CN105887169A - Electrophoresis transfer tool of semi-integral coaches - Google Patents

Electrophoresis transfer tool of semi-integral coaches Download PDF

Info

Publication number
CN105887169A
CN105887169A CN201610456498.1A CN201610456498A CN105887169A CN 105887169 A CN105887169 A CN 105887169A CN 201610456498 A CN201610456498 A CN 201610456498A CN 105887169 A CN105887169 A CN 105887169A
Authority
CN
China
Prior art keywords
electrophoresis
bearing
base
process trolley
circular protrusions
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610456498.1A
Other languages
Chinese (zh)
Other versions
CN105887169B (en
Inventor
姚成虎
王传应
付朋
曹衡
江玉龙
方阳洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Ankai Automobile Co Ltd
Original Assignee
Anhui Ankai Automobile Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Ankai Automobile Co Ltd filed Critical Anhui Ankai Automobile Co Ltd
Priority to CN201610456498.1A priority Critical patent/CN105887169B/en
Publication of CN105887169A publication Critical patent/CN105887169A/en
Application granted granted Critical
Publication of CN105887169B publication Critical patent/CN105887169B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C25ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
    • C25DPROCESSES FOR THE ELECTROLYTIC OR ELECTROPHORETIC PRODUCTION OF COATINGS; ELECTROFORMING; APPARATUS THEREFOR
    • C25D13/00Electrophoretic coating characterised by the process
    • C25D13/12Electrophoretic coating characterised by the process characterised by the article coated
    • CCHEMISTRY; METALLURGY
    • C25ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
    • C25DPROCESSES FOR THE ELECTROLYTIC OR ELECTROPHORETIC PRODUCTION OF COATINGS; ELECTROFORMING; APPARATUS THEREFOR
    • C25D17/00Constructional parts, or assemblies thereof, of cells for electrolytic coating
    • C25D17/06Suspending or supporting devices for articles to be coated
    • C25D17/08Supporting racks, i.e. not for suspending

Abstract

The invention relates to an electrophoresis transfer tool of semi-integral coaches. The electrophoresis transfer tool comprises a process trolley and at least four support structures symmetrically arranged at two ends of the process trolley, wherein each support structure comprises an electrophoresis base and an electrophoresis support, the electrophoresis support is detachably connected with the electrophoresis base, a notch is formed in one side of the electrophoresis support, and the notch is fixedly connected with the inner side of the side skirt rail of a coach framework. Compared with a traditional coach electrophoresis transfer tool, the electrophoresis transfer tool has the advantages that the coach framework can be well conveyed in and out an electrophoresis chamber, and the tool is convenient and reliable to mount and demount; repeated practices show that the tool is applicable to various semi-integral coaches and high in applicability.

