleeve.
Specifically, the construction method of packway parallels of constructing the present invention below explains:
Based on erection construction packway during main structure construction, first adjustable apical ring is screwed together in screw thread Bar.
5 ° of groove weldings are used to be welded in the bottom of threaded rod screw shell.
To be welded connect after pre-buried bar is screwed into screw shell from the bottom of screw shell.
Being embedded in concrete foundation by pre-buried bar, the top mark height controlling pre-buried bar during construction exceeds coagulation Soil finished surface 50 to 60mm.
Hollow loop bar is set on threaded rod, regulates the height that adjustable apical ring extremely needs, so that The elevation of bottom of hollow loop bar meets construction requirement.
To be onstructed complete after need remove packway time, first take off hollow loop bar.
Screw shell is backed out pre-buried bar, thus removes the present invention and construct packway parallels.
Pre-buried bar exposes finished surface part, can carry out covering treatment when ground decoration is constructed, it is not necessary to enter Row cutting process, saves the energy, protection environment.
The present invention constructs the having the beneficial effect that of packway parallels
The present invention constructs packway parallels by setting screw shell in the bottom of threaded rod and pre-buried bar makes to execute Work packway parallels can be removed simply, and pre-buried bar exposes the part on basis can be carried out when construction in later period Covering treatment, it is not necessary to carry out cutting process.Pre-buried bar is stayed concrete bottom intralaminar part, it is to avoid the end of at Plate casting process frequently dismounts construction packway.Threaded rod sets height adjusting part, thus can be free The elevation of bottom of regulation height adjusting part, reduces to take and tears number of times, one-shot forming open, reduce cost, with Time improve Construction Quality.
Above in association with accompanying drawing embodiment, the present invention is described in detail, ordinary skill people in this area The present invention can be made many variations example by member according to the above description.Thus, some details in embodiment Should not constitute limitation of the invention, the present invention by the scope that defines using appended claims as this The protection domain of invention.

Claims (10)

1. a construction packway parallels, it is characterised in that including:
Threaded rod;
It is movably arranged at the height adjusting part of described threaded rod;And
Pre-buried bar, one end of described pre-buried bar is for being embedded in basis in advance, and the other end of described pre-buried bar passes through Screw shell is connected to the bottom of described threaded rod.
2. construction packway parallels as claimed in claim 1, it is characterised in that described altitude mixture control Part includes:
It is screwed together in the adjustable member of described threaded rod;And
It is sheathed on described threaded rod and the hollow loop bar being placed in described adjustable member.
3. construction packway parallels as claimed in claim 2, it is characterised in that described adjustable member is Adjustable apical ring, the two ends of described adjustable apical ring are extended with handle.
4. construction packway parallels as claimed in claim 2, it is characterised in that described threaded rod is Screw mandrel, described adjustable member is the nut adaptive with described screw mandrel.
5. construction packway parallels as claimed in claim 1, it is characterised in that described screw shell For straight screw sleeve, described pre-buried bar is the reinforcing bar adaptive with described straight screw sleeve.
6. the construction method of a packway parallels of constructing, it is characterised in that including:
One threaded rod and a height adjusting part are provided, described height adjusting part is movably arranged at described screw thread Bar;And
One pre-buried bar is provided, one end of described pre-buried bar is embedded in basis in advance, another by described pre-buried bar One end is connected to the bottom of described threaded rod by screw shell.
7. the construction method of packway parallels of constructing as claimed in claim 6, it is characterised in that carry Include for described height adjusting part:
One adjustable member is provided, described adjustable member is screwed together in described threaded rod;And
One hollow loop bar is provided, described hollow loop bar is sheathed on described threaded rod and be placed in described can Adjust on part.
8. the construction method of packway parallels of constructing as claimed in claim 7, it is characterised in that institute Stating adjustable member is adjustable apical ring, and the two ends of described adjustable apical ring are extended with handle.
9. the construction method of packway parallels of constructing as claimed in claim 7, it is characterised in that institute Stating threaded rod is screw mandrel, and described adjustable member is the nut adaptive with described screw mandrel.
10. the construction method of packway parallels of constructing as claimed in claim 6, it is characterised in that described Screw shell is straight screw sleeve, and described pre-buried bar is the reinforcing bar adaptive with described straight screw sleeve.
CN201610227866.5A 2016-04-13 2016-04-13 Construction riding track parallels and its construction method Expired - Fee Related CN105888295B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610227866.5A CN105888295B (en) 2016-04-13 2016-04-13 Construction riding track parallels and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610227866.5A CN105888295B (en) 2016-04-13 2016-04-13 Construction riding track parallels and its construction method

