CN105844082A - Method for judging main facies in sedimentary facies map and system thereof - Google Patents
Method for judging main facies in sedimentary facies map and system thereof Download PDFInfo
- Publication number
- CN105844082A CN105844082A CN201610153389.2A CN201610153389A CN105844082A CN 105844082 A CN105844082 A CN 105844082A CN 201610153389 A CN201610153389 A CN 201610153389A CN 105844082 A CN105844082 A CN 105844082A
- Authority
- CN
- China
- Prior art keywords
- sandstone
- thickness
- monolayer
- sandy ground
- sand
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G16—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
- G16Z—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
- G16Z99/00—Subject matter not provided for in other main groups of this subclass
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The invention discloses a method for judging a main facies in a sedimentary facies map and a system thereof. The method comprises the steps of according to the sandstone thickness of each drill point and the maximum thickness and the minimum thickness of the single-layer sandstone, calculating the sand thickness, the ratio of the sandstone thickness and the stratum thickness, the ratio of the sandstone thickness and the stratum thickness corresponding to the single-layer sandstone with the maximum thickness and the ratio of the sandstone thickness and the stratum thickness corresponding to the single-layer sandstone with the minimum thickness, screening out the drill point where the sandstone thickness is bigger than a preset thickness and the layer number of the sandstone is bigger than a preset layer number, and determining the drilling point as the main facies when the thickness of the single-layer sandstone with the maximum thickness, the thickness of the single-layer sandstone with the minimum thickness, the ratio of the sandstone thickness and the stratum thickness corresponding to the single-layer sandstone with the maximum thickness and the ratio of the sandstone thickness and the stratum thickness corresponding to the single-layer sandstone with the minimum thickness of the screened drill point reach the requirements, so the misjudgment of the main facies is prevented, and the accuracy of the sedimentary facies map is improved.
Description
Technical field
The present invention relates to technical field of geological exploration, deposit the judgement side of leading phase in phasor particularly to a kind of
Method and system.
Background technology
Deposition phasor is basic map important in oil and gas exploration and development, sand body planar distribution map
It is then the main map of establishment deposition phasor, generally comprises sand thickness figure (being called for short sand thickness figure) and sandy ground ratio
Figure (or sand factor figure).On the basis of statistics work area drilling strata and sandstone thickness, establishment is corresponding equivalent
Line chart can obtain sand thickness figure and sandy ground than figure.General sandstone thickness is to add up sandstone in a certain stratigraphic unit
Cumulative thickness, sandy ground is divided by formation thickness by the cumulative thickness of sandstone than then.
Obtaining sandstone cumulative thickness accurately is the key working out sand thickness figure and sandy ground than figure.Sandstone cumulative thickness
Being the statistically thickness of all or most of monolayer sandstone in layer unit, the defect that the method exists is that some bores
Sandstone thickness in monolayer is thin, the layer of sand number of plies is many to meet point, and cumulative thickness is big, and non-dominant is mistakenly considered leading phase mutually;
Otherwise, thickness in monolayer is big, the number of plies is few, cumulative thickness is little leading is mistakenly considered non-dominant phase mutually;In appearance
Problem of stating then can cause the less reliable depositing phasor.
Summary of the invention
Embodiments provide a kind of determination methods depositing leading phase in phasor and system, in order to solve
The problem that in prior art, leading phase misjudgment causes depositing phasor less reliable.