Description

A kind of half loading coach electrophoresis transfer tooling
Technical field
The present invention relates to passenger car field, a kind of transfer tooling for half loading coach electrophoresis process.
Background technology
At present, the most severe, unstable along with global climate, bring various challenge to the product anticorrosion of bus industry, the car load skeleton electrophoresis of passenger vehicle is more and more universal.In order to complete car load electrophoresis process, needing supporting welding on body frame to support seat, for the electrophoresis of unitary body skeleton, because of more for supporting the position of seat welding on chassis, the leeway of selection is relatively big, and installation difficulty is the highest.And for for half loading coach, then need the fastening situation in view of body frame Yu chassis, and then the support seat being used for electrophoresis can only be distributed at side skirt rail, the structure supporting seat is just designed and proposes of a relatively high requirement by this.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of half loading coach electrophoresis transfer tooling, uses simple fixed form easily, meets the requirement of strength in transport process simultaneously, improves the operating efficiency of electrophoresis.
For solving the problems referred to above, the present invention relates to a kind of half loading coach electrophoresis transfer tooling, including process trolley, and be symmetricly set at least four supporting construction at process trolley two ends;Described supporting construction includes that electrophoresis base and electrophoresis bearing, described electrophoresis bearing are detachably connected with electrophoresis base, and the side of described electrophoresis bearing has gap, and described gap is fixing with the inner side of the side skirt rail of Bus Frame to be connected.
Further, described electrophoresis base includes that the pedestal being welded on process trolley, described pedestal upper end are provided with circular protrusions, the lateral opening hole of described circular protrusions cross-under limited location bolt in hole;Described electrophoresis bearing includes base plate, described base plate is provided with the circular hole matched with described circular protrusions, the two ends of base plate are arranged with two U-lags, the same sidewall of described gap and two U-lags connects composition fixed part, the inner side of the side skirt rail of described Bus Frame is welded in fixed part, described electrophoresis bearing is fastened with circular protrusions by circular hole, and the two ends of described caging bolt are each passed through two U-lags and are fixed by nut.
Further, the top of the described gap height far from bottom is less than or equal to 10mm.
The beneficial effects of the present invention is: present configuration is simple and reliable, the process trolley of transhipment is symmetrical arranged at least four supporting construction, the electrophoresis base of supporting construction is fixed on process trolley, electrophoresis bearing welds together with Bus Frame, electrophoresis base and electrophoresis bearing Aided design, fixed and be prone to split, thus the quick assembly and disassembly of Bus Frame and process trolley can be realized by electrophoresis bearing and electrophoresis base;When Bus Frame is transported to electrophoresis workshop by process trolley, Bus Frame can be transported to tiselius apparatus electrophoresis by chain sling, and electrophoresis bearing can be retained on vehicle body with Bus Frame, and does not affect the assembling of Bus Frame.The present invention is compared to traditional passenger vehicle electrophoresis transfer tooling, it is possible to preferably completes the transport of Bus Frame discrepancy Electrophoresis Lab, mounts and dismounts more convenient, reliable simultaneously.Through repeatedly putting into practice, can be used for various half carrying vehicle and use, there is the higher suitability.
Accompanying drawing explanation
Detailed description of the invention with regard to the present invention is described in further detail below in conjunction with the accompanying drawings, wherein:
Fig. 1 is the overall structure schematic diagram of the present invention;
Fig. 2 is the electrophoresis seat structure schematic diagram of the present invention;
Fig. 3 is the electrophoresis bearing installation diagram with electrophoresis base of the present invention;
Fig. 4 be the side skirt rail of electrophoresis bearing and the Bus Frame of the present invention weld schematic diagram.
Detailed description of the invention
With reference to a kind of half loading coach electrophoresis transfer tooling of Fig. 1, including process trolley 100, and it is symmetricly set on four supporting constructions 200 at process trolley two ends.
With reference to shown in Fig. 2 and Fig. 3, described supporting construction 200 includes electrophoresis base 2 and electrophoresis bearing 1, described electrophoresis base 2 includes the pedestal 22 being welded on process trolley 100, described pedestal 22 upper end is provided with circular protrusions 21, the lateral opening hole of described circular protrusions 21 cross-under limited location bolt 3 in hole.
Described electrophoresis bearing 1 includes base plate 10, described base plate 10 is provided with the circular hole 11 matched with described circular protrusions 21, the two ends of base plate 10 are arranged with two U-lags 12, and the side of base plate 10 has gap 13, and described gap 13 connects with the same sidewall of two U-lags 12 composition fixed part;With reference to shown in Fig. 4, the inner side of the side skirt rail 5 of described Bus Frame 300 is welded in fixed part, and described electrophoresis bearing 1 is fastened with circular protrusions 21 by circular hole 11, and the two ends of described caging bolt 3 are each passed through two U-lags 12 and are fixed by nut 4.
Because of electrophoresis bearing 1 with Bus Frame 300 permanent weld on passenger-carrying chassis, therefore need to consider the disguise of electrophoresis bearing 1, preferably the top of gap 13 height dimension far from bottom is designed at below 10mm, it is ensured that do not highlight side skirt rail 5 too many, affect attractive in appearance.
It is it to need with chassis in place of being different from all-loading coach due to half loading coach to carry out fastening assembling, result in the limitation of existing electrophoresis supporting construction welding position.And the present invention optimizes design supporting construction 200, it is divided into electrophoresis base 2 part fixed with process trolley 100 and electrophoresis bearing 1 part fixed with Bus Frame 300, and person mutually detains merga pass caging bolt 3 and dismounts, installation unloading is the most convenient and swift, substantially reduces the time of installing/dismounting on line;And electrophoresis bearing 1 compact conformation, become with gusset group and inside beam 5, weld the assembling without affecting Bus Frame 300 and attractive in appearance.
The above; being only the preferable detailed description of the invention of the present invention, but scope is not limited thereto, any those familiar with the art is in the technical scope of present disclosure; the change that can readily occur in or replacement, all should contain within protection scope of the present invention.Therefore scope is as the criterion with the protection domain of claims.

Claims (3)

1. one and half loading coach electrophoresis transfer tooling, it is characterised in that include process trolley, and be symmetricly set at least four supporting construction at process trolley two ends;Described supporting construction includes that electrophoresis base and electrophoresis bearing, described electrophoresis bearing are detachably connected with electrophoresis base, and the side of described electrophoresis bearing has gap, and described gap is fixing with the inner side of the side skirt rail of Bus Frame to be connected.
A kind of half loading coach electrophoresis transfer tooling the most according to claim 1, it is characterized in that, described electrophoresis base includes that the pedestal being welded on process trolley, described pedestal upper end are provided with circular protrusions, the lateral opening hole of described circular protrusions cross-under limited location bolt in hole;Described electrophoresis bearing includes base plate, described base plate is provided with the circular hole matched with described circular protrusions, the two ends of base plate are arranged with two U-lags, the same sidewall of described gap and two U-lags connects composition fixed part, the inner side of the side skirt rail of described Bus Frame is welded in fixed part, described electrophoresis bearing is fastened with circular protrusions by circular hole, and the two ends of described caging bolt are each passed through two U-lags and are fixed by nut.
A kind of half loading coach electrophoresis transfer tooling the most according to claim 1, it is characterised in that the top of the described gap height far from bottom is less than or equal to 10mm.
CN201610456498.1A 2016-06-22 2016-06-22 A kind of half loading coach electrophoresis transfer tooling Active CN105887169B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610456498.1A CN105887169B (en) 2016-06-22 2016-06-22 A kind of half loading coach electrophoresis transfer tooling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610456498.1A CN105887169B (en) 2016-06-22 2016-06-22 A kind of half loading coach electrophoresis transfer tooling

Publications (2)

Publication Number Publication Date
CN105887169A true CN105887169A (en) 2016-08-24
CN105887169B CN105887169B (en) 2018-01-16

Family

ID=56718050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610456498.1A Active CN105887169B (en) 2016-06-22 2016-06-22 A kind of half loading coach electrophoresis transfer tooling

Country Status (1)

Country Link
CN (1) CN105887169B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112251789A (en) * 2020-10-15 2021-01-22 安徽安凯汽车股份有限公司 Process method for increasing number of single electrophoresis passenger cars

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013145995A1 (en) * 2012-03-29 2013-10-03 本田技研工業株式会社 Sliding-door temporary holding fixture
CN203474938U (en) * 2013-10-08 2014-03-12 厦门金龙联合汽车工业有限公司 Fixing mechanism for passenger car electrophoretic coating
CN204400129U (en) * 2014-12-17 2015-06-17 北汽银翔汽车有限公司 Weldering is coated with transition apparatus
CN204779883U (en) * 2015-05-25 2015-11-18 南京金龙客车制造有限公司 Passenger train electrophoresis technology tray
CN205011855U (en) * 2015-09-10 2016-02-03 南京金龙客车制造有限公司 A electrophoresis tray installation assembly for passenger train
CN205710993U (en) * 2016-06-22 2016-11-23 安徽安凯汽车股份有限公司 A kind of half loading coach electrophoresis transfer tooling

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013145995A1 (en) * 2012-03-29 2013-10-03 本田技研工業株式会社 Sliding-door temporary holding fixture
CN203474938U (en) * 2013-10-08 2014-03-12 厦门金龙联合汽车工业有限公司 Fixing mechanism for passenger car electrophoretic coating
CN204400129U (en) * 2014-12-17 2015-06-17 北汽银翔汽车有限公司 Weldering is coated with transition apparatus
CN204779883U (en) * 2015-05-25 2015-11-18 南京金龙客车制造有限公司 Passenger train electrophoresis technology tray
CN205011855U (en) * 2015-09-10 2016-02-03 南京金龙客车制造有限公司 A electrophoresis tray installation assembly for passenger train
CN205710993U (en) * 2016-06-22 2016-11-23 安徽安凯汽车股份有限公司 A kind of half loading coach electrophoresis transfer tooling

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112251789A (en) * 2020-10-15 2021-01-22 安徽安凯汽车股份有限公司 Process method for increasing number of single electrophoresis passenger cars

Also Published As

Publication number Publication date
CN105887169B (en) 2018-01-16

Similar Documents

Publication Publication Date Title
RU2677747C2 (en) Reinforcement assembly for sill area of pick-up truck bed
US9902348B2 (en) Vehicle body front structure
CN102897228B (en) The rear floor assembly structure of plug-in hybrid-power automobile
JP6737243B2 (en) Vehicle substructure
JP5801897B2 (en) Parts mounting equipment and parts mounting method
CN103568771B (en) Motorcar body with the externally-located reinforcer for connecting back axle
JP6603222B2 (en) Lightweight container
CN105835898B (en) A kind of bogie
CN202879613U (en) Back floor assembly structure of plug-in hybrid power automobile
CN205652142U (en) Framework and have bogie of this framework
RU2514317C2 (en) Seat cantilever support
JPS62187579A (en) Positioning device for car body
JP2011142764A (en) Mobile transformer carrier
CN105887169A (en) Electrophoresis transfer tool of semi-integral coaches
CN205710993U (en) A kind of half loading coach electrophoresis transfer tooling
CN102941983A (en) Universal carrier for carrying diesel engines with V-shaped hitching legs
CN102745241B (en) Frame structure of mining dumper and dumper comprising structure
CN202967152U (en) Universal transport frame for transporting diesel engine with V-shaped hitching leg
CN102414074B (en) Device for attaching an engine cradle to a vehicle body understructure, use of said attachment device, and resulting vehicle
CN105835899B (en) A kind of drawing pull bar mounting interface device and bogie
CN209335522U (en) Hook dismounting tooling
KR20220105435A (en) Running bare chassis for a low-floor bus and manufacturing method thereof
CN202623839U (en) Damper installation plate and automobile bottom surface floor assembly connecting structure
CN205097984U (en) Seat crossbeam fixing device and have its electric automobile
CN104843070A (en) Dumper frame structure of wide-body dumper

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant