CN105880036A - High-reliability flotation column - Google Patents

High-reliability flotation column Download PDF

Info

Publication number
CN105880036A
CN105880036A CN201610386576.5A CN201610386576A CN105880036A CN 105880036 A CN105880036 A CN 105880036A CN 201610386576 A CN201610386576 A CN 201610386576A CN 105880036 A CN105880036 A CN 105880036A
Authority
CN
China
Prior art keywords
land
pressure
chamber
flotation column
mode selection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610386576.5A
Other languages
Chinese (zh)
Other versions
CN105880036B (en
Inventor
施鑫镛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingyi Economic Development Park Operation Management Co ltd
Original Assignee
Quzhou Youde Industrial Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Quzhou Youde Industrial Design Co Ltd filed Critical Quzhou Youde Industrial Design Co Ltd
Priority to CN201610386576.5A priority Critical patent/CN105880036B/en
Publication of CN105880036A publication Critical patent/CN105880036A/en
Application granted granted Critical
Publication of CN105880036B publication Critical patent/CN105880036B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B03SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03DFLOTATION; DIFFERENTIAL SEDIMENTATION
    • B03D1/00Flotation
    • B03D1/14Flotation machines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B03SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03DFLOTATION; DIFFERENTIAL SEDIMENTATION
    • B03D1/00Flotation
    • B03D1/14Flotation machines
    • B03D1/24Pneumatic

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Biotechnology (AREA)
  • Paper (AREA)
  • Treatment Of Liquids With Adsorbents In General (AREA)

Abstract

The invention discloses a high-reliability flotation column which uses a mode selecting part; a switching mechanism is arranged in the mode selecting part; the structure can monitor a working state of the flotation column better, so that blockage of a slurry return pipe can be found, and a floatation mode of the floatation column can be automatically switched to a non-middling circulating mode, so that the reliability of the flotation column is improved; a master controller of the flotation column controls pumping pressure of a pump to repeatedly boost pressure and reduce pressure for impacting a blocked part; and the floatation column can carry out flotation in a first mode and a second mode, so that the blocked part is processed on line.

