CN105836602B - The higher oil pipeline of safety installs equipment - Google Patents

The higher oil pipeline of safety installs equipment Download PDF

Info

Publication number
CN105836602B
CN105836602B CN201610384733.9A CN201610384733A CN105836602B CN 105836602 B CN105836602 B CN 105836602B CN 201610384733 A CN201610384733 A CN 201610384733A CN 105836602 B CN105836602 B CN 105836602B
Authority
CN
China
Prior art keywords
sub bar
cylinder
neonychium
sunpender
oil pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610384733.9A
Other languages
Chinese (zh)
Other versions
CN105836602A (en
Inventor
贺昶明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
De Cheng Measuring And Controlling Equipment Co ltd Of Jiangsu Province
Beijing Institute of Electronic System Engineering
Original Assignee
Jiangsu Decheng Measurement And Control Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Decheng Measurement And Control Equipment Co Ltd filed Critical Jiangsu Decheng Measurement And Control Equipment Co Ltd
Priority to CN201610384733.9A priority Critical patent/CN105836602B/en
Publication of CN105836602A publication Critical patent/CN105836602A/en
Application granted granted Critical
Publication of CN105836602B publication Critical patent/CN105836602B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • B66C1/16Slings with load-engaging platforms or frameworks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • B66C1/122Sling or load protectors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

It include: pedestal the invention discloses the higher oil pipeline installation equipment of safety, sunpender, lifting rope, 2 neonychiums, crane, the sunpender both ends are connect with annulus respectively, it is connect in the middle part of the lifting rope with hanging ring, the lifting rope both ends are connected with the first lock respectively, a cylinder is connected in the middle part of the neonychium, a circular hole is equipped in the middle part of the neonychium, spring stack is equipped in the cylinder, the chassis left side and right side are respectively connected with a guide plate, the guiding plate surface is connected with M pulley, it is reasonable to realize equipment design, convenient for being installed to oil pipeline, and installation effectiveness is higher, easy damaged oil pipeline is not allowed, the higher technical effect of safety.

Description

The higher oil pipeline of safety installs equipment
Technical field
The present invention relates to petroleum machinery research fields, and in particular, to a kind of higher oil pipeline installation of safety is set It is standby.
Background technique
Oil pipeline (also referred to as pipeline, pipeline) is made of oil pipe and its attachment, and according to the needs of process flow, is matched Standby corresponding oil pump unit, design are mounted to a complete pipe-line system, unload to complete oil plant and defeated turn task.
Controlling methodology of oil pipeline, i.e., for transporting the pipe-line system of petroleum and oil product, mainly by petroleum pipeline, oil transportation station And other auxiliary phases close equipment composition, are that one of capital equipment of oil movement and storage industry and crude oil and oil product are main Conveying equipment, compared with the railway and highway oil transportation that belong to land transportation mode, pipeline oil transportation has that freight volume is big, airtightness Good, the features such as at low cost and safety coefficient is high.
The tubing of oil pipeline is generally steel pipe, connects equipment using welding and flange etc. and connects into long-distance pipe, and Control is opened and closed using valve and flow is adjusted, oil pipeline mainly has isothermal conveying, heated transportation and sequentially-fed etc. defeated Send technique.
Oil pipeline during installation, generally use crane and lifting rope binding carry out handling installation, during handling by In the friction of lifting rope, it is easy to cause oil pipeline to damage, do not allow so that wear at the port at oil pipeline inner wall and both ends It is easily docked, and when handling is put into bottom surface, needs manually to be adjusted direction to the oil pipeline of handling, avoid misplacing position It sets, efficiency is lower, and there are security risks.
In conclusion present inventor is in realizing the embodiment of the present application during inventive technique scheme, in discovery Technology is stated at least to have the following technical problems:
In the prior art, that there are efficiency is lower for the installation of existing oil pipeline, is easily damaged oil pipeline, safety compared with The technical problem of difference.
Summary of the invention
The present invention provides a kind of higher oil pipelines of safety to install equipment, solves existing oil pipeline installation It is lower that there are efficiency, is easily damaged oil pipeline, the poor technical problem of safety, realizes equipment design rationally, convenient for pair Oil pipeline is installed, and installation effectiveness is higher, it is not easy to damage oil pipeline, the higher technical effect of safety.
In order to solve the above technical problems, the embodiment of the present application provides oil pipeline installation equipment, the equipment includes:
Pedestal, sunpender, lifting rope, 2 neonychiums, cranes, the sunpender both ends are connect with annulus respectively, in the middle part of the lifting rope It is connect with hanging ring, the lifting rope both ends are connected with the first lock respectively, are connected with a cylinder, the protection in the middle part of the neonychium Pad middle part is equipped with a circular hole, and the cylinder both ends are openning shape, and the neonychium and the cylinder are all made of rubber and are made, described Neonychium and the drum surface are tooth form, and for the cylinder inner wall inserted with N root steel bar, the N is whole more than or equal to 5 Number, the neonychium are round neonychium, and the diameter of the neonychium is greater than the outer diameter of oil pipeline, and the outer diameter of the cylinder is small In being equipped with spring stack in the internal diameter of the oil pipeline, the cylinder, spring stack both ends are connect with the inner wall of the cylinder respectively, The spring stack is in compressive state, and the neonychium upper end is connect with one end of the first steel cable, first steel cable it is another End is connected with the second lock, and the neonychium lower end connect with one end of the second steel cable, the other end of second steel cable and the Three lock connections;The sunpender includes: the first sub bar and the second sub bar, and first sub bar is cylindrical shape, first sub bar Both ends are openning shape, and the first sub bar inner wall is shape of threads, and second sub bar outer surface is shape of threads, second sub bar It is inserted into the first sub bar internal screw thread connection and forms the sunpender, the chassis left side and right side are respectively connected with a guide plate, institute It states guiding plate surface and is connected with M pulley, the M is the integer more than or equal to 10;Wherein, the pan frontward end and rear end connect It is connected to one second guide plate, the second guiding plate surface is connected with P pulley, and the P is the integer more than or equal to 10, described It is equipped with fixation hole on first sub bar and second sub bar, fixing glue passes through the fixation hole to first sub bar and described Second sub bar is fixed.
Wherein, when being installed to oil pipeline, the both ends of oil pipeline are carried out respectively first with 2 neonychiums Protection, specially by neonychium cylinder insertion oil pipeline in, using the spring stack compressive deformation in cylinder to cylinder into Row support so that cylinder be bonded oil pipeline inner wall, it is therefore an objective to be bonded it is easy to carry, generate friction it is not easy to fall off, by cylinder After being inserted into oil pipeline, then the first steel cable of 2 neonychium upper ends is attached by 2 second locks, then by 2 Second steel cable of neonychium lower end is attached by 2 third locks, by steel cable and lock so that between 2 neonychiums in succession It connects, so that neonychium is not easy to fall off during carrying, guarantees safety, 2 end of sunpender is then each passed through 2 protections The circular hole and cylinder of pad, i.e. 2 end of sunpender are each passed through oil pipeline, then latch by first so that sunpender is connect with lifting rope, Then crane catches on hanging ring by suspension hook and is carried, convenient in carrying safety, and good in handling process, can be with using rubber cylinder Oil pipeline inner wall is protected, the power of sunpender is acted on cylinder, prevents sunpender direct friction oil pipeline inner wall, and Neonychium size is bigger than oil pipeline, can use neonychium during handling and protects to the port at oil pipeline both ends Shield is equipped with neonychium, avoids oil pipeline and wear during carrying between sunpender and lifting rope and oil pipeline;
Further, cylinder inner wall can ensure the intensity of cylinder using steel bar inserted with N root steel bar, avoid carrying During huge deformation occur cause to slide, safety is higher, and neonychium and the drum surface are tooth form, utilizes tooth Shape can increase friction, prevent from skidding, guarantee safety;
Further, sunpender includes: the first sub bar and the second sub bar, and the first sub bar is cylindrical shape, and the first sub bar both ends are Openning shape, the first sub bar inner wall are shape of threads, and the second sub bar outer surface is shape of threads, and the second sub bar is inserted into the first sub bar internal screw thread Changing for sunpender entire length may be implemented in connection composition sunpender, the difference for the length being inserted into the first sub bar using the second sub bar Become, the handling to the oil pipeline of different length can be realized, versatility is preferable;
Further, chassis left side and right side are respectively connected with a guide plate, and guiding plate surface connects pulley, hangs in traditional It needs manually to be adjusted the oil pipeline placement direction of handling and position during fortune, in this application, utilizes 2 side of pedestal Guide plate, for crane by oil pipeline handling between guide plate, putting down then as guide plate can be accurately by petroleum pipeline It in road handling to pedestal, does not participate in manually, efficiency and safety are higher, and guide plate is equipped with pulley, are convenient for oil pipeline It slides downward;
Further, pan frontward end and rear end are respectively connected with one second guide plate, and the second guiding plate surface is connected with P cunning Wheel, being respectively provided with the second guide plate in pedestal front and back end can be assisted and be oriented to the front-rear direction of oil pipeline installation, be pacified It is more accurate to fill, and is equipped with fixation hole on the first sub bar and second sub bar, and fixing glue passes through the fixation hole to described the One sub bar and second sub bar are fixed, and can slide, guarantee safety to avoid the first sub bar and the second sub bar in this way.
Wherein, the sunpender, the annulus, the sunpender are all made of bearing steel and are made, the sunpender, the annulus, institute It states sunpender surface and is coated with antirust paint.Wherein, intensity can be ensured using bearing steel, Tu antirust paint can prevent from getting rusty.
Wherein, the N root steel bar is uniformly inserted in the cylinder inner wall.It is uniformly distributed and is uniformly protected convenient for uniform force deformation Hinder safety.
Wherein, the M pulley is evenly distributed on the guide plate.
Wherein, the pedestal is made of bearing steel, and the pedestal is rectangular-shape, and the susceptor surface is coated with antirust Paint.
Wherein, the length of the cylinder is greater than 0.5 meter less than 1 meter.
Wherein, when the curtailment of cylinder insertion, stress is smaller, is equally easy to damage part oil pipeline inner wall, because The length of this cylinder needs to be greater than 0.5 meter, when insertion depth is too long, be easy to cause and carries constant, higher cost.
One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
The higher oil pipeline installation equipment of safety is designed as including: pedestal, sunpender, lifting rope, 2 due to using Neonychium, crane, the sunpender both ends are connect with annulus respectively, are connect in the middle part of the lifting rope with hanging ring, the lifting rope both ends point It is not connected with the first lock, a cylinder is connected in the middle part of the neonychium, is equipped with a circular hole, the cylinder in the middle part of the neonychium Both ends are openning shape, and the neonychium and the cylinder are all made of rubber and are made, and the neonychium and the drum surface are Tooth form, for the cylinder inner wall inserted with N root steel bar, the N is the integer more than or equal to 5, and the neonychium is round neonychium, The diameter of the neonychium is greater than the outer diameter of oil pipeline, and the outer diameter of the cylinder is less than the internal diameter of the oil pipeline, described Spring stack is equipped in cylinder, spring stack both ends are connect with the inner wall of the cylinder respectively, and the spring stack is in compressive state, institute It states neonychium upper end to connect with one end of the first steel cable, the other end of first steel cable and the second lock connect, the protection Pad lower end is connect with one end of the second steel cable, and the other end and the third lock of second steel cable connect;The sunpender includes: One sub bar and the second sub bar, first sub bar are cylindrical shape, and first sub bar both ends are openning shape, in first sub bar Wall is shape of threads, and second sub bar outer surface is shape of threads, and second sub bar is inserted into the first sub bar internal screw thread connection The sunpender is formed, the chassis left side and right side are respectively connected with a guide plate, and the guiding plate surface is connected with M pulley, The M is the integer more than or equal to 10;Wherein, the pan frontward end and rear end are respectively connected with one second guide plate, and described second Guiding plate surface is connected with P pulley, and the P is the integer more than or equal to 10, on first sub bar and second sub bar It is equipped with fixation hole, fixing glue passes through the technical side that first sub bar and second sub bar is fixed in the fixation hole Case, so, it efficiently solves the installation of existing oil pipeline there are efficiency lower, be easily damaged oil pipeline, safety is poor The technical issues of, and then realize equipment design rationally, convenient for installing to oil pipeline, and installation effectiveness is higher, does not allow Easy damaged oil pipeline, the higher technical effect of safety.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the higher oil pipeline installation equipment of safety in the embodiment of the present application one;
Fig. 2 is the structural schematic diagram of one middle hanger of the embodiment of the present application;
Fig. 3 is the schematic side view of cylinder in the embodiment of the present application one;
Fig. 4 is the structural schematic diagram of pedestal in the embodiment of the present application one;
Fig. 5 is the schematic side view of pedestal in the embodiment of the present application one;
Wherein, 1- sunpender, 2- lifting rope, 3- neonychium, 4- annulus, 5- hanging ring, 6- first are latched, 7- cylinder, the first steel of 8- Rope, 9- second are latched, the second steel cable of 10-, 11- third lock, the first sub bar of 12-, the second sub bar of 13-, 14- spring stack, 15- steel Item, 16- oil pipeline, 17- pedestal, 18- guide plate, 19- pulley, 20- fixing glue, the second guide plate of 21-.
Specific embodiment
The present invention provides a kind of higher oil pipelines of safety to install equipment, solves existing oil pipeline installation It is lower that there are efficiency, is easily damaged oil pipeline, the poor technical problem of safety, realizes equipment design rationally, convenient for pair Oil pipeline is installed, and installation effectiveness is higher, it is not easy to damage oil pipeline, the higher technical effect of safety.
Technical solution in the application implementation is to solve above-mentioned technical problem.General thought is as follows:
It is designed as including: pedestal, sunpender, lifting rope, 2 protections using by the higher oil pipeline installation equipment of safety Pad, crane, the sunpender both ends connects with annulus respectively, and the lifting rope middle part is connect with hanging ring, the lifting rope both ends respectively with First lock connection, the neonychium middle part are connected with a cylinder, are equipped with a circular hole, the cylinder both ends in the middle part of the neonychium For openning shape, the neonychium and the cylinder are all made of rubber and are made, and the neonychium and the drum surface are tooth form, The cylinder inner wall is inserted with N root steel bar, and the N is the integer more than or equal to 5, and the neonychium is round neonychium, described The diameter of neonychium is greater than the outer diameter of oil pipeline, and the outer diameter of the cylinder is less than the internal diameter of the oil pipeline, the cylinder Interior to be equipped with spring stack, spring stack both ends are connect with the inner wall of the cylinder respectively, and the spring stack is in compressive state, the guarantor Protection pad upper end is connect with one end of the first steel cable, and the other end of first steel cable and the second lock connect, under the neonychium End is connect with one end of the second steel cable, and the other end and the third lock of second steel cable connect;The sunpender includes: the first son Bar and the second sub bar, first sub bar are cylindrical shape, and first sub bar both ends are openning shape, and the first sub bar inner wall is Shape of threads, second sub bar outer surface are shape of threads, and second sub bar is inserted into the first sub bar internal screw thread connection composition The sunpender, the chassis left side and right side are respectively connected with a guide plate, and the guiding plate surface is connected with M pulley, the M For the integer more than or equal to 10;Wherein, the pan frontward end and rear end are respectively connected with one second guide plate, second guide plate Surface is connected with P pulley, and the P is the integer more than or equal to 10, is equipped on first sub bar and second sub bar Fixation hole, fixing glue pass through the technical solution that first sub bar and second sub bar is fixed in the fixation hole, institute To efficiently solve the installation of existing oil pipeline there are efficiency lower, be easily damaged oil pipeline, the poor technology of safety Problem, and then realize equipment design rationally, convenient for installing to oil pipeline, and installation effectiveness is higher, it is not easy to damage Oil pipeline, the higher technical effect of safety.
In order to better understand the above technical scheme, in conjunction with appended figures and specific embodiments to upper Technical solution is stated to be described in detail.
Embodiment one:
In example 1, the higher oil pipeline installation equipment of safety is provided, Fig. 1-Fig. 5 is please referred to, it is described to set It is standby to include:
Pedestal 17, sunpender 1, lifting rope 2,2 neonychiums 3, crane, the sunpender both ends are connect with annulus 4 respectively, described to hang Rope middle part is connect with hanging ring 5, and the lifting rope both ends are connect with the first lock 6 respectively, is connected with a cylinder in the middle part of the neonychium 7, the neonychium middle part is equipped with a circular hole, and the cylinder both ends are openning shape, and the neonychium and the cylinder are all made of rubber Glue is made, and the neonychium and the drum surface are tooth form, and for the cylinder inner wall inserted with N root steel bar 15, the N is big In the integer for being equal to 5, the neonychium is round neonychium, and the diameter of the neonychium is greater than the outer diameter of oil pipeline, described The outer diameter of cylinder is less than the internal diameter of the oil pipeline, is equipped with spring stack 14 in the cylinder, spring stack both ends respectively with it is described The inner wall of cylinder connects, and the spring stack is in compressive state, and the neonychium upper end is connect with one end of the first steel cable 8, institute The other end and the second lock for stating the first steel cable 9 are connect, and the neonychium lower end is connect with one end of the second steel cable 10, and described the The other end of two steel cables is connect with third lock 11;The sunpender includes: the first sub bar 12 and the second sub bar 13, first son Bar is cylindrical shape, and first sub bar both ends are openning shape, and the first sub bar inner wall is shape of threads, the second sub bar appearance Face is shape of threads, and second sub bar is inserted into the first sub bar internal screw thread connection and forms the sunpender, the chassis left side and Right side is respectively connected with a guide plate 18, and the guiding plate surface is connected with M pulley 19, and the M is the integer more than or equal to 10; Wherein, the pan frontward end and rear end are respectively connected with one second guide plate 21, and the second guiding plate surface is connected with P cunning Wheel, the P are the integer more than or equal to 10, are equipped with fixation hole, fixing glue 20 on first sub bar and second sub bar First sub bar and second sub bar are fixed across the fixation hole.
Wherein, when being installed to oil pipeline 16, first with 2 neonychiums respectively to the both ends of oil pipeline into Cylinder on neonychium, is specially inserted into oil pipeline, using the spring stack compressive deformation in cylinder to cylinder by row protection Be supported so that cylinder be bonded oil pipeline inner wall, it is therefore an objective to be bonded it is easy to carry, generate friction it is not easy to fall off, will justify After cylinder insertion oil pipeline, then the first steel cable of 2 neonychium upper ends is attached by 2 second locks, then by 2 Second steel cable of a neonychium lower end is attached by 2 third locks, by steel cable and lock so that 2 neonychiums are indirect Connection, so that neonychium is not easy to fall off during carrying, guarantees safety, 2 end of sunpender is then each passed through 2 guarantors The circular hole and cylinder of protection pad, i.e. 2 end of sunpender are each passed through oil pipeline, then latch by first so that sunpender and lifting rope connect It connects, then crane catches on hanging ring by suspension hook and carried, convenient in carrying safety, and good in handling process, utilizes rubber cylinder Oil pipeline inner wall can be protected, the power of sunpender is acted on cylinder, prevented in sunpender direct friction oil pipeline Wall, and neonychium size is bigger than oil pipeline, can use neonychium during handling to the port at oil pipeline both ends It is protected, neonychium is equipped between sunpender and lifting rope and oil pipeline, oil pipeline is avoided and is worn during carrying;
Further, cylinder inner wall can ensure the intensity of cylinder using steel bar inserted with N root steel bar, avoid carrying During huge deformation occur cause to slide, safety is higher, and neonychium and the drum surface are tooth form, utilizes tooth Shape can increase friction, prevent from skidding, guarantee safety;
Further, sunpender includes: the first sub bar and the second sub bar, and the first sub bar is cylindrical shape, and the first sub bar both ends are Openning shape, the first sub bar inner wall are shape of threads, and the second sub bar outer surface is shape of threads, and the second sub bar is inserted into the first sub bar internal screw thread Changing for sunpender entire length may be implemented in connection composition sunpender, the difference for the length being inserted into the first sub bar using the second sub bar Become, the handling to the oil pipeline of different length can be realized, versatility is preferable;
Further, chassis left side and right side are respectively connected with a guide plate, and guiding plate surface connects pulley, hangs in traditional It needs manually to be adjusted the oil pipeline placement direction of handling and position during fortune, in this application, utilizes 2 side of pedestal Guide plate, for crane by oil pipeline handling between guide plate, putting down then as guide plate can be accurately by petroleum pipeline It in road handling to pedestal, does not participate in manually, efficiency and safety are higher, and guide plate is equipped with pulley, are convenient for oil pipeline It slides downward;
Further, pan frontward end and rear end are respectively connected with one second guide plate, and the second guiding plate surface is connected with P cunning Wheel, being respectively provided with the second guide plate in pedestal front and back end can be assisted and be oriented to the front-rear direction of oil pipeline installation, be pacified It is more accurate to fill, and is equipped with fixation hole on the first sub bar and second sub bar, and fixing glue passes through the fixation hole to described the One sub bar and second sub bar are fixed, and can slide, guarantee safety to avoid the first sub bar and the second sub bar in this way.
Wherein, in the embodiment of the present application, the sunpender, the annulus, the sunpender are all made of bearing steel and are made, described Sunpender, the annulus, the sunpender surface are coated with antirust paint.Wherein, intensity can be ensured using bearing steel, Tu antirust paint can To prevent from getting rusty.
Wherein, in the embodiment of the present application, the N root steel bar is uniformly inserted in the cylinder inner wall.It is uniformly distributed and is convenient for Uniform force deformation uniformly guarantees safety.
Wherein, in the embodiment of the present application, the M pulley is evenly distributed on the guide plate.
Wherein, in the embodiment of the present application, the pedestal is made of bearing steel, and the pedestal is rectangular-shape, described Susceptor surface is coated with antirust paint.
Wherein, in the embodiment of the present application, the length of the cylinder is greater than 0.5 meter less than 1 meter.
Wherein, in the embodiment of the present application, when the curtailment of cylinder insertion, stress is smaller, is equally easy to damage portion Divide oil pipeline inner wall, therefore the length of cylinder needs to be greater than 0.5 meter, when insertion depth is too long, be easy to cause carrying constant, Higher cost.
Technical solution in above-mentioned the embodiment of the present application, at least have the following technical effects or advantages:
The higher oil pipeline installation equipment of safety is designed as including: pedestal, sunpender, lifting rope, 2 due to using Neonychium, crane, the sunpender both ends are connect with annulus respectively, are connect in the middle part of the lifting rope with hanging ring, the lifting rope both ends point It is not connected with the first lock, a cylinder is connected in the middle part of the neonychium, is equipped with a circular hole, the cylinder in the middle part of the neonychium Both ends are openning shape, and the neonychium and the cylinder are all made of rubber and are made, and the neonychium and the drum surface are Tooth form, for the cylinder inner wall inserted with N root steel bar, the N is the integer more than or equal to 5, and the neonychium is round neonychium, The diameter of the neonychium is greater than the outer diameter of oil pipeline, and the outer diameter of the cylinder is less than the internal diameter of the oil pipeline, described Spring stack is equipped in cylinder, spring stack both ends are connect with the inner wall of the cylinder respectively, and the spring stack is in compressive state, institute It states neonychium upper end to connect with one end of the first steel cable, the other end of first steel cable and the second lock connect, the protection Pad lower end is connect with one end of the second steel cable, and the other end and the third lock of second steel cable connect;The sunpender includes: One sub bar and the second sub bar, first sub bar are cylindrical shape, and first sub bar both ends are openning shape, in first sub bar Wall is shape of threads, and second sub bar outer surface is shape of threads, and second sub bar is inserted into the first sub bar internal screw thread connection The sunpender is formed, the chassis left side and right side are respectively connected with a guide plate, and the guiding plate surface is connected with M pulley, The M is the integer more than or equal to 10;Wherein, the pan frontward end and rear end are respectively connected with one second guide plate, and described second Guiding plate surface is connected with P pulley, and the P is the integer more than or equal to 10, on first sub bar and second sub bar It is equipped with fixation hole, fixing glue passes through the technical side that first sub bar and second sub bar is fixed in the fixation hole Case, so, it efficiently solves the installation of existing oil pipeline there are efficiency lower, be easily damaged oil pipeline, safety is poor The technical issues of, and then realize equipment design rationally, convenient for installing to oil pipeline, and installation effectiveness is higher, does not allow Easy damaged oil pipeline, the higher technical effect of safety.
Although preferred embodiments of the present invention have been described, it is created once a person skilled in the art knows basic Property concept, then additional changes and modifications may be made to these embodiments.So it includes excellent that the following claims are intended to be interpreted as It selects embodiment and falls into all change and modification of the scope of the invention.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to include these modifications and variations.

Claims (1)

1. the higher oil pipeline of safety installs equipment, which is characterized in that the equipment includes:
Pedestal, sunpender, lifting rope, 2 neonychiums, cranes, the sunpender both ends are connect with annulus respectively, in the middle part of the lifting rope with hang Ring connection, the lifting rope both ends are connected with the first lock respectively, are connected with a cylinder in the middle part of the neonychium, in the neonychium Portion is equipped with a circular hole, and the cylinder both ends are openning shape, and the neonychium and the cylinder are all made of rubber and are made, the protection Pad and the drum surface are tooth form, and for the cylinder inner wall inserted with N root steel bar, the N is the integer more than or equal to 5, institute Neonychium is stated as round neonychium, the diameter of the neonychium is greater than the outer diameter of oil pipeline, and the outer diameter of the cylinder is less than institute The internal diameter of oil pipeline is stated, is equipped with spring stack in the cylinder, spring stack both ends are connect with the inner wall of the cylinder respectively, described Spring stack is in compressive state, and the neonychium upper end is connect with one end of the first steel cable, the other end of first steel cable with Second lock connection, the neonychium lower end are connect with one end of the second steel cable, and the other end and third of second steel cable are locked Button connection;The sunpender includes: the first sub bar and the second sub bar, and first sub bar is cylindrical shape, first sub bar both ends For openning shape, the first sub bar inner wall is shape of threads, and second sub bar outer surface is shape of threads, the second sub bar insertion The first sub bar internal screw thread connection forms the sunpender, and the chassis left side and right side are respectively connected with a guide plate, described to lead It is connected with M pulley to plate surface, the M is the integer more than or equal to 10;Wherein, the pan frontward end and rear end are respectively connected with One second guide plate, the second guiding plate surface are connected with P pulley, and the P is the integer more than or equal to 10, and described first Fixation hole is equipped on sub bar and second sub bar, fixing glue passes through the fixation hole to first sub bar and described second Sub bar is fixed;The sunpender, the annulus, the sunpender are all made of bearing steel and are made, the sunpender, the annulus, institute It states sunpender surface and is coated with antirust paint;The N root steel bar is uniformly inserted in the cylinder inner wall;The M pulley is uniformly distributed On the guide plate;The pedestal is made of bearing steel, and the pedestal is rectangular-shape, and the susceptor surface is coated with antirust Paint;The length of the cylinder is greater than 0.5 meter less than 1 meter.
CN201610384733.9A 2016-06-02 2016-06-02 The higher oil pipeline of safety installs equipment Active CN105836602B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610384733.9A CN105836602B (en) 2016-06-02 2016-06-02 The higher oil pipeline of safety installs equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610384733.9A CN105836602B (en) 2016-06-02 2016-06-02 The higher oil pipeline of safety installs equipment

Publications (2)

Publication Number Publication Date
CN105836602A CN105836602A (en) 2016-08-10
CN105836602B true CN105836602B (en) 2018-12-14

Family

ID=56595371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610384733.9A Active CN105836602B (en) 2016-06-02 2016-06-02 The higher oil pipeline of safety installs equipment

Country Status (1)

Country Link
CN (1) CN105836602B (en)

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09301673A (en) * 1996-05-09 1997-11-25 Hitachi Plant Eng & Constr Co Ltd Metal fitting for suspending and lifting large diameter pipe
CN202812702U (en) * 2012-07-11 2013-03-20 深圳三升高科技股份有限公司 Thread expansion derrick boom
CN103359603A (en) * 2013-07-11 2013-10-23 扬州金鑫管业有限公司 Pipeline clamping tool
CN203959639U (en) * 2014-04-30 2014-11-26 江苏德创制管有限公司 A kind of steel pipe hoisting fixture
CN203865840U (en) * 2014-06-06 2014-10-08 江苏华阳金属管件有限公司 Steel pipe lifting device
CN203946136U (en) * 2014-06-27 2014-11-19 天津市管道工程集团有限公司 The special pipe car of transport pipeline in large diameter pipeline
CN104085775A (en) * 2014-07-08 2014-10-08 成都高普石油工程技术有限公司 Device for installing petroleum transmission pipeline
CN205675993U (en) * 2016-06-02 2016-11-09 成都大漠石油技术有限公司 The oil pipeline erecting device that safety is higher

Also Published As

Publication number Publication date
CN105836602A (en) 2016-08-10

Similar Documents

Publication Publication Date Title
CN102358563A (en) Sling
CN204823647U (en) Pipe hoist
CN105800455B (en) Oil pipeline the service of connection devices
CN105836602B (en) The higher oil pipeline of safety installs equipment
CN102976197A (en) Long-pole spreader
CN105819325B (en) The higher oil pipeline of installation effectiveness installs equipment
CN105800454B (en) Energy-saving and environment-friendly oil pipeline installs equipment
CN205675993U (en) The oil pipeline erecting device that safety is higher
CN205662231U (en) Oil pipeline installation device
CN205634610U (en) Self -balancing crane beam
CN204980828U (en) Hook rigging
CN205675994U (en) The oil pipeline erecting device that installation effectiveness is higher
CN103879929B (en) A kind of auxiliary device for the transport of heavy caliber cable coil and using method thereof
CN205772793U (en) Oil pipeline docking facilities
CN205772792U (en) Oil pipeline handling apparatus
CN105836604A (en) Oil conveying pipeline carrying device
CN205927693U (en) Large diameter pipe isolated plant that is geared to needs of job
CN205442379U (en) Balanced sling
CN105836603A (en) Oil conveying pipeline installation device
CN106044535A (en) Oil pipeline lifting equipment
CN205662230U (en) Energy -concerving and environment -protective oil pipeline installation device
CN105836605A (en) Oil conveying pipeline constructing device
CN204937527U (en) A kind of novel traction joint
CN207451422U (en) A kind of frock for the lifting of spring box bracket
CN104310209A (en) Steel structure hoisting clamp

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 610000 No. 880, Gao Dong Road, East Industrial Zone, Xindu District, Chengdu, Sichuan

Applicant after: Chengdu great energy technology Co.,Ltd.

Address before: 610000 No. 880, Gao Dong Road, East Industrial Zone, Xindu District, Chengdu, Sichuan

Applicant before: Chengdu Damo Petroleum Technology Co.,Ltd.

CB02 Change of applicant information
TA01 Transfer of patent application right

Effective date of registration: 20181102

Address after: 224700 No. 1, West Ring Road, Jianhu County, Yancheng City, Jiangsu.

Applicant after: De Cheng measuring and controlling equipment Co.,Ltd. of Jiangsu Province

Address before: 610000 No. 880, Gao Dong Road, East Industrial Zone, Xindu District, Chengdu, Sichuan

Applicant before: Chengdu great energy technology Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190301

Address after: 224700 No. 1, West Ring Road, Jianhu County, Yancheng City, Jiangsu.

Co-patentee after: BEIJING INSTITUTE OF ELECTRONIC SYSTEM ENGINEERING

Patentee after: De Cheng measuring and controlling equipment Co.,Ltd. of Jiangsu Province

Address before: 224700 No. 1, West Ring Road, Jianhu County, Yancheng City, Jiangsu.

Patentee before: De Cheng measuring and controlling equipment Co.,Ltd. of Jiangsu Province

TR01 Transfer of patent right