CN105882891B - Hatch coaming and topside sectional construction method - Google Patents

Hatch coaming and topside sectional construction method Download PDF

Info

Publication number
CN105882891B
CN105882891B CN201510599195.0A CN201510599195A CN105882891B CN 105882891 B CN105882891 B CN 105882891B CN 201510599195 A CN201510599195 A CN 201510599195A CN 105882891 B CN105882891 B CN 105882891B
Authority
CN
China
Prior art keywords
component
longitudinal wall
hatch coaming
floor
box assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510599195.0A
Other languages
Chinese (zh)
Other versions
CN105882891A (en
Inventor
雷周
张华�
檀鸿飞
王永强
刘以高
孟鹏
雷蕾
吕紫维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangnan Shipyard Group Co Ltd
Original Assignee
Shanghai Jiangnan Changxing Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiangnan Changxing Heavy Industry Co Ltd filed Critical Shanghai Jiangnan Changxing Heavy Industry Co Ltd
Priority to CN201510599195.0A priority Critical patent/CN105882891B/en
Publication of CN105882891A publication Critical patent/CN105882891A/en
Application granted granted Critical
Publication of CN105882891B publication Critical patent/CN105882891B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of hatch coaming and topside sectional construction method, mounting structure include at least end plate components, upper sheer strake component, longitudinal wall component, antitorque box assembly, longitudinal wall plate, compartment component, guide rail and vertical bone;Antitorque box assembly includes hatch coaming component, and hatch coaming component includes column;It is further comprising the steps of:S1, fixed end plate components;S2, the side that upper sheer strake component is mounted on to end plate components;S3, the bottom of longitudinal wall component is mounted in end plate components;S4, after the hatch coaming component for installing column is installed on antitorque box assembly, the bottom of antitorque box assembly is mounted on upper sheer strake component, the side of antitorque box assembly is connected to longitudinal wall component;S5, it is set in longitudinal wall component and antitorque box assembly overlying and welds longitudinal wall plate;S6, compartment component and guide rail are installed in side of the longitudinal wall plate far from end plate components.It realizes ship My Perspective On The Co-building, necessary condition is provided for batch shipbuilding.And the requirement of machining accuracy is reduced, and bring considerable economic benefit.

