CN105862709A - Automatic recharge and blockage removing system and working method thereof - Google Patents
Automatic recharge and blockage removing system and working method thereof Download PDFInfo
- Publication number
- CN105862709A CN105862709A CN201610178707.0A CN201610178707A CN105862709A CN 105862709 A CN105862709 A CN 105862709A CN 201610178707 A CN201610178707 A CN 201610178707A CN 105862709 A CN105862709 A CN 105862709A
- Authority
- CN
- China
- Prior art keywords
- recharge
- recharges
- controller
- equipment
- circuit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Soil Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Geophysics And Detection Of Objects (AREA)
- Road Signs Or Road Markings (AREA)
Abstract
The invention discloses an automatic recharge and blockage removing system and a working method thereof and belongs to the technical field of environmental protection. The system structurally comprises a control circuit and an operating circuit. The control circuit is formed by connecting a controller, a first power module, a control switch and a coil of an electromagnetic relay in series. A power supply device is arranged in the controller to supply power to the controller. The controller is connected with a liquid level meter located in a recharge well. The operating circuit comprises a second power module, an operating switch, a time circulation controller, a recharge device and a pump lifting and hole cleaning device. The second power module, the operating switch and the time circulation controller are connected in series to form a power supply branch circuit. The recharge device and a normally-open static contact of the electromagnetic relay are connected in series to form a recharge branch circuit. The pump lifting and hole cleaning device and the recharge branch circuit are connected to the power supply branch circuit in parallel. By adopting the automatic recharge and blockage removing system, the problems that existing recharge devices cannot achieve the purposes of automatic pump lifting and hole cleaning and intelligent opening and closing are solved, manual labor is greatly relieved, and the recharge efficiency is improved.
Description
Technical field
The present invention relates to environmental technology field, specifically one recharges blockage removal system and method for work thereof automatically.
Background technology
At present, the commonly used artificial real-time monitored water level of known inverted well thus control to recharge the opening and closing of facility, due to
The requirement recharged, causes this work often to waste time and energy also not reach and recharge requirement.And either earth's surface is recharged or deep-well returns
Fill, all can run into the problem recharged facility or recharge formation blockage.Blockage problem is the key factor of restriction groundwater recharge efficiency,
The generation of blocking can reduce recharges speed, reduces the working life recharging facility, has a strong impact on the actual utility recharging engineering, system
About recharge popularization and the application of engineering.
Summary of the invention
For the problems referred to above, it is an object of the invention to provide one and automatically recharge blockage removal system and method for work thereof, this system and
Its method of work can recharge equipment, and meeting timing block clearing with intelligent start/stop, has liberated hand labor greatly and has improve back
The efficiency filled.
The present invention solves the technical scheme that its technical problem taked and includes: one recharges blockage removal system automatically, it is characterized in that, bag
Include control circuit and operating circuit,
Described control circuit is made up of the coils connected in series of controller, the first power module, control switch and electromagnetic relay, described
Controller is built-in with electric supply installation and is powered it, and described controller is connected with the liquidometer being positioned at inverted well;
Described operating circuit includes second source module, operating switch, time cycle controller, recharges equipment and return and raise clear hole and set
Standby;Described second source module, operating switch and time cycle controller power supply in series branch road, described in recharge equipment and institute
State the normally opened stationary contact branch road that recharges in series of electromagnetic relay, raise clear hole equipment and the described branch circuit parallel connection that recharges for described time in institute
State on power supply branch road.
Control switch and can use audion or relay etc..
In order to remind staff intuitively when recharging equipment work, further technical scheme is: described control circuit
On be also in series with and recharge warning light.
Further technical scheme is: described controller is single-chip microcomputer.
Further technical scheme is: described liquid level is calculated as pressure-type liquidometer.Pressure-type liquidometer delicate structure, adjustment letter
Single, flexible for installation.
In order to reduce the energy consumption of system, more conforming to the requirement of environmental protection, further technical scheme is: the first described power supply mould
Block is sun-generated electric power.Generally for ensuring personal safety, the voltage of sun-generated electric power is less than 36 volts, can start electromagnetism relay
Device.
In order to remind staff intuitively when recharging equipment break-off, further technical scheme is: described electricity
Magnetic relay also includes that normally closed stationary contact, normally closed stationary contact and time-out recharge warning light time-out in series and recharge cue circuit, institute
State time-out recharge cue circuit be connected in parallel on described in recharge between branch road and described power supply branch road.
Further technical scheme is: described electromagnetic relay also includes armature and armature spring, and armature is pacified by armature spring
Be contained between described normally closed stationary contact and described normally opened stationary contact, by described coil control described armature and normally closed stationary contact or
Normally opened stationary contact connects.This structure makes whole system compact conformation, reliable operation.
The present invention solves the technical scheme of its technical problem and also includes: the above-mentioned method of work automatically recharging blockage removal system, including with
Lower step:
Step 1): the waterline that liquidometer monitors in inverted well requires water level less than recharging, and the equipment of recharging automatically begins to work;
Step 2): time cycle controller automatic switchover realization is recharged equipment and is raised the equipment alternation of clear hole with returning;
Step 3): the waterline that liquidometer monitors in inverted well requires water level higher than recharging, and the equipment of recharging is automatically stopped work.
Further technical scheme is: described step 1) specific works process be: the waterline in inverted well is wanted less than recharging
When seeking water level, waterlevel data is transferred in described controller by described liquidometer, and described controller is by described control switch connection
Circuit, described electromagnetic relay must electrically connect described normally opened stationary contact, described in recharge the operating circuit of equipment and connect and start working.
Further technical scheme is: described step 3) specific works process be: the waterline in inverted well is wanted higher than recharging
When seeking water level, waterlevel data is transferred in described controller by described liquidometer, and described controller is switched off by described control
Circuit, described electromagnetic relay dead electricity disconnects described normally opened stationary contact, described in recharge the operating circuit of equipment and disconnect and quit work.
By coordinating of the coil of electromagnetic relay and armature, it is achieved recharge the connecting or disconnecting of operating circuit of equipment, work as electricity
When magnetic relay obtains electric work, armature is adsorbed on normally opened stationary contact by the coil of electromagnetic relay, recharges the operating circuit of equipment
Connecting, the equipment of recharging is started working;When electromagnetic relay dead electricity quits work, armature loses after suction at armature spring
Being attached to normally closed stationary contact under effect, the operating circuit recharging equipment disconnects, and the equipment of recharging quits work, and time-out recharges and carries simultaneously
Show that lamp luminescence reminds that staff is paused recharges.
The invention has the beneficial effects as follows:
1, by liquidometer monitoring inverted well in height of water level, water level signal is passed to controller by liquidometer, controller according to
The water level signal that receives controls electromagnetic relay action, it is achieved recharge the connecting or disconnecting of operating circuit of equipment;In addition lead to
Cross time cycle controller to automatically switch, recharge equipment with returning and raise the equipment alternation of clear hole, it is achieved regularly block clearing, automatization's journey
Degree height, has liberated hand labor greatly and has improve the efficiency recharged.
2, control device and recharge equipment be separated, maintain easily and simplicity easily repaiied, meanwhile, whole automatically recharge blockage removal system can
With disassembled for transport, can be used for multiple times.
3, the first power module uses sun-generated electric power, reduces energy consumption, more environmentally-friendly, reduces the Financial cost of the equipment of recharging.
Accompanying drawing explanation
Fig. 1 is the structural representation of the embodiment of the present invention.
In figure: 1 inverted well, 2 single-chip microcomputers, 3 control switch, and 4 pressure-type liquidometers, 5 first power modules, 6 recharge prompting
Lamp, 7 electromagnetic relays, 8 normally opened stationary contacts, 9 normally closed stationary contacts, 10 time cycle controllers, 11 second source modules,
12 operating switches, raise clear hole equipment for 13 times, and 14 time-outs recharge warning light, and 15 recharge equipment, 16 armature, 17 armature springs.
Detailed description of the invention
Below in conjunction with Figure of description and specific embodiment, the invention will be further described:
As it is shown in figure 1, one recharges blockage removal system automatically, including control device, recharge equipment 15 and return raise clear hole equipment 13;
Described control device includes by single-chip microcomputer the 2, first power module 5, recharges warning light 6, control switch 3 and electromagnetic relay 7
Coils connected in series constitute control circuit, described single-chip microcomputer 2 is connected with the pressure-type liquidometer 4 being positioned at inverted well 1;Single
The cell panel of built-in its power supply promising of sheet machine 2.
Second source module 11, operating switch 12 and time cycle controller 10 power supply in series branch road, recharge equipment 15
The branch road that recharges in series with the normally opened stationary contact 8 of electromagnetic relay 7, raises clear hole equipment 13 for described time and described recharges branch road also
It is associated on described power supply branch road.
Described electromagnetic relay 7 also includes normally closed stationary contact 9, and it is in series that normally closed stationary contact 9 and time-out recharge warning light 14
Suspend recharge cue circuit, described time-out recharge cue circuit be connected in parallel on described in recharge between branch road and described power supply branch road.Electromagnetism
Relay 7 also includes that armature 16 and armature spring 17, armature 16 are arranged on described normally closed stationary contact 9 by armature spring 17
With between described normally opened stationary contact 8, armature spring 17 is connected at normally opened stationary contact 8, when electromagnetic relay 7 does not works,
Under the effect of armature spring 17, armature 16 is withstood on normally closed stationary contact 9, and when electromagnetic relay 7 works, coil attracts rank
Ferrum 16 overcomes spring force to contact with normally opened stationary contact 8.This structure makes whole system compact conformation, reliable operation.
Controlling switch and can use audion or relay etc., the control program in single-chip microcomputer 2 uses the existing control programs such as PLC.
By time cycle controller 10 automatically switch realization recharge equipment 15 and return raise alternation between clear hole equipment 13, time
Between cycle controller 10 structure as shown in fig. 1, it has three contacts, connects sheet and touches at two at interval of the regular hour
Switch once between point.Under original state, connect sheet and be connected to can connect on two contacts recharging branch road, press operating switch 12
And when electromagnetic relay 7 obtains electric, recharge branch road conducting, recharge equipment 15 and work.After separated in time, connect sheet commutation
Connect back the operating circuit raising clear hole equipment 13, return and raise clear hole equipment 13 and start block clearing.The company of cycle controller 10 over time
The commutation of contact pin, recharges equipment 15 with returning and raises equipment 13 alternation of clear hole.
When pressing operating switch 12, connect sheet and be connected to can connect on two contacts recharging branch road, but electromagnetism continues
During electrical equipment 7 dead electricity, armature 16 contacts with normally closed stationary contact 9, recharges equipment 15 and does not works, and suspends and recharges warning light 14 luminescence,
Staff is reminded to recharge paused.
The first described power module 5 is sun-generated electric power.Generally for ensuring personal safety, the voltage of sun-generated electric power is 36
Below volt, electromagnetic relay 7 can be started.
For ease of the understanding of the present invention, below in conjunction with a work process, the invention will be further described:
First, connect main switch 12, when the waterline in pressure-type liquidometer 4 monitors inverted well 1 is less than warning water level,
Waterlevel data is transferred in single-chip microcomputer 2 by pressure-type liquidometer 4, and single-chip microcomputer 2 is by controlling switch 3 connection circuit, and electromagnetism continues
Electrical equipment 7 obtains electric starting working, and armature is adsorbed on normally opened stationary contact 8 by the coil of electromagnetic relay 7, recharges the work of equipment 15
Make circuit ON, recharge equipment 15 and start working, recharge warning light 6 simultaneously and light.
When the waterline in pressure-type liquidometer 4 monitors inverted well 1 higher than recharge require water level time, pressure-type liquidometer 4 will
Waterlevel data is transferred in single-chip microcomputer 2, and single-chip microcomputer 2 is by controlling switch 3 disconnecting circuits, and electromagnetic relay 7 dead electricity stops work
Making, armature is attached to normally closed stationary contact 9, while the equipment of recharging quits work after losing suction under the effect of armature spring
Time-out recharges warning light 14 and lights.
When time cycle controller 10 is after arrival regulation recharges time interval, and the internal sheet that connects commutates, and cuts off and recharges equipment 15
Power supply, connect back and raise clear hole equipment 13 power supply and start back to raise block clearing;Described time cycle controller 10 arrives regulation block clearing
After time interval, the internal sheet that connects commutates again, connects and recharges equipment 15 power supply, cut off back and raise clear hole equipment 13 power supply, returns
Filling equipment 15 continues normally to work.
The foregoing is only presently preferred embodiments of the present invention, be not whole embodiments of the present invention, not in order to limit this
Bright, all within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. made, should be included in this
Within bright protection domain.
In addition to technical characteristic described in description, remaining technical characteristic is all known to a person skilled in the art technology, in order to highlight this
Bright innovative characteristics, above-mentioned technical characteristic does not repeats them here.
Claims (10)
1. automatically recharge a blockage removal system, it is characterized in that, including control circuit and operating circuit,
Described control circuit is made up of the coils connected in series of controller, the first power module, control switch and electromagnetic relay, described
Controller is built-in with electric supply installation and is powered it, and described controller is connected with the liquidometer being positioned at inverted well;
Described operating circuit includes second source module, operating switch, time cycle controller, recharges equipment and return and raise clear hole and set
Standby;Described second source module, operating switch and time cycle controller power supply in series branch road, described in recharge equipment and institute
State the normally opened stationary contact branch road that recharges in series of electromagnetic relay, raise clear hole equipment and the described branch circuit parallel connection that recharges for described time in institute
State on power supply branch road.
One the most according to claim 1 recharges blockage removal system automatically, it is characterized in that, described control circuit is also in series with
Recharge warning light.
One the most according to claim 1 recharges blockage removal system automatically, it is characterized in that, described controller is single-chip microcomputer.
One the most according to claim 1 recharges blockage removal system automatically, it is characterized in that, described liquid level is calculated as pressure type liquid
Position meter.
One the most according to claim 1 recharges blockage removal system automatically, it is characterized in that, the first described power module is too
Sun can power supply.
One the most according to claim 1 recharges blockage removal system automatically, it is characterized in that, described electromagnetic relay also includes
Normally closed stationary contact, normally closed stationary contact and time-out recharge warning light time-out in series and recharge cue circuit, and described time-out recharges prompting
Circuit in parallel recharges between branch road and described power supply branch road described.
One the most according to claim 6 recharges blockage removal system automatically, it is characterized in that, described electromagnetic relay also includes
Armature and armature spring, armature is arranged between described normally closed stationary contact and described normally opened stationary contact by armature spring, by institute
State the coil described armature of control to be connected with normally closed stationary contact or normally opened stationary contact.
8. automatically recharge a method of work for blockage removal system as claimed in claim 1, it is characterized in that, comprise the following steps:
Step 1): the waterline that liquidometer monitors in inverted well requires water level less than recharging, and the equipment of recharging automatically begins to work;
Step 2): time cycle controller automatic switchover realization is recharged equipment and is raised the equipment alternation of clear hole with returning;
Step 3): the waterline that liquidometer monitors in inverted well requires water level higher than recharging, and the equipment of recharging is automatically stopped work.
Method of work the most according to claim 8, is characterized in that, described step 1) specific works process be: recharge
Waterline in well less than recharge require water level time, waterlevel data is transferred in described controller by described liquidometer, described control
Device must electrically connect described normally opened stationary contact by described control switch connection circuit, described electromagnetic relay, described in recharge equipment
Operating circuit is connected and starts working.
Method of work the most according to claim 8, is characterized in that, described step 3) specific works process be: return
Fill waterline in well higher than recharge require water level time, waterlevel data is transferred in described controller by described liquidometer, described control
Device processed switches off circuit by described control, and described electromagnetic relay dead electricity disconnects described normally opened stationary contact, described in recharge equipment
Operating circuit disconnect and quit work.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610178707.0A CN105862709B (en) | 2016-03-25 | 2016-03-25 | A kind of automatic recharge blockage removal system and its method of work |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610178707.0A CN105862709B (en) | 2016-03-25 | 2016-03-25 | A kind of automatic recharge blockage removal system and its method of work |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105862709A true CN105862709A (en) | 2016-08-17 |
CN105862709B CN105862709B (en) | 2017-11-14 |
Family
ID=56625940
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610178707.0A Active CN105862709B (en) | 2016-03-25 | 2016-03-25 | A kind of automatic recharge blockage removal system and its method of work |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105862709B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109088419A (en) * | 2018-08-31 | 2018-12-25 | 邹平县供电公司 | Single phase poaer supply phasing switch |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3390241A (en) * | 1964-10-23 | 1968-06-25 | Bbc Brown Boveri & Cie | Gas circulating system for compressed gas operated circuit breakers |
JP2000346446A (en) * | 1999-06-01 | 2000-12-15 | Corona Corp | Hot-water supplier provided with one-boiler two-water passage type re-heating function |
CN103453693A (en) * | 2013-06-01 | 2013-12-18 | 湖北东橙新能源科技有限公司 | Pressure reinjection system utilizing pressurization of booster pump |
CN204550119U (en) * | 2015-01-26 | 2015-08-12 | 上海奥德水处理科技有限公司 | A kind of dissolving with Liquid level auto-admission and manual air inlet function |
CN205536681U (en) * | 2016-02-25 | 2016-08-31 | 青岛地质工程勘察院 | Pressure system of recharging of granite area vein structure type geothermal field |
-
2016
- 2016-03-25 CN CN201610178707.0A patent/CN105862709B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3390241A (en) * | 1964-10-23 | 1968-06-25 | Bbc Brown Boveri & Cie | Gas circulating system for compressed gas operated circuit breakers |
JP2000346446A (en) * | 1999-06-01 | 2000-12-15 | Corona Corp | Hot-water supplier provided with one-boiler two-water passage type re-heating function |
CN103453693A (en) * | 2013-06-01 | 2013-12-18 | 湖北东橙新能源科技有限公司 | Pressure reinjection system utilizing pressurization of booster pump |
CN204550119U (en) * | 2015-01-26 | 2015-08-12 | 上海奥德水处理科技有限公司 | A kind of dissolving with Liquid level auto-admission and manual air inlet function |
CN205536681U (en) * | 2016-02-25 | 2016-08-31 | 青岛地质工程勘察院 | Pressure system of recharging of granite area vein structure type geothermal field |
Non-Patent Citations (1)
Title |
---|
司家鑫: "基坑施工中变频恒压回灌装置技术应用", 《建筑机械化》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109088419A (en) * | 2018-08-31 | 2018-12-25 | 邹平县供电公司 | Single phase poaer supply phasing switch |
Also Published As
Publication number | Publication date |
---|---|
CN105862709B (en) | 2017-11-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203008043U (en) | Water supply and drainage control system applied to water tank | |
CN204212244U (en) | A kind of intelligent closestool | |
CN209266864U (en) | A kind of switchgear, breaker and division brake control device | |
CN108418270A (en) | A kind of charging equipment intelligent power supply control system | |
CN105553061A (en) | DC charging pile control system | |
CN201074364Y (en) | Digitalized wireless programmed water supply system | |
CN105862709A (en) | Automatic recharge and blockage removing system and working method thereof | |
CN104122803A (en) | Solar-energy standby power supplying device | |
CN202196301U (en) | Seepage draining intelligence control system of water power station | |
CN103984281A (en) | Permanent magnet switch controller and method based on IGBT and programmable logic technology | |
CN109630390B (en) | PLC control water pumping device of power distribution station | |
CN206181495U (en) | Single live wire intelligence switch gets electric system | |
CN201860175U (en) | Operation controller for field suppression switch | |
CN207051370U (en) | A kind of external breaker controller of electric energy meter | |
CN210038554U (en) | Intelligent water level control system of emulsion pump station | |
CN106230106A (en) | The sewage disposal device that a kind of joint household formula photovoltaic commercial power is complementary | |
CN210919491U (en) | One-key starting control system for water pump of small irrigation pump station | |
CN205355901U (en) | Direct current fills electric pile control system | |
CN208078684U (en) | Charging equipment intelligent power supply control system | |
CN201243964Y (en) | Overflow-proof controller of directly drinking machine | |
CN207218364U (en) | A kind of adaptive anti-shake electric installation of backup type contactor maintenance | |
CN205179403U (en) | Low standby power bull induction cooker system | |
CN205621964U (en) | Intelligence picture peg | |
CN205800812U (en) | Body light control system and pure electric automobile | |
CN201107666Y (en) | Water pump power supply automatic control switch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |