CN105887760B - A kind of ecotypic damaged shore protection repairs structure - Google Patents

A kind of ecotypic damaged shore protection repairs structure Download PDF

Info

Publication number
CN105887760B
CN105887760B CN201610232108.2A CN201610232108A CN105887760B CN 105887760 B CN105887760 B CN 105887760B CN 201610232108 A CN201610232108 A CN 201610232108A CN 105887760 B CN105887760 B CN 105887760B
Authority
CN
China
Prior art keywords
prefabricated
shore protection
cylinder
ecotypic
damaged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610232108.2A
Other languages
Chinese (zh)
Other versions
CN105887760A (en
Inventor
陈梅
陈一梅
施文杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201610232108.2A priority Critical patent/CN105887760B/en
Publication of CN105887760A publication Critical patent/CN105887760A/en
Application granted granted Critical
Publication of CN105887760B publication Critical patent/CN105887760B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention discloses a kind of ecotypic damaged shore protection and repairs structure, including pile foundation concrete structure, placement platform, prefabricated cylinder and prefabricated wedge.Several prefabricated cylinders, which are vertically arranged, is installed on placement platform, and cast-in-place concrete, which is realized, between every two neighboring prefabricated cylinder is seamlessly connected, and the bottom between every two neighboring prefabricated cylinder is fixed with prefabricated wedge;Platform is laid to be arranged on the substructure of side pile foundation concrete structure and former shore protection near water;The inserting piling square pile of side near water of former shore protection substructure, and casting concrete forms pile foundation concrete structure.Ecological, the realization that the present invention can reduce rehabilitation works of bank revetment cost, reduction carbon emission, raising shore protection tear old closed matereial cycle open, improve construction speed and weaken ship wave and act on.

