CN105862931A - Construction method for underground waterproof coil material of large deep foundation pit - Google Patents

Construction method for underground waterproof coil material of large deep foundation pit Download PDF

Info

Publication number
CN105862931A
CN105862931A CN201610212126.4A CN201610212126A CN105862931A CN 105862931 A CN105862931 A CN 105862931A CN 201610212126 A CN201610212126 A CN 201610212126A CN 105862931 A CN105862931 A CN 105862931A
Authority
CN
China
Prior art keywords
construction
construction method
foundation pit
deep foundation
coiled material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610212126.4A
Other languages
Chinese (zh)
Inventor
李川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201610212126.4A priority Critical patent/CN105862931A/en
Publication of CN105862931A publication Critical patent/CN105862931A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods

Abstract

The invention discloses a construction method for an underground waterproof coil material of a large deep foundation pit. The large deep foundation pit comprises a supporting structure, wherein a treatment layer is arranged on the outer side of the supporting structure; the waterproof coil material is arranged on the outer side of the treatment layer; the waterproof coil material is fixed through a steel nail; and a gasket is mounted on the steel nail in a sleeving manner. The construction method achieves the beneficial effects that procedures of binding reinforcing bars, arranging a template, pouring structural concrete, and the like, can be directly carried out without the requirement of laying a protective layer, the operation is easy and convenient, the construction procedures are less, the construction progress is fast, the construction quality is improved, and the construction cost is reduced.

Description

A kind of large deep foundation pit underground waterproof coiled material construction method
Technical field
The present invention relates to a kind of large deep foundation pit underground waterproof coiled material construction method.
Background technology
In building trade, especially large-and-medium size cities high-rise civil building and commercial building, the most all use support deep pit Large Underground Parking Space form, increased available space as far as possible and reduce cost.But at present, China's overwhelming majority underground engineering all uses traditional material, traditional construction construction technology waterproof layer, and the defect of this way is when waterproof layer is destroyed, and subsoil water can form crossfire between waterproof layer and structure.The ratio that Chinese large-sized deep basal pit has supporting underground waterproof engineering pre-installed and inverted adhered new waterproofing techniques to use at present is the lowest, and it has bigger development and application prospect in China, promotes the development of this technology will to produce huge economic benefit and social benefit energetically.
Summary of the invention
The technical problem to be solved in the present invention is the defect overcoming prior art, it is provided that a kind of large deep foundation pit underground waterproof coiled material construction method, it is not necessary to lay any protective layer and can directly carry out assembling reinforcement; install template; the operations such as pouring structure concrete, it is achieved that less operation, reduce the duration.
In order to solve above-mentioned technical problem, the invention provides following technical scheme:
One large deep foundation pit underground waterproof coiled material construction method of the present invention, including supporting construction, the outside of described supporting construction is provided with process layer, and the outside of described process layer is provided with waterproof roll, described waterproof roll is fixed by steel nail, and described steel nail is set with pad;
Its construction method is: carries out campshed, diaphram wall according to design, inverse makees the construction of arch wall enclosed structure, carries out base cleaning, put waterproof roll location line and fixing point bit line.
Further, paving waterproof roll, when coiled material is used in plane, high density polyethylene (HDPE) is carried out empty paving facing to bed course;When coiled material is used in facade, using mechanical means that waterproof roll is fixed on building enclosure wall supporting surface, adhesive layer is towards structure sheaf.
Further, after fixing end, use Special seal material to carry out adhering and sealing in minor face lap-joint or fixing point, be not required to after having checked and accepted lay protective layer, can directly carry out assembling reinforcement, install template, pouring structure concrete subsequent handling.
The present invention is reached to provide the benefit that: can directly carry out assembling reinforcement without laying any protective layer, install the operations such as template, pouring structure concrete, the most easy and simple to handle, working procedure is few, and construction speed is fast, and improves construction quality, reduces construction cost.
Accompanying drawing explanation
Accompanying drawing is for providing a further understanding of the present invention, and constitutes a part for description, is used for together with embodiments of the present invention explaining the present invention, is not intended that limitation of the present invention.In the accompanying drawings:
Fig. 1 is the structural representation of the present invention;
In figure: 1, steel nail;2, pad;3, layer is processed;4, waterproof roll;5, supporting construction.
Detailed description of the invention
Below in conjunction with accompanying drawing, the preferred embodiments of the present invention are illustrated, it will be appreciated that preferred embodiment described herein is merely to illustrate and explains the present invention, is not intended to limit the present invention.
Embodiment 1
As it is shown in figure 1, a kind of large deep foundation pit underground waterproof coiled material construction method, including supporting construction 5, the outside of described supporting construction 5 is provided with process layer 3, the outside of described process layer 3 is provided with waterproof roll 4, and described waterproof roll 4 is fixed by steel nail 1, described steel nail 1 is set with pad 2;
Its construction method is: carries out campshed, diaphram wall according to design, inverse makees the construction of arch wall enclosed structure, carries out base cleaning, put waterproof roll location line and fixing point bit line.
Paving waterproof roll, when coiled material is used in plane, carries out empty paving by high density polyethylene (HDPE) facing to bed course;When coiled material is used in facade, using mechanical means that waterproof roll is fixed on building enclosure wall supporting surface, adhesive layer is towards structure sheaf.
After fixing end, use Special seal material to carry out adhering and sealing in minor face lap-joint or fixing point, be not required to after having checked and accepted lay protective layer, can directly carry out assembling reinforcement, install template, pouring structure concrete subsequent handling.
Can directly carry out assembling reinforcement without laying any protective layer, install the operations such as template, pouring structure concrete, the most easy and simple to handle, working procedure is few, and construction speed is fast, and improves construction quality, reduces construction cost.
Last it is noted that the foregoing is only the preferred embodiments of the present invention, it is not limited to the present invention, although the present invention being described in detail with reference to previous embodiment, for a person skilled in the art, technical scheme described in foregoing embodiments still can be modified by it, or wherein portion of techniques feature is carried out equivalent.All within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. made, should be included within the scope of the present invention.

