CN105833648A CN201610317759.1A CN201610317759A CN105833648A CN 105833648 A CN105833648 A CN 105833648A CN 201610317759 A CN201610317759 A CN 201610317759A CN 105833648 A CN105833648 A CN 105833648A
Authority
CN
China
Prior art keywords
tank
water
chamber
cylinder
seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610317759.1A
Other languages
Chinese (zh)
Inventor
范立元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YINGYANG NON-WOVEN MACHINERY Co Ltd JIANGSU
Original Assignee
YINGYANG NON-WOVEN MACHINERY Co Ltd JIANGSU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YINGYANG NON-WOVEN MACHINERY Co Ltd JIANGSU filed Critical YINGYANG NON-WOVEN MACHINERY Co Ltd JIANGSU
Priority to CN201610317759.1A priority Critical patent/CN105833648A/en
Publication of CN105833648A publication Critical patent/CN105833648A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D50/00Combinations of methods or devices for separating particles from gases or vapours
    • B01D50/40Combinations of devices covered by groups B01D45/00 and B01D47/00

Abstract

The invention discloses a device for dust removal of spiral air flow by means of water, and belongs to the technical field of textile dust removal facilities. The device comprises a machine frame, a water tank, a central pipe, a cylinder body, a dust-containing air lead-in pipe connector fixing base, a purified air lead-out pipe connector fixing base, a spraying mechanism, a water tank processing water circulating and reusing mechanism and a water storage tank, wherein a filter screen is arranged in a cavity of the water tank, the left end and the right end of the central pipe are sealed by central pipe sealing plates respectively, the left end and the right end of the cylinder body are sealed by cylinder body end sealing plates respectively, the upper portion of the dust-containing air lead-in pipe connector fixing base is matched and connected with a dust-containing air lead-in pipe connector, the upper portion of the purified air lead-out pipe connector fixing base is matched and connected with a purified air lead-out pipe connector, the spraying mechanism is arranged in a cavity of the dust-containing air lead-in pipe connector fixing base, the water tank processing water circulating and reusing mechanism is fixed to the machine frame and connected with a filtered water lead-out connector and the spraying mechanism at the same time, the water storage tank is fixed to the top of the cylinder body, one end of a water outlet pipe of the water storage tank is fixed to the side wall of the water storage tank, and the other end of the water outlet pipe of the water storage tank is fixed to the front side wall of the cylinder body or the front side of the water tank. Overhaul and maintenance are convenient, manufacturing difficulty is lowered, the method has the advantages of being high in dust impurity and air separation efficiency and good in effect, and water resources are saved.

Description

Spiral air-flow dust collect unit by water
Technical field
The invention belongs to textile dust extraction facility technology field, be specifically related to a kind of spiral air-flow dust collect unit by water.
Background technology
At the blowing of textile industry, comb and parallel cotton fibers prior to spinning, waste cotton process, Cotton and Hemp blending, air spinning and in the operation of the fiber opening of on-woven production industry, mixed cotton, combing, lapping etc., the disperse meeting of fibrous dust and the floccule environmental effects to operation field, and then undermine the health of online assignment personnel, therefore generally at cleaner set by aforementioned field, cleaner such as bag filter, swinging filter, plate-type dedusting device, honeycomb duster, etc..
As is known in the industry, in weaving and on-woven production field, dedusting method mainly has two kinds: one for dry dust removal (also referred to as dry method dust), two is wet dust removal (also referred to as wet dedusting), owing to wet dust removal has the strong points such as simple in construction, cost of investment is low, efficiency of dust collection is high for dry dust removal, thus it is widely used in recent years.
Technical information about wet dust removal can be seen in disclosed Chinese patent literature, recommend have " textile dust extraction device ", CN204865378U to be provided with " a kind of high effect dust cleaner weaved " such as CN204865374U and CN204865415U introduces and has " a kind of efficient weaving dedusting mechanism " etc., owing to the patent formula of this version exists the logical fraud that disposal ability is weak, thus it is not suitable for big flow dedusting.
Typically there is " Wet dust-collecting apparatus for textile industry " as CN2703768Y discloses, its structure is: in dust laden air delivery outlet is arranged on cistern and be insinuated in the water in cistern, and cistern top arranges purification air-out, and the bottom of cistern arranges emissions delivery outlet, and deposit dirt discharging assistant device (2nd section reciprocal of description page 1) is set in the bottom of cistern;Its dust-cleaning principle is: enter the dust laden air of dust laden air conveying pipe after the dust laden air delivery outlet of each unit enters in water at air inlet, fine dust and dust in dust laden air will be filtered out in water, and escape the purification air purified air-out output (2nd section reciprocal of Instructions Page 2) of the water surface.This patent has simple in construction, length in service life and the strong point of good dedusting effect, but there is following shortcoming: one, due to need to the dust laden air being positioned at cistern (i.e. water tank) carry the length direction of pipe towards under side receive the dust laden air outlet tube of the water layer immersed to cistern with space state, thus dyschezia is to its inspection dredging and to increase manufacture difficulty because dust laden air pipe structure is complicated when there is dust laden air outlet tube blocking situation;They are two years old, the dust laden air of the dust laden air outlet tube output owing to introducing through dust laden air conveying pipe and receiving on it is to enter in water again from water surface effusion and then the output of purified air-out, thus it is of a relatively high that the desilting of cistern is changed the water frequency, add in use and bother, again because if being negligent of timely desilting to change water, then the mouth of pipe of dust laden air outlet tube can be blocked by the dirt in the water cavity of cistern bottom;Its three, owing to the water in cistern does not have the circulated sprinkling effect to dust laden air, thus water resource consumption is big;Its four, due to dust laden air need in water after be purified air, thus treatment effeciency is affected.
For above-mentioned prior art, it is necessary to improved, to this end, the applicant has made useful design and defined technical scheme described below.
Summary of the invention
The task of the present invention is that providing one to contribute to that dust laden air processes chamber separates with water cavity and use and tank chamber is removed contamination and facilitated inspection easily and simplifies structure and reduce manufacture difficulty, be conducive to making dust laden air show as bumping against with cylinder inboard wall to the process purifying the flowing of air outlet direction from dust-laden air introducing port and spirally state flowing and use and make trifle in the world and air efficiently separate, it is of value to and the water in tank is recycled and uses saving water resource, have to be easy to significantly improve and the disposal ability of dust laden air is used the spiral air-flow dust collect unit by water embodying excellent energy-saving effect.
The task of the present invention is performed by, and a kind of spiral air-flow dust collect unit by water, including a frame, this frame is supported on the terrace of field of employment in a state of use;One tank, this tank is suspended at the lower section of described frame with the state in terrace of soaring, left end at the tank intracavity of this tank and the length direction that is positioned at tank chamber is equipped with a drainage screen, by this drainage screen, tank chamber is positioned at the region in left side of drainage screen every setting out a filtration Water circulation chamber, is equipped with one in the position of the bottom corresponding to this filtration Water circulation chamber and crosses drainage and draw interface;One central canal, this central canal is being bearing in described frame corresponding to the position above described tank, and the left end of this central canal and right-hand member are respectively closed by central canal shrouding;One cylinder, in the upper left end of this cylinder and upper right end respectively every being provided with one without cylinder chamber sector notch, the sector notch without cylinder chamber of left end and the sector notch without cylinder chamber of right-hand member form the position relationship at diagonal angle each other and fix with described central canal, and the state that the bottom of cylinder is drawn in the most in opposite directions with its cylinder front side wall and cylinder rear wall stretches towards the tank chamber of described tank, space between the bottom of cylinder front side wall and cylinder rear wall is configured to cylinder body bottom opening, and cylinder front side wall touches with the front inner wall patch in tank chamber, and cylinder rear wall is tactile with the rear side inwall patch in tank chamber, the left side of cylinder and right side are respectively closed by cylinder head plate;One dust laden air introduces pipe joint and fixes seat, this dust laden air introduces pipe joint and fixes seat and be fixed on described cylinder in the position in the front of the sector notch without cylinder chamber corresponding to described right-hand member and this dust laden air introduces pipe joint and fixes the dust laden air of seat and introduce pipe joint and fix seat chamber and communicate with the cylinder chamber of cylinder, and the top fixing seat at this dust laden air introducing pipe joint has connected a dust laden air introducing pipe joint;nullOne purifies air fairlead joint fixes seat,This purification air fairlead joint is fixed seat and is fixed on described cylinder in the position at the rear of the sector notch without cylinder chamber corresponding to described left end and this purification air fairlead joint is fixed the air fairlead joint that purifies of seat and fixed seat chamber and communicate with the cylinder chamber of cylinder,A purification air fairlead joint has been connected on the top that seat fixed by this purification air fairlead joint,Fix seat by dust laden air introducing pipe joint and fix, with purifying air fairlead joint, the diagonal relationship that seat is formed each other、The diagonal relationship that mutually formed by the sector notch without cylinder chamber of described left end and the sector notch without cylinder chamber of right-hand member and made to introduce pipe joint from described dust laden air by being positioned at the guiding of described central canal of cylinder chamber and be introduced to the dust laden air spirally state of described cylinder chamber and fix the direction of seat flow to the described air fairlead joint that purifies;One spraying mechanism and a tank process water circulating and recovering mechanism, spraying mechanism is arranged on described dust laden air and introduces pipe joint and fix seat intracavity, and tank processes water circulating and recovering mechanism position below the front side corresponding to described tank or below rear side and fixes with described frame and cross drainage extraction interface with described and spraying mechanism pipeline is connected simultaneously;One storage tank, this storage tank is being fixed the position on right side of seat or is being fixed on the top of described cylinder in the position introducing the pipe joint left side of fixing seat corresponding to described dust laden air corresponding to described purification air fairlead joint, the storage tank sidewall of this storage tank is fixed with one for the water of the storage tank intracavity of storage tank being introduced one end of the storage tank outlet pipe of described tank intracavity, and the front side of the other end of this storage tank outlet pipe and described cylinder front side wall or tank is fixed.
In a specific embodiment of the present invention, a frame top sealing plate it is provided with at the top of described frame, and offer a dust laden air introducing pipe joint in the position fixing seat corresponding to described dust laden air introducing pipe joint on this frame top sealing plate and fix seat resigning hole, offer a purification air fairlead joint in the position fixing seat corresponding to described purification air fairlead joint and fix seat resigning hole, and offer a storage tank in the position corresponding to described storage tank and step down chamber, dust laden air introduces pipe joint and fixes the top of seat and lean out dust laden air and introduce pipe joint and fix seat resigning hole, purify air fairlead joint to fix the top of seat and lean out purification air fairlead joint and fix seat and step down chamber, and the top of storage tank leans out storage tank and steps down chamber, front side in frame, rear side, left side and right side are each provided with a frame chamber door.
In another specific embodiment of the present invention, the front inner wall in tank chamber, rear side inwall, inner left wall or the right side inwall of described tank are provided with one for finding out the water-level probe of the water level of tank intracavity.
In another specific embodiment of the present invention, and it is being each provided with a central canal supporting device corresponding to the left end of described central canal and the position of right-hand member in described frame, this central canal supporting device is also connected with described tank, and described central canal shrouding and described central canal are fixed with this central canal supporting device.
nullIn another specific embodiment of the present invention,Described central canal supporting device includes front support trailing arm、Rear support trailing arm、Front support rod、Back support rod、Fixing transverse arm and central canal end fixed plate,Front support trailing arm and rear support trailing arm are the most parallel each other,This front support trailing arm and rear support trailing arm are configured to horizontal boom end towards one end of described central canal,And fix towards one end of described frame with frame,Fixing transverse arm is fixed on front support trailing arm and rear support trailing arm towards between one end of central canal,The lower end of front support rod is connected with edge on the front side of described tank,And upper end is connected with the front end of central canal end fixed plate,The lower end of back support rod is connected with edge on the rear side of tank,And upper end is connected with the rear end of central canal end fixed plate,The middle part of central canal end fixed plate is corresponding to the top of fixing transverse arm,Left end and the right-hand member of described central canal are fixed with central canal end fixed plate,Described central canal shrouding is fixed with fixing transverse arm by central canal shrouding screw.
In an also specific embodiment of the present invention, described dust laden air introduces pipe joint and is arranged on introducing pipe joint support, and the top that this introducing pipe joint support fixes seat by introducing pipe joint support bracket bolt and described dust laden air introducing pipe joint is fixed;Described purification air fairlead joint is arranged in fairlead adapter bracket, and this fairlead adapter bracket is fixed with the top that seat fixed by described purification air fairlead joint by fairlead adapter bracket bolt;Described dust laden air introduces pipe joint and purification air fairlead joint is transparent.
In more and in a specific embodiment of the present invention, described spraying mechanism includes a jet pipe and a fog-spray nozzle, the middle part of jet pipe and described dust laden air introducing pipe joint are fixed seat and are fixed, one end of this jet pipe probes into described dust laden air introducing pipe joint and fixes seat intracavity, one end of fog-spray nozzle and jet pipe is fixed and is introduced pipe joint corresponding to dust laden air and fixes the center in seat chamber, and the spray holes of this fog-spray nozzle is towards upper;It is fixed with a motor fixing plate in described frame and in the position processing water circulating and recovering mechanism corresponding to described tank, described tank processes water circulating and recovering mechanism and is arranged on motor fixing plate, draws and is provided with an extraction interface valve at described drainage of crossing on interface.
The present invention's and then in a specific embodiment, described tank processes water circulating and recovering mechanism and includes a motor and a water pump, motor is fixed on described motor fixing plate, water pump coordinates with motor-driven, the pump intake of this water pump connects and has one end of a pump water inlet, and the other end of this pump water inlet is connected with described extraction interface valve, the pump outlet of water pump connects and has one end of a pumping line, and the other end of this pumping line is connected with described jet pipe.
In the most more and in a specific embodiment of the present invention, described sector notch without cylinder chamber be made up of shrouding after shrouding, breach before breach and notch side shrouding enclosure and before breach after shrouding, breach the end of shrouding and notch side shrouding along fixing with described central canal.
At again and then in a specific embodiment of the present invention, shrouding form before being provided with on shrouding before described breach, and shrouding form after being provided with on shrouding after described breach.
One of technique effect of technical scheme that the present invention provides, owing to the cylinder chamber as dust laden air process chamber of cylinder is separated with the tank chamber as water cavity, thus can be removed contamination in tank chamber easily and owing to cylinder and tank are formed split type structure each other, thus inspection can be facilitated and manufacture difficulty can be reduced;Two, fix seat and simultaneously mutually formed diagonal relationship and by the guiding of central canal by the sector notch without cylinder chamber of cylinder left and right end owing to making dust laden air introduce pipe joint with purifying air fairlead joint and fix seat and forming diagonal relationship each other, thus flow in the direction that the dust laden air spirally state being incorporated in cylinder chamber from dust-laden air introduction joint can be made to fix seat to purification air fairlead joint, in flow process, complete dedusting, have strong point high and effective to trifle in the world and air separation efficiency;Three, owing to being processed water circulating and recovering mechanism by tank, the water of tank intracavity is recycled, thus the water resource of preciousness can be saved.
Accompanying drawing explanation
Fig. 1 is embodiments of the invention structure chart.
Fig. 2 is the front view of Fig. 1.
Fig. 3 is the A-A sectional view of Fig. 2.
Fig. 4 is the application state schematic diagram of the present invention.
Detailed description of the invention
For the ease of being more clearly understood from technical spirit and the beneficial effect of the present invention, applicant elaborates the most by way of example, but the description to embodiment is not the restriction to the present invention program, the most pro forma rather than substantial equivalent transformation that is only done by any foundation present inventive concept is regarded as technical scheme category.
The most every concept relating to upper and lower, left and right, the directivity of front and rear or title directionality is all on the basis of the location status shown in Fig. 1, thus can not be understood as being particularly limited to the technical scheme that the present invention provides.
Referring to Fig. 1 to Fig. 3, it is shown that a frame 1 of frame-like, this frame 1 is supported on the terrace of field of employment in a state of use;Show a tank 2, this tank 2 is suspended at the lower section of aforementioned frame 1 with the state in terrace of soaring, in the tank chamber 21 of this tank 2 and the left end of the length direction that is positioned at tank chamber 21 is equipped with a drainage screen 22 pluggablely, by this drainage screen 22 by tank chamber 21 in the region in the left side of drainage screen 22 every setting out a filtration Water circulation chamber 211, be equipped with one in the position of the bottom corresponding to this filtration Water circulation chamber 22 and cross drainage and draw interface 2111;Showing a central canal 3 being similar to ellipse, this central canal 3 is being bearing in aforementioned frame 1 corresponding to the position above aforementioned tank 2, and the left end (i.e. the left end mouth of pipe) of this central canal 3 and right-hand member (i.e. the right-hand member mouth of pipe) are respectively closed by central canal shrouding 31;nullShow a cylinder 4,In the upper left end of this cylinder 4 and upper right end respectively every being provided with one without cylinder chamber sector notch 41,The sector notch without cylinder chamber of left end 41 forms the position relationship at diagonal angle each other with the sector notch without cylinder chamber 41 of right-hand member and fixes with aforesaid central pipe 3,And the state drawn in the most in opposite directions with its cylinder front side wall 42 and cylinder rear wall 43 of the bottom of cylinder 4 stretches towards the tank chamber 21 of aforementioned tank 2,Space between the bottom of cylinder front side wall 42 and cylinder rear wall 43 is configured to cylinder body bottom opening 44,And cylinder front side wall 42 closely pastes tactile by its elastic force (power scolded out relative to cylinder rear wall 43) with the front inner wall in tank chamber 21,And cylinder rear wall 43 closely pastes tactile by the rear side inwall of its elastic force (power scolded out relative to cylinder front side wall 42) with tank chamber 21,The left side of cylinder 4 and right side are respectively closed by cylinder head plate 45;Show that a dust laden air introduces pipe joint and fixes seat 5, this dust laden air introduces pipe joint and fixes seat 5 and be fixed on cylinder 4 in the position in the front of the sector notch without cylinder chamber 41 corresponding to aforementioned right-hand member and this dust laden air introduces pipe joint and fixes the dust laden air of seat 5 and introduce pipe joint and fix seat chamber 51 and communicate with the cylinder chamber 46 of cylinder 4, and the top fixing seat 5 at this dust laden air introducing pipe joint has connected a dust laden air introducing pipe joint 52;nullShow that seat 6 fixed by a purification air fairlead joint,This purification air fairlead joint is fixed seat 6 and is fixed on cylinder 4 in the position at the rear of the sector notch without cylinder chamber 41 corresponding to aforementioned left end and this purification air fairlead joint is fixed the air fairlead joint that purifies of seat 6 and fixed seat chamber 61 and communicate with the cylinder chamber 46 of cylinder 4,A purification air fairlead joint 62 has been connected on the top that seat 6 fixed by this purification air fairlead joint,Fix seat 5 by dust laden air introducing pipe joint and fix, with purifying air fairlead joint, the diagonal relationship that seat 6 is formed each other、The diagonal relationship that mutually formed by the sector notch without cylinder chamber 41 of the sector notch without cylinder chamber 41 of left end with right-hand member and made to introduce pipe joint 52 from aforementioned dust laden air by being positioned at the guiding of central canal 3 of cylinder chamber 46 and be introduced to the direction that the dust laden air spirally state of cylinder chamber 46 fixes seat 6 to aforesaid purification air fairlead joint and flow;Show that a spraying mechanism 7(also can claim humidifier, as follows) and a tank process water circulating and recovering mechanism 8, spraying mechanism 7 is arranged on aforementioned dust laden air introducing pipe joint and fixes in seat chamber 51, tank processes the water circulating and recovering mechanism 8 position below the front side corresponding to aforementioned tank 2 or below rear side fixing with aforementioned frame 1 and be connected with foregoing filtration water extraction interface 2111 and spraying mechanism 7 pipeline simultaneously, and tank is processed the water circulating and recovering mechanism 8 position below the front side corresponding to tank 2 and fixes with frame 1 by the present embodiment;Show a storage tank 9, this storage tank 9 is being fixed the position on right side of seat 6 or is being fixed on the top of aforementioned cylinder 4 in the position (the present embodiment selects the former) introducing the pipe joint left side of fixing seat 5 corresponding to aforementioned dust laden air corresponding to aforementioned purification air fairlead joint, the storage tank sidewall of this storage tank 9 is fixed with one for one end that the water in the storage tank chamber 91 of storage tank 9 is introduced the storage tank outlet pipe 92 in aforementioned tank chamber 21, and the front side of the other end of this storage tank outlet pipe 92 and aforesaid cylinder front side wall 42 or tank 2 is fixed, the other end of storage tank outlet pipe 92 is fixed by the present embodiment with cylinder front side wall 42, and on the pipeline of storage tank outlet pipe 92, it is equipped with an electromagnetic valve 921, when the water level in tank chamber 21 reduces, then by storage tank 9 moisturizing.Also show the water tank seat 94 being fixed on cylinder 4 in FIG, storage tank 9 is fixed with this water tank seat 94.Preferably scheme also can arrange a water storage tank water level sensor 95 in storage tank 9.
nullThe top of aforementioned frame 1 is provided with a frame top sealing plate 11,And offer a dust laden air introducing pipe joint in the position fixing seat 5 corresponding to aforementioned dust laden air introducing pipe joint on this frame top sealing plate 11 and fix seat resigning hole 111,Offer a purification air fairlead joint in the position fixing seat 6 corresponding to aforementioned purification air fairlead joint and fix seat resigning hole 112,And offer a storage tank in the position corresponding to aforementioned storage tank 9 and step down chamber 113,Dust laden air introduces pipe joint and fixes the top of seat 5 and lean out dust laden air and introduce pipe joint and fix seat resigning hole 111,Purify air fairlead joint to fix the top of seat 6 and lean out purification air fairlead joint and fix seat and step down chamber 112,And the top of storage tank 9 leans out storage tank and steps down chamber 113,Front side in frame 1、Rear side、Left side and right side are each provided with a frame chamber door 12.
Being provided with the water-level probe 212 of a water level in finding out tank chamber 21 on the front inner wall in tank chamber 21, rear side inwall, inner left wall or the right side inwall of aforementioned tank 2, water-level probe 212 has been fixed on the left side wall in tank chamber 21 by the present embodiment.When the water level in tank chamber 21 i.e. liquid level less than can not be visited by water-level probe 212 and degree time, signal is fed back to electric control box (not shown) by water-level probe 212, instructed to aforesaid electromagnetic valve 921 by electric control box, electromagnetic valve 921 is made to open, by storage tank outlet pipe 92 to tank chamber 21 moisturizing, vice versa.Water in storage tank 9 is introduced by water inlet pipe 93, and water inlet pipe 93 is connected with water supply line.
And it is being each provided with a central canal supporting device 13 corresponding to the left end of aforesaid central pipe 3 and the position of right-hand member in aforementioned frame 1, this central canal supporting device 13 is also connected with aforesaid tank 2, and aforesaid central canal shrouding 31 and aforesaid central pipe 3 are fixed with this central canal supporting device 13.
nullAforesaid central canal supporting device 13 includes front support trailing arm 131、Rear support trailing arm 132、Front support rod 133、Back support rod 134、Fixing transverse arm 135 and central canal end fixed plate 136,Front support trailing arm 131 and rear support trailing arm 132 are the most parallel each other,This front support trailing arm 131 and rear support trailing arm 132 are configured to horizontal boom end towards one end of aforesaid central pipe 3,And front support trailing arm 131 is fixing with frame 1 towards one end employing front support trailing arm screw 1311 of frame 1,Rear support trailing arm 132 uses rear support trailing arm screw 1321 to fix with frame 1 towards one end of frame 1,Fixing transverse arm 135 is weldingly fixed on front support trailing arm 131 and rear support trailing arm 132 towards between one end of central canal 3,The lower end of front support rod 133 is connected with edge on the front side of aforementioned tank 2,And upper end is connected with the front end of central canal end fixed plate 136 and is limited nut 1331 by front support rod and limits,The lower end of back support rod 134 is connected with edge on the rear side of tank 2,And upper end is connected with the rear end of central canal end fixed plate 136 and is limited nut 1341 by back support rod and limits,The middle part of central canal end fixed plate 136 is corresponding to the top of fixing transverse arm 135,The left end of aforesaid central pipe 3 and right-hand member are fixed with central canal end fixed plate 136,Aforesaid central canal shrouding 31 is fixed with fixing transverse arm 135 by central canal shrouding screw 311.From this section of explanatory note: made tank 2 be in the state being suspended on terrace, therefore back and front supporting bar 133,134 alternatively referred to as forward and backward suspension rod by aforementioned front support rod 133 and back support rod 134.
Aforesaid dust laden air introduces pipe joint 52 and is arranged on introducing pipe joint support 521, and the top that this introducing pipe joint support 521 fixes seat 5 by introducing pipe joint support bracket bolt 5211 and aforementioned dust laden air introducing pipe joint is fixed;Aforesaid purification air fairlead joint 62 is arranged in fairlead adapter bracket 621, and this fairlead adapter bracket 621 is fixed with the top that seat 6 fixed by aforementioned purification air fairlead joint by fairlead adapter bracket bolt 6211;Aforesaid dust laden air introduces pipe joint 52 and purification air fairlead joint 62 is transparent.
Aforesaid spraying mechanism 7 includes jet pipe 71 and a fog-spray nozzle 72, the middle part of jet pipe 71 is fixed seat 5 with aforementioned dust laden air introducing pipe joint and is fixed, one end of this jet pipe 71 probes into aforementioned dust laden air introducing pipe joint and fixes in seat chamber 51, one end of fog-spray nozzle 72 and jet pipe 71 is fixed and is introduced pipe joint corresponding to dust laden air and fixes the center in seat chamber 51, the spray holes of this fog-spray nozzle 72 is towards upper, spray holes designated herein towards on include towards four directions, specifically with spherical crown shape spray;In aforesaid frame 1 lower front of frame 1 (the present embodiment be) and be fixed with a motor fixing plate 14 in the position processing water circulating and recovering mechanism 8 corresponding to aforementioned tank, aforementioned tank processes water circulating and recovering mechanism 8 and is arranged on motor fixing plate 14, draws and is provided with an extraction interface valve 21111 at aforesaid drainage of crossing on interface 2111.
nullPlease see Fig. 1 by emphasis,Aforesaid tank processes water circulating and recovering mechanism 8 and includes motor 81 and a water pump 82,Motor 81 uses motor cabinet to fix bolt 811 and is fixed on motor fixing plate 14 in the position of the bolt hole 141 corresponding to being opened on motor fixing plate 14,And limited by the nut 8111 that limits screwing the end fixing bolt 811 at motor cabinet,Water pump 82 coordinates with motor 81 transmission,The pump intake 821 of this water pump 82 connects and has one end of a pump water inlet 8211,And the other end of this pump water inlet 8211 is connected with aforesaid extraction interface valve 21111,The pump outlet 822 of water pump 82 connects and has one end of a pumping line 8221,And the other end of this pumping line 8221 is connected with aforementioned jet pipe 71.
When drawing interface valve 21111 and opening, in tank chamber 21 after drainage screen 22 filters and enter into the water filtered in Water circulation chamber 211 and sequentially pass through drainage and draw interface 2111, draw interface valve 21111, pump water inlet 8211, pump intake 821, pump outlet 822, pumping line 8221 and jet pipe 71, sprayed by fog-spray nozzle 72, introduce, to by dust laden air, the dust laden air spraying moistening that pipe joint 52 introduces.Dust laden air (i.e. moistening dust laden air) after spraying moistening separates cylinder chamber 46 in, and the trifle in the world of isolated band water backs into tank chamber 21, purifies air and then draws (following it is also mentioned that) by purifying air fairlead joint 62.
The most still seeing Fig. 1 to Fig. 3, aforesaid sector notch without cylinder chamber 41 is made up of shrouding 412 after shrouding before breach 411, breach and notch side shrouding 413 enclosure and before breach, after shrouding 411, breach, the edge, the end of shrouding 412 and notch side shrouding 413 is fixed with aforesaid central pipe 3.
As preferred scheme, shrouding form 4111 before being provided with on shrouding 411 before aforesaid breach, and shrouding form 4121 after being provided with on shrouding 412 after aforesaid breach.
Refer to Fig. 4 and combine Fig. 1 to Fig. 3, applicant describes the use of the present invention, figure 4 illustrates a sweep-up pipe 10, one end of this sweep-up pipe 10 and aforementioned dust laden air introduce pipe joint 52 and connect, and the port closed of suction port this other end of 101(is received in the side of the other end) and a dust absorption fan 102 it is equipped with in the position corresponding to suction port 101.Also show the purification air fairlead 20 connected with aforementioned purification air fairlead joint 62 in the diagram.
Under the work of dust absorption fan 102, dust laden air self-dust-suction mouth 101 in spinning and weaving workshop enters sweep-up pipe 10, enter the dust laden air in sweep-up pipe 10 and introduce pipe joint 52 through dust laden air successively, dust laden air introduces pipe joint and fixes seat chamber 51 and enter the right-hand member of cylinder chamber 46 after spraying moistening through fog-spray nozzle 72, again i.e. at the left end entering cylinder chamber 46 when streaming around central canal 3 under the water conservancy diversion of central canal 3, seat chamber 61 fixed by the most purified air fairlead joint, purify air fairlead joint 62 and purification air fairlead causes spinning and weaving workshop or causes outdoor for 20 times.Through fog-spray nozzle 72 moistening dust laden air with aforesaid spiral status from the right-hand member of cylinder chamber 46 to left end flow during, the tube wall of cavity wall and central canal 3 that the trifle in the world being mixed in dust laden air just follows cylinder chamber 46 under the shock of the cavity wall suffered with cylinder chamber 46 and the tube wall of central canal 3 drops in the tank chamber 21 of tank 2.Enter along with the water of trifle in the world and filter through strainer valve 22 behind tank chamber 21 and processed the work of water circulating and recovering mechanism 8 by aforesaid tank and supply spraying mechanism 7, fog-spray nozzle spray.Also can arrange an adapter with blowoff valve separately in the bottom of tank 2 as preferred scheme.
In sum, the technical scheme that the present invention provides overcomes the deficiency in prior art, has favorably accomplished invention task, has cashed the technique effect described in applicant's superincumbent technique effect hurdle faithfully.

Claims (10)

1.A kind of spiral air-flow dust collect unit by water, it is characterised in that include a frame (1) , this frame (1) It is supported in a state of use on the terrace of field of employment;One tank (2) , this tank (2) To soar, the state in terrace is suspended at described frame (1) Lower section, at this tank (2) Tank chamber (21) In and be positioned at tank chamber (21) The left end of length direction be equipped with a drainage screen (22) , by this drainage screen (22) By tank chamber (21) It is positioned at drainage screen (22) The region in left side every setting out a filtration Water circulation chamber (211) , corresponding to this filtration Water circulation chamber (22) The position of bottom be equipped with one and cross drainage and draw interface (2111) ;One central canal (3) , this central canal (3) Corresponding to described tank (2) The position of top be bearing in described frame (1) On, and this central canal (3) Left end and right-hand member respectively by central canal shrouding (31) Close;One cylinder (4) , at this cylinder (4) Upper left end and upper right end respectively every being provided with one without cylinder chamber sector notch (41) , the sector notch without cylinder chamber of left end (41) Sector notch without cylinder chamber with right-hand member (41) Formed each other diagonal angle position relationship and with described central canal (3) Fixing, and cylinder (4) Bottom with its cylinder front side wall (42) And cylinder rear wall (43) The state drawn in the most in opposite directions is towards described tank (2) Tank chamber (21) Stretch, cylinder front side wall (42) With cylinder rear wall (43) Bottom between space be configured to cylinder body bottom opening (44) , and cylinder front side wall (42) With tank chamber (21) Front inner wall patch touch, and cylinder rear wall (43) With tank chamber (21) Rear side inwall patch touch, cylinder (4) Left side and right side respectively by cylinder head plate (45) Close;One dust laden air introduces pipe joint and fixes seat (5) , this dust laden air introduces pipe joint and fixes seat (5) In the sector notch without cylinder chamber corresponding to described right-hand member (41) The position in front be fixed on described cylinder (4) Upper and this dust laden air introduces pipe joint and fixes seat (5) Dust laden air introduce pipe joint fix seat chamber (51) With cylinder (4) Cylinder chamber (46) Communicate, introduce pipe joint at this dust laden air and fix seat (5) Top connected one dust laden air introduce pipe joint (52) ;One purifies air fairlead joint fixes seat (6) , seat fixed by this purification air fairlead joint (6) In the sector notch without cylinder chamber corresponding to described left end (41) The position at rear be fixed on described cylinder (4) Seat fixed by upper and this purification air fairlead joint (6) Purification air fairlead joint fix seat chamber (61) With cylinder (4) Cylinder chamber (46) Communicate, fix seat at this purification air fairlead joint (6) Top connected a purification air fairlead joint (62) , introduce pipe joint by dust laden air and fix seat (5) Seat is fixed with purifying air fairlead joint (6) The diagonal relationship that formed each other, by the sector notch without cylinder chamber of described left end (41) Sector notch without cylinder chamber with right-hand member (41) The diagonal relationship that mutually forms and by being positioned at cylinder chamber (46) Interior described central canal (3) Guiding and make from described dust laden air introduce pipe joint (52) It is introduced to described cylinder chamber (46) Interior dust laden air spirally state fixes seat to described purification air fairlead joint (6) Direction flowing;One spraying mechanism (7) Water circulating and recovering mechanism is processed with a tank (8) , spraying mechanism (7) It is arranged on described dust laden air introducing pipe joint and fixes seat chamber (51) In, tank processes water circulating and recovering mechanism (8) Corresponding to described tank (2) Front side below or rear side below position and described frame (1) Fix and draw interface with described drainage of crossing simultaneously (2111) And spraying mechanism (7) Pipeline connects;One storage tank (9) , this storage tank (9) Seat is being fixed corresponding to described purification air fairlead joint (6) Right side position or corresponding to described dust laden air introduce pipe joint fixing seat (5) The position in left side be fixed on described cylinder (4) Top, at this storage tank (9) Storage tank sidewall on be fixed with one for by storage tank (9) Storage tank chamber (91) Interior water introduces described tank chamber (21) Interior storage tank outlet pipe (92) One end, and this storage tank outlet pipe (92) The other end and described cylinder front side wall (42) Or tank (2) Front side fix.
2.According to claim 1 Described spiral air-flow dust collect unit by water, it is characterised in that in described frame (1) Top be provided with a frame top sealing plate (11) , at this frame top sealing plate (11) Above and introducing pipe joint corresponding to described dust laden air fixing seat (5) Position offer one dust laden air introduce pipe joint fix seat resigning hole (111) , fixing seat corresponding to described purification air fairlead joint (6) Position offer a purification air fairlead joint and fix seat resigning hole (112) , and corresponding to described storage tank (9) Position offer a storage tank and step down chamber (113) , dust laden air introduces pipe joint and fixes seat (5) Top lean out dust laden air introduce pipe joint fix seat resigning hole (111) , purify air fairlead joint and fix seat (6) Top lean out purification air fairlead joint and fix seat and step down chamber (112) , and storage tank (9) Top lean out storage tank and step down chamber (113) , in frame (1) Front side, rear side, left side and right side be each provided with a frame chamber door (12)
3.According to claim 1 Described spiral air-flow dust collect unit by water, it is characterised in that at described tank (2) Tank chamber (21) Front inner wall, rear side inwall, inner left wall or right side inwall on be provided with one for finding out tank chamber (21) The water-level probe of interior water level (212)
4.According to claim 1 Described spiral air-flow dust collect unit by water, it is characterised in that in described frame (1) Go up and corresponding to described central canal (3) Left end and the position of right-hand member be each provided with a central canal supporting device (13) , this central canal supporting device (13) Also with described tank (2) Connect, described central canal shrouding (31) And described central canal (3) With this central canal supporting device (13) Fixing.
5.According to claim 4 Described spiral air-flow dust collect unit by water, it is characterised in that described central canal supporting device (13) Including front support trailing arm (131) , rear support trailing arm (132) , front support rod (133) , back support rod (134) , fixing transverse arm (135) With central canal end fixed plate (136) , front support trailing arm (131) With rear support trailing arm (132) Before and after each other parallel, this front support trailing arm (131) And rear support trailing arm (132) Towards described central canal (3) One end be configured to horizontal boom end, and towards described frame (1) One end and frame (1) Fixing, fixing transverse arm (135) It is fixed on front support trailing arm (131) And rear support trailing arm (132) Towards central canal (3) One end between, front support rod (133) Lower end and described tank (2) Front side on along connecting, and upper end and central canal end fixed plate (136) Front end connect, back support rod (134) Lower end and tank (2) Rear side on along connecting, and upper end and central canal end fixed plate (136) Rear end connect, central canal end fixed plate (136) Middle part corresponding to fixing transverse arm (135) Top, described central canal (3) Left end and right-hand member and central canal end fixed plate (136) Fixing, described central canal shrouding (31) By central canal shrouding screw (311) With fixing transverse arm (135) Fixing.
6.According to claim 1 Described spiral air-flow dust collect unit by water, it is characterised in that described dust laden air introduces pipe joint (52) It is arranged on introducing pipe joint support (521) On, and this introducing pipe joint support (521) By introducing pipe joint support bracket bolt (5211) Introduce pipe joint with described dust laden air and fix seat (5) Top fix;Described purification air fairlead joint (62) It is arranged on fairlead adapter bracket (621) On, and this fairlead adapter bracket (621) By fairlead adapter bracket bolt (6211) Seat is fixed with described purification air fairlead joint (6) Top fix;Described dust laden air introduces pipe joint (52) With purification air fairlead joint (62) It is transparent.
7.According to claim 1 Described spiral air-flow dust collect unit by water, it is characterised in that described spraying mechanism (7) Including a jet pipe (71) With a fog-spray nozzle (72) , jet pipe (71) Middle part and described dust laden air introduce pipe joint and fix seat (5) Fixing, this jet pipe (71) One end probe into described dust laden air introduce pipe joint fix seat chamber (51) In, fog-spray nozzle (72) With jet pipe (71) One end fix and corresponding to dust laden air introduce pipe joint fix seat chamber (51) Center, this fog-spray nozzle (72) Spray holes towards upper;In described frame (1) Upper and processing water circulating and recovering mechanism corresponding to described tank (8) Position be fixed with a motor fixing plate (14) , described tank processes water circulating and recovering mechanism (8) It is arranged on motor fixing plate (14) On, draw interface at described drainage of crossing (2111) On be provided with an extraction interface valve (21111)
8.According to claim 7 Described spiral air-flow dust collect unit by water, it is characterised in that described tank processes water circulating and recovering mechanism (8) Including a motor (81) With a water pump (82) , motor (81) It is fixed on described motor fixing plate (14) On, water pump (82) With motor (81) Transmission coordinates, at this water pump (82) Pump intake (821) Upper connection has a pump water inlet (8211) One end, and this pump water inlet (8211) The other end and described extraction interface valve (21111) Connect, at water pump (82) Pump outlet (822) Upper connection has a pumping line (8221) One end, and this pumping line (8221) The other end and described jet pipe (71) Connect.
9.According to claim 1 Described spiral air-flow dust collect unit by water, it is characterised in that described sector notch without cylinder chamber (41) By shrouding before breach (411) , shrouding after breach (412) And notch side shrouding (413) Enclosure is constituted and shrouding before breach (411) , shrouding after breach (412) And notch side shrouding (413) The end along and described central canal (3) Fixing.
10.According to claim 9 Described spiral air-flow dust collect unit by water, it is characterised in that shrouding before described breach (411) On be provided with one before shrouding form (4111) , and shrouding after described breach (412) On be provided with one after shrouding form (4121)
CN201610317759.1A 2016-05-12 2016-05-12 Device for dust removal of spiral air flow by means of water Pending CN105833648A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610317759.1A CN105833648A (en) 2016-05-12 2016-05-12 Device for dust removal of spiral air flow by means of water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610317759.1A CN105833648A (en) 2016-05-12 2016-05-12 Device for dust removal of spiral air flow by means of water

Publications (1)

Publication Number Publication Date
CN105833648A true CN105833648A (en) 2016-08-10

Family

ID=56592081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610317759.1A Pending CN105833648A (en) 2016-05-12 2016-05-12 Device for dust removal of spiral air flow by means of water

Country Status (1)

Country Link
CN (1) CN105833648A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2374250Y (en) * 1999-04-30 2000-04-19 中国人民解放军兰州军区环境监测中心站 Self-excited centrifugal dual water membranes purifier
US20010003892A1 (en) * 1999-12-15 2001-06-21 Anelva Corporation Exhaust gas filtration device, auxiliary filtration device and trap device
CN2584279Y (en) * 2002-12-16 2003-11-05 周耀球 Device for fume dust separating and purifying and desulfurization
CN201664564U (en) * 2009-06-26 2010-12-08 长沙吉天环保科技有限公司 Horizontal type cyclone water film and spark separator
CN203155013U (en) * 2013-03-19 2013-08-28 彭兰娟 Efficient boiler dust removal device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2374250Y (en) * 1999-04-30 2000-04-19 中国人民解放军兰州军区环境监测中心站 Self-excited centrifugal dual water membranes purifier
US20010003892A1 (en) * 1999-12-15 2001-06-21 Anelva Corporation Exhaust gas filtration device, auxiliary filtration device and trap device
CN2584279Y (en) * 2002-12-16 2003-11-05 周耀球 Device for fume dust separating and purifying and desulfurization
CN201664564U (en) * 2009-06-26 2010-12-08 长沙吉天环保科技有限公司 Horizontal type cyclone water film and spark separator
CN203155013U (en) * 2013-03-19 2013-08-28 彭兰娟 Efficient boiler dust removal device

Similar Documents

Publication Publication Date Title
CN211358144U (en) Weaving dust collector that dust removal effect is good
CN205411088U (en) Machine of sweeping floor of washing dust collector that sets up behind filter screen induced drafts
CN205867849U (en) Dust removing device for weaving
CN106391527A (en) Dust remover for textile
CN205627423U (en) Energy -conserving thorough weaving dust collector that removes dust
CN205438234U (en) Dust collection device of grinding machine
CN209662872U (en) A kind of air cleaning unit
CN105833648A (en) Device for dust removal of spiral air flow by means of water
CN213761092U (en) Wet dust collector
CN207786192U (en) A kind of dust-extraction unit
CN105817107A (en) Dust-containing air water washing and dedusting device
CN205422997U (en) Engine air inlet unit for cotton picker
CN205332395U (en) Air purifier air cleaning device
CN205182449U (en) Novel mist spray dust removal ware
CN209885511U (en) Workshop integrated dust removal combined device
CN209229900U (en) A kind of dust pelletizing system for ring spinning workshop
CN210529135U (en) Cotton suction device of spinning frame
CN209475929U (en) A kind of energy-saving Heating,Ventilating and Air Conditioning filter
CN207605545U (en) Weaving dust removal device
CN208087807U (en) A kind of chemical fibre twisting equipment
CN206762501U (en) A kind of Novel filtration dust removal machine for environmental protection
CN206916287U (en) Spinning frame waste material collection device
CN208669346U (en) A kind of tunnel drivage auger excavation construction dust-extraction unit
CN105381675A (en) Novel spraying dust remover
CN205115717U (en) A dust extraction for spinning machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160810