CN105854517A - Method for replacing pressure swing adsorption decarburization device before driving by combining nitrogen and evacuation method - Google Patents

Method for replacing pressure swing adsorption decarburization device before driving by combining nitrogen and evacuation method Download PDF

Info

Publication number
CN105854517A
CN105854517A CN201610300815.0A CN201610300815A CN105854517A CN 105854517 A CN105854517 A CN 105854517A CN 201610300815 A CN201610300815 A CN 201610300815A CN 105854517 A CN105854517 A CN 105854517A
Authority
CN
China
Prior art keywords
nitrogen
pressure
valve
program control
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610300815.0A
Other languages
Chinese (zh)
Other versions
CN105854517B (en
Inventor
王猛
宁平
曲思霖
刘定万
杨皓
王娟芸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Tianren Energy Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610300815.0A priority Critical patent/CN105854517B/en
Publication of CN105854517A publication Critical patent/CN105854517A/en
Application granted granted Critical
Publication of CN105854517B publication Critical patent/CN105854517B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/02Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography
    • B01D53/04Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography with stationary adsorbents
    • B01D53/047Pressure swing adsorption
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2259/00Type of treatment
    • B01D2259/40Further details for adsorption processes and devices
    • B01D2259/40001Methods relating to additional, e.g. intermediate, treatment of process gas

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Analytical Chemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Separation Of Gases By Adsorption (AREA)

Abstract

The invention relates to a replacement method before driving after the installation or overhaul of a pressure swing adsorption device, wherein after compressed air purges a pipeline and leakage test and pressure test are qualified, the inside of a tower is full of air, in the first step, an adsorption tower program control valve and a pressure equalizing equipment program control valve are opened, the adsorption tower program control valve and the pressure equalizing equipment program control valve are vacuumized until the pressure is less than or equal to-0.07 MPa, and all the program control valves are closed; and secondly, feeding nitrogen from an outlet main pipe of the adsorption tower to the pressure of 0.005MPa through opening all outlet program control valves through a nitrogen pipeline arranged on an outlet main pipe at the top of the adsorption tower, discharging and replacing the effluent gas from a discharge pipe arranged at a raw material gas inlet, wherein the discharged air amount is 10% -20% of the total capacity of the container, stopping feeding the nitrogen, closing a nitrogen valve, ensuring that the oxygen content in the gas of the raw material gas inlet main pipe reaches-2.5%, the oxygen content of the two steps is repeated to reach-0.2%, the oxygen content of the two steps is repeated again to reach-0.04%, and determining the repetition times according to the required oxygen concentration.

Description

Method of replacing before the driving of a kind of pressure-changeable adsorption decarbonization device utilizing nitrogen to be combined with evacuation method
Technical field
The present invention relates to chemical field, be that one effectively utilizes noble gas, the method reducing gas consumption.
Background technology
1, for chemical plant installations more than operating pressure 0.3MPa, general method of replacing is to enter at unstripped gas Set up nitrogen to replace pipeline at mouth house steward, make access equipment under nitrogen 0.3MPa, be vented after flowing through armamentarium Method drive the oxygen in air away, this method is practical and is used by almost all of chemical plant. The method is applied to import and export straight-through equipment and safely and effectively and saves nitrogen.Also have in product gas outlet total Pipe sets up nitrogen to replace pipeline, makes access equipment under nitrogen 0.3MPa, flows through armamentarium, sets from import department Standing up the oxygen that the method for vacant duct is driven away in air, the reason of both approaches is identical.
2, for pressure-swing absorption apparatus, said method has the biggest defect to be because pressure-swing absorption apparatus Pipeline is intricate, does not has simple direct current channel, and pipeline is many with equipment dead angle, has been generally difficult to caecum The displacement of structure.In order to preferably replace, it is necessary to set up displacement drain on almost all house steward with equipment Guaranteeing to replace without dead angle, leakage point increases naturally, and management difficulty strengthens, and operation is also inconvenient.For 4 Individual following adsorption tower, owing to pressure-equalizing passageway is few, equipment is few, and directly circulation displacement is also feasible, but It is for current adsorption tower up to more than 10, even has the device that 40 adsorption towers work simultaneously, displacement Method uses the big, for 18 towers, 30 cubes of every tower, pressure-equalizing passageway 5 of conventional circulation displacement difficulty exception The adsorbent equipment of root, nitrogen flow 1000 side of marking/hour, time swap is the most all more than 12 hours.If It is general all more than 10 that vertically-arranged changes emptying point, and it is more than 10 that displacement sample point is correspondingly arranged.Each point Sample the displacement of the most qualified guarantee qualified.
3, the nitrogen mark number formulary used by nitrogen displacement be substantially 5 times of container total measurement (volume) or more than, could handle Device oxygen concentration is reduced to 0.2%.
Summary of the invention
Device is installed or drives after overhaul front method of replacing, present invention be characterized in that, through scavenging conduit Road is qualified with leak test pressure testing, is all air in tower, the first step, all adsorption towers set up in bottom whole Evacuation sequencing valve is opened, and opens any one the adsorption tower whole sequencing valves in addition to atmospheric valve, opens adsorption tower The whole of top export sequencing valve, open the sequencing valve that the most all pressure equipment is connected, thus can ensure that device Except the armamentarium of vacuum pump outlet, inverse bleeder holes interconnects.
Evacuate whole adsorption tower with all pressure equipment pressure to-0.07MPa and more fine vacuum, stop evacuating, close All evacuate sequencing valve.This process is reduced to less than 30% the amount of oxygen in equipment, original initial Oxygen partial pressure is reduced to 0.006MPa and following by 0.021MPa.But the concentration that oxygen is in a device does not has Reduce, still be about 21%.
Second step, by being arranged on the nitrogen pipeline on adsorption tower top exit house steward from adsorption column outlet house steward Sending into nitrogen by the whole outlet sequencing valves opened is 0.005MPa to pressure, opens displacement outlet valve, puts Empty substitution is worked off one's feeling vent one's spleen, and displacement gas emptying amount is the 10%~20% of total place capacity, and this process, oxygen The concentration of gas is reduced to by original about 21%~2.5%.Stop sending nitrogen, close nitrogen valve, from raw material Gas intake header analytical sampling mouth samples, and analyzes the oxygen content in gas and reaches~2.5%.
Repeat the first step and second step, sample from raw material gas inlet house steward's analytical sampling mouth, analyze in gas Oxygen content reaches~0.2%.
The concentration of oxygen determines number of repetition as required, and the most generally less than 0.2% oxygen is qualified. Required nitrogen total amount is only 2.5 times of whole container capacity, replaces the about circulation of qualified required time and puts Change the 30% of the time.
Again repeat the first step and second step, sample from raw material gas inlet house steward's analytical sampling mouth, analyze gas In oxygen content should be~0.04%.
For the device of particular/special requirement, if oxygen requires lower, need to increase evacuation and boosting displacement number of times.
Detailed description of the invention
Embodiment 1:18 tower pressure-changeable adsorption decarbonization device is replaced, through overvoltage before driving after installing or having overhauled After contracting air purging pipeline (being initially provided with filling adsorbent) is qualified with leak test pressure testing, in tower, it is all air, The first step, whole evacuation sequencing valves that all adsorption towers are set up in bottom are opened, and open any one absorption The tower whole sequencing valves in addition to atmospheric valve, open the whole of adsorption tower top and export sequencing valve, open the most all The sequencing valve that pressure equipment is connected, evacuates whole adsorption tower with all pressure equipment pressure to-0.070MPa, stops evacuating, Close and all evacuate sequencing valve;Second step, by being arranged on the nitrogen pipeline on adsorption tower top exit house steward Sending into nitrogen from adsorption column outlet house steward by the whole outlet sequencing valves opened is 0.005MPa to pressure, from Gas is flowed out in the blow-down pipe emptying displacement that raw material gas inlet is set up, and emptying tolerance is the 20% of container total capacity, stops Only send nitrogen, close nitrogen valve, sample from raw material gas inlet house steward's analytical sampling mouth, analyze in gas Oxygen content reaches~2.5%, repeats the first step and second step, samples from raw material gas inlet house steward's analytical sampling mouth, Analyzing the oxygen content in gas to reach~0.2%, the most generally less than 0.2% oxygen is qualified.
Embodiment 2:21 tower pressure-changeable adsorption decarbonization device is replaced, through overvoltage before driving after installing or having overhauled After contracting air purging pipeline (being initially provided with filling adsorbent) is qualified with leak test pressure testing, in tower, it is all air, The first step, whole evacuation sequencing valves that all adsorption towers are set up in bottom are opened, and open any one absorption The tower whole sequencing valves in addition to atmospheric valve, open the whole of adsorption tower top and export sequencing valve, open the most all The sequencing valve that pressure equipment is connected, evacuates whole adsorption tower with all pressure equipment pressure to-0.075MPa, stops evacuating, Close and all evacuate sequencing valve;Second step, by being arranged on the nitrogen pipeline on adsorption tower top exit house steward Sending into nitrogen from adsorption column outlet house steward by the whole outlet sequencing valves opened is 0.005MPa to pressure, from Gas is flowed out in the blow-down pipe emptying displacement that raw material gas inlet is set up, and emptying tolerance is the 15% of container total capacity, stops Only send nitrogen, close nitrogen valve, sample from raw material gas inlet house steward's analytical sampling mouth, analyze in gas Oxygen content reaches~2.5%, repeats the first step and second step, samples from raw material gas inlet house steward's analytical sampling mouth, Analyzing the oxygen content in gas to reach~0.2%, the most generally less than 0.2% oxygen is qualified.
Embodiment 3:16 tower pressure-changeable adsorption decarbonization device is replaced, through overcompression before driving after installing or having overhauled After air purging pipeline (being initially provided with filling adsorbent) is qualified with leak test pressure testing, in tower, it is all air, the One step, whole evacuation sequencing valves that all adsorption towers are set up in bottom are opened, and open any one adsorption tower and remove Whole sequencing valves outside atmospheric valve, open the whole of adsorption tower top and export sequencing valve, open and all press equipment The sequencing valve being connected, evacuates whole adsorption tower with all pressure equipment pressure to-0.08MPa, stops evacuating, cut out complete Portion evacuates sequencing valve;Second step, by being arranged on the nitrogen pipeline on adsorption tower top exit house steward from adsorption tower It is 0.005MPa to pressure that outlet header sends into nitrogen by the whole outlet sequencing valves opened, from raw material gas inlet Gas is flowed out in the blow-down pipe emptying displacement set up, and emptying tolerance is the 11% of container total capacity, stops sending nitrogen, closes Closing nitrogen valve, sample from raw material gas inlet house steward's analytical sampling mouth, the oxygen content analyzed in gas reaches ~2.5%, repeat the first step and second step, sample from raw material gas inlet house steward's analytical sampling mouth, analyze in gas Oxygen content reaches~0.2%, and the most generally less than 0.2% oxygen is qualified.

Claims (1)

1. method of replacing before driving after pressure-swing absorption apparatus is installed or overhauled, it is characterised in that After compressed air purging pipeline (being initially provided with filling adsorbent) is qualified with leak test pressure testing, Air it is all in tower, the first step, whole evacuate sequencing valve what all adsorption towers were set up in bottom Open, open any one the adsorption tower whole sequencing valves in addition to atmospheric valve, open absorption tower top The whole of portion export sequencing valve, open the sequencing valve that the most all pressure equipment is connected, evacuate and all inhale Attached tower and all pressure equipment pressure, to-0.07MPa or more condition of high vacuum degree, stop evacuating, and close complete Portion evacuates sequencing valve;Second step, by being arranged on the nitrogen tube on adsorption tower top exit house steward Road sends into nitrogen from adsorption column outlet house steward by the whole outlet sequencing valves opened 0.005MPa, the blow-down pipe emptying displacement set up from raw material gas inlet is flowed out gas, is vented tolerance For the 10%~20% of container total capacity, stop sending nitrogen, close nitrogen valve, from unstripped gas Intake header analytical sampling mouth samples, and analyzes the oxygen content in gas and reaches~2.5%, repeats The first step and second step, sample from raw material gas inlet house steward's analytical sampling mouth, analyzes in gas Oxygen content reaches~0.2%, again repeats the first step and second step, from raw material gas inlet house steward Analytical sampling mouth samples, and analyzes the oxygen content in gas and reaches~0.04%, oxygen as required The concentration of gas determines number of repetition, and the most generally less than 0.2% oxygen is qualified.
CN201610300815.0A 2016-05-10 2016-05-10 Method for replacing pressure swing adsorption decarburization device before driving by combining nitrogen and evacuation method Active CN105854517B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610300815.0A CN105854517B (en) 2016-05-10 2016-05-10 Method for replacing pressure swing adsorption decarburization device before driving by combining nitrogen and evacuation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610300815.0A CN105854517B (en) 2016-05-10 2016-05-10 Method for replacing pressure swing adsorption decarburization device before driving by combining nitrogen and evacuation method

Publications (2)

Publication Number Publication Date
CN105854517A true CN105854517A (en) 2016-08-17
CN105854517B CN105854517B (en) 2018-12-28

Family

ID=56631533

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610300815.0A Active CN105854517B (en) 2016-05-10 2016-05-10 Method for replacing pressure swing adsorption decarburization device before driving by combining nitrogen and evacuation method

Country Status (1)

Country Link
CN (1) CN105854517B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106949373A (en) * 2017-03-23 2017-07-14 中车西安车辆有限公司 A kind of pressure vessel nitrogen displacement method and device
CN112717630A (en) * 2020-12-31 2021-04-30 天脊煤化工集团股份有限公司 Method for replacing adsorbent of adsorption tower on line

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101549240A (en) * 2009-04-23 2009-10-07 天津大学 Method containing carbon dioxide replacement for absorbing methane in condensed coal bed gas through pressure varying mode
CN102556974A (en) * 2010-12-27 2012-07-11 湖北中科博策新材料研究院 Method for continuously preparing iodine pentafluoride

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101549240A (en) * 2009-04-23 2009-10-07 天津大学 Method containing carbon dioxide replacement for absorbing methane in condensed coal bed gas through pressure varying mode
CN102556974A (en) * 2010-12-27 2012-07-11 湖北中科博策新材料研究院 Method for continuously preparing iodine pentafluoride

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘朋立: ""PSA变压吸附程控阀故障的处理"", 《煤炭化工》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106949373A (en) * 2017-03-23 2017-07-14 中车西安车辆有限公司 A kind of pressure vessel nitrogen displacement method and device
CN112717630A (en) * 2020-12-31 2021-04-30 天脊煤化工集团股份有限公司 Method for replacing adsorbent of adsorption tower on line

Also Published As

Publication number Publication date
CN105854517B (en) 2018-12-28

Similar Documents

Publication Publication Date Title
CN105981109B (en) The system and method for improving the sensitivity for sobbing desorption system
CN107247108B (en) Transformer oil on-line monitoring high-concentration vacuum oil-gas separation device and method
CN104656618B (en) Pressure-variable adsorption agent regenerating control device and its control method
CN105854517A (en) Method for replacing pressure swing adsorption decarburization device before driving by combining nitrogen and evacuation method
CN105181856A (en) Automatic detection device for insulated gas of single-hole sulfur hexafluoride electrical equipment
CN203874635U (en) Device for recycling tank field heavy polluted oil waste gas
KR20090069360A (en) Multi gas supply equipment through one line to gas chromatograph without sample replacement
CN101113974B (en) Liquid phase medium preprocess device of on-line chromatographic study and using method, and used thereof
CN110146349B (en) Pressurized air sampling device and sampling method thereof
CN210923164U (en) Sampling pipeline of atmosphere analyzer in furnace
CN209065415U (en) A kind of oxygen rapid regeneration device
CN105854518B (en) Method of replacing before a kind of pressure-changeable adsorption decarbonization device combined using nitrogen with evacuation is got angry
CN205426895U (en) Bottled high -purity gas analysis system
CN109420646B (en) Gas purging device and purging method for uranium concentration plant
CN107099349B (en) Desulfurizer and its sulfur method
CN215115421U (en) Water quality sample pretreatment device
CN201253495Y (en) Automatic bailer of concentration device at vacuum state
CN208399220U (en) A kind of gas producing device acquiring parallel gas
CN208057370U (en) A kind of deacidification tank on vacuum pump
CN211488812U (en) Full self-cleaning device of gas analysis appearance preliminary treatment
CN207324425U (en) A kind of clarifier for supercritical carbon dioxide Brayton cycle electricity generation system
CN112198022A (en) Water quality sample pretreatment device
CN106823686A (en) Closed cycle type molecular sieve performance test machine
CN219200972U (en) Down sampler of waste liquid recovery tank
CN2933544Y (en) Horizontal adsorption tower molecular sieve compacting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 610072 No. 301, Unit 4, Building 13, No. 118, Jinze Road, Qingyang District, Chengdu City, Sichuan Province

Applicant after: Yang Hao

Address before: 610031 No. 3724 Wantong Financial Plaza, 88 Jinfu Road, Jinniu District, Chengdu City, Sichuan Province

Applicant before: Yang Hao

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220510

Address after: 610041 No. 801, 8th Floor, No. 88 South Keyuan Road, Chengdu High-tech Zone, Sichuan Province

Patentee after: SICHUAN TIANREN ENERGY TECHNOLOGY Co.,Ltd.

Address before: 610072 No. 301, Unit 4, Building 13, No. 118, Jinze Road, Qingyang District, Chengdu City, Sichuan Province

Patentee before: Yang Hao

TR01 Transfer of patent right