CN105835264B - Novel injection molding waste recovery storage facilities - Google Patents

Novel injection molding waste recovery storage facilities Download PDF

Info

Publication number
CN105835264B
CN105835264B CN201610361745.XA CN201610361745A CN105835264B CN 105835264 B CN105835264 B CN 105835264B CN 201610361745 A CN201610361745 A CN 201610361745A CN 105835264 B CN105835264 B CN 105835264B
Authority
CN
China
Prior art keywords
injection molding
storage barrel
delivery pipe
bung
molding waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610361745.XA
Other languages
Chinese (zh)
Other versions
CN105835264A (en
Inventor
罗会鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinzhai Hongwei New Material Co., Ltd.
Original Assignee
Wuhu Xinning New Material Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhu Xinning New Material Science & Technology Co Ltd filed Critical Wuhu Xinning New Material Science & Technology Co Ltd
Priority to CN201610361745.XA priority Critical patent/CN105835264B/en
Publication of CN105835264A publication Critical patent/CN105835264A/en
Application granted granted Critical
Publication of CN105835264B publication Critical patent/CN105835264B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/62Plastics recycling; Rubber recycling

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Injection Moulding Of Plastics Or The Like (AREA)
  • Robotics (AREA)
  • Environmental & Geological Engineering (AREA)

Abstract

The invention discloses a kind of novel injection molding waste recovery storage facilities, including pass through the sequentially connected more delivery pipes of bridge piece and storage barrel;One end of more delivery pipes is connected bucket with injection molding machine waste outlet, and the other end extends in storage barrel;It is equipped on the side wall and bottom wall of storage barrel on the heating layer and bottom wall for heating injection molding waste and is additionally provided with a discharge port, being arranged one on discharge port goes out funnel;Transparent testing tube is equipped on the side wall of every delivery pipe, one end of testing tube is connected to delivery pipe and the other end extends straight up;The heating mantle for being heated to delivery pipe is arranged on the outer wall of more delivery pipes;Wherein, storage barrel top cover is set there are one bung, and the axial direction of the bottom face upper edge storage barrel of bung is extended with a telescopic rod and the end of telescopic rod is equipped with stirring-head.The equipment is able to maintain that in storage barrel that reclaimed materials is heated evenly, remain in entire bucket be pure molten condition plastics, improve the efficiency of recycling.

Description

Novel injection molding waste recovery storage facilities
Technical field
The present invention relates to injection molding waste recycling, and in particular, to novel injection molding waste recovery storage facilities.
Background technology
In production of plastics parts, the machine either in injection molding machine injection molding operation or before injection molding debugs mold Many injection molding wastes can be all generated in the process, if not recycled the waste that can cause raw material, virtually increased Production cost.And during recycling storage, because uneven heating is even partially hardened can occur for a large amount of reclaimed materials in storage barrel, It makes troubles subsequently taking out use.
Therefore, urgent need will provide one kind and be able to maintain that in storage barrel that reclaimed materials is heated evenly, and remain in entire bucket For the novel injection molding waste recovery storage facilities of the plastics of pure molten condition.
Invention content
The object of the present invention is to provide a kind of novel injection molding waste recovery storage facilities, which is able to maintain that in storage barrel Reclaimed materials is heated evenly, remain in entire bucket be pure molten condition plastics, improve the efficiency of recycling.
To achieve the goals above, the present invention provides a kind of novel injection molding waste recovery storage facilities, including pass through company Connect the sequentially connected more delivery pipes of bend pipe and storage barrel;One end of more delivery pipes is connected bucket with injection molding machine waste outlet, separately One end extends in storage barrel;The heating layer and bottom wall for heating injection molding waste are equipped on the side wall and bottom wall of storage barrel It is additionally provided with a discharge port, being arranged one on discharge port goes out funnel;Transparent test is equipped on the side wall of every delivery pipe Pipe, one end of testing tube is connected to delivery pipe and the other end extends straight up;It is arranged on the outer wall of more delivery pipes useful In the heating mantle heated to delivery pipe;Wherein, storage barrel top cover is set there are one bung, the bottom face upper edge storage barrel of bung Axial direction is extended with a telescopic rod and the end of telescopic rod is equipped with stirring-head.
Preferably, bridge piece is metal gooseneck.
Preferably, the stage casing of testing tube has the anti-overflow storage bin of a ball-shaped.
Preferably, go out funnel and closure or openness are controlled by valve.
Preferably, bung is transparent bung.
Preferably, the inner wall of storage barrel is equipped with containing mark ruler.
According to above-mentioned technical proposal, the present invention conveys injection molding waste using the more sequentially connected delivery pipes of head and the tail, and two The trend for changing pipeline between root delivery pipe by bridge piece, facilitates the specific special case according to workshop to be laid out.Note Modeling waste material enters after storage barrel if can be recycled in the short time can open heating layer heat preservation so that the plastics in storage barrel Always be in molten condition, in this way open discharge port on be arranged go out funnel can easily be discharged recycling injection molding give up Material;And transparent testing tube is equipped on the side wall of every delivery pipe, one end of testing tube is connected to delivery pipe and the other end is perpendicular Directly upwardly extend.In this way, using storage barrel as origin, if blocked at n-th of bridge piece, from (n+1)th testing tube Start to have the rising of molten plastic liquid level in subsequent testing tube, it is n-th that can very quickly be accurately positioned at this time It is blocked at bridge piece, the heating mantle that maintenance personnel need to only open n-th of bridge piece both ends adds corresponding delivery pipe Heat so that the solid plastic block refuse at blocking continues to convey at molten plastic, just pointedly can quickly dredge in this way It is logical.Meanwhile after reclaimed materials enters storage barrel, opens stirring-head stirring reclaimed materials and bring it about cold and hot exchange, in average bucket Molten condition plastics temperature, convenient for from going out in funnel to exclude, improving organic efficiency in subsequent operation.
Other features and advantages of the present invention will be described in detail in subsequent specific embodiment part.
Description of the drawings
Attached drawing is to be used to provide further understanding of the present invention, an and part for constitution instruction, with following tool Body embodiment is used to explain the present invention together, but is not construed as limiting the invention.In the accompanying drawings:
Fig. 1 is according to a kind of structural schematic diagram of novel injection molding waste recovery storage facilities provided by the invention.
Reference sign
1- bridge piece 2- delivery pipes
3- storage barrel 4- heating layers
5- goes out funnel 6- testing tubes
7- valve 8- bungs
9- heating mantle 10- telescopic rods
11- stirring-heads
Specific implementation mode
The specific implementation mode of the present invention is described in detail below in conjunction with attached drawing.It should be understood that this place is retouched The specific implementation mode stated is merely to illustrate and explain the present invention, and is not intended to restrict the invention.
In the present invention, in the absence of explanation to the contrary, the noun of locality that " upward " etc. is included in the term only represents Orientation of the term under normal service condition, or be those skilled in the art understand that be commonly called as, and be not construed as to the term Limitation.
Referring to Fig. 1, a kind of novel injection molding waste recovery storage facilities of the present invention, including it is sequentially connected by bridge piece 1 More delivery pipes 2 and storage barrel 3;One end of more delivery pipes 2 is connected bucket with injection molding machine waste outlet, and the other end extends to storage It deposits in bucket 3;It is equipped on the side wall and bottom wall of storage barrel 3 on the heating layer 4 and bottom wall for heating injection molding waste and is additionally provided with one A discharge port is arranged one on discharge port and goes out funnel 5;It is equipped with transparent testing tube 6 on the side wall of every delivery pipe 2, surveys One end of test tube 6 is connected to delivery pipe 2 and the other end extends straight up;It is arranged with and is used on the outer wall of more delivery pipes 2 The heating mantle 9 heated to delivery pipe 2;Wherein, 3 top cover of storage barrel is set there are one bung 8, and the bottom face upper edge of bung 8 stores The axial direction of bucket 3 is extended with a telescopic rod 10 and the end of telescopic rod 10 is equipped with stirring-head 11.
The present invention conveys injection molding waste using the sequentially connected delivery pipe of more head and the tail 2, passes through between two delivery pipes 2 Bridge piece 1 changes the trend of pipeline, facilitates the specific special case according to workshop to be laid out.Injection molding waste enters storage barrel If can be recycled in the short time can open the heat preservation of heating layer 4 after 3 so that the plastics in storage barrel 3 are in melting always State, open in this way be arranged on discharge port go out funnel 5 injection molding waste of recycling can easily be discharged;And every defeated It send and is equipped with transparent testing tube 6 on the side wall of pipe 2, one end of testing tube 6 is connected to delivery pipe 2 and the other end prolongs straight up It stretches.In this way, be origin with storage barrel 3, if blocked at n-th of bridge piece 1, since (n+1)th testing tube 6 after The testing tube 6 in face is inner to have the rising of molten plastic liquid level, and it is n-th of connecting bending that can very quickly be accurately positioned at this time It being blocked at pipe 1, the heating mantle 9 that maintenance personnel need to only open n-th of 1 both ends of bridge piece heats corresponding delivery pipe 2, It, so just being capable of pointedly Quick dredging so that the solid plastic block refuse at blocking continues to convey at molten plastic. Meanwhile after reclaimed materials enters storage barrel 3, opens the stirring reclaimed materials of stirring-head 11 and bring it about cold and hot exchange, in average bucket Molten condition plastics temperature, convenient for from going out in funnel 5 to exclude, improving organic efficiency in subsequent operation.
In the present embodiment, come according to workshop specific works region for the ease of controlling the extending direction of bridge piece 1 Size be laid out conveying circuit, it is preferable that bridge piece 1 is metal gooseneck.
When being blocked at bridge piece 1, the liquid level in testing tube 6 can be gradually increasing, in order to prevent in delivery pipe 2 Conveying speed is very fast and so that molten plastic is sprayed from testing tube 6 and causes to scald, and preferably the stage casing of testing tube 6 has a ball The anti-overflow storage bin of type.
In addition, for the ease of control molten plastic along the speed and opportunity for going out the discharge of funnel 5 from storage barrel 3, it is excellent Selection of land goes out funnel 5 and controls closure or openness by valve 7.
In addition, can intuitively observe the molten plastic amount in storage barrel 3 for the ease of operative employee to prevent it from excessively overflowing Go out, it is preferable that bung 8 is transparent bung.
Further, it is taken out quantitatively when recycling uses for convenience, preferably the inner wall of storage barrel 3 is equipped with containing mark Ruler.
The preferred embodiment of the present invention is described in detail above in association with attached drawing, still, the present invention is not limited to above-mentioned realities The detail in mode is applied, within the scope of the technical concept of the present invention, a variety of letters can be carried out to technical scheme of the present invention Monotropic type, these simple variants all belong to the scope of protection of the present invention.
It is further to note that specific technical features described in the above specific embodiments, in not lance In the case of shield, can be combined by any suitable means, in order to avoid unnecessary repetition, the present invention to it is various can The combination of energy no longer separately illustrates.
In addition, various embodiments of the present invention can be combined randomly, as long as it is without prejudice to originally The thought of invention, it should also be regarded as the disclosure of the present invention.

Claims (5)

1. a kind of novel injection molding waste recovery storage facilities, which is characterized in that including sequentially connected more by bridge piece (1) Root delivery pipe (2) and storage barrel (3);Wherein, the one end for being located at the delivery pipe (2) on head is connected with injection molding machine waste outlet Logical, the other end is connect with the bridge piece (1);Positioned at one end of the delivery pipe (2) of tail portion and the bridge piece (1) Connection, the other end extend in the storage barrel (3);It is equipped on the side wall and bottom wall of the storage barrel (3) for heating It states and is additionally provided with a discharge port on the heating layer (4) and the bottom wall of injection molding waste, a discharging leakage is arranged on the discharge port It struggles against (5);Transparent testing tube (6), one end of the testing tube (6) and institute are equipped on the side wall of the every delivery pipe (2) It states delivery pipe (2) connection and the other end extends straight up;It is arranged with for institute on the outer wall of the more delivery pipes (2) State the heating mantle (9) of delivery pipe (2) heating;Wherein, storage barrel (3) top cover is set there are one bung (8), the bung (8) axial direction of storage barrel (3) described in bottom face upper edge is extended with the end of a telescopic rod (10) and the telescopic rod (10) End is equipped with stirring-head (11), and the stage casing of the testing tube (6) has the anti-overflow storage bin of a ball-shaped.
2. novel injection molding waste recovery storage facilities according to claim 1, which is characterized in that the bridge piece (1) For metal gooseneck.
3. novel injection molding waste recovery storage facilities according to claim 1, which is characterized in that it is described go out funnel (5) Closure or openness are controlled by valve (7).
4. novel injection molding waste recovery storage facilities according to claim 1, which is characterized in that the bung (8) is Bright bung.
5. novel injection molding waste recovery storage facilities according to claim 4, which is characterized in that the storage barrel (3) Inner wall is equipped with containing mark ruler.
CN201610361745.XA 2016-05-27 2016-05-27 Novel injection molding waste recovery storage facilities Active CN105835264B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610361745.XA CN105835264B (en) 2016-05-27 2016-05-27 Novel injection molding waste recovery storage facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610361745.XA CN105835264B (en) 2016-05-27 2016-05-27 Novel injection molding waste recovery storage facilities

Publications (2)

Publication Number Publication Date
CN105835264A CN105835264A (en) 2016-08-10
CN105835264B true CN105835264B (en) 2018-11-06

Family

ID=56594823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610361745.XA Active CN105835264B (en) 2016-05-27 2016-05-27 Novel injection molding waste recovery storage facilities

Country Status (1)

Country Link
CN (1) CN105835264B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108192132A (en) * 2017-12-30 2018-06-22 李柯英 A kind of equipment for being used to prepare polyethylene
CN108219248A (en) * 2017-12-30 2018-06-29 李柯英 A kind of high-strength polyethylene and preparation method thereof
CN108201839A (en) * 2017-12-30 2018-06-26 李国俊 A kind of agitating device for being used to produce polyvinyl chloride
CN108192189A (en) * 2017-12-30 2018-06-22 李柯英 A kind of modified poly ethylene and preparation method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4104736B2 (en) * 1998-07-03 2008-06-18 フジ化成工業株式会社 Curling heat treatment system for magnetic tape
CN101402098A (en) * 2008-10-30 2009-04-08 杭州新余宏机械有限公司 System and method for recycling waste toilet articles
CN101486248A (en) * 2008-12-24 2009-07-22 冯龙初 Delivery conduit of plastic foam environment friendly recycling prilling unit
CN204977374U (en) * 2015-07-15 2016-01-20 芜湖信宁新材料科技有限公司 Collecting device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104943124A (en) * 2015-07-15 2015-09-30 芜湖信宁新材料科技有限公司 Material gathering device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4104736B2 (en) * 1998-07-03 2008-06-18 フジ化成工業株式会社 Curling heat treatment system for magnetic tape
CN101402098A (en) * 2008-10-30 2009-04-08 杭州新余宏机械有限公司 System and method for recycling waste toilet articles
CN101486248A (en) * 2008-12-24 2009-07-22 冯龙初 Delivery conduit of plastic foam environment friendly recycling prilling unit
CN204977374U (en) * 2015-07-15 2016-01-20 芜湖信宁新材料科技有限公司 Collecting device

Also Published As

Publication number Publication date
CN105835264A (en) 2016-08-10

Similar Documents

Publication Publication Date Title
CN105835264B (en) Novel injection molding waste recovery storage facilities
CN204902578U (en) Full -automatic energy -conserving magnesium alloy melting arrangement
CN106042273B (en) Anti-clogging injection molding waste recycles storage facilities
CN106003472B (en) Injection molding waste recycles storage facilities
CN105818330B (en) Injection molding waste with early warning mechanism recycles storage facilities
CN101302447B (en) Method for exchanging changing absorber oil in benzol scrubber when resistance rises in winter
CN101966523A (en) Device for clearing screw rod plastic by oil tank heating method
CN206799172U (en) Anti-leak environmental protection plus sulphur device in carbon disulphide production
CN105758196B (en) Protective device for glass substrate furnace discharge
CN204648975U (en) Billet oxidization iron sheet clears structure fast
CN114438268A (en) Boiling device and method for processing blast furnace hearth freezing
CN207552162U (en) Kiln throat tubular construction
CN208343383U (en) A kind of injection barrel of injector
CN206601041U (en) A kind of horizontal revolving cylinder cooler feed chute
CN203470894U (en) Sliding nozzle device for improving molten steel cleanliness by separating and recovering stuffing sand
CN207680523U (en) Gas injection formula modified pitch tank agitating device
CN204138682U (en) Cooling stave poling repairs coupling device
CN110126317A (en) A kind of processing method of HDPE connected plastic-steel spirally-wound pipe
CN205877364U (en) Pneumatic play liquid valve
CN206858628U (en) A kind of blade steel refining electroslag furnace with efficient cooling effect
CN207210592U (en) A kind of clinker automatic recovery system
CN205537105U (en) Melting furnace of tumbling
CN204237808U (en) A kind of heating device for blast furnace
CN204080052U (en) A kind of waste aluminum retrieving arrangement
KR101801930B1 (en) System for Supplying Sealant of Tire

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190527

Address after: 237300 North Eighth Road, Jinzhai Modern Industrial Park, Jinzhai County, Luan City, Anhui Province

Patentee after: Jinzhai Hongwei New Material Co., Ltd.

Address before: 241000 First Floor of No. 23 Factory Building of New Wuhu Science and Technology Enterprise Incubator, Wuhu County, Wuhu City, Anhui Province

Patentee before: WUHU XINNING NEW MATERIAL SCIENCE & TECHNOLOGY CO., LTD.

TR01 Transfer of patent right