Description

Hatch coaming and topside sectional construction method
Technical field
The present invention relates to field of shipbuilding, more particularly to a kind of hatch coaming and topside sectional construction method.
Background technology
Present container ship hatch coaming building technology integrated with topside has become in the external advanced shipbuilding enterprise such as South Korea Ripe application, and produce considerable economic benefit.Since the required precision of its construction is very high, it is related to thick plates technology, thickness Plate jigsaw reversible deformation places principle, segment construction precision control program, hatch coaming and antitorque case integrated construction precision controlling party Many difficult points such as case.Required precision height is easy tod produce in the prior art, and processing does not reach requirement;More dock is needed to coordinate, Quantities is larger;Set-up time is long, and installation process complexity leads to problems such as paint damage area big.
Invention content
In view of the foregoing deficiencies of prior art, the purpose of the present invention is to provide a kind of hatch coamings and topside segmentation to build Method is made, high for solving required precision in the prior art, processing does not reach requirement;Need more dock to coordinate, quantities compared with Greatly;Set-up time is long, and installation process complexity leads to problems such as paint damage area big.
In order to achieve the above objects and other related objects, a kind of hatch coaming of present invention offer and topside sectional construction method, Mounting structure includes at least end plate components, upper sheer strake component, longitudinal wall component, antitorque box assembly, longitudinal wall plate, compartment component, leads Rail and vertical bone;The antitorque box assembly includes hatch coaming component, and the hatch coaming component includes column;It is further comprising the steps of:
S1, the fixed end plate components;
S2, the side that the upper sheer strake component is mounted on to the end plate components;
S3, the bottom of the longitudinal wall component is mounted in the end plate components;
S4, after the hatch coaming component for installing the column is installed on the antitorque box assembly, by the torsion box The bottom of component is mounted on the upper sheer strake component, and the side of the antitorque box assembly is connected to the longitudinal wall component;
S5, it is set in the longitudinal wall component and antitorque box assembly overlying and welds the longitudinal wall plate;
S6, the compartment component and the guide rail are installed in side of the longitudinal wall plate far from the end plate components.
Preferably, the end plate components include outside plate and the strong frame of the first floor;The step S1 further includes step:
S11, it is fixed on the vertical bone is parallel on the outside plate;
S12, the strong frame of the first floor is fixed on the vertical bone by the limiting slot on the strong frame of the first floor.
Preferably, the upper sheer strake component includes upper sheer strake, the strong frame in deck and the strong frame of the second floor;The step S2 It further include step:
S21, it is fixed on the vertical bone is parallel on the upper sheer strake;
S22, the strong frame of the second floor is fixed on the vertical bone by the limiting slot on the strong frame of the second floor;
S23, the strong frame in the deck is fixed between two strong frames of the second floor.
Preferably, the longitudinal wall component includes longitudinal wall plate, floor frame component, platform deck and floor;The step S3 is also Including step:
S31, the floor frame component is mounted on the longitudinal wall plate;
S32, the fixed platform deck are connected to described indulge on the longitudinal wall plate, and by the platform deck side Bone;
S33, the floor is fixed on the longitudinal wall plate, and is connected to the platform deck and the floor frame component The opposite other side;
S34, by vertical bone fixation in the floor far from the limiting slot of the platform deck side.
Preferably, the antitorque box assembly includes interior longitudinal wall component, hatch coaming component and piping unit;The step S4 is also Including step:
The bottom of the bottom and the hatch coaming component of S41, the connection interior longitudinal wall component;
S42, the piping unit is installed between the interior longitudinal wall component and the hatch coaming component.
Preferably, the hatch coaming component includes main deck component, hatch coaming longitudinal wall component and column;The step S41 It further include step:
S411, the hatch coaming longitudinal wall component and the uprights vertical be fixed on the main deck component respectively.
Preferably, the hatch coaming longitudinal wall component includes bracket, hatch coaming partition board and hatch coaming longitudinal wall plate;The step S411 further includes step:
The bracket and the hatch coaming partition board are in turn mounted on the hatch coaming longitudinal wall plate.
Preferably, the interior longitudinal wall component includes interior longitudinal wall and the strong frame of third floor;The step S41 further includes step:
S412, after the parallel installation vertical bone of the interior longitudinal wall extending direction, the strong frame of third floor is passed through into limit Position slot is mounted on the vertical bone.
Preferably, the compartment component includes the first shifting board and the second shifting board;The step S6 further includes step:
S61, first shifting board and second shifting board be mounted on the longitudinal wall plate successively so that described the The axis of symmetry of one shifting board and second shifting board is located on the same line;
S62, the installation guide rail so that the guide rail is parallel to pair of first shifting board and second shifting board Claim axis.
As described above, the bilge well coating process of the present invention, has the advantages that:It is segmented by hatch coaming and topside It builds, realizes ship My Perspective On The Co-building, to provide necessary condition for batch shipbuilding.And hatch coaming and topside sectional construction drop The low requirement of machining accuracy, while dock lifting number, ETL estimated time of loading and paint damage area can be greatly reduced, and bring considerable Economic benefit.
Description of the drawings
Fig. 1 is shown as the structural schematic diagram of hatch coaming and topside sectional construction of the present invention;
Fig. 2 is shown as the structural schematic diagram of end plate components in Fig. 1;
Fig. 3 is shown as the structural schematic diagram of upper sheer strake component in Fig. 1;
Fig. 4 is shown as the structural schematic diagram of longitudinal wall component in Fig. 1;
Fig. 5 is shown as the structural schematic diagram of antitorque box assembly in Fig. 1;
Fig. 6 is shown as the structural schematic diagram of hatch coaming component in Fig. 5;
Fig. 7 is shown as the structural schematic diagram of hatch coaming longitudinal wall component in Fig. 6;
Fig. 8 is shown as the structural schematic diagram of interior longitudinal wall component in Fig. 5;
Fig. 9 is shown as the structural schematic diagram of shifting board component in Fig. 1.
Specific implementation mode
Illustrate that embodiments of the present invention, those skilled in the art can be by this specification below by way of specific specific example Disclosed content understands other advantages and effect of the present invention easily.The present invention can also pass through in addition different specific realities The mode of applying is embodied or practiced, the various details in this specification can also be based on different viewpoints with application, without departing from Various modifications or alterations are carried out under the spirit of the present invention.
It please refers to Fig.1 to Fig. 9.It should be noted that the diagram provided in the present embodiment only illustrates this in a schematic way The basic conception of invention, package count when only display is with related component in the present invention rather than according to actual implementation in schema then Mesh, shape and size are drawn, when actual implementation kenel, quantity and the ratio of each component can be a kind of random change, and its Assembly layout kenel may also be increasingly complex.
As shown in Fig. 1 and Fig. 5 to 7, the present invention provides a kind of hatch coamings and topside sectional construction method, and mounting structure is extremely Include end plate components 1, upper sheer strake component 2, longitudinal wall component 3, antitorque box assembly 4, longitudinal wall plate 5, compartment component 6,7 and of guide rail less Vertical bone 8;Antitorque box assembly 4 includes hatch coaming component 41, and hatch coaming component 41 includes column 411;It is further comprising the steps of:
S1, fixed end plate components 1;It, first will fixed end plate components 1 when dock carries out hatch coaming and topside sectional construction It is fixed on the mounting bracket of dock.S2, the side that upper sheer strake component 2 is mounted on to end plate components 1;By upper sheer strake component 2 It is fixedly connected by modes such as welding with the sheet material portions of end plate components 1, forms the plate face of an entirety.S3, by longitudinal wall component 3 Bottom be mounted on end plate components 1 on;Vertical bone 8 can be provided in usual end plate components 1, longitudinal wall component 3 is arranged above by it Limiting slot connect with vertical bone 8, to be connected to end plate components 1.After connection, longitudinal wall component 3 extends perpendicularly to vertical bone 8 Setting direction in end plate components 1.S4, it after the hatch coaming component 41 for installing column 411 is installed on antitorque box assembly 4, incites somebody to action The bottom of antitorque box assembly 4 is mounted on upper sheer strake component 2, and the side of antitorque box assembly 4 is connected to longitudinal wall component 3;Pass through Column 411 and hatch coaming component 41 etc. are advanced to the installation of segmentation stage, can effectively balance whole installation process so that work Phase does not have to be deposited in a part, and then reduces the time of shipbuilding.S5, it is covered on longitudinal wall component 3 and antitorque box assembly 4 And weld longitudinal wall plate 5;S6, compartment component 6 and guide rail 7 are installed in side of the longitudinal wall plate 5 far from end plate components.After installation, Entire hatch coaming and topside sectional construction are completed.
As shown in Fig. 2, in the present embodiment, end plate components 1 include outside plate 11 and the strong frame of the first floor 12;Step S1 further includes Step:S11, it is fixed on vertical bone 8 is parallel on outside plate 11;Multigroup 8 parallel arrangement of vertical bone is on outside plate 11, between indulging between bone 8 Every that can be equidistant, can also be arranged as required to.S12, by the limiting slot on the strong frame of the first floor 12 by first rib The strong frame of plate 12 is fixed on vertical bone 8, and the strong 12 place plane of frame of the first floor is perpendicular to 11 place plane of outside plate and vertical bone 8.It is logical Often, the strong frame of the first floor 12 includes multiple limiting slots, multiple limiting slot uniform intervals, and the strong frame of first rib plate 12 can be made to answer Power is uniform, it is not easy to generate deformation.
As shown in figure 3, upper sheer strake component 2 includes the strong frame of upper sheer strake 21, strong 22 and second floor of frame in deck 23;Step S2 further includes step:S21, it is fixed on vertical bone 8 is parallel on upper sheer strake 21;S22, pass through the limit on the strong frame of the second floor 23 The strong frame of second floor 23 is fixed on vertical bone 8 by slot;After installation, the place face of the strong frame of the second floor 23 is perpendicular to upper sheer strake 21 Place face and vertical bone 8.There are two limiting slots for the usual strong setting of frame 23 of second floor, can be fixed in by two vertical bones 8 On upper sheer strake 21.S23, the strong frame in deck 22 is fixed between the strong frame of two the second floors 23.The strong 22 place face of frame in deck is flat Row is in vertical bone 8 and perpendicular to the place face in second floor strong frame 23 place face and upper sheer strake 21.
As shown in figure 4, longitudinal wall component 3 includes longitudinal wall plate 31, floor frame component 32, platform deck 33 and floor 34;At this In one preferred embodiment of invention, floor frame component 32 includes first rib grillage 321, the second floor frame 322 and third floor frame 323.Step S3 further includes step:S31, floor frame component 32 is mounted on longitudinal wall plate 31;It is fixed on longitudinal wall plate 31 multigroup The vertical bone 8 being mutually parallel, 32 place face of floor frame component is perpendicular to the place face of longitudinal wall plate 31 and vertical bone 8.This hair as shown in Figure 3 Two first rib grillages 321,322 He of place floor frame are secured in a bright preferred embodiment, on longitudinal wall plate 31 respectively Two third floor framves 323.The place face of first rib grillage 321, the second floor frame 322 and third floor frame 323 is each perpendicular to The place face of longitudinal wall plate 31 and vertical bone 8.S32, fixed platform deck 33 connect on longitudinal wall plate 31, and by 33 side of platform deck In vertical bone 8;The place face of platform deck 33 is parallel to vertical bone 8, and perpendicular to the place face of floor frame component 32.S33, by floor 34 are fixed on longitudinal wall plate 31, and are connected to the other side opposite with floor frame component 32 of platform deck 33;The one of the present invention In preferred embodiment, it includes three floors 34 to indulge wall panel assembly 3, corresponding mounted on the side of two first rib grillages 321 respectively With the side of a third floor frame 323.S34, vertical bone 8 is fixed on to limiting slot of the floor 34 far from 33 side of platform deck In.In one embodiment of the present invention, a limiting slot is respectively opened up three sides of the floor 34 far from platform deck 33, it is solid altogether A fixed vertical bone 8.In the present embodiment, it is welded as multifibres single side Lincoln weld between vertical wall panel assembly 3, groove is opened in framework Face.
As shown in figure 5, antitorque box assembly 4 includes interior longitudinal wall component 42, hatch coaming component 41 and piping unit 43;Step S4 It further include step:The bottom of the bottom of longitudinal wall component 42 and hatch coaming component 41 in S41, connection;S42, in interior longitudinal wall component 42 Piping unit 43 is installed between hatch coaming component 41.After the bottom of interior longitudinal wall component 42 is connected with the bottom of hatch coaming component 41 A platform is formed, piping unit 43 is placed on platform.
As shown in fig. 6, hatch coaming component 41 includes main deck component 412, hatch coaming longitudinal wall component 413 and column 411;Step Rapid S41 further includes step:S411, hatch coaming longitudinal wall component 413 and column 411 be vertically fixed on main deck component 412 respectively On.Further, in a preferred embodiment, as shown in fig. 7, hatch coaming longitudinal wall component 413 includes bracket 4131, cabin Mouth enclosure plate 4132 and hatch coaming longitudinal wall plate 4133;Step S411 further includes step:By bracket 4131 and hatch coaming partition board 4132 It is in turn mounted on hatch coaming longitudinal wall plate 4133.
As shown in figure 8, interior longitudinal wall component 42 includes interior longitudinal wall 421 and the strong frame of third floor 422;Step S41 further includes step Suddenly:S412, after bone 8 is indulged in the parallel installation of 421 extending direction of interior longitudinal wall, the strong frame of third floor 422 is mounted on by limiting slot On vertical bone 8.Direction is vertical
As shown in figure 9, compartment component 6 includes the first shifting board 61 and the second shifting board 62;Step S6 further includes step:
S61, the first shifting board 61 and the second shifting board 62 be mounted on longitudinal wall plate 5 successively so that the first shifting board 61 It is located on the same line with the axis of symmetry of the second shifting board 62;S62, installation guide rail 7 so that guide rail 7 is parallel to shifting board 61 and second shifting board 62 the axis of symmetry.
To sum up, the present invention realizes ship My Perspective On The Co-building by hatch coaming and topside sectional construction, to be batch shipbuilding Necessary condition is provided.And hatch coaming and topside sectional construction reduce the requirement of machining accuracy, while dock can be greatly reduced Number, ETL estimated time of loading and paint damage area are lifted, and brings considerable economic benefit.
The above-described embodiments merely illustrate the principles and effects of the present invention, and is not intended to limit the present invention.It is any ripe The personage for knowing this technology can all carry out modifications and changes to above-described embodiment without violating the spirit and scope of the present invention.Cause This, institute is complete without departing from the spirit and technical ideas disclosed in the present invention by those of ordinary skill in the art such as At all equivalent modifications or change, should by the present invention claim be covered.

Claims (9)

1. a kind of hatch coaming and topside sectional construction method, which is characterized in that mounting structure includes at least end plate components (1), the side of a ship Push up strake component (2), longitudinal wall component (3), antitorque box assembly (4), longitudinal wall plate (5), compartment component (6), guide rail (7) and vertical bone (8);The antitorque box assembly (4) includes hatch coaming component (41), and the hatch coaming component (41) includes column (411);Also wrap Include following steps:
S1, the fixed end plate components (1);
S2, the side that the upper sheer strake component (2) is mounted on to the end plate components (1);
S3, the bottom of the longitudinal wall component (3) is mounted in the end plate components (1);
S4, after the hatch coaming component (41) for installing the column (411) is installed on the antitorque box assembly (4), by institute The bottom for stating antitorque box assembly (4) is mounted on the upper sheer strake component (2), and the side of the antitorque box assembly (4) connects In the longitudinal wall component (3);
S5, it is covered on the longitudinal wall component (3) and antitorque box assembly (4) and welds the longitudinal wall plate (5);
S6, the compartment component (6) and the guide rail (7) are installed in side of the longitudinal wall plate (5) far from the end plate components.
2. hatch coaming according to claim 1 and topside sectional construction method, which is characterized in that the end plate components (1) Including outside plate (11) and the strong frame of the first floor (12);The step S1 further includes step:
S11, it is fixed on the vertical bone (8) is parallel on the outside plate (11);
S12, the strong frame of the first floor (12) is fixed on by described indulge by the limiting slot on the strong frame of the first floor (12) On bone (8).
3. hatch coaming according to claim 1 and topside sectional construction method, which is characterized in that the upper sheer strake component (2) include upper sheer strake (21), the strong frame in deck (22) and the strong frame of the second floor (23);The step S2 further includes step:
S21, it is fixed on the vertical bone (8) is parallel on the upper sheer strake (21);
S22, the strong frame of the second floor (23) is fixed on by described indulge by the limiting slot on the strong frame of the second floor (23) On bone (8);
S23, the strong frame in the deck (22) is fixed between two strong frames of the second floor (23).
4. hatch coaming according to claim 1 and topside sectional construction method, which is characterized in that the longitudinal wall component (3) Including longitudinal wall plate (31), floor frame component (32), platform deck (33) and floor (34);The step S3 further includes step:
S31, the floor frame component (32) is mounted on the longitudinal wall plate (31);
S32, the fixed platform deck (33) are connected on the longitudinal wall plate (31), and by the platform deck (33) side The vertical bone (8);
S33, the floor (34) is fixed on the longitudinal wall plate (31), and is connected to the platform deck (33) and the rib The opposite other side of grillage component (32);
S34, vertical bone (8) is fixed in limiting slot of the floor (34) far from the platform deck (33) side.
5. hatch coaming according to claim 1 and topside sectional construction method, which is characterized in that the antitorque box assembly (4) include interior longitudinal wall component (42), hatch coaming component (41) and piping unit (43);The step S4 further includes step:
S41, the connection interior longitudinal wall component (42) bottom and the hatch coaming component (41) bottom;
S42, the piping unit (43) is installed between the interior longitudinal wall component (42) and the hatch coaming component (41).
6. hatch coaming according to claim 5 and topside sectional construction method, which is characterized in that the hatch coaming component (41) include main deck component (412), hatch coaming longitudinal wall component (413) and column (411);The step S41 further includes step:
S411, the hatch coaming longitudinal wall component (413) and the column (411) be vertically fixed on the main deck component respectively (412) on.
7. hatch coaming according to claim 6 and topside sectional construction method, which is characterized in that the hatch coaming longitudinal wall group Part (413) includes bracket (4131), hatch coaming partition board (4132) and hatch coaming longitudinal wall plate (4133);The step S411 further includes Step:
The bracket (4131) and the hatch coaming partition board (4132) are in turn mounted on the hatch coaming longitudinal wall plate (4133).
8. hatch coaming according to claim 5 and topside sectional construction method, which is characterized in that the interior longitudinal wall component (42) include interior longitudinal wall (421) and the strong frame of third floor (422);The step S41 further includes step:
S412, after the parallel installation vertical bone (8) of interior longitudinal wall (421) extending direction, by the strong frame of third floor (422) it is mounted on the vertical bone (8) by limiting slot.
9. hatch coaming according to claim 1 and topside sectional construction method, which is characterized in that the compartment component (6) Including the first shifting board (61) and the second shifting board (62);The step S6 further includes step:
S61, first shifting board (61) and second shifting board (62) be mounted on the longitudinal wall plate (5) successively, made The axis of symmetry for obtaining first shifting board (61) and second shifting board (62) is located on the same line;
S62, the installation guide rail (7) so that the guide rail (7) is parallel to first shifting board (61) and second compartment The axis of symmetry of plate (62).
CN201510599195.0A 2015-09-18 2015-09-18 Hatch coaming and topside sectional construction method Active CN105882891B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510599195.0A CN105882891B (en) 2015-09-18 2015-09-18 Hatch coaming and topside sectional construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510599195.0A CN105882891B (en) 2015-09-18 2015-09-18 Hatch coaming and topside sectional construction method

Publications (2)

Publication Number Publication Date
CN105882891A CN105882891A (en) 2016-08-24
CN105882891B true CN105882891B (en) 2018-07-31

Family

ID=57002772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510599195.0A Active CN105882891B (en) 2015-09-18 2015-09-18 Hatch coaming and topside sectional construction method

Country Status (1)

Country Link
CN (1) CN105882891B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110877677A (en) * 2019-10-30 2020-03-13 沪东中华造船(集团)有限公司 Integrated flat ground manufacturing method for translation type hatch cover system of large-scale ocean bulk cargo ship

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106114752A (en) * 2016-06-27 2016-11-16 广州文冲船厂有限责任公司 A kind of container ship deck pillar installation method
CN107054561A (en) * 2016-12-23 2017-08-18 中国船舶工业集团公司第七0八研究所 A kind of oil cargo tank new structure of big strong frame spacing
CN107128438B (en) * 2017-05-09 2018-12-21 中国船舶工业集团公司第七0八研究所 A kind of longitudinal framed plate structure applied to Large Container Ship
CN107161283B (en) * 2017-05-24 2019-02-26 广船国际有限公司 A kind of manufacturing method of complicated linetype segmentation
CN107839841B (en) * 2017-12-02 2024-02-02 浙江宏盛造船有限公司 Deck transport ship
CN108190723B (en) * 2017-12-21 2019-12-06 沪东中华造船(集团)有限公司 Hoisting method for side sections with outer plate bulwarks and hatch coamings
CN108146578B (en) * 2017-12-21 2019-07-12 沪东中华造船(集团)有限公司 A kind of manufacturing method of two phase stainless steel chemical tanker topside segmentation
CN108163140B (en) * 2017-12-25 2019-10-15 沪东中华造船(集团)有限公司 A kind of method of construction of width type segmentation
CN108177730A (en) * 2017-12-25 2018-06-19 沪东中华造船(集团)有限公司 A kind of integrated method of construction of topside segmentation
CN108394514B (en) * 2018-04-26 2019-08-09 广船国际有限公司 A kind of ship deck block method of construction
CN108909938B (en) * 2018-06-28 2020-07-07 广船国际有限公司 Sectional construction method
CN110182300A (en) * 2019-04-22 2019-08-30 沪东中华造船(集团)有限公司 A kind of pre-buried construction method of container ship side sectional pipe Xi part
CN111532372B (en) * 2020-04-28 2023-12-15 江苏扬子鑫福造船有限公司 Integrated inspection channel for ballast tank of ore carrier and construction method thereof
CN112758276B (en) * 2020-12-30 2023-03-14 大连船舶重工集团有限公司 Method for integrally building hatch circumference and torsion box of ultra-large container ship
CN113998073B (en) * 2021-11-30 2023-03-24 广州黄船海洋工程有限公司 Integrated installation method of longitudinal hatch coaming and torsion box of container
CN114802642B (en) * 2022-04-08 2023-03-14 江南造船(集团)有限责任公司 Construction method of container ship torsion box section and container ship
CN116892199B (en) * 2023-09-08 2023-12-05 中船黄埔文冲船舶有限公司 Lifting foundation for offshore wind power installation platform and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1548338A (en) * 2003-05-09 2004-11-24 现代重工业株式会社 Notch assembling method for assembling upper deck assembly, hatch coaming assembly with longitudinal bulk head assembly each other in shipbuilding technology
CN1583502A (en) * 2003-08-21 2005-02-23 沪东中华造船(集团)有限公司 Unitary pre-assembling method for cross piece, anti-twist deck, hatching coaming and railing frame
CN101362505A (en) * 2008-09-26 2009-02-11 江苏熔盛重工有限公司 Production technology of hatch coaming and hatch cover
CN101408248A (en) * 2008-07-02 2009-04-15 广州机械科学研究院 Elastic compensating coaxial combined seal ring
CN103661807A (en) * 2013-11-29 2014-03-26 大连船舶重工集团有限公司 Positioning method for broadside block assembling of pre-mounting pressure guide rail bracket

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5675286A (en) * 1979-11-27 1981-06-22 Mitsubishi Heavy Ind Ltd Building method of cell structure for container ship

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1548338A (en) * 2003-05-09 2004-11-24 现代重工业株式会社 Notch assembling method for assembling upper deck assembly, hatch coaming assembly with longitudinal bulk head assembly each other in shipbuilding technology
CN1583502A (en) * 2003-08-21 2005-02-23 沪东中华造船(集团)有限公司 Unitary pre-assembling method for cross piece, anti-twist deck, hatching coaming and railing frame
CN101408248A (en) * 2008-07-02 2009-04-15 广州机械科学研究院 Elastic compensating coaxial combined seal ring
CN101362505A (en) * 2008-09-26 2009-02-11 江苏熔盛重工有限公司 Production technology of hatch coaming and hatch cover
CN103661807A (en) * 2013-11-29 2014-03-26 大连船舶重工集团有限公司 Positioning method for broadside block assembling of pre-mounting pressure guide rail bracket

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
舱口围板与舷侧分段预合拢后船台合拢精度控制;何毅;《中国造船工程学会造船工艺学术委员会壳舾涂一体化学组2008年学术会议论文集》;20081101;第309-311页 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110877677A (en) * 2019-10-30 2020-03-13 沪东中华造船(集团)有限公司 Integrated flat ground manufacturing method for translation type hatch cover system of large-scale ocean bulk cargo ship

Also Published As

Publication number Publication date
CN105882891A (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN105882891B (en) Hatch coaming and topside sectional construction method
CN101885368B (en) Method for manufacturing and installing guide rail in container ship cargo hold
CN102513766B (en) Tank container end frame assembling tooling
CN110155249A (en) A kind of ship's space method of construction with big window
CN105882890A (en) Mounting method of guide rail frame for container ship and special jig frame for guide rail frame
CN110254622A (en) A kind of prepackage method of ship's outfit
CN105109617B (en) A kind of Ship Structure for the large-scale A cabinet frames of reassembling type
US20110146431A1 (en) Rigid beam of portal frame type platform
WO2023098149A1 (en) Combined bulkhead platform structure suitable for refrigerated container ship
KR100647925B1 (en) End strake for cargo containment installation of lng carrier
CN104754891A (en) Hanging type heavy article mounting electric cabinet
CN109850060A (en) The installation method of straight subsection profile in a kind of shipbuilding
WO2018173657A1 (en) Welding path specification method, program, teaching program and welding robot system
KR20170050287A (en) Assembly method of double bottom curved block of vessel
CN202388175U (en) End frame assembling fixture of tank type container
CN104112037A (en) Designing method for improving cargo dead weight of bulk cargo ship
CN204495521U (en) A kind of can three directions regulate hydraulic exciting mechanism
CN113086125A (en) Movable support column installation method
CN208409030U (en) The welding tooling of network cabinet grid door
CN204039443U (en) A kind of aircraft target ship part oscillating aging corrector
CN203345398U (en) Conveying fixing frame for round storage tank
CN206135325U (en) A girder for chute
CN206099790U (en) Pin -connected panel photovoltaic contravariant cabinet
US9993900B2 (en) Method for positioning welding clamp
CN210825064U (en) Sheet metal segmentation hoist and mount frock

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181212

Address after: 201913 No. 988 Changxing Jiangnan Avenue, Chongming County, Shanghai

Patentee after: Jiannan Shipbuilding (Group) Co., Ltd.

Address before: 201913 1888 Jiangnan Avenue, Changxing Township, Chongming County, Shanghai

Patentee before: Shanghai Jiangnan Changxing Heavy Industry Co.,Ltd.

TR01 Transfer of patent right