CN105888279A - Processing method of commercial concrete floor cracks - Google Patents

Processing method of commercial concrete floor cracks Download PDF

Info

Publication number
CN105888279A
CN105888279A CN201610244955.0A CN201610244955A CN105888279A CN 105888279 A CN105888279 A CN 105888279A CN 201610244955 A CN201610244955 A CN 201610244955A CN 105888279 A CN105888279 A CN 105888279A
Authority
CN
China
Prior art keywords
crack
concrete floor
processing method
commerical ready
mixed concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610244955.0A
Other languages
Chinese (zh)
Inventor
方耀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610244955.0A priority Critical patent/CN105888279A/en
Publication of CN105888279A publication Critical patent/CN105888279A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0288Repairing or restoring floor slabs

Abstract

The invention relates to a processing method of commercial concrete floor cracks. The processing method of the commercial concrete floor cracks comprises the following steps of analyzing crack formation reasons after discovering the commercial concrete floor cracks; looking for crack generation reasons, and making a solution aiming at the generation reasons; carrying out wall crack processing according to the solution, and continuously observing processed walls. The processing method of the commercial concrete floor cracks disclosed by the invention is scientific and reasonable, different solutions are made aiming at different generation reasons, and the concrete floor cracks can be repaired more effectively.

Description

A kind of processing method of commerical ready-mixed concrete floor crack
Technical field
The present invention relates to concrete product post-processing technique field, be specifically related to the processing method of a kind of commerical ready-mixed concrete floor crack.
Background technology
Along with the fast development of commerical ready-mixed concrete, the appearance of the concrete such as the use of additive, large fluidity, high intensity, distress in concrete with and give birth to, be the most commonly seen quality problems of concrete, be also one of problem of having a headache the most in industry.Mr. Yang Wenke mention in " problem of modern concrete science and research " book " before 30 years, who dare oneself construction concrete works have crack?Today, who dares the concrete works free from flaw that oneself is constructed " [1].As can be seen here, crack problem is the most universal, and some areas present the phenomenon growed in intensity, and distress in concrete annoyings field engineer always, and the moment affects the durability of modern concrete.Therefore, the most correctly process distress in concrete, become the problem needing in the industry to solve.
Summary of the invention
For solving the above-mentioned problems in the prior art, the invention provides the processing method of a kind of commerical ready-mixed concrete floor crack.
The technique effect of the present invention is achieved through the following technical solutions:
The processing method of a kind of commerical ready-mixed concrete floor crack, comprises the following steps: after finding commerical ready-mixed concrete floor crack, fracture Crack cause is analyzed;Find causes of cracks, and formulate solution for producing cause;Carry out cracking of wall surface process according to solution, and metope after processing is carried out continuous observation.
Further, described crack is crosscutting concern.
Further, described Crack cause causes for adding water in concrete when transportation tank car discharging in work progress starching stone separation.
Further, described Crack cause also includes not carrying out quadric-plastering and overlay film maintenance to pouring beam slab.
Further, described solution includes: first: process surface checking;Second: obvious crack is processed.
Further, described crackle is Temperature Cracks.
Further, described Crack cause is that temperature is high and dry, and concrete dehydration is very fast, and reaction is fast, the most repeatedly wipes one's face and does not take maintenance measure so that inside concrete and the outside temperature difference are big, and temperature stress cracks.
Further, described solution is: crackle occurring, removing surface is clean, lays silk screen thereon, then pour the waterproof slightly expanded concrete of microlith on silk screen.
Further, described Crack cause causes concrete to mix with profit pump water for violating job specfication.
The invention has the beneficial effects as follows:
The processing method of commerical ready-mixed concrete floor crack disclosed in this invention, scientific and reasonable, formulate different solutions for different producing cause, it is possible to more efficiently make up cracks on concrete floor.
Detailed description of the invention
The present invention is realized by detailed description below:
Embodiment one:
It is the January that certain engineering pours the time, pours third layer beam slab and crack occurs.Concrete design strength is C30, identifies this position, detects analysis, and 10d concrete springback intensity is 22.6MPa, and concrete strength meets normal development of age.By water-storing test, for non-penetrating crack, the most a width of about the 1mm of fracture width, minimum 0.5mm, the state that big bottom is little in top, the penetration of fracture is at 10-40mm, and length is between 0.2-1.5m.
Crack cause
Cast-in-situ beam slab was constructed in the January, and this area is in season in severe winter, and the temperature difference is relatively big sooner or later, and noon, temperature was at 20 DEG C, nocturnal temperature is only 8 DEG C, and that night all blows powerful north wind to second day noon, dry, concrete dehydration is very fast, and temperature is low, early age strength of concrete slower development.In work progress, this beam slab concrete uses Vehicle loaded pump in pumping, pumping line is longer, pump machine insufficient pressure, for making concrete be more conducive to conveying, add water situation when transportation tank car discharging, when causing being pumped to this beam slab working face, this position concrete uniformity is poor, occurs that slight slurry stone separates.After construction terminates, the most do not carry out quadric-plastering and film covering curing to pouring beam slab.Therefore, irregular cracks is produced.
Processing scheme
Concrete processing scheme is as follows.
(1) surface checking processes.Being cleaned up by pending concrete surface, after drying with fine, soft fur brush brushwork epoxy resin slurries repeatedly at surface checking line, each certain time (once brushing the most dry before treating) brushes once, and brushing thickness is till covering crackle.
(2) for obvious crack, surface clean is clean.Axis centered by crack, is in the shape of the letter V along both sides, crack about 2cm and chisels, and blows clean with air compressor machine punching.First uniformly prepare (as excessively thickness can slightly be diluted with water) according to 1:1 with aqueous epoxy resins and curing agent, embedding mend in bottom portion of groove, afterwards with waterproof microdilatancy mortar screeding and compaction, film covering curing.
Later stage follows the tracks of
Being tracked the treatment effect at this position observing, intensity detection is qualified, and does not occur leaking, processes position from phenomenons such as new cracking, the development of edge, old crack and the peelings of cement mortar face, and process produces a desired effect.
Embodiment 2:
Certain engineering, designs three layers of office building, and intensity is C25, and crack occurs in top layer.Identifying this layer, detect analysis, 15d concrete springback intensity is about 26MPa, and concrete strength meets normal development of age, and xoncrete structure is no problem.The flooring of 200 square metres, has 4 0.5-1.8m, after form removal, infiltration phenomenon occurs from following observation flooring, and wherein 3 is crosscutting concern.
Crack cause
Engineering time is September, and temperature is high and is dried, and concrete dehydration is very fast, and reaction is fast, the most repeatedly wipes one's face and does not take maintenance measure so that inside concrete and the outside temperature difference are big, and temperature stress produces, and belongs to typical thermal cracking.
Processing scheme
Owing to belonging to top layer crosscutting concern, the first roof of storied building at whole 200 square metres cleans up, and repaves Φ 4*150*150mm steel wire, then the thick waterproof slightly expanded concrete of microlith of 4-5mm is poured above, the maintenance of receipts face is good, after 28d age, finally does water-proofing treatment above.
Later stage follows the tracks of
This engineering has been put into using 2 years half, and currently without occurring that concrete comes off, leaks and the phenomenon such as infiltration, treatment effect is good.
Embodiment 3
Certain engineering, designs 18 layers of residential building, and beam slab intensity is C25, and this building is divided into 4 unit, belongs to three Rooms, room two two and defends house type, one of the 12nd layer take four articles of beams as four limits grid in, occur that area is about 20 square metres without dew palpebral fissure seam but the phenomenon of infiltration.Identifying this layer, detect analysis, the concrete strength at other positions is normal, but this position low strength, and occur leaking sand holes phenomenon, seep water the most serious.
Crack cause
Make land used pump conveying equipment the most, before carrying out concrete pumping, first with water and mortar profit pump.Reflect according to field worker, the mixed material of profit pump water and mortar is not walked clearly with tower crane, and directly it is discharged to this position, the concrete immediately come up mixes with substantial amounts of profit pump water, cause 2-3 cube of initial concrete to make low strength because stirring into too much water, belong to serious not causing according to job specfication behavior.
Processing scheme
Owing to this concrete has been mixed into excess water, the ratio of mud has changed by, and intensity step-down is irreversible.And belong to little high-rise house owed by a citizen, consider for safety and quality, this position is pounded, edge dabbing, from new formwork, pour C30 slightly expanded concrete.
Later stage follows the tracks of
After maintenance reaches 28d age, this position is carried out technical appraisement, be fully achieved anticipated requirement.
Last it is noted that the foregoing is only the preferred embodiments of the present invention, it is not limited to the present invention, although the present invention being described in detail with reference to previous embodiment, for a person skilled in the art, technical scheme described in foregoing embodiments still can be modified by it, or wherein portion of techniques feature is carried out equivalent.All within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. made, should be included within the scope of the present invention.

Claims (9)

1. the processing method of a commerical ready-mixed concrete floor crack, it is characterised in that: comprise the following steps: after finding commerical ready-mixed concrete floor crack, fracture Crack cause is analyzed;Find causes of cracks, and formulate solution for producing cause;Carry out cracking of wall surface process according to solution, and metope after processing is carried out continuous observation.
The processing method of a kind of commerical ready-mixed concrete floor crack the most according to claim 1, it is characterised in that: described crack is crosscutting concern.
The processing method of a kind of commerical ready-mixed concrete floor crack the most according to claim 2, it is characterised in that: described Crack cause causes starching stone and separates for adding water in concrete when transportation tank car discharging in work progress.
The processing method of a kind of commerical ready-mixed concrete floor crack the most according to claim 3, it is characterised in that: described Crack cause also includes not carrying out quadric-plastering and overlay film maintenance to pouring beam slab.
The processing method of a kind of commerical ready-mixed concrete floor crack the most according to claim 4, it is characterised in that: described solution includes: first: process surface checking;Second: obvious crack is processed.
The processing method of a kind of commerical ready-mixed concrete floor crack the most according to claim 1, it is characterised in that: described crackle is Temperature Cracks.
The processing method of a kind of commerical ready-mixed concrete floor crack the most according to claim 6, it is characterized in that: described Crack cause is that temperature is high and dry, concrete dehydration is very fast, reaction is fast, the most repeatedly wipe one's face and do not take maintenance measure, making inside concrete and the outside temperature difference big, temperature stress cracks.
8. according to the processing method of a kind of commerical ready-mixed concrete floor crack described in claim 6 or 7, it is characterised in that: described solution is: crackle occurring, removing surface is clean, lays silk screen thereon, then pour the waterproof slightly expanded concrete of microlith on silk screen.
The processing method of a kind of commerical ready-mixed concrete floor crack the most according to claim 1, it is characterised in that: described Crack cause causes concrete to mix with profit pump water for violating job specfication.
CN201610244955.0A 2016-04-19 2016-04-19 Processing method of commercial concrete floor cracks Pending CN105888279A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610244955.0A CN105888279A (en) 2016-04-19 2016-04-19 Processing method of commercial concrete floor cracks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610244955.0A CN105888279A (en) 2016-04-19 2016-04-19 Processing method of commercial concrete floor cracks

Publications (1)

Publication Number Publication Date
CN105888279A true CN105888279A (en) 2016-08-24

Family

ID=56704190

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610244955.0A Pending CN105888279A (en) 2016-04-19 2016-04-19 Processing method of commercial concrete floor cracks

Country Status (1)

Country Link
CN (1) CN105888279A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457485A (en) * 2018-02-06 2018-08-28 厦门防水博士建筑工程有限公司 A kind of concrete floor cracking percolating water repairerment technique

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR890001380B1 (en) * 1984-10-31 1989-05-02 장종근 Filling method for crack in concrete structure
CN101294446A (en) * 2007-04-28 2008-10-29 段智斌 Anticracking processing method for wall surface

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR890001380B1 (en) * 1984-10-31 1989-05-02 장종근 Filling method for crack in concrete structure
CN101294446A (en) * 2007-04-28 2008-10-29 段智斌 Anticracking processing method for wall surface

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赖云: "《商品混凝土楼面裂缝成因及控制》", 《山西建筑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457485A (en) * 2018-02-06 2018-08-28 厦门防水博士建筑工程有限公司 A kind of concrete floor cracking percolating water repairerment technique

Similar Documents

Publication Publication Date Title
CN105669145B (en) A kind of high-strength anti-shrink type concrete interface treating agent
CN106381921A (en) 360-degree underground waterproof structure system and construction method thereof
CN106801517A (en) A kind of schoolhouse surface consolidation of Prefabricated porous plate brick mixed structure strengthens method
CN101333828A (en) Inorganic heat-insulating mortar exterior wall heat insulation construction method
CN104211341B (en) Interior wall premixing motar and production method thereof
CN1962530A (en) Thermal insulation material and its preparing process and usage
CN106917515A (en) A kind of concrete microcrack reinforcing construction method
CN103787630A (en) Anti-cracking thermal-insulating cement mortar and preparation method thereof
CN102373666A (en) Method for quickly roughening concrete by retarder flushing
CN105888279A (en) Processing method of commercial concrete floor cracks
CN104230238B (en) Exterior wall premixing motar and production method thereof
CN110776293A (en) Oil-seepage-preventing concrete construction method for oil stain collecting tank
CN104844097A (en) Enhanced crack-resistant cement floor material
KR100943296B1 (en) Method for preventing concrete wall from seepage by using inorganic permeable waterproofing composite
CN104803631A (en) Preparation method for cement mortar for anti-crack cement floor
CN108612253A (en) A kind of prefabricated high-durability lightweight steel construction compound core plate and its construction method entirely
CN107542170A (en) A kind of cast in situ ferroconcrete wall or beam construction joint surface construction method
CN101220713A (en) No-leakage structure of steel reinforced concrete pool and well, and leakage preventing method
CN108166533A (en) A kind of Waterproofing Technology of Underground Works method
CN107540314A (en) A kind of post-cast strip basal plane inorganic agent and its construction method
CN114319778A (en) Construction method of foam concrete heat-preservation sound-insulation terrace
CN206752955U (en) A kind of Anti-corrosion ceramic tile ground structure
KR20140109022A (en) Functionality special mortar composition use Method of water proofing
CN112411892A (en) Bare top decoration structure of steel structure building and elastic coating construction method
CN104179198A (en) Comprehensive basement waterproofing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160824

RJ01 Rejection of invention patent application after publication