Claims (3)

1. a large deep foundation pit underground waterproof coiled material construction method, it is characterized in that, including supporting construction (5), the outside of described supporting construction (5) is provided with process layer (3), the outside of described process layer (3) is provided with waterproof roll (4), described waterproof roll (4) is fixed by steel nail (1), and described steel nail (1) is set with pad (2);
Its construction method is: carries out campshed, diaphram wall according to design, inverse makees the construction of arch wall enclosed structure, carries out base cleaning, put waterproof roll location line and fixing point bit line.
A kind of large deep foundation pit underground waterproof coiled material construction method the most according to claim 1, it is characterised in that paving waterproof roll, when coiled material is used in plane, carries out empty paving by high density polyethylene (HDPE) facing to bed course;When coiled material is used in facade, using mechanical means that waterproof roll is fixed on building enclosure wall supporting surface, adhesive layer is towards structure sheaf.
A kind of large deep foundation pit underground waterproof coiled material construction method the most according to claim 2; it is characterized in that; after fixing end; Special seal material is used to carry out adhering and sealing in minor face lap-joint or fixing point; examination is not required to after completing lay protective layer; assembling reinforcement be can directly carry out, template, pouring structure concrete subsequent handling installed.
CN201610212126.4A 2016-04-07 2016-04-07 Construction method for underground waterproof coil material of large deep foundation pit Pending CN105862931A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610212126.4A CN105862931A (en) 2016-04-07 2016-04-07 Construction method for underground waterproof coil material of large deep foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610212126.4A CN105862931A (en) 2016-04-07 2016-04-07 Construction method for underground waterproof coil material of large deep foundation pit

Publications (1)

Publication Number Publication Date
CN105862931A true CN105862931A (en) 2016-08-17

Family

ID=56636145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610212126.4A Pending CN105862931A (en) 2016-04-07 2016-04-07 Construction method for underground waterproof coil material of large deep foundation pit

Country Status (1)

Country Link
CN (1) CN105862931A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284430A (en) * 2016-08-26 2017-01-04 中国十七冶集团有限公司 A kind of structural concrete for large deep foundation pit with waterproofing protection
CN109322325A (en) * 2018-09-06 2019-02-12 海南大学 It is a kind of that Fuel Tanking Unit and its construction method are freezed by freezing pipe

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090006361A (en) * 2007-07-11 2009-01-15 (주)리뉴시스템 Concrete reverse other opinion segment drainage spatial-temporal method
CN201826858U (en) * 2010-10-09 2011-05-11 卢桂才 Reaction bonding type sealing waterproof roll material for tunnel pre-paving
CN203145055U (en) * 2013-01-06 2013-08-21 广州禹神建筑防水材料有限公司 Underground construction pre-laid reversely-adhered waterproof structure
CN104695488A (en) * 2015-03-17 2015-06-10 深圳大学建筑设计研究院 Underground composite wall external water-proofing structure
CN204982977U (en) * 2015-09-24 2016-01-20 中建四局第一建筑工程有限公司 Basement bottom plate and waterproofing membrane integration waterproof construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090006361A (en) * 2007-07-11 2009-01-15 (주)리뉴시스템 Concrete reverse other opinion segment drainage spatial-temporal method
CN201826858U (en) * 2010-10-09 2011-05-11 卢桂才 Reaction bonding type sealing waterproof roll material for tunnel pre-paving
CN203145055U (en) * 2013-01-06 2013-08-21 广州禹神建筑防水材料有限公司 Underground construction pre-laid reversely-adhered waterproof structure
CN104695488A (en) * 2015-03-17 2015-06-10 深圳大学建筑设计研究院 Underground composite wall external water-proofing structure
CN204982977U (en) * 2015-09-24 2016-01-20 中建四局第一建筑工程有限公司 Basement bottom plate and waterproofing membrane integration waterproof construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
叶军 等: "天津站交通枢纽后广场工程地下结构防水技术", 《中国建筑防水》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284430A (en) * 2016-08-26 2017-01-04 中国十七冶集团有限公司 A kind of structural concrete for large deep foundation pit with waterproofing protection
CN109322325A (en) * 2018-09-06 2019-02-12 海南大学 It is a kind of that Fuel Tanking Unit and its construction method are freezed by freezing pipe

Similar Documents

Publication Publication Date Title
JP5529892B2 (en) Device for starting and reaching a shield machine in a sealed state
CN204326566U (en) A kind of structure utilizing carbon fiber reinforcement reinforced concrete post
CN102162255B (en) Method for reinforcing existing pile foundation in collapsed loess area by slip casting
CN202300445U (en) Super-shallow underpass tunnel support structure with long pipe shed for crossing road
CN107268688B (en) Construction method for reinforcing and sealing I-shaped steel joint of underground continuous wall
CN105862931A (en) Construction method for underground waterproof coil material of large deep foundation pit
CN204187141U (en) A kind of through-flooring tube circumference leakage preventing structure
CN202431281U (en) Waterproof structure outside side wall of subway station main body
CN103696437B (en) A kind of construction method of cutting lattice column
CN206299392U (en) A kind of high osmosis water-rich sand layer shield end reinforcement system
CN108385686A (en) A kind of cast-in-situ bored pile exempts from stripping and exempts from ring cutting to cut pile crown technique
CN204139413U (en) A kind of cast-in-place hollow slab of zonal cooling formula anti-floating
CN207685818U (en) It is a kind of it is repeatable utilize lead wall device
CN102720275A (en) Flexible coiled material for deformation joint and construction method of flexible coiled material
CN217758982U (en) Waterproof node structure in anti-floating anchor rod top
CN104343204B (en) Sectional continuous floating-resistant cast-in-situ hollow slab
CN103628899B (en) Retain CRD median septum and be welded with water flange construction technology
CN206607675U (en) A kind of basement composite external wall anti-cracking and seepage control structure construction
CN110552378A (en) Underground space roof subsides post-cast strip and seals structure in advance
CN205776327U (en) A kind of slip casting bag buried pipeline basis of band pipe pillow
CN204126094U (en) A kind of cast-in-place hollow slab of segmentation dislocation type anti-floating
CN107060040A (en) A kind of underground pipe gallery drainage system based on existing blowdown canal
CN202530481U (en) Waterproof structure of basement wall
CN202170705U (en) Window frame fixing seat
CN205444910U (en) Can have enough to meet need structure firmware with PVC plastic tubing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160817