Publications (2)

Publication Number Publication Date
CN105888295A true CN105888295A (en) 2016-08-24
CN105888295B CN105888295B (en) 2019-05-10

Family

ID=57013535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610227866.5A Expired - Fee Related CN105888295B (en) 2016-04-13 2016-04-13 Construction riding track parallels and its construction method

Country Status (1)

Country Link
CN (1) CN105888295B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3314630A1 (en) * 1981-11-11 1984-10-25 Wolfgang 7958 Laupheim Baumann Support for the building industry for the vertical support of a ceiling formwork
EP0665348A1 (en) * 1994-01-08 1995-08-02 Gerhard Dingler Telescopic strut for building construction
CN202273433U (en) * 2011-08-29 2012-06-13 殷华欢 Holder
CN202520011U (en) * 2012-03-16 2012-11-07 中国三冶集团有限公司第一建筑工程公司 Floor shore device
CN204001819U (en) * 2014-07-10 2014-12-10 绍兴上虞宏晟技术转让服务有限公司 A kind of grafting rotary adjustment type building iron structure support bar
CN204139578U (en) * 2014-10-21 2015-02-04 广西盛虎金属制品有限公司 The pre-buried assembling wall attaching parts of scaffold

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3314630A1 (en) * 1981-11-11 1984-10-25 Wolfgang 7958 Laupheim Baumann Support for the building industry for the vertical support of a ceiling formwork
EP0665348A1 (en) * 1994-01-08 1995-08-02 Gerhard Dingler Telescopic strut for building construction
CN202273433U (en) * 2011-08-29 2012-06-13 殷华欢 Holder
CN202520011U (en) * 2012-03-16 2012-11-07 中国三冶集团有限公司第一建筑工程公司 Floor shore device
CN204001819U (en) * 2014-07-10 2014-12-10 绍兴上虞宏晟技术转让服务有限公司 A kind of grafting rotary adjustment type building iron structure support bar
CN204139578U (en) * 2014-10-21 2015-02-04 广西盛虎金属制品有限公司 The pre-buried assembling wall attaching parts of scaffold

Also Published As

Publication number Publication date
CN105888295B (en) 2019-05-10

Similar Documents

Publication Publication Date Title
US20160186403A1 (en) Helical pile assembly
CN102373803A (en) Novel precast concrete pipe die and construction method thereof
CN203847038U (en) Drilling wellhead overflow-proof pipe
CN102400567A (en) Spiral pipe lifting support device
CN203856202U (en) Simple pullable sizing device of reserved holes
CN107237493A (en) Quickly remove formula and reserve device in concrete floor hole
CN104612401A (en) Construction method of column structure without seam line
EP2352607A2 (en) Method for exchangeably fastening a refractory purge plug or sleeve and a container for molten metal
CN105888295A (en) Construction riding track shim plate and construction method thereof
CN206458110U (en) Rectangle steel tubing string construction plumbing device in inverse method one-column one-pile
CN105544832B (en) A kind of shell roofing and its construction method
CN205188812U (en) Rail guard template
CN213952981U (en) Steel pipe supporting base of stair platform
CN107288341A (en) A kind of reserving hole building mortion and construction method
CN210798281U (en) Early-dismantling jacking structure for double lead screws of building template
CN104878926B (en) One kind hangs template system construction method and can have enough to meet the need rest
CN107044204B (en) Facilitate the pre-buried ring of cutting
CN205369950U (en) Built -in fitting locator
CN104929367B (en) The control device of flat concrete pouring quality and its using method
CN107498242A (en) Can the serial welding positioner structure and its application method processed
CN211524188U (en) Temporary support for mounting assembled concrete stairs
CN105839621A (en) Construction method of sudden-changed-section drilled pile made of anisotropic materials
CN106825323B (en) Modern assembled architecture engineering reinforcing cage stirrup coiling hold-down mechanism
CN106734765B (en) Modern assembled architecture engineering steel reinforcement cage tie hoop cutting system
CN109469342A (en) Assembled back taper the rim of a bowl embedded bar controls mold and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200520

Address after: 300457 no.2599 Binhe Road, Tanggu, Binhai New District, Tianjin

Patentee after: Tianjin Construction Engineering Co.,Ltd. of China Construction Eighth Engineering Bureau

Address before: 200122, No. 1568, Century Avenue, Shanghai, 27, Pudong New Area

Patentee before: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190510