CN105866836B - Mine three-dimensional earthquake whole process geological prospecting Forecasting Methodology - Google Patents

Mine three-dimensional earthquake whole process geological prospecting Forecasting Methodology Download PDF

Info

Publication number
CN105866836B
CN105866836B CN201610191231.4A CN201610191231A CN105866836B CN 105866836 B CN105866836 B CN 105866836B CN 201610191231 A CN201610191231 A CN 201610191231A CN 105866836 B CN105866836 B CN 105866836B
Authority
CN
China
Prior art keywords
geological
seismic exploration
mine
whole process
coal seam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610191231.4A
Other languages
Chinese (zh)
Other versions
CN105866836A (en
Inventor
刘建功
李玉宝
武延辉
宋佳
王鹏
王国举
马文涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Coal Science Research Institute Co.,Ltd.
Original Assignee
Hebei Coal Science Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Coal Science Research Institute filed Critical Hebei Coal Science Research Institute
Priority to CN201610191231.4A priority Critical patent/CN105866836B/en
Publication of CN105866836A publication Critical patent/CN105866836A/en
Application granted granted Critical
Publication of CN105866836B publication Critical patent/CN105866836B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • G01V1/28Processing seismic data, e.g. analysis, for interpretation, for correction
    • G01V1/30Analysis

Abstract

The invention discloses a kind of mine three-dimensional earthquake whole process geological prospecting Forecasting Methodology, it is related to subterranean coal exploration engineering field.Described method includes following steps:Hidden geological tectonic whether there is using 3-d seismic exploration method delineation minable coal seam position;Disclosed using actual tunnel and results of drilling is constraints, real-time verification and assay are carried out to the result of 3-d seismic exploration;Minable coal seam geological information after verification and analysis is dissolved into 3-d seismic exploration result, with iterative feedback method, the exploration area result for not meeting detection accuracy requirement is explained and reapplied by being reprocessed, again, constraints constantly changes, and ultimately forms colliery 3-D seismics whole process geological analysis achievement.The method can effectively improve 3-D seismics processing and the precision explained, can to greatest extent predict, find out geological structure situation in digging coverage, not only facilitate tunnel arrangement of mining area, but also scientificlly and effectively can avoid and reduce industrial accident.

Description

Mine three-dimensional earthquake whole process geological prospecting Forecasting Methodology
Technical field
The present invention relates to subterranean coal exploration engineering field, more particularly to a kind of mine three-dimensional earthquake whole process geological prospecting are pre- Survey method.
Background technology
Colliery 3-D seismics are to comprehensively utilize exploration engineering that is multidisciplinary and growing up, and 3-D seismics are as on a kind of well Exploration engineering, can verify before shaft building and in advance mine geological structure before tunnelling, accurately describe tomography and karst collapse col umn Distribution, provides geologic basis for mine planning, Mining block design and roadway layout, optimizes integral layout, improve production and imitates Rate.Tunnelling is carried out in the case where detection of geological conditions is unknown, easily produces security incident, it is serious also to cause personnel Injures and deaths, bring huge economic loss, can effectively grasp architectonic characteristic using 3-D seismics technology, and take arrange in advance Apply, farthest can avoid and reduce various drivings and exploitation accident, ensure safety in production.With various Processing and Interpretation Technologies It is continuous progressive, 3-D seismics technology to mine hidden geological tectonic detect accuracy and precision is higher and higher, at present into One of important technical in being described for mine shaft geology.
The submission of existing colliery 3-D seismics processing interpretation results report is all disposable, but with colliery exploitation and The driving in tunnel, almost all of earthquake prediction data can be verified, but seldom by the real data of exposure and original three Dimension seismic interpretation achievement is fed back, this results in 3-D seismics processing and explains that precision is difficult to effectively improve, and seriously restricts The development of 3-D seismics technology, makes it be difficult to meet that coal industry field melts the needs of of adopting.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of mine three-dimensional earthquake whole process geological prospecting Forecasting Methodology, institute The method of stating can effectively improve 3-D seismics processing and the precision explained, can to greatest extent predict, find out that digging influences model Interior geological structure situation is enclosed, had not only facilitated tunnel arrangement of mining area, but also scientificlly and effectively can avoid and reduce industrial accident.
In order to solve the above technical problems, the technical solution used in the present invention is:A kind of mine three-dimensional earthquake whole process geology Prospecting prediction method, it is characterised in that described method includes following steps:
1)The preservation situation of Mine area geologic structure is described using 3-d seismic exploration method, whether delineation minable coal seam position deposits In hidden geological tectonic, and determine its specific location and scope;
2)Disclosed using actual tunnel and results of drilling is constraints, wherein probing carries out vertical wire constraint, tunnel Disclose and carry out horizontal wire constraint, real-time verification and assay are carried out to the result of 3-d seismic exploration;
3)Minable coal seam geological information after verification and analysis is dissolved into 3-d seismic exploration result, it is anti-with iteration Feedback method, the exploration area result for not meeting detection precision requirement is reprocessed by 3-d seismic exploration method, is solved again Release and reapply, with the continuous change of digging, coal seam discloses more and more, and constraints constantly changes, to 3-D seismics Data geology dynamic interpretation prediction whole-process control, ultimately forms colliery 3-D seismics whole process geological analysis achievement.
Further technical solution is, the step 1)In:When minable coal seam area carries out 3-d seismic exploration, using fried Medicine focus is excited, and receiving station receives detector data, and wherein wave detector arrangement interval is track pitch 10m, shot point spacing 10m, Line-spacing 40m, sample rate 0.5ms, record length 2s, finally forms the CDP face elements of 5m*5m, investigation depth, which reaches, to be surveyed in underground Construction below the domain of exploratory area within 1500m, it is deep-controlled in the following 100m of ash difficult to understand.
It is using beneficial effect caused by above-mentioned technical proposal:The method is pre- by a conventional static three-dimensional earthquake Survey expands to multiple dynamical feedback prediction and evaluation, and detection method also in traditional 3-D seismics basic data, adds probing Data are disclosed with digging, from indirect detection to direct detection, establish iterative feedback mechanism, effectively increase 3-D seismics prediction essence Accuracy.
Since this method fully takes into account the verification situation of digging and live exposure data to earthquake prediction, and carry out continuous Iterative feedback processing, explain, predict and verify again, on the basis of the technology of conventional three-dimensional earthquake, establishes drilling and digging discloses For the iterative feedback mechanism of checking information, the 3-D seismics whole process geology dynamic realized truly is explored, can be maximum Limit finds out mine development end, the geological structure preservation situation in the range of back production destroying infection, improves prospecting prediction precision, for optimization Mine design provides foundation, more can effectively avoid the accidents such as roof fall, gushing water from occurring, and ensures the security of the lives and property of people.
The precision of 3-D seismic interpretation achievement is fundamentally improved, is carried for mine planning, Mining block design and roadway layout For geologic basis, optimize integral layout, improve production efficiency, farthest avoid and reduce various drivings and exploitation accident, Production safety is ensured.
Brief description of the drawings
Fig. 1 is the flow chart of the method for the invention;
Fig. 2 is 3-d seismic exploration schematic diagram in the present invention;
Wherein:1st, receiving station 2, wave detector 3, shot point 4, seismic reflection circuit.
Embodiment
With reference to the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Ground describes, it is clear that described embodiment is only the part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work Embodiment, belongs to the scope of protection of the invention.
Many details are elaborated in the following description to facilitate a thorough understanding of the present invention, still the present invention can be with Implemented using other different from other manner described here, those skilled in the art can be without prejudice to intension of the present invention In the case of do similar popularization, therefore the present invention is from the limitation of following public specific embodiment.
As shown in Figure 1, the invention discloses a kind of mine three-dimensional earthquake whole process geological prospecting Forecasting Methodology, the method bag Include following steps:
1)Hidden geological tectonic whether there is using 3-d seismic exploration method delineation minable coal seam position, and determine that its is specific Position and scope;
Specifically, as shown in Fig. 2, when minable coal seam area carries out 3-d seismic exploration, excited, connect using dynamite source Receive station 1 and receive 2 data of wave detector, wherein 2 arrangement interval of wave detector is track pitch 10m, shot point 3 spacing 10m, line-spacing 40m, sample rate 0.5ms, record length 2s, finally form the CDP of 5m*5m in underground(Depth collection point altogether)Face element, investigation depth, which reaches, to be surveyed Construction below the domain of exploratory area within 1500m, it is deep-controlled in the following 100m of ash difficult to understand, by D seismic modeling, solve Release, inverting integrated technique is to being predicted coal seam and geological structure preservation situation.
2)Disclosed using actual tunnel and results of drilling is constraints, wherein probing carries out vertical wire constraint, tunnel Disclose and carry out horizontal wire constraint, real-time verification and assay are carried out to the result of 3-d seismic exploration;
3)Minable coal seam geological information after verification and analysis is dissolved into 3-d seismic exploration result, it is anti-with iteration Feedback method, the exploration area result for not meeting detection precision requirement is reprocessed by 3-d seismic exploration method, is solved again Release and reapply, constraints constantly changes, and to 3D seismic data geology dynamic interpretation prediction whole-process control, ultimately forms coal Ore deposit 3-D seismics whole process geological analysis achievement.
A conventional static three-dimensional earthquake prediction is expanded to multiple dynamical feedback prediction and evaluation, detection method by the method Also in traditional 3-D seismics technical foundation data, add probing and digging discloses data, from indirect detection to directly spy Survey, establish iterative feedback mechanism, effectively increase 3-D seismics prediction precision.,
Since this method fully takes into account the verification situation of digging and live exposure data to earthquake prediction, and carry out continuous Iterative feedback processing, explain, predict and verify again, in the basic data of the technology of conventional three-dimensional earthquake, establishes drilling and digging The iterative feedback mechanism for checking information is disclosed, wherein probing carries out vertical wire constraint, tunnel, which discloses, carries out horizontal wire about Beam, constraints constantly change, and realize 3-D seismics whole process geology dynamic exploration control truly, being capable of maximum limit Degree finds out mine development end, the geological structure preservation situation in the range of back production destroying infection, improves prospecting prediction precision, to optimize ore deposit Well design provides foundation, more can effectively avoid the accidents such as roof fall, gushing water from occurring, and ensures the security of the lives and property of people.
The precision of 3-D seismics achievement is fundamentally improved, provides ground for mine planning, Mining block design and roadway layout Matter foundation, optimizes integral layout, improves production efficiency, farthest avoids and reduces various drivings and exploitation accident, ensure Production safety.

Claims (1)

1. a kind of mine three-dimensional earthquake whole process geological prospecting Forecasting Methodology, it is characterised in that described method includes following steps:
1) the preservation situation of Mine area geologic structure is described using 3-d seismic exploration method, delineation minable coal seam position whether there is Hidden geological tectonic, and determine its specific location and scope;
2) disclosed using actual tunnel and results of drilling is constraints, wherein probing carries out vertical wire constraint, tunnel discloses Horizontal wire constraint is carried out, real-time verification and assay are carried out to the result of 3-d seismic exploration;
3) it will verify and be dissolved into the minable coal seam geological information after assay in 3-d seismic exploration result, it is anti-with iteration Feedback method, the exploration area result for not meeting detection precision requirement is reprocessed by 3-d seismic exploration method, is solved again Release and reapply, with the continuous change of digging, coal seam discloses more and more, and constraints constantly changes, to 3-D seismics Data geology dynamic interpretation prediction whole-process control, ultimately forms colliery 3-D seismics whole process geological analysis achievement;
Wherein, in the step 1):When minable coal seam area carries out 3-d seismic exploration, excited, received using dynamite source Stand (1) receive wave detector (2) data, wherein wave detector (2) arrangement interval is track pitch 10m, shot point (3) spacing 10m, line-spacing 40m, Sample rate 0.5ms, record length 2s, ultimately form the CDP face elements of 5m*5m, and investigation depth reaches 1500m below survey area Within construction, it is deep-controlled in the following 100m of ash difficult to understand.
CN201610191231.4A 2016-03-30 2016-03-30 Mine three-dimensional earthquake whole process geological prospecting Forecasting Methodology Active CN105866836B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610191231.4A CN105866836B (en) 2016-03-30 2016-03-30 Mine three-dimensional earthquake whole process geological prospecting Forecasting Methodology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610191231.4A CN105866836B (en) 2016-03-30 2016-03-30 Mine three-dimensional earthquake whole process geological prospecting Forecasting Methodology

Publications (2)

Publication Number Publication Date
CN105866836A CN105866836A (en) 2016-08-17
CN105866836B true CN105866836B (en) 2018-04-17

Family

ID=56627472

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610191231.4A Active CN105866836B (en) 2016-03-30 2016-03-30 Mine three-dimensional earthquake whole process geological prospecting Forecasting Methodology

Country Status (1)

Country Link
CN (1) CN105866836B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869997A (en) * 2017-04-01 2017-06-20 山东东山王楼煤矿有限公司 A kind of colliery multi-aquifer prevention and controls
CN108761532B (en) * 2018-05-08 2021-02-19 河北煤炭科学研究院 Coal mine working face fault prediction method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110320182A1 (en) * 2007-08-01 2011-12-29 Austin Geomodeling Method and system for dynamic, three-dimensional geological interpretation and modeling
CN104111479A (en) * 2014-07-17 2014-10-22 河北煤炭科学研究院 Underground coal mine in-excavating channel wave seism fore-detection method

Also Published As

Publication number Publication date
CN105866836A (en) 2016-08-17

Similar Documents

Publication Publication Date Title
Hatherly Overview on the application of geophysics in coal mining
Alber et al. Rock mechanical investigations of seismic events in a deep longwall coal mine
CN104166164B (en) The many wave reflection 3-D seismics forward probe methods of coal roadway tunneling geological structure three-component
US20170205531A1 (en) Geological modeling workflow
CN105700010B (en) Colliery joint earthquake holographic forecast method
Bellefleur et al. Vertical seismic profiling using distributed acoustic sensing with scatter‐enhanced fibre‐optic cable at the Cu–Au New Afton porphyry deposit, British Columbia, Canada
CN102495434A (en) Advanced geological prediction method for underground engineering
Place et al. Seismic characterization of the Grängesberg iron deposit and its mining-induced structures, central Sweden
CN106610503A (en) Omnidirectional slot wave seismic detection method in coal mine excavation process
Chen et al. Tunnel prospecting based on integrated interpretation of geophysical data: Xiangyun Tunnel, Yunnan Province, China
Martí et al. High-resolution seismic characterization in an urban area: Subway tunnel construction in Barcelona, Spain
Kästner et al. Seismic imaging in the Krafla high-temperature geothermal field, NE Iceland, using zero-and far-offset vertical seismic profiling (VSP) data
CN105866836B (en) Mine three-dimensional earthquake whole process geological prospecting Forecasting Methodology
Zhou et al. Seeing coal‐seam top ahead of the drill bit through seismic‐while‐drilling
CN102798884B (en) Tunnel roof two-dimensional seismic exploration method and system
Nie et al. Comprehensive ahead prospecting of tunnels in severely weathered rock mass environments with high water inrush risk: a case study in Shaanxi Province
Jingbin et al. The application of seismic attribute analysis technique in coal field exploration
Liu et al. Applied research of comprehensive advance geological prediction in Daluoshan water diversion tunnel
Gochioco Seismic surveys for coal exploration and mine planning
Guo et al. Overburden response to longwall mining
Van Schoor et al. Deep-Level Gold and Platinum Mining: The Application of Geophysics in South Africa
CN203616488U (en) Well-ground seismic imaging system taking hammerhead of down-hole hammer as hypocenter
Imaña et al. 3D modeling for VMS exploration in the Pyhäsalmi district, Central Finland in
Du et al. Stress background and rock fractures revealed by ultrasonic borehole television in the Fankou Lead-Zinc Mine
Qi et al. Recognition of Concealed Rock in Zhuxi Ore Concentration area Based on Integrated Geophysical Method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 054000, 126 West Main Street, Hebei, Xingtai

Patentee after: Hebei Coal Science Research Institute Co.,Ltd.

Address before: 054000, 126 West Main Street, Hebei, Xingtai

Patentee before: HEBEI COAL Research Institute

CP01 Change in the name or title of a patent holder