CN105835358A - Carbon fiber tube bonding clamp for undergraduate formula car suspensions - Google Patents
Carbon fiber tube bonding clamp for undergraduate formula car suspensions Download PDFInfo
- Publication number
- CN105835358A CN105835358A CN201610338704.9A CN201610338704A CN105835358A CN 105835358 A CN105835358 A CN 105835358A CN 201610338704 A CN201610338704 A CN 201610338704A CN 105835358 A CN105835358 A CN 105835358A
- Authority
- CN
- China
- Prior art keywords
- carbon fiber
- fiber pipe
- hole
- adjusting screw
- joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C65/00—Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor
- B29C65/78—Means for handling the parts to be joined, e.g. for making containers or hollow articles, e.g. means for handling sheets, plates, web-like materials, tubular articles, hollow articles or elements to be joined therewith; Means for discharging the joined articles from the joining apparatus
- B29C65/7841—Holding or clamping means for handling purposes
- B29C65/7844—Holding or clamping means for handling purposes cooperating with specially formed features of at least one of the parts to be joined, e.g. cooperating with holes or ribs of at least one of the parts to be joined
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C65/00—Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor
- B29C65/48—Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor using adhesives, i.e. using supplementary joining material; solvent bonding
- B29C65/52—Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor using adhesives, i.e. using supplementary joining material; solvent bonding characterised by the way of applying the adhesive
- B29C65/54—Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor using adhesives, i.e. using supplementary joining material; solvent bonding characterised by the way of applying the adhesive between pre-assembled parts
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C65/00—Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor
- B29C65/78—Means for handling the parts to be joined, e.g. for making containers or hollow articles, e.g. means for handling sheets, plates, web-like materials, tubular articles, hollow articles or elements to be joined therewith; Means for discharging the joined articles from the joining apparatus
- B29C65/7802—Positioning the parts to be joined, e.g. aligning, indexing or centring
- B29C65/7805—Positioning the parts to be joined, e.g. aligning, indexing or centring the parts to be joined comprising positioning features
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C66/00—General aspects of processes or apparatus for joining preformed parts
- B29C66/001—Joining in special atmospheres
- B29C66/0012—Joining in special atmospheres characterised by the type of environment
- B29C66/0014—Gaseous environments
- B29C66/00145—Vacuum, e.g. partial vacuum
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C66/00—General aspects of processes or apparatus for joining preformed parts
- B29C66/01—General aspects dealing with the joint area or with the area to be joined
- B29C66/02—Preparation of the material, in the area to be joined, prior to joining or welding
- B29C66/024—Thermal pre-treatments
- B29C66/0242—Heating, or preheating, e.g. drying
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C66/00—General aspects of processes or apparatus for joining preformed parts
- B29C66/50—General aspects of joining tubular articles; General aspects of joining long products, i.e. bars or profiled elements; General aspects of joining single elements to tubular articles, hollow articles or bars; General aspects of joining several hollow-preforms to form hollow or tubular articles
- B29C66/51—Joining tubular articles, profiled elements or bars; Joining single elements to tubular articles, hollow articles or bars; Joining several hollow-preforms to form hollow or tubular articles
- B29C66/52—Joining tubular articles, bars or profiled elements
- B29C66/522—Joining tubular articles
Abstract
The invention specifically relates to a carbon fiber tube bonding clamp for undergraduate formula car suspensions, and the carbon fiber tube bonding clamp for undergraduate formula car suspensions is low in production cost, high in bonding quality and good in bonding precision. The clamp comprises a sealing box, wherein the box body of the sealing box is internally provided with a positioning mechanism; the positioning mechanism comprises a bracket frame; a plurality of parallel adjusting screw rods which are vertically placed are arranged in the bracket frame; a carbon fiber tube is vertically arranged between every two adjacent adjusting screw rods and the side wall of one side of the carbon fiber tube contacts with the side walls of the two adjacent adjusting screw rods; the side walls of the other sides of the carbon fiber tubes contact with two side surfaces of V-shaped clamping slots on locking rods. The carbon fiber tubes are fixed by the adjusting screw rods and the locking rods, so that the coaxiality between the carbon fiber tubes and metal joints during the bonding therebetween satisfies a requirement; through the arrangement of the plurality of adjusting screw rods and the locking rods, the mass production for bonding between the carbon fiber tubes and the metal joints can be realized.
Description
Technical field
The present invention relates to equation motorcycle race suspension technical field, be specifically related to a kind of university students's equation
Racing car suspension carbon fiber pipe bonding jig.