A kind of determination methods depositing in phasor leading phase, comprises the following steps:
Add up each each layer sandstone thickness, the sandstone number of plies and formation thickness boring and meeting point;
According to described each layer sandstone thickness screening maximum gauge of monolayer sandstone and minimum thickness, determine that monolayer is
Thick sandstone and the thinnest sandstone of monolayer;
Calculate each boring according to described each layer sandstone thickness, the sandstone number of plies and formation thickness and meet the sand thickness of point, sand
Sandy ground ratio that ground is more corresponding than, the thickest sandstone of monolayer and sandy ground ratio corresponding to the thinnest sandstone of monolayer;
It is more than more than preset thickness and the sandstone number of plies according to each sand thickness boring chance point and sand layers number riddled sand thickness
Point met by the brill presetting the number of plies;
Respectively reach at the thickness boring the thickest sandstone of monolayer meeting point filtered out and the most flaggy thickness of monolayer
Maximum empirical thickness and minimum empirical thickness, and sandy ground corresponding to the thickest sandstone of monolayer than and the thinnest sandstone of monolayer
Corresponding sandy ground ratio respectively reach maximum experience sandy ground than and minimum experience sandy ground ratio, determine described in filter out
Bore chance point and take phase as the leading factor.
Preferably, described sand is calculated by below equation thick:
Wherein, h is that described sand is thick, and n is the described sandstone number of plies, hiIt is the thickness of i-th layer of sandstone.
Preferably, calculate described sandy ground by below equation to compare:
Wherein, ρ is described sandy ground ratio, and H is described formation thickness.
Preferably, calculate sandy ground ratio corresponding to the thickest sandstone of described monolayer by below equation and monolayer is the thinnest
The sandy ground ratio that sandstone is corresponding:
Wherein, ρmaxFor the sandy ground ratio that the thickest sandstone of described monolayer is corresponding, hmaxFor the thickest sandstone of described monolayer
Thickness, ρminFor the sandy ground ratio that the thinnest sandstone of described monolayer is corresponding, hminFor the most flaggy thickness of described monolayer.
A kind of judgement system depositing in phasor leading phase, including:
Statistical module, for adding up each each layer sandstone thickness, the sandstone number of plies and formation thickness boring chance point;
First screening module, for the maximum gauge according to described each layer sandstone thickness screening monolayer sandstone and
Little thickness, determines the thickest sandstone of monolayer and the thinnest sandstone of monolayer;
Computing module, for calculating each brill according to described each layer sandstone thickness, the sandstone number of plies and formation thickness
Meet the sand that the sand thickness of point, sandy ground ratio corresponding to sandy ground ratio, the thickest sandstone of monolayer and the thinnest sandstone of monolayer are corresponding
Ground ratio;
Second screening module, for the sand according to each brill chance point is thick and sand layers number riddled sand thickness is more than default
Thickness and the sandstone number of plies meet point more than the brill presetting the number of plies;
Judge module, at the thickness boring the thickest sandstone of monolayer meeting point filtered out and the thinnest sandstone of monolayer
Thickness respectively reach maximum empirical thickness and minimum empirical thickness, and the sandy ground ratio that the thickest sandstone of monolayer is corresponding
The sandy ground ratio that sandstone the thinnest with monolayer is corresponding respectively reaches maximum experience sandy ground ratio and minimum experience sandy ground ratio, really
The brill filtered out described in Ding is met point and is taken phase as the leading factor.
Preferably, to calculate described sand by below equation thick for described computing module:
Wherein, h is that described sand is thick, and n is the described sandstone number of plies, hiIt is the thickness of i-th layer of sandstone.
Preferably, described computing module by below equation calculate described sandy ground compare:
Wherein, ρ is described sandy ground ratio, and H is described formation thickness.
Preferably, described computing module calculates, by below equation, the sandy ground ratio that the thickest sandstone of described monolayer is corresponding
And the sandy ground ratio that the thinnest sandstone of monolayer is corresponding:
Wherein, ρmaxFor the sandy ground ratio that the thickest sandstone of described monolayer is corresponding, hmaxFor the thickest sandstone of described monolayer
Thickness, ρminFor the sandy ground ratio that the thinnest sandstone of described monolayer is corresponding, hminFor the most flaggy thickness of described monolayer.
In the embodiment of the present invention, a kind of determination methods depositing leading phase in phasor and system, bore according to each and meet
Sandstone thickness, the maximum gauge of monolayer sandstone and the minimum thickness of point, calculates sand thickness, sandy ground ratio, monolayer
Sandy ground ratio that thick sandstone is corresponding and sandy ground ratio corresponding to the thinnest sandstone of monolayer, screening is shaked out thick more than presetting thickness
Degree and the sandstone number of plies meet point more than the brill presetting the number of plies, in the thickness boring the thickest sandstone of monolayer meeting point filtered out
Degree, the sandy ground ratio sandstone the thinnest with monolayer that the most flaggy thickness of monolayer, the thickest sandstone of monolayer are corresponding are corresponding
Than respectively reaching, sandy ground determines when requiring that the brill filtered out is met point and taken phase as the leading factor, it is to avoid the erroneous judgement of leading phase, carries
The accuracy of high deposition phasor.
Accompanying drawing explanation
In order to be illustrated more clearly that inventive embodiments of the present invention or technical scheme of the prior art, below
The accompanying drawing used required in embodiment or description of the prior art will be briefly described, it is clear that
Ground, the accompanying drawing in describing below is only some embodiments of present invention invention, common for this area
From the point of view of technical staff, on the premise of not paying creative work, it is also possible to obtain according to these accompanying drawings
Other accompanying drawing.
A kind of steps flow chart depositing the determination methods dominating phase in phasor that Fig. 1 provides for the embodiment of the present invention
Figure;
A kind of functional module depositing the judgement system dominating phase in phasor that Fig. 2 provides for the embodiment of the present invention
Figure.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clearly
Chu, be fully described by, it is clear that described embodiment be only a part of embodiment of the present invention rather than
Whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not making creation
The every other embodiment obtained under property work premise, broadly falls into the scope of protection of the invention.
With reference to Fig. 1, embodiments provide a kind of determination methods depositing and dominating phase in phasor, the party
Method includes:
Step 100, adds up each each layer sandstone thickness, the sandstone number of plies and formation thickness boring and meeting point;
Step 101, according to maximum gauge and the minimum thickness of described each layer sandstone thickness screening monolayer sandstone,
Determine the thickest sandstone of monolayer and the thinnest sandstone of monolayer;
Specifically, the monolayer sandstone with maximum gauge is the thickest sandstone of described monolayer, has minimum thickness
Monolayer sandstone is the thinnest sandstone of described monolayer;
Step 102, calculates each boring according to described each layer sandstone thickness, the sandstone number of plies and formation thickness and meets point
Sandy ground ratio corresponding to sand thickness, sandy ground ratio corresponding to sandy ground ratio, the thickest sandstone of monolayer and the thinnest sandstone of monolayer;
Specifically, described sand is calculated by below equation (1) thick:
In formula (1), h is that described sand is thick, and n is the described sandstone number of plies, hiIt is the thickness of i-th layer of sandstone;
Calculate described sandy ground by below equation (2) to compare:
In formula (2), ρ is described sandy ground ratio, and H is described formation thickness;
By below equation (3) calculate respectively with (4) sandy ground ratio corresponding to the thickest sandstone of described monolayer and
The sandy ground ratio that the thinnest sandstone of monolayer is corresponding:
Wherein, ρmaxFor the sandy ground ratio that the thickest sandstone of described monolayer is corresponding, hmaxFor the thickest sandstone of described monolayer
Thickness, ρminFor the sandy ground ratio that the thinnest sandstone of described monolayer is corresponding, hminFor the most flaggy thickness of described monolayer;
Step 103, bores the sand thickness meeting point with sand layers number riddled sand thickness more than preset thickness and sand according to each
Rock stratum number meets point more than the brill presetting the number of plies;
Step 104, in the thickness boring the thickest sandstone of monolayer meeting point filtered out and the most flaggy thickness of monolayer
Degree respectively reaches maximum empirical thickness and minimum empirical thickness, and sandy ground ratio corresponding to the thickest sandstone of monolayer and list
The sandy ground ratio that the thinnest sandstone of layer is corresponding respectively reaches maximum experience sandy ground ratio and minimum experience sandy ground ratio, determines institute
State the brill chance point filtered out and take phase as the leading factor;
Specifically, the brill filtered out described in meets point for step 103 medium sand thickness more than preset thickness and the sandstone number of plies
Point is met more than the brill presetting the number of plies.
Based on same inventive concept, embodiments provide a kind of judgement system depositing and dominating phase in phasor
System, as in figure 2 it is shown, owing to principle and a kind of deposition of this system solution technical problem dominate phase in phasor
Determination methods is similar, and therefore the enforcement of this system can refer to the enforcement of method, repeats no more in place of repetition.
Statistical module 200, for adding up each each layer sandstone thickness, the sandstone number of plies and stratum boring chance point
Thickness;
First screening module 201, for the maximum gauge according to described each layer sandstone thickness screening monolayer sandstone
And minimum thickness, determine the thickest sandstone of monolayer and the thinnest sandstone of monolayer;
Computing module 202, every for calculating according to described each layer sandstone thickness, the sandstone number of plies and formation thickness
Individual boring meets sand thickness of point, sandy ground ratio corresponding to sandy ground ratio, the thickest sandstone of monolayer and monolayer the thinnest sandstone correspondence
Sandy ground ratio;
Second screening module 203, for meeting according to each brill, the sand of point is thick and sand layers number riddled sand thickness is more than
Preset thickness and the sandstone number of plies meet point more than the brill presetting the number of plies;
Judge module 204, for the thinnest at the thickness boring the thickest sandstone of monolayer meeting point filtered out and monolayer
The thickness of sandstone respectively reaches maximum empirical thickness and minimum empirical thickness, and the sand that the thickest sandstone of monolayer is corresponding
The ground sandy ground ratio more corresponding than sandstone the thinnest with monolayer respectively reaches maximum experience sandy ground ratio and minimum experience sandy ground ratio,
The brill filtered out described in determining is met point and is taken phase as the leading factor.
Should be appreciated that should according to module that in one of the above deposition phasor, the judgement system of leading phase includes is only
The logical partitioning that the function that system realizes is carried out, in actual application, can carry out the superposition of above-mentioned module or tear open
Point.And the function that a kind of judgement system depositing in phasor leading phase that this embodiment provides is realized is with upper
The a kind of of embodiment offer is provided and deposits the determination methods one_to_one corresponding of leading phase in phasor, real for this system institute
Existing more detailed handling process, is described in detail in said method embodiment one, the most detailed
Thin description.
Those skilled in the art are it should be appreciated that embodiments of the invention can be provided as method, system or meter
Calculation machine program product.Therefore, the present invention can use complete hardware embodiment, complete software implementation or knot
The form of the embodiment in terms of conjunction software and hardware.And, the present invention can use and wherein wrap one or more
Computer-usable storage medium containing computer usable program code (include but not limited to disk memory,
CD-ROM, optical memory etc.) form of the upper computer program implemented.
The present invention is with reference to method, equipment (system) and computer program according to embodiments of the present invention
Flow chart and/or block diagram describe.It should be understood that can by computer program instructions flowchart and/
Or flow process in each flow process in block diagram and/or square frame and flow chart and/or block diagram and/or
The combination of square frame.These computer program instructions can be provided to general purpose computer, special-purpose computer, embedded
The processor of datatron or other programmable data processing device is to produce a machine so that pass through computer
Or the instruction that the processor of other programmable data processing device performs produces for realizing at flow chart one stream
The device of the function specified in journey or multiple flow process and/or one square frame of block diagram or multiple square frame.
These computer program instructions may be alternatively stored in and can guide computer or other programmable data processing device
In the computer-readable memory worked in a specific way so that be stored in this computer-readable memory
Instruction produces the manufacture including command device, and this command device realizes at one flow process of flow chart or multiple stream
The function specified in journey and/or one square frame of block diagram or multiple square frame.
These computer program instructions also can be loaded in computer or other programmable data processing device, makes
Sequence of operations step must be performed to produce computer implemented process on computer or other programmable devices,
Thus the instruction performed on computer or other programmable devices provides for realizing in one flow process of flow chart
Or the step of the function specified in multiple flow process and/or one square frame of block diagram or multiple square frame.
Although preferred embodiments of the present invention have been described, but those skilled in the art once know base
This creativeness concept, then can make other change and amendment to these embodiments.So, appended right is wanted
Ask and be intended to be construed to include preferred embodiment and fall into all changes and the amendment of the scope of the invention.
Obviously, those skilled in the art can carry out various change and modification without deviating from this to the present invention
Bright spirit and scope.So, if the present invention these amendment and modification belong to the claims in the present invention and
Within the scope of its equivalent technologies, then the present invention is also intended to comprise these change and modification.
Claims (8)
1. one kind deposits the determination methods of leading phase in phasor, it is characterised in that comprise the following steps:
Add up each each layer sandstone thickness, the sandstone number of plies and formation thickness boring and meeting point;
According to described each layer sandstone thickness screening maximum gauge of monolayer sandstone and minimum thickness, determine that monolayer is
Thick sandstone and the thinnest sandstone of monolayer;
Calculate each boring according to described each layer sandstone thickness, the sandstone number of plies and formation thickness and meet the sand thickness of point, sand
Sandy ground ratio that ground is more corresponding than, the thickest sandstone of monolayer and sandy ground ratio corresponding to the thinnest sandstone of monolayer;
It is more than more than preset thickness and the sandstone number of plies according to each sand thickness boring chance point and sand layers number riddled sand thickness
Point met by the brill presetting the number of plies;
Respectively reach at the thickness boring the thickest sandstone of monolayer meeting point filtered out and the most flaggy thickness of monolayer
Maximum empirical thickness and minimum empirical thickness, and sandy ground corresponding to the thickest sandstone of monolayer than and the thinnest sandstone of monolayer
Corresponding sandy ground ratio respectively reach maximum experience sandy ground than and minimum experience sandy ground ratio, determine described in filter out
Bore chance point and take phase as the leading factor.
2. the method for claim 1, it is characterised in that calculate described sand by below equation thick:
Wherein, h is that described sand is thick, and n is the described sandstone number of plies, hiIt is the thickness of i-th layer of sandstone.
3. method as claimed in claim 2, calculates described sandy ground by below equation and compares:
Wherein, ρ is described sandy ground ratio, and H is described formation thickness.
4. method as claimed in claim 3, it is characterised in that calculate described monolayer by below equation
Sandy ground ratio that thick sandstone is corresponding and sandy ground ratio corresponding to the thinnest sandstone of monolayer:
Wherein, ρmaxFor the sandy ground ratio that the thickest sandstone of described monolayer is corresponding, hmaxFor the thickest sandstone of described monolayer
Thickness, ρminFor the sandy ground ratio that the thinnest sandstone of described monolayer is corresponding, hminFor the most flaggy thickness of described monolayer.
5. one kind deposits the judgement system of leading phase in phasor, it is characterised in that including:
Statistical module, for adding up each each layer sandstone thickness, the sandstone number of plies and formation thickness boring chance point;
First screening module, for the maximum gauge according to described each layer sandstone thickness screening monolayer sandstone and
Little thickness, determines the thickest sandstone of monolayer and the thinnest sandstone of monolayer;
Computing module, for calculating each brill according to described each layer sandstone thickness, the sandstone number of plies and formation thickness
Meet the sand that the sand thickness of point, sandy ground ratio corresponding to sandy ground ratio, the thickest sandstone of monolayer and the thinnest sandstone of monolayer are corresponding
Ground ratio;
Second screening module, for the sand according to each brill chance point is thick and sand layers number riddled sand thickness is more than default
Thickness and the sandstone number of plies meet point more than the brill presetting the number of plies;
Judge module, at the thickness boring the thickest sandstone of monolayer meeting point filtered out and the thinnest sandstone of monolayer
Thickness respectively reach maximum empirical thickness and minimum empirical thickness, and the sandy ground ratio that the thickest sandstone of monolayer is corresponding
The sandy ground ratio that sandstone the thinnest with monolayer is corresponding respectively reaches maximum experience sandy ground ratio and minimum experience sandy ground ratio, really
The brill filtered out described in Ding is met point and is taken phase as the leading factor.
6. system as claimed in claim 5, it is characterised in that described computing module passes through below equation meter
Calculate described sand thick:
Wherein, h is that described sand is thick, and n is the described sandstone number of plies, hiIt is the thickness of i-th layer of sandstone.
7. system as claimed in claim 6, it is characterised in that described computing module passes through below equation meter
Calculate described sandy ground to compare:
Wherein, ρ is described sandy ground ratio, and H is described formation thickness.
8. system as claimed in claim 7, it is characterised in that described computing module passes through below equation meter
Calculate sandy ground ratio corresponding to the thickest sandstone of described monolayer and the thinnest sandstone of monolayer corresponding sandy ground ratio:
Wherein, ρmaxFor the sandy ground ratio that the thickest sandstone of described monolayer is corresponding, hmaxFor the thickest sandstone of described monolayer
Thickness, ρminFor the sandy ground ratio that the thinnest sandstone of described monolayer is corresponding, hminFor the most flaggy thickness of described monolayer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610153389.2A CN105844082B (en) | 2016-03-11 | 2016-03-11 | The judgment method and system of phase are dominated in a kind of deposition phasor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610153389.2A CN105844082B (en) | 2016-03-11 | 2016-03-11 | The judgment method and system of phase are dominated in a kind of deposition phasor |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105844082A true CN105844082A (en) | 2016-08-10 |
CN105844082B CN105844082B (en) | 2018-11-02 |
Family
ID=56587132
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610153389.2A Expired - Fee Related CN105844082B (en) | 2016-03-11 | 2016-03-11 | The judgment method and system of phase are dominated in a kind of deposition phasor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105844082B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108254786A (en) * | 2018-01-02 | 2018-07-06 | 中国石油天然气集团公司 | A kind of reservoir sequence recognition methods and device |
CN109324171A (en) * | 2018-11-15 | 2019-02-12 | 中国海洋石油集团有限公司 | A kind of sedimentary facies quantitative identification method based on lithology statistics |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103218750A (en) * | 2013-04-03 | 2013-07-24 | 中国海洋石油总公司 | Geology evaluation method for offshore sedimentary rock oil field |
CN103901502A (en) * | 2014-03-11 | 2014-07-02 | 中国海洋石油总公司 | Offshore oilfield reservoir prediction method based on composite sand body construction plate |
CN104268377A (en) * | 2014-09-11 | 2015-01-07 | 西安石油大学 | Brittleness index determining method based on industrial components of coal rocks |
CN104598766A (en) * | 2015-03-05 | 2015-05-06 | 成都理工大学 | Oil and gas reservoir comprehensive assessment oriented spatial case-based reasoning method |
CN105239998A (en) * | 2015-08-21 | 2016-01-13 | 中国海洋石油总公司 | Well distribution method based on offshore oilfield reservoir subdivision |
-
2016
- 2016-03-11 CN CN201610153389.2A patent/CN105844082B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103218750A (en) * | 2013-04-03 | 2013-07-24 | 中国海洋石油总公司 | Geology evaluation method for offshore sedimentary rock oil field |
CN103901502A (en) * | 2014-03-11 | 2014-07-02 | 中国海洋石油总公司 | Offshore oilfield reservoir prediction method based on composite sand body construction plate |
CN104268377A (en) * | 2014-09-11 | 2015-01-07 | 西安石油大学 | Brittleness index determining method based on industrial components of coal rocks |
CN104598766A (en) * | 2015-03-05 | 2015-05-06 | 成都理工大学 | Oil and gas reservoir comprehensive assessment oriented spatial case-based reasoning method |
CN105239998A (en) * | 2015-08-21 | 2016-01-13 | 中国海洋石油总公司 | Well distribution method based on offshore oilfield reservoir subdivision |
Non-Patent Citations (6)
Title |
---|
ER CHUANG等: "Features of tight sandstone reservoir and origin of tightness:an example from chang-7member,Triassic yanchang formation in chenghao area,orbos basin", 《ACTA GEOLOGICA SINICA》 * |
于兴河等: "三角洲沉积的结构-成因分类与编图方法", 《沉积学报》 * |
罗晓容等: "油气运移输导层研究及量化表征方法", 《石油学报》 * |
耳闯等: "沉积环境对富有机质页岩分布的控制作用-以鄂尔多斯盆地三叠系延长组长7油层组为例", 《天然气地球科学》 * |
耳闯等: "辽河坳陷双台子构造带沙三段沉积相展布特征与沉积主控因素", 《沉积学报》 * |
高福坤: "运用单因素成图方法编制沉积相图", 《中国西部科技》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108254786A (en) * | 2018-01-02 | 2018-07-06 | 中国石油天然气集团公司 | A kind of reservoir sequence recognition methods and device |
CN108254786B (en) * | 2018-01-02 | 2019-09-10 | 中国石油天然气集团公司 | A kind of reservoir sequence recognition methods and device |
CN109324171A (en) * | 2018-11-15 | 2019-02-12 | 中国海洋石油集团有限公司 | A kind of sedimentary facies quantitative identification method based on lithology statistics |
Also Published As
Publication number | Publication date |
---|---|
CN105844082B (en) | 2018-11-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103454678B (en) | A kind of determination method and system of seismic slice tautochronism | |
CN106285660B (en) | Method and device for identifying low-resistance oil layer of multilayer sandstone oil reservoir | |
CN109725349B (en) | Method and device for recovering ancient landform in hydrocarbon generation critical period | |
CN102518428A (en) | Oily water layer recognition method and device | |
CN109115987B (en) | Rock physical model-based fluid factor evaluation method and device | |
CN110632652B (en) | Method and device for determining oil-gas migration mode of fault block oil-gas reservoir | |
CN110632657B (en) | Mudstone smearing type fault sealing analysis method and device | |
CN104834006B (en) | The treating method and apparatus of structure origin cause of formation deposition parameter figure | |
CN105888659A (en) | Method and device for determining lithologic oil-gas reservoir forming probability | |
CN107589469A (en) | The determination method and apparatus of oil-water interfaces | |
CN105866832A (en) | Method and device for recognizing low-grade fault of deep tight sandstone gas reservoir | |
CN109425900A (en) | A kind of Seismic Reservoir Prediction method | |
CN106019370A (en) | Information recommendation method and device | |
CN106990436B (en) | The recognition methods of karst collapse col umn and device | |
CN110632656B (en) | Method and device for analyzing transverse sealing property of fault | |
CN105844082A (en) | Method for judging main facies in sedimentary facies map and system thereof | |
CN106650042A (en) | Method and device for confirming fracture conduction capacity parameter | |
CN110359841A (en) | The track of horizontal well determines method, the Drilling Control method and apparatus of horizontal well | |
CN105572746A (en) | Method and device for determining position of drilling well | |
CN106842316A (en) | Crack determines method and apparatus | |
CN107368688B (en) | Method and device for determining marine single sand body | |
EP4357585A1 (en) | Method and apparatus for identifying high permeability streaks in marine carbonate rock bioclastic limestone oil reservoir | |
Dasgupta et al. | Accurate reservoir characterization to reduce drilling risk in Khuff-C carbonate, Ghawar field, Saudi Arabia | |
CN107976717A (en) | The definite method and device of clastic rock oil reservoir grade | |
CN109267994A (en) | Low permeability oil field water breakthrough mode identification method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
DD01 | Delivery of document by public notice |
Addressee: Ear rush Document name: payment instructions |
|
DD01 | Delivery of document by public notice | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181102 |
|
CF01 | Termination of patent right due to non-payment of annual fee |