Description

High reliability flotation column
The present invention is the divisional application of patent of invention " a kind of high reliability flotation column ", and the applying date of original application is 2014 April 11, the application number of original application is 2014101442108, and the invention and created name of original application is " a kind of high reliability flotation Post ".
Technical field
The application relates to the equipment in a kind of flotation field, is specifically related to a kind of flotation column with two set inflatable structures.
Background technology
Flotation column has been the conventional equipment in flotation field, and flotation column is generally of middling cycle structure, middling cycle structure Again being inflated by the chats of not fully flotation in return flotation column, existing middling cycle structure is wished more uniform by ore pulp Distribution, therefore uses more return pipe, but too much return pipe branch causes the diameter of pipe less thus is adapted to chats Back amount, and return pipe clogging inevitably occurs.
Overcoming return pipe to block currently without particularly effective technical scheme, first, return pipe is blocked in floatation process In be difficult to find because flotation column for close space, at overfall, there is substantial amounts of overflow foam, these factors result in difficulty In the blocking finding return pipe;On the other hand, even if being found that the best way of blocking is dredged, can only be to shut down dimension Repair.But the ore pulp sorted the most completely in flotation column can only stop flotation and drain, this wastes the mineral resources of preciousness undoubtedly.
Summary of the invention
It is an object of the invention to provide the flotation column of a kind of high reliability, solve return pipe in aforesaid prior art The problem of blocking.
The present invention realizes by the following method, a kind of high reliability flotation column, and it includes the import of feeding, bottom Ore discharge exports, and flotation column bottom has chats collection portion, and chats collection portion is connected with distributor, and distributor passes through multiple return pipes The interface being connected to flotation column, return pipe and flotation column is positioned at the top in chats collection portion.
More preferably, chats collection portion is sent by pumping to mode selection part, mould after being collected by the middle ore pulp of flotation column and converging Formula selection portion is connected with distributor.
More preferably, the feeding end of mode selection part is connected with pump, and discharge end is connected with distributor, sets in mode selection part Having switching construction, switching construction to have two land, the respectively first land and the second land, the diameter of the first land is less than the Two land diameters, the shell of mode selection part is divided into minor diameter and major diameter portion, these two parts corresponding first land respectively and Second land, the center of switching construction also has the passage that in confession, ore pulp flows through;Chamber between first land and feeding end is One chamber, the chamber between two land is the second chamber, and the second land is the 3rd chamber with the chamber of discharge end;Second land and discharge end it Between be provided with stopper section, this stopper section determines the minimum space in the 3rd chamber;Mode selection part is also associated with charging portion, pressure-sensing Portion and muffler, switching construction has two positions in mode selection part, when primary importance, charging portion, pressure-sensing portion with First chamber is connected, and muffler and the second chamber are connected;During the second place, charging portion, pressure-sensing portion and muffler all with the second chamber It is connected;Muffler is connected with jet plate.
More preferably, flotation column is in the case of normal work, and return pipe feed back is smooth and easy, and pump is sent into after being pressurizeed by middle ore pulp Mode selection part, in mode selection part, middle ore pulp flows through from switching construction central passage and exits into distribution from discharge end Device, switching construction is pushed to primary importance, and charging portion supplies to middle ore pulp, and pressure-sensing portion is in pressured state, muffler with Second chamber is connected and is in idle state.
More preferably, when at least one in return pipe is blocked, the middle ore pulp discharge of discharge end is not smooth, at this moment discharge end Interior pressure increases, and switching construction is pushed away by middle ore pulp to feeding end, and switching construction is finally stable in the second place, by the second ring Platform jointly coordinates location with minor diameter;Charging portion, pressure-sensing portion and muffler be all connected with the second chamber, charging portion confession Gases at high pressure are directly entered muffler, and penetrate from jet plate, make flotation column work on until flotation of ore pulp in flotation column Separate complete, and pressurized force value decline in pressure-sensing portion is triggered, and this status signal is reached main control computer.
More preferably, main control computer, after obtaining the blocked signal sent in pressure-sensing portion, sends instruction to pump so that it is Improving pumping pressure, and worked at this pressure one scheduled time of holding by pump, pumping pressure drops to initial pressure afterwards, In this predetermined time, switching construction is pushed to primary importance from the second place, but its state is unstable, overall flotation column The most erratic switching, through the most such boosting, step-down step after, main control computer measuring pressure sense again The force value in survey portion, if its pressure rises to and stablizes in original state, then explanation switching construction has been returned to first Putting, what the blocking of return pipe 5 obtained solves or is affected to be down in acceptable scope.
More preferably, main control computer is pulsed buck to the control of pump.
Beneficial effect:
1) the present patent application employs mode selection part, has switching construction in mode selection part, and this structure is preferably to flotation The duty of post is monitored, and is not only able to find the blocking of return pipe, moreover it is possible to the flotation pattern of automatic switchover flotation column, carries The high reliability of flotation column;
2) main control computer of the flotation column of the application is by the control of the pumping pressure to pump, and boosting repeatedly and step-down, to blocking Position is impacted, no matter and flotation column in the flrst mode or can be carried out flotation in the second pattern, thus realize existing Online block part is processed.
Accompanying drawing explanation
Fig. 1 is flotation column structural representation of the present invention.
Fig. 2 is the first state of mode selection part.
Fig. 3 is the second state of mode selection part.
In figure: 1, flotation column;2, import;3, distributor;4, overfall;5, return pipe;6, jet plate;7, chats is collected Portion;8, tunable pump;9, mode selection part;10, charging portion;11, pressure-sensing portion;12, the first chamber;13, the second chamber;14, the 3rd Chamber;15, feeding end;16, discharge end;17, the first land;18, the second land.
Detailed description of the invention
As it is shown in figure 1, flotation column 1 includes the import of feeding, ore discharge outlet (not providing reference) of bottom, flotation column Bottom has chats collection portion 7, and the middle ore pulp of flotation column is collected after converging and delivered to model selection by pump 8 by chats collection portion 7 Portion 9, mode selection part 9 is connected with distributor 3, and middle ore pulp uniformly enters each return pipe through the distributional effects of distributor 3, And the interface returning to flotation column 1, return pipe and flotation column 1 is positioned at the top in chats collection portion 7.
Can know from Fig. 2, the feeding end 15 of mode selection part 9 is connected with pump 8, and discharge end 16 is connected with distributor 3, mould The switching construction in formula selection portion 9 has two land, the respectively first land 17 and the second land 18, the diameter of the first land 17 Less than the second land diameter 18, the shell of mode selection part 9 is divided into minor diameter and major diameter portion, these two parts the most corresponding the One land 17 and the second land 18, the center of switching construction also has the passage that in confession, ore pulp flows through.First land 17 and pan feeding Chamber between end 15 is the first chamber 12, and the chamber between two land is the second chamber, and the chamber of the second land 18 and discharge end 16 is the Three chambeies 14.Second land 18 by minor diameter backstop, but also will not can prop up to the right discharge end 16 so that the 3rd chamber is thorough Disappearing, optional specific embodiment is to be provided with stopper section between the second land 18 and discharge end 16, and this stopper section determines the 3rd The minimum space in chamber 14.Mode selection part 9 is also associated with charging portion 10, and pressure-sensing portion 11 and muffler, switching construction is at mould Having two positions in formula selection portion 9, during primary importance, charging portion 10, pressure-sensing portion 11 are connected with the first chamber 12, muffler with Second chamber 13 is connected;During the second place, charging portion 10, pressure-sensing portion 11 and muffler are all connected with the second chamber 13.
Operation principle is explained as follows: flotation column 1 is in the case of normal work, and return pipe feed back is smooth and easy, and pump 8 is by middle ore pulp Sending into mode selection part 9 after pressurization, in mode selection part 9, middle ore pulp flows through and from discharge end from switching construction central passage 16 exit into distributor 3, and due to the fluid pressure effect in middle slurry ore deposit, switching construction is pushed to primary importance, charging portion 10 to Middle ore pulp supplies, and pressure-sensing portion 11 is in pressured state, and muffler and the second chamber 13 are connected and are in idle state.
When at least one in return pipe is blocked, the middle ore pulp discharge of discharge end 16 is not smooth, at this moment discharge end 16 internal pressure Power increases, and switching construction is pushed away by middle ore pulp to feeding end 15, and switching construction is finally stable in the second place, by the second land 18 jointly coordinate location with minor diameter.At this moment, charging portion 10, pressure-sensing portion 11 and muffler are all connected with the second chamber 13, The gases at high pressure of 10 confessions of charging portion are directly entered muffler, and penetrate from jet plate 6, make flotation column work on until flotation Flotation of ore pulp in post separates complete, and pressurized force value decline in pressure-sensing portion 11 is triggered, and this status signal is reached master control Machine reminds operating personnel to note.
So, by mode selection part 9, make flotation column can carry out floating operation in both modes, when return pipe quilt Time stifled, flotation column automatically switches to the second pattern, makes the flotation of flotation column carry out completely, embodying higher reliability.
Further, flotation column is not also the most shut down the blocking to return pipe 5 and is carried out cleaning and propose creativeness by the application Solution, specific as follows, main control computer, after the signal obtaining pressure-sensing portion 11, confirms that at least one return pipe is blocked, Then instruction is sent to pump 8 so that it is improve pumping pressure, and worked at this pressure one scheduled time of holding by pump 8, afterwards Pumping pressure drops to initial pressure, and in this predetermined time, switching construction is pushed to primary importance from the second place, but its shape State is unstable, the overall the most erratic switching of flotation column, but regardless of which kind of pattern, the operation of flotation all Directly carrying out, through the most such boosting, step-down step after, the force value of main control computer measuring pressure detecting part 11 again, If its pressure rises to and stablizes in original state, then explanation switching construction has been returned to primary importance, blocking up of return pipe 5 What plug obtained solves or is affected to be down in acceptable scope.Preferably mode is that main control computer is arteries and veins to the control of pump 8 Rush formula buck.
Although the disclosed high reliability flotation column related to being particularly described with reference to embodiment, reality described above It is illustrative and not restrictive for executing example, and without departing from the present invention, all of changing and modifications all exists Within protection scope of the present invention.

Claims (3)

1. high reliability flotation column (1), it includes the import (2) of feeding, the ore discharge outlet of bottom, it is characterised in that flotation column Bottom has chats collection portion (7), and chats collection portion (7) is connected with distributor (3), and distributor (3) is by multiple return pipes even The interface receiving flotation column (1), return pipe and flotation column (1) is positioned at the top in chats collection portion (7), and chats collection portion (7) will The middle ore pulp of flotation column is collected after converging and is delivered to mode selection part (9), mode selection part (9) and distributor (3) phase by pump (8) Even;Main control computer, after obtaining the blocked signal sent in pressure-sensing portion, sends instruction to pump so that it is improve pumping pressure, And pump is worked one scheduled time of holding at this pressure, pumping pressure drops to initial pressure afterwards, this predetermined time In, switching construction is pushed to primary importance from the second place, but its state is unstable, and overall flotation column is in both modes Erratic switching, through the most such boosting, step-down step after, the pressure of main control computer measuring pressure detecting part again Value, if its pressure rises to and stablizes in original state, then explanation switching construction has been returned to primary importance, return pipe 5 Blocking obtain solve or affected be down in acceptable scope.
High reliability flotation column the most according to claim 1, it is characterised in that: the feeding end (15) of mode selection part (9) Being connected with pump (8), discharge end (16) is connected with distributor (3), is provided with switching construction in mode selection part (9), and switching construction has Having two land, the respectively first land (17) and the second land (18), the diameter of the first land is less than the second land diameter, mould The shell in formula selection portion is divided into minor diameter and major diameter portion, these two parts corresponding first land and the second land respectively, switching The center of structure also has the passage that in confession, ore pulp flows through;Chamber between first land and feeding end is the first chamber (12), two Chamber between land is the second chamber (13), and the second land is the 3rd chamber (14) with the chamber of discharge end;Second land and discharge end it Between be provided with stopper section, this stopper section determines the minimum space in the 3rd chamber (14);Mode selection part (9) is also associated with charging portion (10), pressure-sensing portion (11) and muffler, switching construction has two positions in mode selection part, when primary importance, fills Gas portion, pressure-sensing portion are connected with the first chamber, and muffler and the second chamber are connected;During the second place, charging portion, pressure-sensing portion and Muffler is all connected with the second chamber;Muffler is connected with jet plate (6).
3. according to the high reliability flotation column described in claim 1 and 2, it is characterised in that: main control computer is pulse to the control of pump Formula buck.
CN201610386576.5A 2014-04-11 2014-04-11 High reliability flotation column Active CN105880036B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610386576.5A CN105880036B (en) 2014-04-11 2014-04-11 High reliability flotation column

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201410144210.8A CN103878074B (en) 2014-04-11 2014-04-11 A kind of high reliability flotation column
CN201610386576.5A CN105880036B (en) 2014-04-11 2014-04-11 High reliability flotation column

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410144210.8A Division CN103878074B (en) 2014-04-11 2014-04-11 A kind of high reliability flotation column

Publications (2)

Publication Number Publication Date
CN105880036A true CN105880036A (en) 2016-08-24
CN105880036B CN105880036B (en) 2019-03-05

Family

ID=50947393

Family Applications (5)

Application Number Title Priority Date Filing Date
CN201610386576.5A Active CN105880036B (en) 2014-04-11 2014-04-11 High reliability flotation column
CN201610386570.8A Active CN106000661B (en) 2014-04-11 2014-04-11 A kind of flotation column of high reliability
CN201410144210.8A Expired - Fee Related CN103878074B (en) 2014-04-11 2014-04-11 A kind of high reliability flotation column
CN201610386582.0A Active CN105797871B (en) 2014-04-11 2014-04-11 flotation column
CN201610386581.6A Active CN105964418B (en) 2014-04-11 2014-04-11 The flotation column of high reliability

Family Applications After (4)

Application Number Title Priority Date Filing Date
CN201610386570.8A Active CN106000661B (en) 2014-04-11 2014-04-11 A kind of flotation column of high reliability
CN201410144210.8A Expired - Fee Related CN103878074B (en) 2014-04-11 2014-04-11 A kind of high reliability flotation column
CN201610386582.0A Active CN105797871B (en) 2014-04-11 2014-04-11 flotation column
CN201610386581.6A Active CN105964418B (en) 2014-04-11 2014-04-11 The flotation column of high reliability

Country Status (1)

Country Link
CN (5) CN105880036B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105880036B (en) * 2014-04-11 2019-03-05 衢州市优德工业设计有限公司 High reliability flotation column
CN108459626A (en) * 2017-09-21 2018-08-28 湖北博南科技有限公司 The devices and methods therefor of Packed flotation column liquid level is automatically controlled based on pressure difference

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1207800A (en) * 1996-01-16 1999-02-10 科勒公司 Diverter valve
EP1400492A2 (en) * 2002-08-26 2004-03-24 Amcol International Corporation Method and apparatus for removing hydrocarbons from water by air flotation
JP2006231193A (en) * 2005-02-24 2006-09-07 Mitsubishi Heavy Ind Ltd Recovering device and method, and separating and recovering system and method of electronic tag, and surfacing recovering device and method of settling matter
CN101362119A (en) * 2008-10-09 2009-02-11 湖南君毅科技发展有限公司 Flotation column for sorting mineral
CN201702028U (en) * 2010-04-15 2011-01-12 孙小宇 Quick micro-bubble floatation integrated mechanism
CN102121397A (en) * 2010-12-27 2011-07-13 淄博矿业集团有限责任公司 Paste filling pipeline system for coal mine
CN102240610A (en) * 2011-07-04 2011-11-16 福建省龙岩龙能粉煤灰综合利用有限公司 Self-gas supply mixed fly ash multistage flotation separation system
CN202199429U (en) * 2011-07-04 2012-04-25 福建省龙岩龙能粉煤灰综合利用有限公司 Self-air supplying fly ash flotation separation system
CN203076080U (en) * 2013-01-23 2013-07-24 沈阳华大科技有限公司 Magnetic floatation separation device with jet bubble generators
CN203484233U (en) * 2013-09-10 2014-03-19 中国矿业大学 Pre-floating type rotational flow microbubble flotation column separation equipment
CN105797871A (en) * 2014-04-11 2016-07-27 衢州市优德工业设计有限公司 Flotation column

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1253666A1 (en) * 1983-02-17 1986-08-30 Предприятие П/Я Р-6767 Flotation machine
RU2121884C1 (en) * 1997-11-04 1998-11-20 Открытое Акционерное Общество "Уралэнергоцветмет" Pneumatic floatation column machine
KR100297279B1 (en) * 1998-09-08 2001-08-07 이재근 Countercurrent and baffle flotation column apparatus for separating unburned carbon and mineral from fly ash
CN2416960Y (en) * 2000-03-27 2001-01-31 平顶山煤业(集团)田庄选煤厂 Micro bubble type flotation machine
CN2431047Y (en) * 2000-07-07 2001-05-23 中国矿业大学(北京校区) Bidirectionally inflating jet flotation column
CN100402121C (en) * 2003-03-27 2008-07-16 杰里·弗里德曼 System and method of gas energy management for particle flotation and separation
CN200963607Y (en) * 2006-10-16 2007-10-24 孙玉堂 Combined flotation column
US20140016433A1 (en) * 2009-04-23 2014-01-16 Peter Douglas Jack Method and apparatus for generating micro bubbles in a fluid flow
CN201404861Y (en) * 2009-05-13 2010-02-17 湖南省电力粉煤灰开发有限公司 Floatation column special for circulating fluidized bed boiler fly ash
CN201568278U (en) * 2009-08-06 2010-09-01 王力辉 High and low pressure switching valve for concrete pump
CN201889232U (en) * 2010-06-04 2011-07-06 高坷 Regenerated fuel separating column
CN101844113B (en) * 2010-06-08 2012-11-14 长沙矿冶研究院 Flotation machine for efficiently recovering fine-particle minerals
CN103480502B (en) * 2013-09-10 2016-01-20 中国矿业大学 Three-product cyclone microbubble floatation column screening installation and method
CN203862406U (en) * 2014-04-11 2014-10-08 衢州市优德工业设计有限公司 High-reliability flotation column

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1207800A (en) * 1996-01-16 1999-02-10 科勒公司 Diverter valve
EP1400492A2 (en) * 2002-08-26 2004-03-24 Amcol International Corporation Method and apparatus for removing hydrocarbons from water by air flotation
JP2006231193A (en) * 2005-02-24 2006-09-07 Mitsubishi Heavy Ind Ltd Recovering device and method, and separating and recovering system and method of electronic tag, and surfacing recovering device and method of settling matter
CN101362119A (en) * 2008-10-09 2009-02-11 湖南君毅科技发展有限公司 Flotation column for sorting mineral
CN201702028U (en) * 2010-04-15 2011-01-12 孙小宇 Quick micro-bubble floatation integrated mechanism
CN102121397A (en) * 2010-12-27 2011-07-13 淄博矿业集团有限责任公司 Paste filling pipeline system for coal mine
CN102240610A (en) * 2011-07-04 2011-11-16 福建省龙岩龙能粉煤灰综合利用有限公司 Self-gas supply mixed fly ash multistage flotation separation system
CN202199429U (en) * 2011-07-04 2012-04-25 福建省龙岩龙能粉煤灰综合利用有限公司 Self-air supplying fly ash flotation separation system
CN203076080U (en) * 2013-01-23 2013-07-24 沈阳华大科技有限公司 Magnetic floatation separation device with jet bubble generators
CN203484233U (en) * 2013-09-10 2014-03-19 中国矿业大学 Pre-floating type rotational flow microbubble flotation column separation equipment
CN105797871A (en) * 2014-04-11 2016-07-27 衢州市优德工业设计有限公司 Flotation column
CN105964418A (en) * 2014-04-11 2016-09-28 衢州市优德工业设计有限公司 High-reliability flotation column

Also Published As

Publication number Publication date
CN105880036B (en) 2019-03-05
CN105964418B (en) 2018-02-02
CN105797871A (en) 2016-07-27
CN106000661A (en) 2016-10-12
CN105797871B (en) 2018-02-27
CN105964418A (en) 2016-09-28
CN103878074B (en) 2016-08-03
CN106000661B (en) 2018-03-09
CN103878074A (en) 2014-06-25

Similar Documents

Publication Publication Date Title
CN105880036A (en) High-reliability flotation column
CN105170337B (en) A kind of method for floating improving reliability
CN203188268U (en) High-power submersible flow jetting front-and-back spraying gas lift subsea pipeline trencher
CN203862406U (en) High-reliability flotation column
CN102182457A (en) Intelligent dust-fall device of excavator
CN103644368A (en) Intelligent pipeline crossing pusher
CN105817343B (en) A kind of flotation column
JP5514194B2 (en) Injection head for performing the injection filling process
CN214441216U (en) Cleaning device for drill rod of hydraulic breaking hammer of excavating equipment
CN102925932B (en) A kind of electrolytic lead anode plate high-pressure spray washing device
CN204994529U (en) Thick liquid sediment autosegregation's fiberizer
CN102380229A (en) Continuous extraction device and continuous extraction method adopting same
AU2013242816A1 (en) Device for non-entry mining
CN202212299U (en) Structure of electroplating resisting machine
CN202072667U (en) Device used for delaying coking hydraulic decoking
CN205887291U (en) Automatic oil spout protector
CN212175785U (en) Y-shaped mud sucker platform for cleaning equipment in tubular pile
CN218943848U (en) Drilling construction is with eyewash device with temperature regulation function
CN202516825U (en) Automatic barrel washing device
CN205445570U (en) Water jet fracturing tubular column device
CN202237362U (en) Continuous extracting device
CN103394964B (en) A kind of Digit Control Machine Tool with antirust flusher
CN202240196U (en) Cooling device for cutting machine
CN210269208U (en) Inert gas generator test mechanism
CN208950635U (en) A kind of high position drill site extraction system connection structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230112

Address after: Room 106, East 1st Floor, Management Committee of Shandong Pingyi Economic Development Zone, West Section of Jinhua Road, Pingyi County Economic Development Zone, Linyi City, Shandong Province, 273300

Patentee after: Pingyi Economic Development Park Operation Management Co.,Ltd.

Address before: Room 101, No.19, donggeng village, Xinxin street, Kecheng District, Quzhou green industry cluster district, Quzhou City, Zhejiang Province

Patentee before: QUZHOU YOUDE INDUSTRIAL DESIGN Co.,Ltd.

TR01 Transfer of patent right