CN105873236A - Connection establishing method and device - Google Patents

Connection establishing method and device Download PDF

Info

Publication number
CN105873236A
CN105873236A CN201510036819.8A CN201510036819A CN105873236A CN 105873236 A CN105873236 A CN 105873236A CN 201510036819 A CN201510036819 A CN 201510036819A CN 105873236 A CN105873236 A CN 105873236A
Authority
CN
China
Prior art keywords
target
information
message
base station
time domain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201510036819.8A
Other languages
Chinese (zh)
Inventor
邹伟
谢峰
刘旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201510036819.8A priority Critical patent/CN105873236A/en
Priority to PCT/CN2015/083909 priority patent/WO2016115847A1/en
Publication of CN105873236A publication Critical patent/CN105873236A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a connection establishing method and device. The method includes the following steps that: a notification message which is issued by a base station and is used for indicating establishing a connection with a target transmission point (TP) is received, wherein the notification message carries time domain parameter information for establishing the connection with the target transmission point (TP) under a pattern switching mode; and the connection with the target transmission point (TP) under the pattern switching mode is established according to the time domain parameter information. With the method and device of the invention adopted, a problem that a new connection cannot be established under a switching mode in the prior art can be solved, and therefore, a new connection can be established flexibly.

Description

Connection establishment method and device
Technical field
The present invention relates to the communications field, in particular to connection establishment method and device.
Background technology
The fast development of mobile Internet, Internet of Things and other service application has become as promotion the 5th generation shifting The main drive that the dynamic communication technology (5G) develops.They an urgent demand 5G has the access speed of the optical fiber that matches in excellence or beauty Rate, the concatenation ability of hundred billion equipment, perfect real-time experience and wireless broadband Internet access ability anywhere or anytime. Additionally, the important indicators such as energy consumption efficiency, spectrum efficiency and peak rate are also required to when 5G system designs comprehensive Consider.IMT-2020 (5G) propelling group has been set up to promote the development of 5G technology in 2013.According to state Border overall condition, it is contemplated that 5G vision, critical capability demand and frequency spectrum planning will be formed for 2015, afterwards will Start 5G standardization effort, and after the year two thousand twenty, start commercialization.International standard aspect, LTE-Advanced Technical standard mainly 3GPP International Organization for standardization work out.Industry it was initially believed that in the 3GPP R14 stage Work starting the research on standard towards 5G.
In following mobile network, traffic needs can improve constantly, terminal number and kind the most constantly break out Formula increases.As one of the important scenes of 5G and technological means, super-intensive network (Ultra Dense Network, Referred to as UDN) just receive more and more attention.When existing LTE-A technology is applied to super-intensive network In, the interference between each cell common reference signal is increasingly severe along with the increase of number of cells.In order to avoid this Individual interference, it is frequently necessary to carry out the coordination switch of minizone, i.e. closes cell portion certain period in UDN Interference is reduced in base station, and closes another part cell base station in another a period of time.In order to coordinate and reduce each little The interference in district, it is possible to use preferably return link carrys out real-time interactive service flow information, and according to service traffics Information carries out the centralized Control of each community switch.But, preferable return link considerably increases return network Lower deployment cost, all being difficult under all covering scene in actual network design all realizes ideal passback.
Fig. 1 is the schematic diagram of super-intensive network breaker in middle mode of operation in correlation technique, as it is shown in figure 1, grand base Covering of standing can provide large range of Radio Link support, but cause the quality of link farther out due to transmission range Affected by certain;Each little base station provides more excellent Radio Link for terminal, for strengthening the appearance of network Amount.But, the densification covered along with small-cell, the distribution of little base station more crypto set and unordered, slight interval Interference become sufficiently complex, create more edge customer, seriously limit the whole of whole UDN network Body handling capacity.In order to coordinate the interference between each community in the case of return link is nonideal, through frequently with The interference coordination pattern (hereinafter referred to as pattern switching mode) of community switch, the most each community is carried out by pattern Carry out the switch of cell signal according to certain pattern, thus reduce the interference between each community.The right side of Fig. 1 Show the switch pattern example of each small-cell, it can be seen that the switch pattern of different small-cells is different, But they are to synchronize in time, and are all made up of multiple unit interval sections.In each unit interval section, respectively Community can determine the on off state of oneself according to pattern.Concrete switch pattern can be by unified point of Centroid Join, it is also possible to produced through consultation according to the disturbance regime detected by each community and its neighbor cell.In pattern Carry out community switch unit interval section can from the radio frames of one 1 millisecond (ms) subframe to multiple 10ms, The control duration (the most whole switch pattern cycle) of whole pattern depends on the physical length switching pattern, permissible From several ms to tens, ms hundreds of, thousand of, the most longer.So, the related control information of each minizone Can carry out according to the actual delay profiles of return link alternately, and produce corresponding length aperiodicity or Periodically switch control rule pattern.
Although pattern switching mode can effectively carry out interference coordination in the case of return link is nonideal, but Limit the peak rate of user the most to a certain extent.This is because community is in pass in a part of subframe section Closing OFF state, user cannot utilize this part subframe to carry out data transmission.In order to overcome this shortcoming, can To use multi-link data transfer scheme, i.e. user to set up multiple connection with adjacent multiple cell base stations simultaneously, Different connections is used to carry out data transmission in the different switch unit interval.So, this user just can utilize All subframes carry out data transmission, and substantially increase the peak rate of transmission.Further, each little due to UDN District uses the channel of identical frequency, this multi-link communication mode to have only to just use a set of wireless device It is achieved that do not increase the cost of user terminal, the alien frequencies dual link scheme that this and 3GPP discuss is the most not With.But, it is concrete that the multi-link data transmission method discussed in the past does not consider under pattern switching mode Implementation method.
For correlation technique can not be set up new connectivity problem in switching mode, effective solution is the most not yet proposed Certainly scheme.
Summary of the invention
The invention provides connection establishment method and device, so that at least solve can not be at switching mode in correlation technique The lower new connectivity problem of foundation.
According to an aspect of the invention, it is provided a kind of connection establishment method, including: receive what base station issued Transmit some TP with target and set up the notification message being connected, wherein, described notification message carries and described mesh Mark TP sets up the time domain parameter information connected;According under described time domain parameter information and described pattern switching mode Described target TP set up connect.
Further, before being connected with the foundation of described target TP according to described time domain parameter information, also include: Receive the prompting message that described base station sends, wherein, described prompting message be used for pointing out described terminal at one or Multiple subframes keep duty prepare for setting up to be connected with described target TP.
Further, set up even with described target TP under pattern switching mode according to described time domain parameter information Connect and include: to base station send feedback information, wherein, described feedback information carries for described target TP sets up the end side information connected;Complete to hand over by described end side information and described target TP in described base station After Hu, according under described end side information and described time domain parameter information and described pattern switching mode Target TP is set up and is connected.
Further, before sending described feedback information to base station, also include: receive what described base station sent First instruction message, determines according to described first instruction message and sets up the described TP connected;Or, according to right The result that business is analyzed determines sets up described target TP connected.
Further, build with described target TP under described pattern switching mode according to described time domain parameter information Vertical connection includes: receiving the second instruction message that described base station issues, wherein, described second instruction message is used for Described terminal is indicated to set up, with described target TP, the starting point being connected.
Further, described notification message includes at least one of: the Stochastic accessing of described target TP is wireless Network Temporary Identifier and random access guiding mark, the radio resource control RRC of described target TP connects builds Vertical message, the encryption order of described target TP, the connection of described target TP reconfigures request message, institute The carrying RRC connection stating target TP reconfigures request message.
According to a further aspect in the invention, it is provided that a kind of connection establishment method, including: receive what network determined The identification information of some TP is transmitted for setting up the target under the pattern switching mode being connected with terminal;To described end End sends sets up, with described target TP, the notification message being connected, and wherein, carries and institute in described notification message Stating target TP and set up the time domain parameter information connected, described notification message is used for notifying that described terminal is according to described Time domain parameter information is set up with described target TP under described pattern switching mode and is connected.
Further, after sending, to described terminal, the notification message being connected with the foundation of described target TP, also Including: receive the feedback information of the described terminal that described terminal sends, wherein, described feedback information carries For setting up, with described target TP, the end side information being connected;According to the described end side information received and institute Stating target TP, to complete information mutual.
According to a further aspect in the invention, it is provided that a kind of connection establishment device, including: the first receiver module, The point TP that transmits with the target under pattern switching mode issued for receiving base station sets up the notification message being connected, Wherein, described notification message carries the time domain parameter information being connected with the foundation of described target TP;The company of foundation Connection module, for setting up with described target TP under described pattern switching mode according to described time domain parameter information Connect.
Further, described device also includes: the second receiver module, for receiving the prompting that described base station sends Message, wherein, described prompting message is used for pointing out described terminal to keep duty in one or more subframes Prepare for setting up to be connected with described target TP.
Further, described link block of setting up includes: transmitting element, for sending feedback information to base station, Wherein, described feedback information carries for setting up, with described target TP, the end side information being connected;Set up Connect unit, after described end side information and described target TP being completed alternately in described base station, root Build with described target TP under described pattern switching mode according to described end side information and described time domain parameter information Vertical connection.
Further, described device also includes: first determines subelement, for receiving the finger that described base station sends Show message, determine according to described instruction message and set up the described TP connected;Or, second determines subelement, Determine, according to the result that business is analyzed, described target TP that foundation connects for connecting.
Further, described link block of setting up includes: described device also includes: the 3rd receiver module, is used for Receiving the second instruction message that described base station issues, wherein, described second instruction message is used for indicating described terminal The starting point being connected is set up with described target TP.
According to a further aspect in the invention, it is provided that a kind of terminal, one of said apparatus is at least included.
According to a further aspect in the invention, it is provided that a kind of connection establishment device, including: the 4th receiver module, The target under the pattern switching mode being connected with terminal foundation determined for receiving network transmits some TP's Identification information;Sending module, sets up, with described target TP, the notification message being connected for sending to described terminal, Wherein, described notification message carries the time domain parameter information being connected of setting up with described target TP, described logical Know that message is for notifying that described terminal is according to described under described time domain parameter information and described pattern switching mode Target TP is set up and is connected.
Further, described device also includes: the 5th receiver module, for receiving the described of described terminal transmission The feedback information of terminal, wherein, carries in described feedback information and to be connected for setting up with described target TP End side information;Information interactive module, for according to the described end side information received and described target TP Complete information mutual.
According to a further aspect in the invention, it is provided that a kind of base station, one of said apparatus is at least included.
By the present invention, use and receive the notification message being connected with target transmission point TP foundation that base station issues, Wherein, described notification message carries the time domain parameter information being connected with the foundation of described target TP;According to institute State time domain parameter information to be connected with the described target TP foundation under described pattern switching mode, solve relevant skill Art can not be set up new connectivity problem in switching mode, and then reached the effect that flexible foundation newly connects.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, The schematic description and description of the present invention is used for explaining the present invention, is not intended that inappropriate limitation of the present invention. In the accompanying drawings:
Fig. 1 is the schematic diagram of super-intensive network breaker in middle mode of operation in correlation technique;
Fig. 2 is the flow chart one of connection establishment method according to embodiments of the present invention;
Fig. 3 is the flowchart 2 of connection establishment method according to embodiments of the present invention;
Fig. 4 is the block diagram one of connection establishment device according to embodiments of the present invention;
Fig. 5 is the block diagram one of connection establishment device according to the preferred embodiment of the invention;
Fig. 6 is the block diagram two of connection establishment device according to embodiments of the present invention;
Fig. 7 is the schematic diagram that user according to embodiments of the present invention carries out multi-link communication;
Fig. 8 is the flow chart setting up connection according to the user in correlation technique;
Fig. 9 is the flow chart one that user according to embodiments of the present invention accesses target transmission point;
Figure 10 is the flowchart 2 that user according to embodiments of the present invention accesses target transmission point;
Figure 11 is the flow chart one that user accesses target transmission point according to the preferred embodiment of the invention;
Figure 12 is the flowchart 2 that user accesses target transmission point according to the preferred embodiment of the invention;
Figure 13 is the flow chart 3 that user accesses target transmission point according to the preferred embodiment of the invention;
Figure 14 is the flow chart four that user accesses target transmission point according to the preferred embodiment of the invention;
Figure 15 is the flow chart five that user accesses target transmission point according to the preferred embodiment of the invention;
Figure 16 is the flow chart six that user accesses target transmission point according to the preferred embodiment of the invention;
Figure 17 is the flow chart seven that user accesses target transmission point according to the preferred embodiment of the invention;
Figure 18 is the flow chart eight that user accesses target transmission point according to the preferred embodiment of the invention;
Figure 19 is the flow chart nine that user accesses target transmission point according to the preferred embodiment of the invention;
Figure 20 is the flow chart ten that user accesses target transmission point according to the preferred embodiment of the invention;
Figure 21 is the flow chart 11 that user accesses target transmission point according to the preferred embodiment of the invention.
Detailed description of the invention
Below with reference to accompanying drawing and describe the present invention in detail in conjunction with the embodiments.It should be noted that do not rushing In the case of Tu, the embodiment in the application and the feature in embodiment can be mutually combined.
Providing a kind of connection establishment method in the present embodiment, Fig. 2 is that connection according to embodiments of the present invention is built The flow chart one of cube method, as in figure 2 it is shown, this flow process comprises the steps:
Step S202, what reception base station issued transmits what some TP foundation was connected with the target under pattern switching mode Notification message, wherein, carries in this notification message and sets up, with this target TP, the time domain parameter information being connected;
Step S204, is connected with this target TP foundation under pattern switching mode according to this time domain parameter information.
By above-mentioned steps, receive the notification message being connected with target transmission point TP foundation that base station issues, its In, this notification message carries and sets up the time domain parameter letter being connected with this target TP under pattern switching mode Breath;It is connected with this target TP foundation under pattern switching mode according to this time domain parameter information, solves relevant Technology can not be set up new connectivity problem in switching mode, and then reached the effect that flexible foundation newly connects.
It is connected in order to ensure setting up with this target TP, is setting up with this target TP according to this time domain parameter information Before connection, receiving the prompting message that this base station sends, wherein, this prompting message is used for pointing out this terminal one Individual or multiple frame keep duty to prepare for setting up to be connected with this target TP.
Set up, with this target TP under pattern switching mode, the mode being connected according to this time domain parameter information and have multiple, In an optional embodiment, to base station send feedback information, wherein, this feedback information carries for The end side information being connected is set up with this target TP;In this base station by complete with this target TP for this end side information After becoming alternately, according to this end side information and this time domain parameter information and this target under pattern switching mode TP sets up connection.
In an optional embodiment, it may be determined that establish with this target TP and be connected, establish determining After connection, send this feedback information to base station.Determine that setting up, with this target TP, the mode being connected has multiple, In an optional embodiment, receive the first instruction message that this base station sends, according to this first instruction message Determine to set up with this TP and be connected;Or, determine according to the result that business is analyzed and build with this target TP Vertical connection.
In another optional embodiment, according under described time domain parameter information and described pattern switching mode Described target TP set up connect before can also include: receive the second instruction message that described base station issues, Wherein, described second instruction message is for indicating described terminal to set up, with described target TP, the starting point being connected..
Above-mentioned notification message can also include at least one of: the random access radio network of this target TP Temporary mark and random access guiding mark, the radio resource control RRC connection establishment message of this target TP, The encryption order of this target TP, the connection of this target TP reconfigures request message, the carrying of this target TP RRC connection reconfigures request message, by special difference interior in notification message, determines that setting up TP connection holds The step of row.
The embodiment of the present invention additionally provides a kind of connection establishment method, and Fig. 3 is connection according to embodiments of the present invention The flowchart 2 of method for building up, as it is shown on figure 3, this flow process comprises the steps:
Step S302, receives the target under the pattern switching mode being connected with terminal foundation that network determines Transmit the identification information of some TP;
Step S304, sends to this terminal and sets up the notification message being connected, wherein, this notice with this target TP Carrying in message and set up, with this target TP, the time domain parameter information being connected, this notification message is used for notifying this end Hold and be connected with this target TP foundation under this pattern switching mode according to this time domain parameter information.
By above-mentioned steps, receive the mark for setting up the target transmission point TP being connected with terminal that network determines Knowledge information;Send to this terminal and set up, with this target TP, the notification message being connected, wherein, in this notification message Carry and set up, with this target TP, the time domain parameter information that is connected, this notification message be used for notifying this terminal according to This time domain parameter information is set up with this target TP under pattern switching mode and is connected, and solves in correlation technique not New connectivity problem can be set up in switching mode, and then reached the effect that flexible foundation newly connects.
After sending, to this terminal, the notification message being connected with the foundation of this target TP, receive what this terminal sent The feedback information of this terminal, wherein, carries in this feedback information for setting up, with this target TP, the end being connected Side information;Information is completed mutual according to this end side information received and this target TP.
Embodiments providing a kind of connection establishment device, this device is used for realizing above-described embodiment and preferably Embodiment, had carried out repeating no more of explanation.As used below, term " module " can be real The software of existing predetermined function and/or the combination of hardware.Although the device described by following example is preferably with soft Part realizes, but hardware, or the realization of the combination of software and hardware also may and be contemplated.
Fig. 4 is the block diagram one of connection establishment device according to embodiments of the present invention, as shown in Figure 4, and including: the One receiver module 42 and set up link block 44, is briefly described modules below.
First receiver module 42, that base station issues transmits a some TP with target under pattern switching mode for receiving Set up the notification message connected, wherein, this notification message carries and sets up, with this target TP, the time domain being connected Parameter information;
Set up link block 44, for according to this time domain parameter information and this target TP under pattern switching mode Set up and connect.
Fig. 5 is the block diagram one of connection establishment device according to the preferred embodiment of the invention, as it is shown in figure 5, this dress Put and also include:
Second receiver module 52, for receiving the prompting message that this base station sends, wherein, this prompting message is used Duty is kept to prepare for setting up to be connected with this target TP in one or more subframes in pointing out this terminal.
In an optional embodiment, above-mentioned link block of setting up may include that transmitting element, for Base station sends feedback information, wherein, carries for setting up, with this target TP, the end being connected in this feedback information Side information;Set up and connect unit, for this end side information and this target TP being completed alternately in this base station Afterwards, it is connected with the foundation of this target TP according to this end side information and this time domain parameter information.
In an optional embodiment, this device also includes: first determines subelement, is used for receiving this base station The instruction message sent, determines according to this instruction message and sets up this TP connected;Or, second determines that son is single Unit, determines, according to the result being analyzed business, this target TP that foundation connects for connecting.
Above-mentioned device also includes: the 3rd receiver module, for receiving the second instruction message that described base station issues, Wherein, described second instruction message is for indicating described terminal to set up, with described target TP, the starting point being connected.
The embodiment of the present invention additionally provides a kind of terminal, at least includes one of said apparatus.
The embodiment of the present invention additionally provides a kind of connection establishment device, and Fig. 6 is connection according to embodiments of the present invention Set up the block diagram two of device, as shown in Figure 6, including: the 4th receiver module 62 and sending module 64, below Modules is carried out brief description.
4th receiver module 62, for receive that network determines for setting up the target transmission point being connected with terminal The identification information of TP;
Sending module 64, for be connected with this target TP foundation under pattern switching mode to the transmission of this terminal Notification message, wherein, carries in this notification message and sets up, with this target TP, the time domain parameter information being connected, This notification message is for notifying that this terminal is according to this time domain parameter information and this target TP under pattern switching mode Set up and connect.
In an optional embodiment, this device also includes: the 5th receiver module, is used for receiving this terminal and sends out The feedback information of this terminal sent, wherein, carries in this feedback information for being connected with the foundation of this target TP End side information;Information interactive module, for complete with this target TP according to this end side information received One-tenth information is mutual.
The embodiment of the present invention additionally provides a kind of base station, at least includes one of said apparatus.
Below in conjunction with alternative embodiment, the embodiment of the present invention is further described.
Fig. 7 is the schematic diagram that user according to embodiments of the present invention carries out multi-link communication, though as it is shown in fig. 7, So pattern switching mode can effectively carry out interference coordination in the case of return link is nonideal, but also one Determine to limit in degree the peak rate of user.This is because each community is in pass in a part of subframe section Closed state, user cannot utilize this part subframe to carry out data transmission.In order to overcome this shortcoming, can use Multi-link data transfer scheme, i.e. user are simultaneously and adjacent multiple cell base stations set up multiple connection, not The same switch unit interval uses different connections to carry out data transmission.In figure user A simultaneously and base station 2,3, 4 establish multiple connection.Owing to base station 2,3,4 is different at same time period on off state, user A is permissible Different connections is utilized to carry out data transmission at different time.So, this user can enter in all subframes Row data are transmitted, and substantially increase the peak rate of single user transmission.Further, make due to each community of UDN Be the channel of identical frequency, the communication mode of this multi-link time-division has only to just use a set of wireless device It is achieved that do not increase the cost of user terminal.
Fig. 8 is the flow chart setting up connection according to the user in correlation technique, as shown in Figure 8, in tradition In LTE/LTE-A system, user sets up connection and comprises the following steps:
Step (1), random access guiding;
Step (2), accidental access response;
Step (3), RRC connection request;
Step S804, RRC connection establishment;
Step (5), RRC connection establishment completes;
Step (6), initial user information request;
Step (7), initial context sets up request;
Step (8), encryption order;
Step (9), RRC connects and heavily joins request;
Step (10), encryption completes;
Step S811, RRC connects and has heavily joined;
Step (12), initial context sets up response;
Step (13), request is set up in carrying;
Step (14), carrying-RRC connects and heavily joins request;
Step (15), carrying-RRC connects and has heavily joined;
Step (16), carrying foundation completes.
This alternative embodiment is for how under pattern switching mode, the multi-link method for building up of proposition, with Based on above-mentioned steps, under pattern switching mode, provide a kind of multi-link method for building up, it is achieved pattern switchs Multi-link communication under pattern, promotes user's peak rate.To this end, provide under a kind of pattern switching mode New establishment of connection method, the method can make full use of and connect to come and other one or more transmission points (TP) one or more new connection is set up.For simplified description, it is assumed that user passes a community System method and base station establish one or more connection.Fig. 9 is that user according to embodiments of the present invention accesses Target transmits the flow chart one of point, as it is shown in figure 9, include herein below:
Step S902, user and network carry out the mutual of business information, and network equipment carries out new TP connection and builds After vertical judgement selects with target TP, notice has connected the new connection establishment in base station and has determined and target TP mark, user Based on business demand after the network equipment new service request of transmission or business are more newly requested, network equipment enters The analysis that row is certain, it may be judged whether need to set up new connection for this user and other transmission points.If it is required, New TP is connected decision by network equipment and selected target transmits point identification notice and connected base station;
S904, new TP connection establishment relevant information is mutual;
S906, new TP connection establishment notifies, after base station receives this information, and after target TP interactive information, Transmission " new TP connection establishment notice " message, to user, notifies that it keeps work in certain or multiple subframe State, and indicate carry out new connection establishment;
S908, new TP connection establishment confirms, user sends " confirmation of new TP connection establishment " message, confirms User side needed for being properly received of " new TP connection establishment notice " message, and the new connection of reporting base stations foundation Information, including the information that can comprise in the various access signaling message that user in tradition access way sends;
S910, new TP connection establishment relevant information is mutual, and base station and target transmit some TP and believe the most alternately Breath, transmits and confirms the parameters newly connected;
S912, user and target transmit point and carry out new TP connection establishment, and user is by " new TP connection establishment is led to Know " instruction in message carries out next step new connection establishment process.
It should be noted that " new TP connection establishment notice " message and " confirmation of new TP connection establishment " message In information can also be with wireless heterogeneous networks (RRC) the message transmission existed in LTE, such as RRC Connect reconfiguration message and RRC connection reconfigures completion message." new TP connection establishment notice " message is permissible The user's which step from the step shown in tradition connection establishment procedure chart 8 is indicated to open with " beginning step number " Begin directly to interact with target TP.In order to make user be smoothed out new establishment of connection, base station needs in advance Interact with target TP, it is provided that set up the information needed for new connection, and it is new to obtain foundation at target TP Relevant parameter needed for connection, then by " new TP connection establishment notice " message informing user.
User can wherein comprise and transmit point to send new TP connection request after Direct Analysis business demand with other Setting up instruction and the relevant information of the request of new connection, user is directly according to business demand or local measurements Carry out new TP and connect judgement and the selection of target TP.Figure 10 is that user according to embodiments of the present invention accesses target Transmit the flowchart 2 of point, as shown in Figure 10, comprise the following steps:
Step S1002, user determines that the judgement of new TP connection establishment and target TP select, user's Direct Analysis Send new TP connection request after business demand, wherein comprise and transmit a request setting up new connection with other Instruction and relevant information;
Step S1004, user thinks that the base station connected sends new TP connection request;
Step S1006-S1014 is identical with step S904-S912, does not repeats them here.
" new TP connection establishment notice " message can comprise user and send the initial random access lead of new connection The position of Radio Resource.This position can be in ON or the OFF subframe of current base station, but must be at mesh In the ON subframe of mark TP.Optionally, the instruction information of this position includes sub-frame offset and frequency shift (FS), point Do not indicate time domain and the frequency offset of the current location of this position and transmission " new TP connection establishment notice " message Amount.Hereafter, user traditionally continues new establishment of connection process from the step (1) shown in Fig. 8.
Set up by the connection establishment process of tradition LTE/LTE-A after carrying out the new pre-interaction of TP connection establishment New connection, then carries out the communication that multiple spot is multi-link.Here, " new TP connection establishment notice " message can To comprise the position that user sends the Radio Resource of the new initial random access lead connected.This position can worked as In ON or the OFF subframe of front base station, but must be in the ON subframe of target TP.Optionally, this position Instruction information include sub-frame offset and frequency shift (FS), indicate respectively this position and send " new TP connection establishment Notice " time domain of current location of message and frequency offset amount.Hereafter, user is traditionally from shown in Fig. 8 Step (1) continue new establishment of connection process.Optionally, network is that whole UDN region specifies one Public is initially accessed channel, and this information is notified this user by unicast or broadcast mode by base station.This method Require that all TP in UDN must be ON state in this public channel place subframe that is initially accessed, figure 11 is the flow chart one that user accesses target transmission point according to the preferred embodiment of the invention, as shown in figure 11, Comprise the following steps:
S1102, the new pre-interaction of TP connection establishment;
Step (1)-step (16) is identical with Fig. 8, does not repeats them here.
S1104, user and base station and target transmit point and carry out the multi-link data communication of multiple spot.
" new TP connection establishment notice " message can comprise the relevant of the accidental access response that user needs to monitor Information, including random access radio network temporary mark (RA-RNTI) and the random access guiding of target TP Mark (RAPID).From the connection of tradition LTE/LTE-A after carrying out the new pre-interaction of TP connection establishment Setting up process, user traditionally continues new establishment of connection process from the step (2) shown in Fig. 8, figure 12 is the flowchart 2 that user accesses target transmission point according to the preferred embodiment of the invention, as shown in figure 12, Comprise the following steps:
S1202, the new pre-interaction of TP connection establishment;
Step (2)-step (16) is identical with Fig. 8, does not repeats them here.
S1204, user and base station and target transmit point and carry out the multi-link data communication of multiple spot.
" new TP connection establishment notice " message comprises from the phase in " accidental access response " of target TP Pass information, from the connection establishment process of tradition LTE/LTE-A after carrying out the new pre-interaction of TP connection establishment, User traditionally continues new establishment of connection process from the step (3) shown in Fig. 8, and Figure 13 is according to this The user of invention preferred embodiment accesses target and transmits the flow chart 3 of point, as shown in figure 13, including following step Rapid:
S1302, the new pre-interaction of TP connection establishment;
Step (3)-step (16) is identical with Fig. 8, does not repeats them here.
S1304, user and base station and target transmit point and carry out the multi-link data communication of multiple spot.
" new TP connection establishment notice " message comprises and is properly received " RRC connection establishment " from target TP Relevant information needed for message, from tradition LTE/LTE-A's after carrying out the new pre-interaction of TP connection establishment Connection establishment process, user traditionally continues new establishment of connection process from the step (4) shown in Fig. 8, Figure 14 is the flow chart four that user accesses target transmission point according to the preferred embodiment of the invention, as shown in figure 14, Comprise the following steps:
S1402, the new pre-interaction of TP connection establishment;
Step (4)-step (16) is identical with Fig. 8, does not repeats them here.
S1404, user and base station and target transmit point and carry out the multi-link data communication of multiple spot.
" new TP connection establishment notice " message comprises in " RRC connection establishment " message of target TP Relevant information, after carrying out the new pre-interaction of TP connection establishment from tradition LTE/LTE-A connection establishment Process, user traditionally continues new establishment of connection process, Figure 15 from the step (5) shown in Fig. 8 It is the flow chart five that user accesses target transmission point according to the preferred embodiment of the invention, as shown in figure 15, bag Include following steps:
S1502, the new pre-interaction of TP connection establishment;
Step (5)-step (16) is identical with Fig. 8, does not repeats them here.
S1504, user and base station and target transmit point and carry out the multi-link data communication of multiple spot.
" new TP connection establishment notice " message comprises " the encryption order " being properly received from target TP and disappears Relevant information needed for breath, from the company of tradition LTE/LTE-A after carrying out the new pre-interaction of TP connection establishment Connecing the process of foundation, user traditionally continues new establishment of connection process from the step (8) shown in Fig. 8, Figure 16 is the flow chart six that user accesses target transmission point according to the preferred embodiment of the invention, as shown in figure 16, Comprise the following steps:
S1602, the new pre-interaction of TP connection establishment;
Step (8)-step (16) is identical with Fig. 8, does not repeats them here.
S1604, user and base station and target transmit point and carry out the multi-link data communication of multiple spot.
" new TP connection establishment notice " message comprise be properly received from target TP " RRC connect heavily join Relevant information needed for request information, from tradition after carrying out the new pre-interaction of TP connection establishment The connection establishment process of LTE/LTE-A, user traditionally continues newly to connect from the step (9) shown in Fig. 8 The process of setting up connect, Figure 17 is the flow chart that user accesses target transmission point according to the preferred embodiment of the invention Seven, as shown in figure 17, comprise the following steps:
S1702, the new pre-interaction of TP connection establishment;
Step (9)-step (16) is identical with Fig. 8, does not repeats them here.
S1704, user and base station and target transmit point and carry out the multi-link data communication of multiple spot.
" RRC connects and heavily joins request " that " new TP connection establishment notice " message comprises from target TP disappears Relevant information in breath, from the connection of tradition LTE/LTE-A after carrying out the new pre-interaction of TP connection establishment Setting up process, user traditionally continues new establishment of connection process from the step (10) shown in Fig. 8, figure 18 is the flow chart eight that user accesses target transmission point according to the preferred embodiment of the invention, as shown in figure 18, Comprise the following steps:
S1802, the new pre-interaction of TP connection establishment;
Step (10)-step (16) is identical with Fig. 8, does not repeats them here.
S1804, user and base station and target transmit point and carry out the multi-link data communication of multiple spot.
" new TP connection establishment notice " message comprise be properly received from target TP " carrying-RRC connect Heavily join the relevant information needed for request information, from tradition after carrying out the new pre-interaction of TP connection establishment The connection establishment process of LTE/LTE-A, user traditionally continues newly to connect from the step (14) shown in Fig. 8 The process of setting up connect, Figure 19 is the flow chart that user accesses target transmission point according to the preferred embodiment of the invention Nine, as shown in figure 19, comprise the following steps:
S1902, the new pre-interaction of TP connection establishment;
Step (14)-step (16) is identical with Fig. 8, does not repeats them here.
S1904, user and base station and target transmit point and carry out the multi-link data communication of multiple spot.
" new TP connection establishment notice " message comprise from target TP " carrying-RRC connect heavily join please Ask " relevant information in message, from tradition LTE/LTE-A after carrying out the new pre-interaction of TP connection establishment Connection establishment process, user traditionally continues new establishment of connection mistake from the step (15) shown in Fig. 8 Journey, Figure 20 is the flow chart ten that user accesses target transmission point according to the preferred embodiment of the invention, such as Figure 20 Shown in, comprise the following steps:
S2002, the new pre-interaction of TP connection establishment;
Step (15)-step (16) is identical with Fig. 8, does not repeats them here.
S2004, user and base station and target transmit point and carry out the multi-link data communication of multiple spot.
After carrying out the new pre-interaction of TP connection establishment, and the connection of traditional LTE/LTE-A of target TP It has been established that the communication that multiple spot is multi-link can directly be carried out." new TP connection establishment notice " message comprises " new TP connection establishment complete instruction " and newly connect the various parameters used, user directly utilizes to be correlated with and believes Breath carries out data transmission, and Figure 21 is the flow process that user accesses target transmission point according to the preferred embodiment of the invention Figure 11, as shown in figure 21, comprises the following steps:
S2102, the new pre-interaction of TP connection establishment;
S2104, user and base station and target transmit point and carry out the multi-link data communication of multiple spot.
User may be inserted into after the new pre-interaction of TP connection establishment completes a user and target TP with Machine access procedure with realize smoothly itself and target TP follow-up alternately.
By this alternative embodiment, it is possible to be smoothed out new establishment of connection in switching mode.By " new TP connection establishment notifies " message, base station can notify that user keeps work shape in certain or multiple OFF subframe State rather than close transceiver by previous mode, thus ensure that its mutual with target TP.Secondly, The present invention, by indicating new connection establishment method, enables communication system to carry out new establishment of connection flexibly, fills Divide and utilize base station side information and existing user to connect, reduce the delay of new connection establishment.
Obviously, those skilled in the art should be understood that each module of the above-mentioned present invention or each step can be used General calculating device realizes, and they can concentrate on single calculating device, or is distributed in multiple meter Calculating on the network that device is formed, alternatively, they can realize with calculating the executable program code of device, Perform it is thus possible to be stored in storing in device by calculating device, and in some cases, can With be different from order herein perform shown or described by step, or they are fabricated to respectively each collection Become circuit module, or the multiple modules in them or step are fabricated to single integrated circuit module realize. So, the present invention is not restricted to the combination of any specific hardware and software.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for this area Technical staff for, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, Any modification, equivalent substitution and improvement etc. made, should be included within the scope of the present invention.

Claims (17)

1. a connection establishment method, it is characterised in that including:
The notice being connected with the target transmission point TP foundation under pattern switching mode that reception base station issues disappears Breath, wherein, carries in described notification message and sets up, with described target TP, the time domain parameter information being connected;
It is connected with the described target TP foundation under described pattern switching mode according to described time domain parameter information.
Method the most according to claim 1, it is characterised in that according to described time domain parameter information with described Described target TP under pattern switching mode is set up before connecting, and also includes:
Receiving the prompting message that described base station sends, wherein, described prompting message is used for prompt terminal one Individual or multiple subframe keep duty to prepare for setting up to be connected with described target TP.
Method the most according to claim 1, it is characterised in that according to described time domain parameter information and described figure Described target TP under sample switching mode is set up connection and is included:
To base station send feedback information, wherein, described feedback information carries for described target TP sets up the end side information connected;
After described end side information and described target TP are completed alternately by described base station, according to described End side information and described time domain parameter information are set up with described target TP under described pattern switching mode Connect.
Method the most according to claim 3, it is characterised in that before sending described feedback information to base station, Also include:
Receive the first instruction message that described base station sends, determine that foundation is even according to described first instruction message Described target TP connect;Or,
Determine according to the result that business is analyzed and set up described target TP connected.
Method the most according to claim 1, it is characterised in that according to described time domain parameter information with described Described target TP under pattern switching mode is set up before connecting, and also includes:
Receiving the second instruction message that described base station issues, wherein, described second instruction message is used for indicating Terminal sets up, with described target TP, the starting point being connected.
Method the most according to claim 5, it is characterised in that described notification message includes at least one of:
The random access radio network temporary mark of described target TP and random access guiding mark, described The radio resource control RRC connection establishment message of target TP, the encryption order of described target TP, described The connection of target TP reconfigures request message, and the carrying RRC of described target TP connects to reconfigure to be asked Seek message.
7. a connection establishment method, it is characterised in that including:
Receive the target transmission point under the pattern switching mode being connected with terminal foundation that network determines The identification information of TP;
Send to described terminal and set up the notification message being connected, wherein, described notice with described target TP Carrying in message and set up, with described target TP, the time domain parameter information being connected, described notification message is used for Notify that described terminal is according to described time domain parameter information and described target TP under described pattern switching mode Set up and connect.
Method the most according to claim 7, it is characterised in that sending and described target to described terminal After TP sets up the notification message connected, also include:
Receive the feedback information of the described terminal that described terminal sends, wherein, described feedback information carries Have for setting up, with described target TP, the end side information being connected;
Information is completed mutual according to the described end side information received and described target TP.
9. a connection establishment device, it is characterised in that including:
First receiver module, that base station issues transmits point with target under pattern switching mode for receiving TP sets up the notification message connected, and wherein, carries and set up with described target TP in described notification message The time domain parameter information connected;
Set up link block, for according to described time domain parameter information and the institute under described pattern switching mode State target TP and set up connection.
Device the most according to claim 9, it is characterised in that described device also includes:
Second receiver module, for receiving the prompting message that described base station sends, wherein, described prompting disappears Breath keeps duty to be to set up even with described target TP for prompt terminal in one or more subframes Connect and prepare.
11. devices according to claim 10, it is characterised in that described link block of setting up includes:
Transmitting element, for sending feedback information to base station, wherein, carries use in described feedback information In setting up, with described target TP, the end side information being connected;
Set up and connect unit, for described end side information being completed with described target TP in described base station After Jiao Hu, according under described end side information and described time domain parameter information and described pattern switching mode Described target TP set up connect.
12. devices according to claim 11, it is characterised in that described device also includes:
First determines subelement, for receiving the first instruction message that described base station sends, according to described the One instruction message determines sets up the described TP connected;Or,
Second determines subelement, determines what foundation connected for connecting according to the result being analyzed business Described target TP.
13. devices according to claim 9, it is characterised in that described device also includes:
3rd receiver module, for receiving the second instruction message that described base station issues, wherein, described the Two instruction message are for indicating terminal to set up, with described target TP, the starting point being connected.
14. 1 kinds of terminals, it is characterised in that include device described at least one of claim 9 to 13.
15. 1 kinds of connection establishment devices, it is characterised in that including:
4th receiver module, for receive that network determines for setting up the target transmission point being connected with terminal The identification information of TP;
Sending module, sets up, with described target TP, the notification message being connected for sending to described terminal, Wherein, described notification message carries and sets up the time domain parameter information being connected, institute with described target TP State notification message for notifying that described terminal is according under described time domain parameter information and pattern switching mode Described target TP is set up and is connected.
16. devices according to claim 15, it is characterised in that described device also includes:
5th receiver module, for receiving the feedback information of the described terminal that described terminal sends, wherein, Described feedback information carries for setting up, with described target TP, the end side information being connected;
Information interactive module, for completing with described target TP according to the described end side information received Information is mutual.
17. 1 kinds of base stations, it is characterised in that include the device described in claim 15 or 16.
CN201510036819.8A 2015-01-23 2015-01-23 Connection establishing method and device Withdrawn CN105873236A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201510036819.8A CN105873236A (en) 2015-01-23 2015-01-23 Connection establishing method and device
PCT/CN2015/083909 WO2016115847A1 (en) 2015-01-23 2015-07-13 Connection establishment method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510036819.8A CN105873236A (en) 2015-01-23 2015-01-23 Connection establishing method and device

Publications (1)

Publication Number Publication Date
CN105873236A true CN105873236A (en) 2016-08-17

Family

ID=56416355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510036819.8A Withdrawn CN105873236A (en) 2015-01-23 2015-01-23 Connection establishing method and device

Country Status (2)

Country Link
CN (1) CN105873236A (en)
WO (1) WO2016115847A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106453164A (en) * 2016-11-15 2017-02-22 电子科技大学 Method for reducing returned data volume in ultra dense network

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102355292A (en) * 2011-08-05 2012-02-15 中兴通讯股份有限公司 Method and apparatus for parameter transmission, and method and apparatus for parameter generation
CN102792717A (en) * 2010-01-11 2012-11-21 捷讯研究有限公司 Control channel interference management for heterogeneous network
CN103959839A (en) * 2011-08-12 2014-07-30 黑莓有限公司 Methods of channel state information feedback and transmission in coordinated multi-point wireless communications system
CN104105097A (en) * 2014-07-30 2014-10-15 宇龙计算机通信科技(深圳)有限公司 Frequency allocation method, frequency allocation device and base station
CN104253838A (en) * 2013-06-27 2014-12-31 北京世纪互联宽带数据中心有限公司 CDN (content delivery network) node and CDN service system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130142291A1 (en) * 2011-12-05 2013-06-06 Esmael Hejazi Dinan Synchronization Signals Detection
CN103973399B (en) * 2013-01-31 2018-11-16 中兴通讯股份有限公司 A kind of method generating carrier configuration information and network side equipment and user equipment
CN104301979B (en) * 2013-07-19 2018-05-01 华为技术有限公司 A kind of method for controlling uplink transmission power of UE, device, UE and base station

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102792717A (en) * 2010-01-11 2012-11-21 捷讯研究有限公司 Control channel interference management for heterogeneous network
CN102355292A (en) * 2011-08-05 2012-02-15 中兴通讯股份有限公司 Method and apparatus for parameter transmission, and method and apparatus for parameter generation
CN103959839A (en) * 2011-08-12 2014-07-30 黑莓有限公司 Methods of channel state information feedback and transmission in coordinated multi-point wireless communications system
CN104253838A (en) * 2013-06-27 2014-12-31 北京世纪互联宽带数据中心有限公司 CDN (content delivery network) node and CDN service system
CN104105097A (en) * 2014-07-30 2014-10-15 宇龙计算机通信科技(深圳)有限公司 Frequency allocation method, frequency allocation device and base station

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106453164A (en) * 2016-11-15 2017-02-22 电子科技大学 Method for reducing returned data volume in ultra dense network

Also Published As

Publication number Publication date
WO2016115847A1 (en) 2016-07-28

Similar Documents

Publication Publication Date Title
CN104581854B (en) A kind of wireless connection method and device
CN104581810B (en) A kind of switching method based on carrier wave polymerization polymerize switching method and apparatus between plate
CN108141299A (en) The method and apparatus obtained for the system information in wireless communication system
CN109548144A (en) A kind of transmission method and device of paging information
CN107493608A (en) A kind of method and apparatus for carrying out Stochastic accessing
CN108141749A (en) For the method and apparatus of initial access in a wireless communication system
CN105451251B (en) A kind of DRS configuration method, measurement method and the relevant device of unlicensed spectrum
CN106470382A (en) Authority checking method, configuration information method of reseptance, device, base station and terminal
CN102271358B (en) Alien frequencies isosystem measurement dispatching method, device and terminal under LTE connection mode
CN108966318A (en) Communication device and network selection method
CN109392044A (en) The method and apparatus of cell switching
CN103476105B (en) Space connector synchronization method
CN104969619B (en) Backhaul link establishment method, base station, relay node and system
CN103716873A (en) Synchronization in a communication system
CN109314896A (en) Cell switching method, device and readable storage medium storing program for executing
CN101998486B (en) Measurement interval configuration method and device
CN108616933A (en) Communication processing method and device under a kind of central location-distributed unit framework
CN105451271A (en) Resource management method and device
CN106664699A (en) Method for operating terminal in wireless communication system, and terminal using said method
CN107710840A (en) For conveyer to device(D2D)The method and apparatus of synchronizing signal
CN104126324B (en) Wireless access point control method and relevant device, system
CN103546919B (en) The report method and device of measurement report
CN103907393B (en) A kind of method, apparatus and system for establishing wireless link
CN102271407B (en) Method for dispatching terminal
CN107371176B (en) A kind of cell operation method and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20160817