Description

A kind of ecotypic damaged shore protection repairs structure
Technical field
The present invention relates to cruiseway to renovate architecture construction technical field, and in particular to one kind is applied to the restricted boat in inland river The recovery technique of road vertical type breakage shore protection.
Background technology
Yangtze River Delta Area cruiseway has built a large amount of vertical type shore protections, by long-term use and ship wave and flow action, There is a certain degree of breakage.Processing to damaged more serious shore protection, it is mostly to remove to rebuild by the way of, removes and rebuild On the one hand cofferdam need to be arranged, surrounding environment and Navigation in Navigable is had a great influence, on the other hand tearing old material open needs to handle, and newly-built Shore protection expends construction material, and cost is higher.
The concrete walls method for strengthening and rush the recovery scenarios such as pile sinking plate method for strengthening that existing vertical type shore protection breakage is repaired, although The former preferable substructure of shore protection use condition is make use of, still, fails effectively to be utilized to tearing old material open, and pure hard knot Structure shortage is ecological, is computed finding that such recovery scenario carbon emission is higher, still has much room for improvement.
Green Development, it is the new concept that new era proposes to all trades and professions to move towards the conservation culture New Times.Shore protection is Common regulating structure in marine traffic engineering and hydraulic engineering, its structural maintenance reparation is one of task of channel maintenance, also The theory of Ecological Civilization Construction is made supporting movement to cut off enemy, in addition to considering structural stability and economy, it is also contemplated that the ecological functions of structure, money Source recycles, and the energy-saving and emission-reduction of recovery project.
The content of the invention
Goal of the invention:It is an object of the invention to solve the deficiencies in the prior art, there is provided a kind of ecotypic broken Damage shore protection and repair structure.
Technical scheme:The ecotypic damaged shore protection reparation structure of one kind of the present invention, including pile foundation concrete structure, Platform, prefabricated cylinder and prefabricated wedge are laid, several described prefabricated cylinders, which are vertically arranged, is installed on placement platform, per adjacent Concrete is cast between two prefabricated cylinders and realizes seamless connection, and the bottom between every two neighboring prefabricated cylinder is fixed There is prefabricated wedge;The placement platform is arranged on the substructure of former shore protection, and near water the one of the substructure of former shore protection Side is pile foundation concrete structure, has equidistantly been downwardly into square pile in pile foundation concrete structure and has poured concrete.
Wherein, in construction period, prefabricated wedge can be used for fixing two neighboring prefabricated cylinder, be poured to set up template Concrete, in addition, prefabricated wedge with the cast-in-place concrete collective effect to ensure that two neighboring prefabricated cylinder can be seamless Connection.
Further, the prefabricated cylinder is that transmission is all provided with without bottom structure, the side near water and land-based area side of prefabricated cylinder up and down There is an osculum and front and rear symmetrical, prefabricated cylinder is under-filled to be had and tear past heritage (such as the stone and coagulation removed in former shore protection top open Soil block) and metaling, top is fill stratum, plants herbaceous plant (such as yellow fragrant) on fill stratum, the thickness of fill stratum is according to institute That removes tears the adjustment of past heritage quantity open, but at least needs the embedded depth more than root system of plant.
Further, a diameter of 1.2~1.5m of the prefabricated cylinder, its wall thickness are that 8~12cm (such as could be arranged to 10cm), its height removes the height determination of part according to former shore protection;The osculum is symmetrical arranged, and osculum is away from bottom of cylinder Height be calculated by the antiskid and stability against overturning of bank revetment reinforcement structure, at cylinder internal drainage hole arrange loaded filter.
Further, the placement platform refers to pour in the substructure of side pile foundation concrete structure and former shore protection near water The platform of layer concrete formation is built, its thickness is 10~15cm, lays embedded bar in platform, embedded bar and prefabricated wedge shape Block fixes prefabricated cylinder jointly, and each prefabricated cylinder is corresponding with double six roots of sensation embedded bar altogether, and a diameter of the 8 of the embedded bar ~12mm, such as can be 10mm.
Further, the square pile is square pile made of armored concrete, and is close to the side near water of former shore protection, adjacent Spacing and size between two square piles are determined by former shore protection service condition and waterway classification.
Further, the height of the pile foundation concrete structure and the substructure of former shore protection is highly consistent, and thick Width of the degree i.e. perpendicular to riverbank direction is 40cm.
Beneficial effect:The present invention is by prefabricated cylinder, square pile and the cooperation for laying the parts such as platform, along with using former Shore protection tears past heritage open, greatly reduces the energy resource consumption for tearing old transport of materials process open and avoids the dirt for tearing old building materials open to environment Dye;Prefabricated cylinder and square pile etc. can be prefabricated in the factory in advance simultaneously, and the speed of application of recovery project is accelerated.
In addition, the yellow fragrant ecological and landscape for waiting plant, on the one hand can improving reparation structure of earthing plantation in prefabricated cylinder, On the other hand, sagging branch can weaken current after the shaping of the plant such as Huang Xin and ship wave washes away to shore protection, and prefabricated cylinder also can Avoid recovery project from arranging construction cofferdam, do not influence navigation channel and normally open the navigation or air flight, the concave-convex form of cylinder side near water can weaken ship wave Destruction to shore protection, it is also beneficial to inhabiting for aquatic animal.
Secondly, the pile foundation concrete structure that square pile is formed with the concrete poured can prevent ship wave from being washed away to shore protection With scour, the durability of recovery project is improved.
In summary, delicate structure of the present invention, it is easy for construction, can be effectively using tearing old material open, per the production of linear meter(lin.m.) recovery project Raw carbon emission amount can reduce 20%, be advantageous to improvement of the ecological environment and the energy-saving and emission-reduction of whole society work is carried out.
Brief description of the drawings
Fig. 1 is the sectional schematic diagram of side of the present invention;
Fig. 2 is stereogram of the present invention;Fig. 3 is the structural representation of wedge in the present invention.
Embodiment
Technical solution of the present invention is described in detail below, but protection scope of the present invention is not limited to the implementation Example.
As depicted in figs. 1 and 2, a kind of ecotypic damaged shore protection of the invention repairs structure, including pile foundation concrete knot Structure 2, platform 3, prefabricated cylinder 5, prefabricated wedge 6 are laid, several prefabricated cylinders 5, which are vertically arranged to be installed on, lays platform 3, often Be cast between two neighboring prefabricated cylinder 5 the concrete soil body 7 realize be seamlessly connected, and per two neighboring prefabricated cylinder 5 it Between bottom be fixed with prefabricated wedge 6;Lay platform 3 to be arranged on the substructure 4 of former shore protection, the lower junction of former shore protection The inserting piling square pile of side near water 1 of structure 4, and casting concrete, form side pile foundation concrete structure 2 near water.
Above-mentioned prefabricated cylinder 5 is that transmission is equipped with draining without bottom structure, the side near water and land-based area side of prefabricated cylinder 5 up and down Hole, under-filled in prefabricated cylinder 5 tear past heritage and metaling open, and the top of prefabricated cylinder 5 is fill stratum, and grass planting is planted on fill stratum This plant;And a diameter of 1.2~1.5m of prefabricated cylinder 5, its wall thickness are 8~12cm, and its height is according to former shore protection dismounting portion The height divided determines;Osculum is symmetrical arranged, height of the osculum away from the bottom of cylinder 5 by bank revetment reinforcement structure antiskid and anti-incline Stable calculation is obtained, and loaded filter is arranged at the internal drainage hole of cylinder 5.
Placement platform 3 in the present embodiment is the placement platform 3 formed by concreting, pre-buried in the placement platform 3 Reinforcing bar 8, embedded bar 8 fix prefabricated cylinder 5 jointly with prefabricated wedge 6, and it is pre- that each prefabricated cylinder 5 is corresponding with the double six roots of sensation altogether Reinforcing bar 8 is buried, a diameter of 8~12mm of embedded bar 8, the thickness for laying platform 3 is 10~15cm.
Square pile 1 is square pile made of armored concrete;The height of pile foundation concrete structure 2 and the substructure 4 of former shore protection It is highly consistent, its thickness (i.e. perpendicular to the width in riverbank direction) is 40cm.
The present invention construction process be:
Precasting yard shifts to an earlier date prefabricated cylinder 5, wedge 6 and square pile 1 → cut former shore protection damaged portion and flatten → revetment True fixed pile → the square pile 1 of preceding underwater dredging → measurement and positioning unwrapping wire allocate and transport and pile sinking → model sheetinstallat → square pile 1 on pour coagulation Soil forms pile foundation concrete structure 2 → arrangement embedded bar 8 casting concrete layer and forms placement 3 → handling of platform and lay prefabricated Good cylinder 5 and wedge 6, pay attention to setting up template casting concrete between compactness → cylinder 5 between cylinder 5 and wedge 6 Past heritage and the yellow herbaceous plant such as fragrant of rubble → earthing plantation are torn in filling open in 7 → cylinder of the soil body 5.
Waterway classification and former shore protection service condition determination of the size of square pile 1 and spacing of arrangement according to where shore protection, typically 3rd, long 3~6m, sectional dimension are used in level Four navigation channel, and for 0.2m × 0.2m square pile 1, stake spacing is 0.5m, during piling Pay attention to the disturbance of the soil body.
When the materials such as old block of stone and concrete block are torn in backfill open in cylinder 5, filler should be noted that grading, therefore match somebody with somebody certain proportion Metaling, improving the under-filled compactness for tearing past heritage open of cylinder 5 prevents top is banketed from falling into leakage, and top is planted yellow fragrant etc. after banketing Plant, strengthen disappear wave and the landscape effect of rehabilitation works of bank revetment.Navigation channel where the placement selection of time of the prefabricated cylinder 5 of transmission Lowstand period, convenient construction condition.

