CN105863065A - Kazak-nationality yurt framework convenient to tear down, build and move - Google Patents
Kazak-nationality yurt framework convenient to tear down, build and move Download PDFInfo
- Publication number
- CN105863065A CN105863065A CN201610376582.2A CN201610376582A CN105863065A CN 105863065 A CN105863065 A CN 105863065A CN 201610376582 A CN201610376582 A CN 201610376582A CN 105863065 A CN105863065 A CN 105863065A
- Authority
- CN
- China
- Prior art keywords
- spherical zone
- kazak
- build
- grid
- tear down
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000003187 abdominal effect Effects 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
- E04B1/34315—Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
- E04B1/34331—Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by three-dimensional elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Securing Of Glass Panes Or The Like (AREA)
Abstract
The invention relates to a Kazak-nationality yurt framework convenient to tear down, build and move. The Kazak-nationality yurt framework comprises a door frame fixed on the ground, wherein a plurality of gratings are sequentially connected to two sides of the door frame and are integrally circularly arrayed, the intersections among the gratings and the space between the door frame and the gratings are fixed through connecting components, the gratings are sleeved with annular connecting ball belts, stay bars are inserted into the circumference surfaces of the upper end of the connecting ball belt at equal intervals, the upper ends of the stay bars incline inwards and are connected with an annular dome rack ring, and upward arched crosspieces are arranged in the dome rack ring. By rapidly connecting every two adjacent gratings and the gratings with the door frame through the connecting components but not a common binding manner, the tightness between every two adjacent gratings and the tightness between the gratings with the door frame can be further adjusted at will after the connecting components are used, thereby meeting the building requirement. By virtue of the connecting ball belts, the gratings can be rapidly connected with the stay bars, and the stay bars can be uniformly distributed in ball belt grooves of the connecting ball belts, so that the Kazak-nationality yurt framework can be used for rapidly building yurts.
Description
Technical field
The application relates to a kind of Kazak's yurt framework being easy to tear down and build movement.
Background technology
In prior art, yurt is naturally to be produced and perfect by very long nomadism experience, and ancient and traditional removable construction style, is axial symmetry round building.Kazak's yurt skeleton is nomadism needs for convenience, uses a small amount of timber and rope to make, and has the advantages such as light, durable, wind resistance, protection against the tide and earthquake-proof.Kazak's tradition yurt skeleton (framework) structure, contains the multi-subject knowledges such as mathematics, physics, chemistry.If to Kazak's tradition yurt skeleton from the bottom up with geometry view, then finding that its grill portion is corresponding " cylinder ", strut tripe abdominal section is corresponding " spherical zone ", and strut straight part is corresponding " round platform ", and vault frame part is corresponding " spherical crown ".
Building yurt is not only complexity but also easy engineering.Because the tradition rope such as each parts of yurt skeleton and part junction bandage, tape wrap, cord and hawser fixes, and has certain combinator.Say and complicated be because much stricter than the house of one common brick tile structure of lid of its program.Tradition yurt is by numerous grids, strut, vault frame, doorframe;Enclose felt, to drape over one's shoulders felt, top felt, Caulis Achnatheri Splendentis flat;The parts such as rope, signature rope assemble, just in case wrongly installed in which link, next step is just difficult to.
In prior art, although have some about building the unique texture of yurt, but its purpose all failing to reach to enable people who are unskilled's fast construction yurt, the related art scheme of the application, have no report.
Summary of the invention
For solving the defect in above-mentioned technology, the purpose of the application is to propose a kind of Kazak's yurt framework being easy to tear down and build movement that can quickly assemble.
The purpose of the application is achieved in that is easy to tear down and build the doorframe that Kazak's yurt framework of movement includes fixing on the ground, it is connected with some grids in turn in doorframe both sides, the overall rounded arrangement of some grids, grid infall between described some grids, and fixed by connector between doorframe and grid, the connection spherical zone of annular it is socketed with in grid upper end, it is plugged with strut along connecting spherical zone upper end periphery equi-spaced apart, strut upper end slopes inwardly and is connected with annular vault frame ring, is provided with arch beam upwardly in vault frame ring.
Further, described connection spherical zone is spherical zone shape, thereon, offers respectively in order to grafting strut and the upper spherical zone groove of grid and lower spherical zone groove at lower surface.
Further, connect spherical zone and be divided into left spherical zone, right spherical zone and lintel spherical zone, left spherical zone, right spherical zone and the upper and lower periphery of lintel spherical zone offer respectively in order to grafting strut and the upper spherical zone groove of grid and lower spherical zone groove, carry notch is offered at upper spherical zone groove excircle, strut lower end is entered upper spherical zone groove by carry notch, and can move into place along upper spherical zone groove.
Further, connect end between left spherical zone, right spherical zone and lintel spherical zone and there is some staggered tenons set up, the sequentially grafting of each tenon, and positioned by latch.
Further, in tenon, offer the through hole for grafting latch, offer the cavity through with through hole in tenon side, upper and lower both sides, in cavity, be placed with the decorative pearl on top of an official cap, after the decorative pearl on top of an official cap, be provided with top spring.
Further, latch offers the groove in order to be connected with the decorative pearl on top of an official cap.
Owing to implementing technique scheme, grid quickly can be connected with doorframe with grid, grid by connector, it is attached without re-using the common mode of binding, also can arbitrarily adjust the tightness between grid and grid, grid and doorframe after using connector to meet the needs built.Then quickly grid can be connected with strut by connecting spherical zone, only strut need to be evenly distributed in the spherical zone groove connecting spherical zone, therefore the application has the effectiveness of fast construction yurt.
Accompanying drawing illustrates: the concrete structure of the application is given by following drawings and Examples:
Fig. 1 is easy for tearing down and building the structural representation of Kazak's yurt framework of movement;
Fig. 2 is the structural representation that the connector of tightness adjustable is connected with between grid;
Fig. 3 is also the structural representation that the connector of tightness adjustable is connected with between grid;
Fig. 4 is the structural representation of doorframe;
Fig. 5 is the structural representation that grid is connected with doorframe;
Fig. 6 is the structural representation connecting spherical zone;
Fig. 7 is the profile connecting spherical zone.
nullLegend: 1、Arch beam,2、Vault frame ring,3、Strut,4、Spherical zone groove,5、Carry notch,6、Connect spherical zone,7、Grid,8、Top felt,9、Drape over one's shoulders felt,10、Felt curtain,11、Enclose felt,12、Doorframe,13、Door leaf,14、Belt fixture,15、Grid infall,16、Metallic plate,17、Belt,18、Hook,19、Hook loop,20、Rotating shaft,21、Hasp,22、Hasp seat,23、Lintel,24、Right stile,25、Right connection position,26、Threshold,27、Left connection position,28、Left-hand door stile,29、Left spherical zone,30、Lintel spherical zone,31、Doorframe installation position,32、Right spherical zone,33、Connecting portion,34、Upper spherical zone groove,35、Lower spherical zone groove,36、Groove,37、Latch,38、Top spring,39、The decorative pearl on top of an official cap,40、Tenon,41、Through hole,42、Connector.
Detailed description of the invention:
The application is not limited by following embodiment, can determine specific embodiment according to the technical scheme of the application and practical situation.
Embodiment: as shown in Figure 1, it is easy to tear down and build the doorframe 12 that Kazak's yurt framework of movement includes fixing on the ground, it is connected with some grids 7 in turn in doorframe 12 both sides, the overall rounded arrangement of some grids 7, the connection spherical zone 6 of annular it is socketed with in grid 7 upper end, being plugged with strut 3 along connecting spherical zone 6 upper end periphery equi-spaced apart, strut 3 upper end slopes inwardly and is connected with annular vault frame ring 2, is provided with arch beam 1 upwardly in vault frame ring 2.
Outside grid 7, it is with felt, is equipped with between strut 3 and drapes over one's shoulders felt 9, vault frame 1 is equipped with top felt 8.
As shown in Figure 4, described doorframe includes lintel 23 and the threshold 26 of downside of upside, left and right stile 28,24 it is provided with between lintel 23 and threshold 26, left and right stile 28,24 is equiped with door leaf 13 respectively, at lintel 23, it is provided with collapsible felt curtain 10, at left and right stile 28,24, is respectively arranged with the left connection position 27 in order to installation connecting element 42, right connection position 25.
As shown in Fig. 1,6,7, described connection spherical zone 6 is spherical zone shape, thereon, offers respectively in order to grafting strut 3 and the upper spherical zone groove 34 of grid 7 and lower spherical zone groove 35 at lower surface.
Connect spherical zone 6 and be divided into left spherical zone 29, right spherical zone 32 and lintel spherical zone 30, left spherical zone 29, right spherical zone 32 and the upper and lower periphery of lintel spherical zone 30 offer respectively in order to grafting strut 3 and the upper spherical zone groove 34 of grid 7 and lower spherical zone groove 35, carry notch 5 is offered at upper spherical zone groove 34 excircle, strut 3 lower end is entered upper spherical zone groove 34 by carry notch 5, and can move into place along upper spherical zone groove 34.
Connect end between left spherical zone 29, right spherical zone 32 and lintel spherical zone 30 and there is some staggered tenons 40 set up, each tenon 40 sequentially grafting, and positioned by latch 37.
Offering the through hole 41 for grafting latch 37 in tenon 40, in the tenon 40 be positioned at upper and lower both sides, through hole 41 offers the cavity through with through hole 41, is placed with the decorative pearl on top of an official cap 39 outside cavity, is provided with top spring 38 inside the decorative pearl on top of an official cap 39.
The groove 36 in order to be connected is offered with the decorative pearl on top of an official cap 39 on latch 37.
Such as Fig. 2, shown in 3, grid infall 15 between described some grids 7 is fixed by connector, before described connector includes being fixed on metallic plate 16, belt fixture 14 at rear end face and hasp seat 22, belt 17 it is interspersed with in belt fixture 14, the belt 17 opening on metallic plate 16 front end face extends metallic plate 16 rear end face, and belt 17 end is provided with hook 18, it is fixed with hasp seat 22 at metallic plate 16 rear end face on the downside of hook 18, hasp seat 22 is connected with hasp 21 by rotating shaft 20, the connection alive of hasp 21 front end has hook loop 19, hook loop 19 and hook 18 clasp joints, thus form a closing structure, the grid 7 of grid infall 15 is positioned at this closing structure, locked by belt 17.
Attachment structure between described belt fixture 14 and belt 17 is prior art, and belt fixture 14 includes the chuck in order to clamping belt 17, by the size of the chuck clamping to belt 17 different parts, i.e. adjustable belt Yu the surrounded circle of discount.Certainly the attachment structure between belt fixture 14 and belt 17 can also is that other prior aries, belt fixture 14 effect in this application is only that by the regulation belt 17 position in belt fixture 14, thus change the distance between hook 18 and hook loop 19, and then affect the attachment force of each grid infall 15.
As shown in Figure 5, it is fixed with connector 42 at the left and right stile 28,24 of described doorframe 12, the belt fixture 14 of described connector 42, hasp seat 22 is arranged at aforementioned left connection position 27, right connection position 25, and face inside and outside hasp seat 22 and 14 points of row left or right stiles 28 or 24 of belt fixture.Remaining structure is with the attachment structure between aforementioned grid and grid, thus forms a closing structure, is fastenedly connected with doorframe 12 by grid 7.
Above technical characteristic constitutes the most preferred embodiment of the application, and it has stronger adaptability and optimal implementation result, can increase and decrease inessential technical characteristic according to actual needs, meet the needs of different situations.
Claims (9)
1. the Kazak's yurt framework being easy to tear down and build movement, including the doorframe fixed on the ground, it is connected with some grids in turn in doorframe both sides, the overall rounded arrangement of some grids, it is characterized in that: the grid infall between described some grids, and fixed by connector between doorframe and grid, the connection spherical zone of annular it is socketed with in grid upper end, it is plugged with strut along connecting spherical zone upper end periphery equi-spaced apart, strut upper end slopes inwardly and is connected with annular vault frame ring, is provided with arch beam upwardly in vault frame ring.
It is easy to tear down and build Kazak's yurt framework of movement the most as claimed in claim 1, it is characterised in that: described connection spherical zone is spherical zone shape, thereon, offers respectively in order to grafting strut and the upper spherical zone groove of grid and lower spherical zone groove at lower surface.
It is easy to tear down and build Kazak's yurt framework of movement the most as claimed in claim 1 or 2, it is characterized in that: connect spherical zone and be divided into left spherical zone, right spherical zone and lintel spherical zone, left spherical zone, right spherical zone and the upper and lower periphery of lintel spherical zone offer respectively in order to grafting strut and the upper spherical zone groove of grid and lower spherical zone groove, carry notch is offered at upper spherical zone groove excircle, strut lower end is entered upper spherical zone groove by carry notch, and can move into place along upper spherical zone groove.
It is easy to tear down and build Kazak's yurt framework of movement the most as claimed in claim 3, it is characterised in that: connect end between left spherical zone, right spherical zone and lintel spherical zone and there is some staggered tenons set up, the sequentially grafting of each tenon, and positioned by latch.
It is easy to tear down and build Kazak's yurt framework of movement the most as claimed in claim 4, it is characterized in that: in tenon, offer the through hole for grafting latch, in the tenon being positioned at upper and lower both sides, through hole offers the cavity through with through hole, outside cavity, it is placed with the decorative pearl on top of an official cap, inside the decorative pearl on top of an official cap, is provided with top spring.
It is easy to tear down and build Kazak's yurt framework of movement the most as claimed in claim 5, it is characterised in that: offer the groove in order to be connected with the decorative pearl on top of an official cap on latch.
It is easy to tear down and build Kazak's yurt framework of movement the most as claimed in claim 1, it is characterized in that: described doorframe includes lintel and the threshold of downside of upside, left and right stile it is provided with between lintel and threshold, left and right stile is equiped with door leaf respectively, at lintel, it is provided with collapsible felt curtain, at left and right stile, is respectively arranged with the left connection position in order to installation connecting element, right connection position.
It is easy to tear down and build Kazak's yurt framework of movement the most as claimed in claim 7, it is characterized in that: before described connector includes being fixed on metallic plate, belt fixture at rear end face and hasp seat, it is interspersed with belt in belt fixture, belt opening on metallic plate front end face extends metallic plate rear end face, and belt ends is provided with hook, it is fixed with hasp seat at metallic plate rear end face on the downside of hook, hasp seat is connected with hasp by rotating shaft, the connection alive of hasp front end has hook loop, hook loop and hook clasp joint, thus form a closing structure, the grid of grid infall is positioned at this closing structure, locked by belt.
It is easy to tear down and build Kazak's yurt framework of movement the most as claimed in claim 8, it is characterized in that: at the left and right stile of described doorframe, be fixed with connector, the belt fixture of described connector, hasp seat is arranged at aforementioned left connection position, right connection position, and hasp seat divides face inside and outside row left or right stile with belt fixture.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610376582.2A CN105863065A (en) | 2016-05-31 | 2016-05-31 | Kazak-nationality yurt framework convenient to tear down, build and move |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610376582.2A CN105863065A (en) | 2016-05-31 | 2016-05-31 | Kazak-nationality yurt framework convenient to tear down, build and move |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105863065A true CN105863065A (en) | 2016-08-17 |
Family
ID=56643248
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610376582.2A Pending CN105863065A (en) | 2016-05-31 | 2016-05-31 | Kazak-nationality yurt framework convenient to tear down, build and move |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105863065A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3393331B2 (en) * | 1998-10-13 | 2003-04-07 | 赤花化工株式会社 | Simple assembly circular house |
CN2651350Y (en) * | 2003-10-29 | 2004-10-27 | 江苏华东机房集团有限公司 | Embedded flexible floor board |
CN2856285Y (en) * | 2005-10-18 | 2007-01-10 | 赵振华 | Large ger |
CN102817485A (en) * | 2012-08-31 | 2012-12-12 | 中国京冶工程技术有限公司 | Mongolian yurt |
CN204754294U (en) * | 2015-07-14 | 2015-11-11 | 王新跃 | Novel can dismantlement type yurt |
CN205078638U (en) * | 2015-07-20 | 2016-03-09 | 芜湖奕辰模具科技有限公司 | Novel mechanical connection axle construction |
CN205776769U (en) * | 2016-05-31 | 2016-12-07 | 木尔扎别克·阿不力卡斯 | It is easy to tear down and build Kazak's yurt framework of movement |
-
2016
- 2016-05-31 CN CN201610376582.2A patent/CN105863065A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3393331B2 (en) * | 1998-10-13 | 2003-04-07 | 赤花化工株式会社 | Simple assembly circular house |
CN2651350Y (en) * | 2003-10-29 | 2004-10-27 | 江苏华东机房集团有限公司 | Embedded flexible floor board |
CN2856285Y (en) * | 2005-10-18 | 2007-01-10 | 赵振华 | Large ger |
CN102817485A (en) * | 2012-08-31 | 2012-12-12 | 中国京冶工程技术有限公司 | Mongolian yurt |
CN204754294U (en) * | 2015-07-14 | 2015-11-11 | 王新跃 | Novel can dismantlement type yurt |
CN205078638U (en) * | 2015-07-20 | 2016-03-09 | 芜湖奕辰模具科技有限公司 | Novel mechanical connection axle construction |
CN205776769U (en) * | 2016-05-31 | 2016-12-07 | 木尔扎别克·阿不力卡斯 | It is easy to tear down and build Kazak's yurt framework of movement |
Non-Patent Citations (1)
Title |
---|
木尔扎别克·阿不力卡斯: "哈萨克毡房及其几何体结构", 《伊犁师范学院学报(社会科学版)》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105189887B (en) | Cooperatively form the ladder module of temporary stairways | |
US20110290588A1 (en) | Temporary viewing platforms | |
JP2016518539A (en) | Tiling system for articulated impact relief | |
KR200442821Y1 (en) | Assembly Pillar | |
CN205776769U (en) | It is easy to tear down and build Kazak's yurt framework of movement | |
CN105863065A (en) | Kazak-nationality yurt framework convenient to tear down, build and move | |
EP1739252A3 (en) | Balcony and/or terrace floor | |
CN101177979B (en) | Monolithic-construction automatic damping storied building | |
Torsing et al. | The shaded dome™: A smart, cool & adaptable facility for sport venues | |
KR102037665B1 (en) | Prefabricated stairs block for multi-purpose building materials | |
TWI651046B (en) | Pet springboard positioning structure | |
DE112016004200T5 (en) | BUILDING WITH SAFETY AND PROTECTION FUNCTION | |
KR200359060Y1 (en) | Removable Shade Tent | |
RU162646U1 (en) | YURTA BASHKIRSKAYA | |
KR200468276Y1 (en) | Assembly Pillar | |
CN105401866A (en) | Net structure | |
ITCO20110059A1 (en) | PROTECTION FENCING | |
KR102497758B1 (en) | Prefabricated dome-type architecture and installation method of prefabricated dome type architecture | |
KR101445313B1 (en) | Expressing various shapes and a method of manufacturing a mesh fence | |
KR102069728B1 (en) | Spacer for wire fence | |
CN104278942B (en) | Sun blind base fixing device | |
KR20230053190A (en) | Square type assembly pillar\ | |
Déry | Mór építészet Pesten: A Párisi Udvar története | |
KR101548270B1 (en) | Inflatable tent with the courtyard structure | |
Baumgart | Rob Kennon Architects |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160817 |
|
WD01 | Invention patent application deemed withdrawn after publication |