Background technology
Carbon fibre composite is progressively popularized to civil area from high-end fields such as Aero-Space,
Carbon fiber pipe has the advantages such as proportion is little, rigidity is big, intensity is high, corrosion-resistant, is widely used in medical treatment
In apparatus, sports equipment.But owing to himself characteristic makes the mechanical connection of carbon fiber pipe the most tired
Difficulty, so using glue bonding, becomes a kind of fairly simple efficient connected mode.Nowadays,
FSAE university students's formula car contest uses carbon fiber pipe bonding with metal joint a large amount of
Adhesive product as the guiding mechanism of racing car suspension system.
Suspension is embodied in its kinetic characteristic for dynamic (dynamical) importance and is delivered to from tire
The power on chassis and the response of moment.For the entire vehicle design of equation motorcycle race, suspension property is clearly
Affect the key factor of car load control stability and ride comfort, therefore the design of suspension system sets at car load
In occupation of very important status in meter.By in upper and lower for carbon fiber Successful utilization to suspension system yoke
After, can loss of weight 57%, but selecting carbon fiber pipe is the material of the double transverse arms in independent suspension system
Afterwards, an important problem occurs therewith, be the connection of carbon fiber and metallic article.
Use adhesive that the method needing two parts gluedd joint to stick into a part is referred to as glue to connect.Glue
Connecting fiber destruction minimum, the stress collection of generation is medium and small, and the gross mass finally sticking into a part is little,
Surface unusual light, the processing technology made are the easiest, fabrication and processing cost ratio is relatively low, and compare
Relatively can resist corrosion, the permanent deformation of generation is little.But, it is more difficult to control be glue connect quality,
Transmit very top load as glue connects, then stress can be unreliable.At present, domestic to FSAE carbon fiber
The research of the bonding problem of suspension mainly with Harbin Institute of Technology as representative by changing viscose glue
The factors such as the type of agent, bonding length, bonding gap, surface process carry out improving and studying.
Although achieving certain progress and improvement, but due to the viscose glue mistake at carbon fiber pipe Yu aluminium joint
Cheng Zhong, the impact of anthropic factor is the biggest.Through replica test laggard row data analysis and process,
Just find that the diversity of the adhesive strength of each test specimen is very big, and adhesive strength often occurs not
Satisfactory case.And FSAE racing car is for safety, absolutely not allow that carbon fiber suspension occurs
The probability that adhesive strength is not enough, therefore, the FSAE racing car of many universities transfers to use traditional steel
The suspension transverse arm of system welding.
During common technique for sticking, there is no special jig for cementing, existing fine for carbon
The fixture of dimension pipe is mainly used in punching carbon fiber pipe or surface process, its folder of such fixture
Hold position to be typically at staple joint, and due to the matched in clearance between joint and carbon fiber pipe, because of
The axis of this bonding process center tap and carbon fiber pipe can produce the skew of certain angle each other,
The axiality between carbon fiber pipe and metal joint cannot be ensured after bonding, the most easily occur that glue glues
Connecing a layer skewness, bonding quality is difficult to ensure that unanimously.The tubing folder of existing machining
Tool is for metal tube mostly, owing to metal is bigger with the physical property gap of carbon fiber, it is impossible to straight
Connect the existing tubing fixture of use, and general fixture once can only clamp a pipe fitting, also cannot
Mass production.
Summary of the invention
For the deficiency of said apparatus, it is an object of the invention to provide a kind of production cost low, bonding
University students's equation motorcycle race suspension carbon fiber pipe bonding jig that quality is high, adhesive reinforcement is good.
For achieving the above object, the technical solution adopted in the present invention is: a kind of university students side
Formula racing car suspension carbon fiber pipe bonding jig, including seal box, the case lid of seal box is arranged on
Casing top, arranges bubble-tight sealing strip between case lid and casing, the through hole that body side is arranged
Being connected with one end of vacuum tube by vacuum adapter, the other end of vacuum tube is connected with vacuum pump, institute
State and on vacuum tube, be additionally provided with Pressure gauge;
Arranging detent mechanism in described casing, described detent mechanism includes bracket cage, in bracket cage
Adjusting screw rod that several are parallel to each other, that vertically place is set, between two adjacent adjusting screw rods
Interstitial site front the check lock lever that can the most front and back regulate is set, check lock lever arranges court
The V-arrangement draw-in groove of position between two adjacent adjusting screw rods, this V-arrangement draw-in groove and two adjacent adjusting screw rods
Constitute the location to carbon fiber pipe;The upper/lower terminal of described carbon fiber pipe connects with a metal respectively
Head connects, and two metal joints are respectively by can vertically up-down adjustment, horizontal positioned pressure
Tight metallic plate is fixed.
Preferably, the two ends up and down of described check lock lever are each passed through two and compress setting on metallic plate
, the strip vertically offered regulation through hole, the length direction place of regulation through hole flat
Face is vertical with the plane at bracket cage place;The locking of level is set on the sidewall of described compression metallic plate
Through hole, locking through hole connects with regulation through hole, arranges regulation screw in described locking through hole, adjusts
Joint screw contacts with check lock lever;Adjusting screw rod vertically arranges location on compression metallic plate
Through hole, sheathed locking nut, lock washer on described adjusting screw rod, the end face of lock washer and pressure
The end contact of tight metallic plate;Make two to compress metallic plate and produce the thrust that direction is relative;Described
Metal joint and seal box in the electrical heating wire that arranges be connected.
Preferably, described metal joint includes end round platform and dome platform, described end round platform straight
Footpath is more than the diameter of dome platform, and the bottom of round platform of the described end arranges blanking cover, the upper end of round platform of the described end
Face, the lateral surface position of dome platform arrange the first sealing gasket, and the upper end of described dome platform arranges second
Sealing gasket, the medial surface of carbon fiber pipe contacts with the lateral surface of dome platform, the end face of carbon fiber pipe with
The upper surface contact of the first sealing gasket;The internal diameter of described carbon fiber pipe is slightly less than outside dome platform
Footpath;
Preferably, the bottom of described end round platform in axial direction arrange multiple circumferentially first
Permeability hole, the lateral wall of described dome platform radially arranges multiple second permeability hole, described
The first permeability hole and the second permeability hole communicate;On the lateral surface of described dome platform, second infiltration
Sealing film is set outside hole.
Preferably, described metal joint arranges ventilative through hole along its axis direction, ventilative through hole
Female thread is set on inwall.
Preferably, the medial wall of described casing arranges electrostatic precipitation plate, electrostatic precipitation plate and casing
The distribution box that outside is arranged connects;Chute is vertically set on the medial surface of described casing, sliding
The shape of groove adapts with the shape of bracket cage.
Preferably, described sealing film includes plastic layer, the both sides brushing low melting point stone of plastic layer
Wax, described plastic layer is mixed by EVA and LDPE, and wherein the mass fraction of EVA is
The mass fraction of 50%-70%, LDPE is 30%-50%.
According to any one university students's equation motorcycle race suspension carbon fiber pipe bonding jig above-mentioned
Using method, it is characterised in that: described using method comprises the following steps: preheat, clamping,
Heating gluing, evacuation;
Described preheating steps is: carbon fiber pipe is heated to the first preheating temperature t1, makes carbon fine
The internal diameter of dimension pipe is slightly larger than the external diameter of dome platform;Then two joints are inserted the two of carbon fiber pipe
End, and glue is poured in the first permeability hole of round platform bottom surface, the end, cover blanking cover;
Described clamping step is: between being placed on by carbon fiber pipe between adjacent two adjusting screw rods
The front of gap position, and compress metallic plates metal with carbon fiber metal pipe two ends respectively with two and connect
Head contact;Then adjust regulation screw, make check lock lever seesaw, allow the V-arrangement card of its upper setting
Two sides of groove and the sidewall contact of the side of carbon fiber pipe, and make the side of carbon fiber pipe opposite side
The sidewall contact of wall and adjacent two adjusting screw rods, the circumferential direction making carbon fiber pipe is locked;
Then use locking nut, lock washer to compress metallic plate to two and apply the pretension that direction is relative
Power, the axial direction making carbon fiber pipe is locked;Then the bracket cage of carbon fiber pipe is delayed by clamping
Slowly snap in the chute in casing;
Described heating glue application step is: cover tightly case lid, connects the power supply of distribution box, makes electrostatic inhale
Dirt plate is initially powered up and adsorbs seal box internal dust;Use electrical heating wire by joint after certain time
It is heated to the second preheating temperature t2, melts sealing film, make glue pass through the second permeability hole and flow into carbon
In gap between fiber pipe and metal joint;
Described vacuum step is: opens vacuum pump, is slowly extracted out by the air within seal box,
Form vacuum environment;After the pressure in seal box reaches certain value, pressurize a period of time carries out vacuum
Solidification.
Preferably, in described preheating steps, joint is heated to the 3rd preheating temperature t3.
Preferably, in described preheating steps, the first preheating temperature t1, the 3rd preheating temperature
T3 is less than the melting temperature of sealing film.
The following beneficial effect of the present invention: adjusting screw rod and check lock lever are easy to adjust, and can be effective
Carbon fiber pipe is fixed, to ensure carbon fiber pipe and metal joint between the two same time bonding
Axle degree meets requirement, arranges multiple adjusting screw rod and check lock lever can realize carbon fiber pipe and metal joint
Bonding mass production, improves production efficiency.
Accompanying drawing explanation
Fig. 1 is bonding jig structural representation;
Fig. 2 is bonding jig structural representation under case lid open mode;
Fig. 3 is seal box front view sectional view;
Fig. 4 is the A-A sectional view of Fig. 3;
Fig. 5 is the B-B sectional view of Fig. 4;
Fig. 6 is carbon fiber pipe and metal joint connection sectional view;
Fig. 7 is carbon fiber pipe and metal joint connecting shaft mapping;
Fig. 8 is for compressing metallic plate axonometric drawing;
Fig. 9 is housing bracket axonometric drawing;
Figure 10 is that housing bracket axle surveys explosive view.
Detailed description of the invention
As shown in Fig. 1-Figure 10, a kind of university students's equation motorcycle race suspension carbon fiber pipe is bonding
Fixture, including seal box, the case lid 1 of seal box is arranged on casing 2 top, case lid 1 and casing
Bubble-tight sealing strip 18 is set between 2, the through hole that casing 2 side is arranged by vacuum adapter with
One end of vacuum tube 3 connects, and the other end of vacuum tube 3 is connected with vacuum pump 5, described vacuum tube
Pressure gauge 4 it is additionally provided with on 3;On the medial wall of described casing 2, electrostatic precipitation plate 15, electrostatic are set
Dust-catching board 15 is connected with the distribution box 17 arranged outside casing 2;In described casing 2, location is set
Mechanism, described detent mechanism includes bracket cage 13, along vertically side on the medial surface of described casing 2
To arranging chute 16, the shape of chute 16 adapts with the shape of bracket cage 13.So can be square
Just bracket cage 13 is put into casing 2 or from casing 2 take out.
Arranging detent mechanism in described casing 2, described detent mechanism includes bracket cage 13, bracket
Adjusting screw rod 14 that several are parallel to each other, that vertically place, two adjacent tune are set in frame 13
Interstitial site front between joint screw rod 14 arranges the check lock lever 9 that can the most front and back regulate,
The V-arrangement draw-in groove of position, this V-arrangement between two adjacent adjusting screw rods 14 are set on check lock lever 9
Draw-in groove and two adjacent adjusting screw rods 14 constitute the location to carbon fiber pipe 7;Described carbon fiber pipe 7
Upper/lower terminal be connected with a metal joint 6 respectively, two metal joints 6 are respectively by can edge
Vertical direction up-down adjustment, horizontal positioned compression metallic plate 8 is fixed.Accordingly even when carbon fiber
The internal diameter of pipe 7 is more than the external diameter of metal joint 6 epirelief round platform 62, it is also possible to locked by adjustment
Bar 9, makes check lock lever 9 jointly be corrected the position of carbon fiber pipe 7 with adjusting screw rod 14, makes
The axis of carbon fiber pipe 7 and the axis of metal joint 6 keep coaxial.Described metal joint 6 can
To be stainless joint, it is also possible to be aluminum alloy joint, it is also possible to be almag joint or other
The joint of metal material.
The two ends up and down of check lock lever 9 are each passed through on two compression metallic plates 8 of horizontal positioned, edge
The strip regulation through hole 81 that vertical direction is offered, such check lock lever 9 can be along regulation through hole 81
Seesaw, the plane at the length direction place of regulation through hole 81 and the plane at bracket cage 13 place
Vertically;The locking through hole 82 of level is set on the sidewall of described compression metallic plate 8, locks through hole
82 connect with regulation through hole 81, arrange regulation screw 83, regulation in described locking through hole 82
Screw 83 contacts with check lock lever 9, by turning adjusting screw 83, can change check lock lever 9 and adjust
Position in joint through hole 81, it is achieved thereby that regulatory function before and after check lock lever 9.Can also edge
Fore-and-aft direction is horizontally disposed with a set of screw slider structure, and slide block is connected with check lock lever 9, the most also may be used
To realize regulatory function before and after check lock lever 9.
The two ends of described carbon fiber pipe 7 are connected with metal joint 6 respectively, described metal joint 6
Including end round platform 61 and dome platform 62, the diameter of described end round platform 61 is more than dome platform 62
Diameter, described dome platform 62 inserts in carbon fiber pipe 7;The internal diameter of described carbon fiber pipe 7
It is slightly less than the external diameter of dome platform 62.
Glue brushing between carbon fiber pipe 7 and joint 6 is generally first outside joint 6
Brushing glue, is then enclosed within carbon fiber pipe 7 on joint 6, but so can cause unnecessary glue
Water is extruded with the gap of joint 6 from carbon fiber pipe 7, and the lateral wall of joint 6 speckles with residual gum
Also having the glue of residual on the inwall of the ventilative through hole 68 in water, even joint 6, these are residual
The most difficult removal after staying glue curing, has had a strong impact on the use of joint 6, and glue brushing is at joint
6 outer rear flank, also easily contact with the dust of residual in air, so can affect the adhesive effect of glue.
Therefore preferably embodiment is: the bottom of described end round platform 61 in axial direction arranges multiple
First permeability hole 63, the lateral wall of described dome platform 62 radially arranges multiple second and oozes
Open-work 64, the first described permeability hole 63 communicates with the second permeability hole 64;Described dome platform
On the sidewall of 62, outside the second permeability hole 64, sealing film 67 is set.Round platform of the described end 61
Bottom arranges blanking cover 65, and the upper surface of round platform of the described end 61, the lateral surface position of dome platform 62 set
Putting the first sealing gasket 69, the upper end of described dome platform 62 arranges the second sealing gasket 66, carbon fiber pipe
The medial surface of 7 contacts with the lateral surface of dome platform 62, the end face of carbon fiber pipe 7 and the first sealing gasket
The upper surface contact of 69.
Adjusting screw rod 14 vertically arranges positioning through hole 84, institute on compression metallic plate 8
State sheathed locking nut 12, lock washer 11, the end face of lock washer 11 on adjusting screw rod 14
With the end contact compressing metallic plate 8;Make two to compress metallic plate 8 and produce the compression that direction is relative
Power;When two locking nuts 12 of top, lower section move up and down along adjusting screw rod 14, i.e. simultaneously
Can realize compressing the up-down adjustment function of metallic plate 8, it is also possible to a sleeve screw rod is vertically set
Slide block structure, slide block is connected with compressing metallic plate 8, so can also realize compressing metallic plate 8
Up-down adjustment function.Described metal joint 6 is connected with the electrical heating wire 70 arranged in seal box.
Described metal joint 6 arranges ventilative through hole 68 along its axis direction, ventilative through hole 68
Arranging female thread on inwall, the described corresponding position of compression metallic plate 8 arranges and breathes freely through hole 68
The metallic plate air-vent 84 of concentric;In described metallic plate air-vent 84, alignment pin 85 is set,
The shape of alignment pin 85 adapts with the shape of ventilative through hole 68.
In order to make sealing film have certain intensity, the pressure of glue can be born, have again simultaneously
Having the feature of low melting point, convenient thawing, more preferable embodiment is: described sealing film 67
Including plastic layer, the both sides brushing low melt point paraffin of plastic layer, described plastic layer is by EVA and LDPE
Mix, wherein the mass fraction of EVA be the mass fraction of 50%-70%, LDPE be 30%-50%.
According to any one above-mentioned university students's equation motorcycle race suspension carbon fiber pipe bonding jig
Using method, described using method comprises the following steps: preheat, clamping, heating gluing,
Evacuation;
In order to ensure carbon fiber pipe 7 and joint 6 bonding after axiality, should try one's best when both coordinate
Reducing fit tolerance, the internal diameter of most preferably described carbon fiber pipe 7 is slightly less than dome platform 62
External diameter, but such assembling can be more difficult, the most before assembly, needs to carry carbon fiber pipe 7
Before be heated to the first preheating temperature t1, there is thermal expansion after making carbon fiber pipe 7 be heated, such carbon is fine
The internal diameter of dimension pipe 7, slightly larger than the external diameter of dome platform 62, can assemble easily.Therefore described
Preheating steps be: carbon fiber pipe 7 is heated to the first preheating temperature t1, makes carbon fiber pipe 7
Internal diameter slightly larger than the external diameter of dome platform 62;Then two joints 6 are inserted carbon fiber pipe 7
Two ends, and glue is poured in the first permeability hole 63 of end round platform 61 bottom surface, cover blanking cover 65.
Described clamping step is: carbon fiber pipe 7 is placed on adjacent two adjusting screw rods 14 it
Between the front of interstitial site, and with two compress metallic plates 8 respectively with carbon fiber metal pipe 7 liang
The metal joint 6 of end contacts;Then adjust regulation screw 83, make check lock lever 9 seesaw, allow
Two sides of the V-arrangement draw-in groove arranged on it and the sidewall contact of the side of carbon fiber pipe 7, and make
The sidewall of carbon fiber pipe 7 opposite side and the sidewall contact of adjacent two adjusting screw rods 14, make carbon
The circumferential direction of fiber pipe 7 is locked;Then use locking nut 12, lock washer 11 to two
Individual compression metallic plate 8 applies the pretightning force that direction is relative, makes the axial direction of carbon fiber pipe 6 be locked
Extremely;Then by clamping, the bracket cage 13 of carbon fiber pipe 6 slowly snaps in the chute 16 in casing 2
In.
Described heating glue application step is: cover tightly case lid 1, connects the power supply of distribution box 17, makes quiet
Electricity dust-catching board 15 is initially powered up and adsorbs seal box internal dust;Electrical heating is used after certain time
Joint 6 is heated to the second preheating temperature t2 by silk 70, melts sealing film 67, makes glue pass through
Second permeability hole 64 flows in the gap between carbon fiber pipe 7 and joint 6;Owing to being provided with
One sealing gasket the 69, second sealing gasket 66, glue may not flow in ventilative through hole 68, also will not flow
On earth on the lateral surface of round platform 61, effectively raise bonding quality.
Described vacuum step is: opens vacuum pump 5, is slowly taken out by the air within seal box
Go out, form vacuum environment;After the pressure in seal box reaches certain value, pressurize a period of time is carried out
Vacuum solidification.
In order to accelerate the efficiency of technique for sticking, more preferable embodiment is: described preheating steps
In, joint 6 is heated to the 3rd preheating temperature t3.So can save in heating glue application step and connect
The heat time heating time of 6.Simultaneously in order to ensure that sealing film 67 melts in heating glue application step,
In described preheating steps, the first preheating temperature t1, the 3rd preheating temperature t3 are less than sealed thin
The melting temperature of film 67.
Claims (10)
1. university students's equation motorcycle race suspension carbon fiber pipe bonding jig, including seal box,
The case lid (1) of seal box is arranged on casing (2) top, between case lid (1) and casing (2)
Bubble-tight sealing strip (18) is set, the through hole that casing (2) side is arranged by vacuum adapter with
One end of vacuum tube (3) connects, and the other end of vacuum tube (3) is connected with vacuum pump (5),
Pressure gauge (4) it is additionally provided with on described vacuum tube (3);
It is characterized in that: detent mechanism, described detent mechanism bag are set in described casing (2)
Include bracket cage (13), tune that several are parallel to each other, that vertically place is set in bracket cage (13)
Joint screw rod (14), the interstitial site front between two adjacent adjusting screw rods (14) is arranged can
The check lock lever (9) of regulation before and after in the horizontal direction, check lock lever (9) is upper to be arranged towards two adjacent tune
The V-arrangement draw-in groove of position, this V-arrangement draw-in groove and two adjacent adjusting screw rods (14) between joint screw rod (14)
Constitute the location to carbon fiber pipe (7);The upper/lower terminal of described carbon fiber pipe (7) respectively with
One metal joint (6) connects, and two metal joints (6) are respectively by can be the most upper and lower
Regulation, horizontal positioned compression metallic plate (8) is fixed.
A kind of university students's equation motorcycle race suspension carbon fiber pipe the most according to claim 1 glues
Welding fixture, it is characterised in that: the two ends up and down of described check lock lever (9) are each passed through two compressions
Upper strip regulation through hole (81) that arrange, that vertically offer of metallic plate (8), regulation
The plane at the length direction place of through hole (81) is vertical with the plane at bracket cage (13) place;Institute
State and compress the locking through hole (82) that level is set on the sidewall of metallic plate (8), locking through hole (82)
Connect with regulation through hole (81), regulation screw (83) be set in described locking through hole (82),
Regulation screw (83) contacts with check lock lever (9);Adjusting screw rod (14) is through compressing metallic plate
(8) positioning through hole (84) is vertically set on, the upper sheathed lock of described adjusting screw rod (14)
Jack panel (12), lock washer (11), the end face of lock washer (11) and compression metallic plate (8)
End contact, make two to compress metallic plate (8) and produce the relative thrust in direction;Described
Metal joint (6) is connected with the electrical heating wire (70) arranged in seal box.
A kind of university students's equation motorcycle race suspension carbon fiber pipe the most according to claim 1 glues
Welding fixture, it is characterised in that: described metal joint (6) includes end round platform (61) and dome
Platform (62), the diameter of described end round platform (61) is more than the diameter of dome platform (62), described
The bottom of end round platform (61) arranges blanking cover (65), the upper surface at round platform of the described end (61), convex
The lateral surface position of round platform (62) arranges the first sealing gasket (69), described dome platform (62)
Upper end arranges the second sealing gasket (66), the medial surface of carbon fiber pipe (7) and dome platform (62)
Lateral surface contacts, the end face of carbon fiber pipe (7) and the upper surface contact of the first sealing gasket (69);
The internal diameter of described carbon fiber pipe (7) is slightly less than the external diameter of dome platform (62).
A kind of university students's equation motorcycle race suspension carbon fiber pipe the most according to claim 3 glues
Welding fixture, it is characterised in that: the bottom of described end round platform (61) in axial direction arranges multiple
The first permeability hole (63) circumferentially, radially side, the lateral wall of described dome platform (62)
To arranging multiple second permeability hole (64), described the first permeability hole (63) and the second permeability hole
(64) communicate;On the lateral surface of described dome platform (62), outside the second permeability hole (64)
Sealing film (67) is set.
A kind of university students's equation motorcycle race suspension carbon fiber pipe the most according to claim 3 glues
Welding fixture, it is characterised in that: described metal joint (6) arranges ventilative logical along its axis direction
Hole (68), the inwall of ventilative through hole (68) arranges female thread.
A kind of university students's equation motorcycle race suspension carbon fiber pipe the most according to claim 1
Bonding jig, it is characterised in that: electrostatic precipitation plate (15) is set on the medial wall of described casing (2),
The distribution box (17) that electrostatic precipitation plate (15) is arranged with casing (2) outside is connected;Described case
Chute (16), the shape of chute (16) and torr are vertically set on the medial surface of body (2)
The shape of frame-saw (13) adapts.
A kind of university students's equation motorcycle race suspension carbon fiber pipe the most according to claim 4 glues
Welding fixture, it is characterised in that: described sealing film (67) includes plastic layer, the two of plastic layer
Side brushing low melt point paraffin, described plastic layer is mixed by EVA and LDPE, wherein EVA
The mass fraction that mass fraction is 50%-70%, LDPE be 30%-50%.
8. according to any one university students's equation motorcycle race described in claim 1 to claim 6
The suspension using method of carbon fiber pipe bonding jig, it is characterised in that: described using method bag
Include following steps: preheat, clamping, heating gluing, evacuation;
Described preheating steps is: carbon fiber pipe (7) is heated to the first preheating temperature t1,
Make the internal diameter external diameter slightly larger than dome platform (62) of carbon fiber pipe (7);Then by two joints
(6) insert the two ends of carbon fiber pipe (7), and glue is poured into the of end round platform (61) bottom surface
In one permeability hole (63), cover blanking cover (65);
Described clamping step is: carbon fiber pipe (7) is placed on adjacent two adjusting screw rods (14)
Between the front of interstitial site, and with two compress metallic plate (8) respectively with carbon fiber metal
Metal joint (6) contact at pipe (7) two ends;Then adjust regulation screw (83), make locking
Bar (9) seesaws, and allows two sides of the V-arrangement draw-in groove arranged on it and carbon fiber pipe (7)
The sidewall contact of side, and make the sidewall of carbon fiber pipe (7) opposite side and adjacent two tune
The sidewall contact of joint screw rod (14), the circumferential direction making carbon fiber pipe (7) is locked;Then
Use locking nut (12), lock washer (11) to compress metallic plate (8) to two and apply direction
Relative pretightning force, the axial direction making carbon fiber pipe (6) is locked;Then the carbon by clamping
The bracket cage (13) of fiber pipe (6) slowly snaps in the chute (16) in casing (2);
Described heating glue application step is: cover tightly case lid (1), connects the power supply of distribution box (17),
Electrostatic precipitation plate (15) is made to be initially powered up and adsorb seal box internal dust;Use after certain time
Joint (6) is heated to the second preheating temperature t2 by electrical heating wire (70), melts sealing film (67),
Make glue pass through the second permeability hole (64) to flow between carbon fiber pipe (7) and metal joint (6)
Gap in;
Described vacuum step is: open vacuum pump (5), by slow for the air within seal box
Extract out, form vacuum environment;After the pressure in seal box reaches certain value, pressurize a period of time enters
Row vacuum solidification.
A kind of university students's equation motorcycle race suspension carbon fiber pipe the most according to claim 8 glues
The using method of welding fixture, it is characterised in that: in described preheating steps, by joint (6)
It is heated to the 3rd preheating temperature t3.
A kind of university students's equation motorcycle race suspension carbon fiber pipe the most according to claim 8
The using method of bonding jig, it is characterised in that: in described preheating steps, the first preheating temperature
Degree t1, the 3rd preheating temperature t3 are less than the melting temperature of sealing film (67).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610338704.9A CN105835358B (en) | 2016-05-19 | 2016-05-19 | A kind of university student's equation motorcycle race suspension carbon fiber pipe bonding jig |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610338704.9A CN105835358B (en) | 2016-05-19 | 2016-05-19 | A kind of university student's equation motorcycle race suspension carbon fiber pipe bonding jig |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105835358A true CN105835358A (en) | 2016-08-10 |
CN105835358B CN105835358B (en) | 2018-02-23 |
Family
ID=56593087
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610338704.9A Expired - Fee Related CN105835358B (en) | 2016-05-19 | 2016-05-19 | A kind of university student's equation motorcycle race suspension carbon fiber pipe bonding jig |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105835358B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110159623A (en) * | 2018-02-15 | 2019-08-23 | 卡本卡车拖车有限责任公司 | Load guide device and the method for bonding load guide device |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5968304A (en) * | 1997-05-14 | 1999-10-19 | Ashland, Inc. | Process for forming fluid flow conduit systems and products thereof |
CN101495793A (en) * | 2007-02-02 | 2009-07-29 | 绝缘工业集团 | Pre-applied protective jacketing construction for pipe and block insulation |
WO2009148318A1 (en) * | 2008-06-06 | 2009-12-10 | Tersia Nederland Bv | Coupling piece with flange, conduit system with at least one such coupling piece, method for connecting a conduit and a coupling piece, and connecting device |
CN102825788A (en) * | 2012-01-18 | 2012-12-19 | 东莞泰合复合材料有限公司 | Carbon fiber composite material tube fitting joint reinforcing and accurate local heating method |
JP2014000700A (en) * | 2012-06-18 | 2014-01-09 | Kasai Kogyo Co Ltd | Method of joining synthetic resin components and ultrasonic welding machine |
CN105538696A (en) * | 2010-08-06 | 2016-05-04 | 麦克瑞制造公司 | Rack type pipe feeder for a pipe fusion machine |
CN205685740U (en) * | 2016-05-19 | 2016-11-16 | 西华大学 | A kind of university students's equation motorcycle race suspension carbon fiber pipe bonding jig |
-
2016
- 2016-05-19 CN CN201610338704.9A patent/CN105835358B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5968304A (en) * | 1997-05-14 | 1999-10-19 | Ashland, Inc. | Process for forming fluid flow conduit systems and products thereof |
CN101495793A (en) * | 2007-02-02 | 2009-07-29 | 绝缘工业集团 | Pre-applied protective jacketing construction for pipe and block insulation |
WO2009148318A1 (en) * | 2008-06-06 | 2009-12-10 | Tersia Nederland Bv | Coupling piece with flange, conduit system with at least one such coupling piece, method for connecting a conduit and a coupling piece, and connecting device |
CN105538696A (en) * | 2010-08-06 | 2016-05-04 | 麦克瑞制造公司 | Rack type pipe feeder for a pipe fusion machine |
CN102825788A (en) * | 2012-01-18 | 2012-12-19 | 东莞泰合复合材料有限公司 | Carbon fiber composite material tube fitting joint reinforcing and accurate local heating method |
JP2014000700A (en) * | 2012-06-18 | 2014-01-09 | Kasai Kogyo Co Ltd | Method of joining synthetic resin components and ultrasonic welding machine |
CN205685740U (en) * | 2016-05-19 | 2016-11-16 | 西华大学 | A kind of university students's equation motorcycle race suspension carbon fiber pipe bonding jig |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110159623A (en) * | 2018-02-15 | 2019-08-23 | 卡本卡车拖车有限责任公司 | Load guide device and the method for bonding load guide device |
Also Published As
Publication number | Publication date |
---|---|
CN105835358B (en) | 2018-02-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106536336B (en) | Modularization for carrier chassis shapes node and its application method | |
CN206703047U (en) | A kind of PCB suction disc devices of manipulator | |
CN105835358A (en) | Carbon fiber tube bonding clamp for undergraduate formula car suspensions | |
CN205685740U (en) | A kind of university students's equation motorcycle race suspension carbon fiber pipe bonding jig | |
CN201474204U (en) | Stair upright post composite member | |
CN201096249Y (en) | Built-in gap bridge assembled three-way pipe fitting | |
CN109755060A (en) | The production method of key and key | |
CN200940704Y (en) | Nove electromagnetic three-way valve | |
CN205412690U (en) | Compound pipe, pin -connected panel filtration membrane group , membrane filter unit and system | |
CN205137634U (en) | Convector radiator | |
CN210798161U (en) | Floor heating plate for installing floor heating pipeline capable of conducting heat quickly | |
CN206718921U (en) | A kind of car radiator | |
CN201183581Y (en) | Antishocking front fork base of bicycle | |
CN207882649U (en) | A kind of double anchor crystal-vibration-chip manufacturing devices | |
CN206384035U (en) | Interior board component, back wall board component and the vehicle of vehicle | |
CN206713577U (en) | Crop high-temperature test device | |
CN205952124U (en) | Section bar member equipment car single round structure | |
CN206057984U (en) | In the integrated air passage block of line style | |
CN201472577U (en) | Structural improvement for axle tube of bicycle | |
CN205422139U (en) | Be applied to film studio of making a video recording and prevent displacement components | |
CN210512737U (en) | Water chamber integrated type automobile cooler | |
CN214713096U (en) | Shock-proof rim of wheelchair | |
CN207179398U (en) | Novel planar L ED lamp | |
CN215891398U (en) | Hydraulic pipe combined type pipe clamp | |
CN107364113B (en) | Method for producing bicycle frame by using 3D printing technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180223 Termination date: 20190519 |
|
CF01 | Termination of patent right due to non-payment of annual fee |