Claims (6)

1. a kind of ecotypic damaged shore protection repairs structure, it is characterised in that:Including pile foundation concrete structure, lay platform, pre- Rounding cylinder and prefabricated wedge, several described prefabricated cylinders, which are vertically arranged, is installed on placement platform, per two neighboring pre- rounding Concrete is cast between cylinder and realizes seamless connection, and the bottom between every two neighboring prefabricated cylinder is fixed with prefabricated wedge shape Block;The placement platform is arranged on the substructure of former shore protection, and the side near water of the substructure of former shore protection is mixed for pile foundation Xtah Crude Clay structure, square pile has equidistantly been downwardly into pile foundation concrete structure and has poured concrete;
Wherein, the platform of laying is the placement platform formed by concreting, lays embedded bar in platform, embedded bar Prefabricated cylinder is fixed jointly with prefabricated wedge, and each prefabricated cylinder is corresponding with double six roots of sensation embedded bar altogether.
2. ecotypic damaged shore protection according to claim 1 repairs structure, it is characterised in that:On the prefabricated cylinder is For lower transmission without bottom structure, the side near water and land-based area side of prefabricated cylinder are respectively provided with osculum, under-filled in prefabricated cylinder to tear past heritage open And metaling, prefabricated cylinder top are fill stratum, and herbaceous plant is planted on fill stratum.
3. ecotypic damaged shore protection according to claim 2 repairs structure, it is characterised in that:The prefabricated cylinder it is straight Footpath is 1.2 ~ 1.5m, and its wall thickness is 8 ~ 12cm, and the height that its height removes part according to former shore protection determines;The osculum is symmetrical Set, height of the osculum away from bottom of cylinder repairs the antiskid of structure by shore protection and stability against overturning is calculated, and is arranged in cylinder Loaded filter is arranged at water hole.
4. ecotypic damaged shore protection according to claim 1 repairs structure, it is characterised in that:The embedded bar it is straight Footpath is 8 ~ 12mm, and the thickness for laying platform is 10 ~ 15cm.
5. ecotypic damaged shore protection according to claim 1 repairs structure, it is characterised in that:The square pile is mixed for reinforcing bar Square pile made of solidifying soil.
6. ecotypic damaged shore protection according to claim 1 repairs structure, it is characterised in that:The pile foundation concrete knot The height of structure is highly consistent with the substructure of former shore protection, and width of the thickness i.e. perpendicular to riverbank direction is 40cm.
CN201610232108.2A 2016-04-14 2016-04-14 A kind of ecotypic damaged shore protection repairs structure Active CN105887760B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610232108.2A CN105887760B (en) 2016-04-14 2016-04-14 A kind of ecotypic damaged shore protection repairs structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610232108.2A CN105887760B (en) 2016-04-14 2016-04-14 A kind of ecotypic damaged shore protection repairs structure

Publications (2)

Publication Number Publication Date
CN105887760A CN105887760A (en) 2016-08-24
CN105887760B true CN105887760B (en) 2018-02-02

Family

ID=56704936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610232108.2A Active CN105887760B (en) 2016-04-14 2016-04-14 A kind of ecotypic damaged shore protection repairs structure

Country Status (1)

Country Link
CN (1) CN105887760B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268527A (en) * 2017-06-23 2017-10-20 交通运输部天津水运工程科学研究所 Man-made island shore protection safeguard structure
CN108166441A (en) * 2017-12-19 2018-06-15 上海市政工程设计研究总院(集团)有限公司 A kind of pile foundation assembled shore protection

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11241326A (en) * 1998-02-24 1999-09-07 Kumagai Gumi Co Ltd Slope repairing construction method for lake/marsh shore
JP2001234521A (en) * 2000-02-23 2001-08-31 Mitsugi Kishi Revetment repair construction method for river by using tuff
CN201065524Y (en) * 2007-07-03 2008-05-28 上海市政工程设计研究总院 Vertical dike
CN102635089B (en) * 2012-03-31 2015-06-24 江苏大学 Ecological riparian zone construction method
CN104878718B (en) * 2015-05-28 2016-11-02 杭州江润科技有限公司 A kind of construction method of ecological retaining wall structure

Also Published As

Publication number Publication date
CN105887760A (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN105133627B (en) Construction under single wall steel sheet-pile cofferdam flowing water state
CN108193642B (en) Revetment reinforcing facility and construction method thereof
CN210315102U (en) Slope protection reinforced roadbed structure of composite ecological decoration panel
CN103015367B (en) High-efficiency economical construction method for revetment
CN105350526B (en) Method for setting up steel platform
CN106930231A (en) A kind of construction method of the engineering flood bank reinforcing that is applied to pass the flood period
CN101457526A (en) Circular deep foundation ditch concrete pile arranging support and major structure inversing construction method
CN104895083A (en) Underwater pile-cap foundation pit guide frame and cofferdam support construction method thereof
CN107268650A (en) A kind of industrial swirling flow precipitates pool structure not drainage open caisson method
CN104358196B (en) Highway open to traffic Embankment Subsidence disposes the construction method of structure
CN108505529A (en) A kind of construction method of the bearing platform construction steel cofferdam of Through Steel case arch bridge
JP2010196271A (en) Method for reinforcing existing revetment
CN202323865U (en) Novel revetment combined structure
CN105887760B (en) A kind of ecotypic damaged shore protection repairs structure
CN102817298B (en) Construction method on permafrost
CN105332382B (en) Adjacent river foundation ditch builds island cofferdam clay water stop construction method
CN204728333U (en) A kind of underwater support table foundation ditch leading truck
CN105155421B (en) Complete embedding circular construction method in a kind of single pile Single column pier river course shallow water
CN204676485U (en) A kind of Eco-economic Type bank protection structure
CN108677999B (en) Silt bagged soil retaining wall structure and construction method
CN111335263A (en) Method for building artificial island
CN104088288B (en) The preparation method of container caisson and application thereof
CN107940102B (en) Underground raw water pipeline protection construction method
CN110042851A (en) Reduce and wears riverway cofferdam and river bed reinforcement means under neighbouring high-speed rail deformation of pile foundation
CN202925538U (en) Rammer used in construction on frozen earth

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant