CN105863291A - Method for smearing high-ductility cement-based composite material to reinforce masonry wall without constructional columns - Google Patents

Method for smearing high-ductility cement-based composite material to reinforce masonry wall without constructional columns Download PDF

Info

Publication number
CN105863291A
CN105863291A CN201610249922.5A CN201610249922A CN105863291A CN 105863291 A CN105863291 A CN 105863291A CN 201610249922 A CN201610249922 A CN 201610249922A CN 105863291 A CN105863291 A CN 105863291A
Authority
CN
China
Prior art keywords
composite material
masonry wall
ductility cement
high ductility
base composite
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610249922.5A
Other languages
Chinese (zh)
Inventor
李向民
许清风
高润东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Building Science Research Institute Co Ltd
Original Assignee
Shanghai Building Science Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Building Science Research Institute Co Ltd filed Critical Shanghai Building Science Research Institute Co Ltd
Priority to CN201610249922.5A priority Critical patent/CN105863291A/en
Publication of CN105863291A publication Critical patent/CN105863291A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention provides a method for smearing a high-ductility cement-based composite material to reinforce a masonry wall without constructional columns. The construction speed is high, the influence range is small, and it can be guaranteed that the bearing capacity and deformation of the masonry wall meet the following use requirements. The bearing capacity of the reinforced masonry wall is improved by over 40% compared with that of the masonry wall before reinforcement. Meanwhile, the high-ductility cement-based composite material is adopted to be smeared on the masonry wall for reinforcing the masonry wall, the use amount of reinforcing materials can be effectively reduced, and the consumption of resources and energy by an existing building reinforcement and reconstruction industry is reduced.

Description

Smear high ductility cement-base composite material and reinforce the method without constructional column masonry wall
Technical field
The present invention relates to building engineering field, the most just relate to one and smear high ductility cement Based composites reinforces the method without constructional column masonry wall, for the reinforcement and repair of existing building.
Background technology
Masonry structure building has obtained popularization and application on a large scale in China.After using for many years, Generally there is a certain degree of aging or damage in masonry structure, and owing to part building uses function Adjustment makes its working load increase, and safety stock is decreased obviously, need to be by rational reinforcement means Improve its bearing capacity, it is ensured that safe handling.
Chinese patent ZL201210282611.0 discloses a kind of steel structure reinforcing masonry The method of wall, it comprises the following steps: 1) holes respectively at collar tie beam two ends, is respectively adopted high-strength Two pieces of strengthening steel slabs of common brick wall both sides, to wearing, are reliably connected by bolt with the collar tie beam of upper end; 2) it is respectively adopted chemical bolt in two bottom sides to be connected with constructional column by connector;3) steel will be reinforced The lower end of plate is connected at the edge of a wing of connector by high-strength bolt, back side strengthening steel slab connection side Method is identical with this;4) hole on Strengthened Masonry Walls wall, insert reinforced bar fastener, bend and weld shape Become back-shaped button, the steel plate of fastening both sides;5) element cement or other overcover are smeared at surface of wall After, i.e. complete the reinforcing to body of wall.Enhance the deformability of body of wall, extend body of wall by opening Splitting the time destroyed, the energy dissipation capacity of body of wall is significantly enhanced.But this is consolidated structure and utilizes Steel structure reinforcing high cost, the most easily produces masonry wall and destroys.
Summary of the invention
It is an object of the invention to need to break for the above-mentioned existing ruggedized construction of masonry wall without constructional column The technological deficiency of bad existing masonry wall structure, it is provided that one smears high ductility cement-base composite material Reinforce the method without constructional column masonry wall, (right according to the sheared destruction pattern without constructional column masonry wall Angle failure by shear), by masonry wall both sides of the edge and diagonally opposed to smear high ductility cement based multiple Condensation material improves its bearing capacity.
Technical scheme
In order to realize above-mentioned technical purpose, what the present invention designed smears high ductility cement-base composite material Reinforcing the method without constructional column masonry wall, it comprises the following steps:
(1) floating dust on masonry wall surface is removed;
(2) along need to smear high ductility cement-base composite material edges of regions nail on width be about 10~ 20mm, thickness is equal to the batten of the thickness smearing high ductility cement-base composite material, by this district Territory surrounds;
(3) surface of wall smear high ductility cement-base composite material region the fullest stamp One layer of primer;
(4) when primer is unseasoned, high ductility cement-base composite material is spread upon what batten surrounded Region is the most floating, and it is 200~500mm that high ductility cement-base composite material smears width, thickness Being 10~20mm, the diagonally opposed ECC centrage smeared overlaps with body of wall diagonal;
(5) batten, water seasoning 28 days are removed
Beneficial effect
The present invention provides the side smearing the reinforcing of high ductility cement-base composite material without constructional column masonry wall Method not only speed of application is fast, coverage is little, and can guarantee that the bearing capacity of masonry wall is full The follow-up use requirement of foot;Masonry wall after reinforcing, its bearing capacity ratio improves more than 40% before reinforcing. Use simultaneously and smear high ductility cement-base composite material Strengthened Masonry Walls wall, can effectively save reinforcing material Material consumption, reduces the consumption to energy resource of the existing building strengthening reconstruction industry.
Accompanying drawing explanation
Accompanying drawing 1 is embodiment of the present invention floor map.
Accompanying drawing 2 is the sectional view in A-A direction in accompanying drawing.
Detailed description of the invention
Below in conjunction with the accompanying drawings and embodiment, the present invention will be further described.
Embodiment
As shown in figure 1 and 2, one is smeared high ductility cement-base composite material and is reinforced nothing structure The method of post masonry wall, it comprises the following steps:
The first step, removes the floating dust on masonry wall 1 surface;
Second step, nails on width about along smearing high ductility cement-base composite material edges of regions 10mm, the batten of thickness 15mm, this region is surrounded;
3rd step, smears high ductility cement-base composite material region at surface of wall uniform, full Last layer primer is broken on ground;
4th step, when primer is unseasoned, spreads upon batten by high ductility cement-base composite material The region that surrounds is the most floating, and vertical and diagonally opposed high ductility cement-base composite material width is equal For 300mm, thickness is 15mm, in the diagonally opposed high ductility cement-base composite material smeared Heart line overlaps with body of wall diagonal;
5th step, removes batten, water seasoning 28 days.
The present invention provides the side smearing the reinforcing of high ductility cement-base composite material without constructional column masonry wall Method not only speed of application is fast, coverage is little, and can guarantee that the bearing capacity of masonry wall is full The follow-up use requirement of foot;Masonry wall after reinforcing, its bearing capacity ratio improves more than 40% before reinforcing. Use simultaneously and smear high ductility cement-base composite material Strengthened Masonry Walls wall, can effectively save reinforcing material Material consumption, reduces the consumption to energy resource of the existing building strengthening reconstruction industry.
Structure depicted in the present embodiment institute accompanying drawings, ratio, size etc., the most only in order to coordinate Content disclosed in description, understands for those skilled in the art and reads, and being not used to Limit the enforceable qualifications of the present invention, therefore do not have technical essential meaning, any structure Modification, the change of proportionate relationship or the adjustment of size, do not affecting what the present invention can be generated by Under effect and the purpose that can reach, all should still fall and obtain energy at disclosed technology contents In the range of containing.Meanwhile, in this specification cited as " on ", D score, "left", "right", The term of " middle ", " clockwise ", " counterclockwise " etc., is merely convenient to understanding of narration, And it being not used to limit the enforceable scope of the present invention, being altered or modified of its relativeness, in nothing Under essence change technology contents, when being also considered as the enforceable category of the present invention.

Claims (4)

1. smear high ductility cement-base composite material and reinforce the method without constructional column masonry wall, it is characterised in that it comprises the following steps:
(1) floating dust on masonry wall surface is removed;
(2) along smearing high ductility cement-base composite material edges of regions nail batten;
(3) smear high ductility cement-base composite material region at dry masonry wall surface of wall and smear primer;
(4) when primer is unseasoned, in high ductility cement-base composite material is spread upon the region that batten surrounds and floating;
(5) batten, water seasoning at least 28 days are removed.
Smear high ductility cement-base composite material the most as claimed in claim 1 and reinforce the method without constructional column masonry wall, it is characterised in that: in described step (4), the oblique centrage smearing high ductility cement-base composite material overlaps with body of wall diagonal.
Smear high ductility cement-base composite material the most as claimed in claim 1 and reinforce the method without constructional column masonry wall, it is characterized in that: needing described in described step (2) to smear high ductility cement-base composite material peak width is 200~500mm, and thickness is 10~20mm.
Smear high ductility cement-base composite material the most as claimed in claim 1 and reinforce the method without constructional column masonry wall, it is characterised in that: in described step (1), batten width is about 10~20mm, and thickness is equal to the thickness smearing ECC.
CN201610249922.5A 2016-04-20 2016-04-20 Method for smearing high-ductility cement-based composite material to reinforce masonry wall without constructional columns Pending CN105863291A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610249922.5A CN105863291A (en) 2016-04-20 2016-04-20 Method for smearing high-ductility cement-based composite material to reinforce masonry wall without constructional columns

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610249922.5A CN105863291A (en) 2016-04-20 2016-04-20 Method for smearing high-ductility cement-based composite material to reinforce masonry wall without constructional columns

Publications (1)

Publication Number Publication Date
CN105863291A true CN105863291A (en) 2016-08-17

Family

ID=56632460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610249922.5A Pending CN105863291A (en) 2016-04-20 2016-04-20 Method for smearing high-ductility cement-based composite material to reinforce masonry wall without constructional columns

Country Status (1)

Country Link
CN (1) CN105863291A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106968455A (en) * 2017-05-20 2017-07-21 深圳大学 The ruggedized construction and reinforcement means of sea sand reinforced beam

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011169099A (en) * 2011-02-03 2011-09-01 Tatsuhiko Komura Overall method of earthquake-proofing on principle of hoop-clamping for whole building without earthquake proof
CN102889003A (en) * 2012-11-04 2013-01-23 西安建筑科技大学 Method for increasing constructional column for brick masonry wall
CN202925925U (en) * 2012-11-04 2013-05-08 西安建筑科技大学 Reinforcing device for brick masonry wall
CN202925921U (en) * 2012-11-04 2013-05-08 西安建筑科技大学 High-ductility masonry wall between windows
CN202945816U (en) * 2012-11-04 2013-05-22 西安建筑科技大学 Brickwork wall between windows and reinforced by high-ductility fiber concrete

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011169099A (en) * 2011-02-03 2011-09-01 Tatsuhiko Komura Overall method of earthquake-proofing on principle of hoop-clamping for whole building without earthquake proof
CN102889003A (en) * 2012-11-04 2013-01-23 西安建筑科技大学 Method for increasing constructional column for brick masonry wall
CN202925925U (en) * 2012-11-04 2013-05-08 西安建筑科技大学 Reinforcing device for brick masonry wall
CN202925921U (en) * 2012-11-04 2013-05-08 西安建筑科技大学 High-ductility masonry wall between windows
CN202945816U (en) * 2012-11-04 2013-05-22 西安建筑科技大学 Brickwork wall between windows and reinforced by high-ductility fiber concrete

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘沩: ""高性能水泥复合砂浆钢筋网薄层(HPFL)加固农村民居空斗砌体抗震性能试验研究"", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106968455A (en) * 2017-05-20 2017-07-21 深圳大学 The ruggedized construction and reinforcement means of sea sand reinforced beam

Similar Documents

Publication Publication Date Title
CN107542266A (en) The shear wall formwork method for blocking of mortar leakage prevention
CN105863291A (en) Method for smearing high-ductility cement-based composite material to reinforce masonry wall without constructional columns
CN204676879U (en) Model sheetinstallat structure
Cardoso et al. Building details of a tabique dwelling in Trás-os-Montes e Alto Douro region
DE202006015693U1 (en) Wood-concrete connecting unit for use in building construction, has slab and support units connected with each other by connection unit that is embedded in slab unit, where slab unit is made of concrete and support unit is made of wood
CN204609123U (en) A kind of Steel concrete compound beam structure
CN105735666B (en) A kind of method of rapid reinforcement concrete column
CN207568036U (en) A kind of nail connection timber buildings roof system, superstructure
CN214531017U (en) Formwork structure of closed type pipe shaft corner column
CN104847038A (en) Progressive collapse resistant cold-formed thin-walled profile combined wall and quick field mounting method thereof
CN207260377U (en) Floor combination
CN105908988A (en) Method for reinforcing masonry wall through bamboo tendon, cement and mortar surface layer
CN209603530U (en) A kind of reinforced beam composite reinforcing structure
CN208777519U (en) A kind of high-strength profiled sheet-fiber reinforcement regeneration concrete compoboard
CN206737292U (en) A kind of novel fabricated stair precast concrete
CN208267403U (en) The carbon cloth reinforced structure at coupled shear walls hole after a kind of
CN104929241B (en) The beam slab rod structure of green ecological feasibility building system
CN206319463U (en) A kind of floor system framework and floor system
CN206144186U (en) Structure of bamboo reinforcement recycled concrete increase method of section reinforcing concrete post
CN105715069B (en) A kind of method of rapid reinforcement Reinforced Concrete Columns
CN105863290A (en) Method for reinforcing masonry wall without structural columns by sticking environmentally-friendly textile fabric
CN103967208A (en) Light steel-small diameter wood composite load-bearing column with Z-shaped cross section and preparation method thereof
CN213297262U (en) Beam column reinforced structure based on concrete bar planting technology
CN211257428U (en) Vertical beam is consolidated to shear force wall
CN209211738U (en) A kind of novel light steam-pressing aero-concrete floor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160817