CN105828341B - A kind of method and device by base station access Packet Transport Network access ring - Google Patents

A kind of method and device by base station access Packet Transport Network access ring Download PDF

Info

Publication number
CN105828341B
CN105828341B CN201510003393.6A CN201510003393A CN105828341B CN 105828341 B CN105828341 B CN 105828341B CN 201510003393 A CN201510003393 A CN 201510003393A CN 105828341 B CN105828341 B CN 105828341B
Authority
CN
China
Prior art keywords
base station
access ring
ptn access
ptn
preset
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510003393.6A
Other languages
Chinese (zh)
Other versions
CN105828341A (en
Inventor
何诗嘉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Group Shanghai Co Ltd
Original Assignee
China Mobile Group Shanghai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Group Shanghai Co Ltd filed Critical China Mobile Group Shanghai Co Ltd
Priority to CN201510003393.6A priority Critical patent/CN105828341B/en
Publication of CN105828341A publication Critical patent/CN105828341A/en
Application granted granted Critical
Publication of CN105828341B publication Critical patent/CN105828341B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mobile Radio Communication Systems (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention discloses a kind of method and devices by base station access Packet Transport Network PTN access ring, to the network performance index according to each base station of acquisition, the first base station for meeting preset condition and the second base station are accessed in same PTN access ring, network bandwidth utilization factor is improved.The method by base station access Packet Transport Network PTN access ring, comprising: obtain the network performance index of each base station in preset range;When the network performance index for determining first base station and the second base station in the preset range meets preset condition, the first base station and second base station are accessed in same PTN access ring.

Description

A kind of method and device by base station access Packet Transport Network access ring
Technical field
The present invention relates to field of communication technology more particularly to a kind of sides by base station access Packet Transport Network PTN access ring Method and device.
Background technique
Currently, each base station is base area in Packet Transport Network (Packet Transport Network, PTN) network Position is managed to access to same PTN access ring, once PTN access ring is provided with, PTN access ring locating for each base station is just It is no longer changed, the set-up mode of this PTN access ring has ignored the service traffics demand of each base station completely, causes network The waste of resource.
In the prior art in order to guarantee the normal operation of PTN network, although PTN network can be acquired using corresponding tool Various network performance indexes, to be monitored to PTN network, but related merely in the prior art to PTN network performance The monitoring of index, such as: acquisition and monitoring to network flow are not for further processing, according to net to network flow It is adjusted in the PTN access ring that network flow accesses each base station.
In conclusion although the various network performance indexes in PTN network are acquired in the prior art, not to network Performance indicator is further processed to adjust the PTN access ring of each base station access.
Summary of the invention
The embodiment of the invention provides it is a kind of by base station access Packet Transport Network PTN access ring method and device, to It is according to the network performance index of each base station of acquisition, the first base station and the access of the second base station that meet preset condition is same In PTN access ring, network bandwidth utilization factor is improved.
A kind of method by base station access Packet Transport Network PTN access ring provided in an embodiment of the present invention, this method comprises: Obtain the network performance index of each base station in preset range;When determining first base station and the second base station in the preset range Network performance index when meeting preset condition, the first base station and second base station are accessed in same PTN access ring.
In the above method provided in an embodiment of the present invention, the network performance index of each base station is obtained, default item will be met The first base station of part and the second base station are accessed in same PTN access ring, such as: by the first base station of network flow busy period complementation It accesses in same PTN access ring with the second base station, thus the limited bandwidth resources of reasonable utilization, and only obtains in the prior art The network performance index of each base station is taken, network performance index is not further processed to adjust each base station access PTN access ring is compared, and when accessing base station in PTN access ring, is considered the network performance index of base station, will be met preset condition First base station and the second base station access in same PTN access ring, improve network bandwidth utilization factor.
In a kind of possible embodiment, in the above method provided in an embodiment of the present invention, obtain every in preset range The network performance index of one base station, specifically includes: obtaining the flow curve in preset range in each base station preset time, the stream Amount curve is used to describe the corresponding relationship at each moment in the data traffic and preset time of each base station;It is bent according to the flow Line determines the network performance index of each base station.
In a kind of possible embodiment, in the above method provided in an embodiment of the present invention, the network performance index, It include: data traffic summation, first time period and second time period;Wherein, the first time period is particular flow rate curve In the peak flow corresponding period, the second time period be the particular flow rate curve in flow valley it is corresponding when Between section, the particular flow rate curve be the flow curve in data traffic be greater than the first preset threshold part.
In a kind of possible embodiment, in the above method provided in an embodiment of the present invention, the preset condition includes Following two condition: condition one: the sum of bandwidth availability ratio of the first base station and second base station is less than the second default threshold Value;Condition two: overlapping time section between the first time period of the first base station and the second time period of second base station Length is greater than the second time period of third predetermined threshold value and/or the first base station and the first time period of second base station Between overlapping time section length be greater than the 4th preset threshold.
In a kind of possible embodiment, in the above method provided in an embodiment of the present invention, by the first base station and Second base station is accessed in same PTN access ring, is specifically included: when determining the first base station and second base station is not It, will be in the PTN access ring where the first base station cutover to second base station when with link point base stations in PTN access ring Or it will be in the PTN access ring where second base station cutover to the first base station;When determine the first base station be PTN Link point base stations in access ring cut second base station when second base station is the chain Node base station in PTN access ring It is connected in the PTN access ring where the first base station;When determine the first base station and second base station be PTN access When the chain Node base station of ring, the first base station and second base station are accessed in same PTN access ring.
In a kind of possible embodiment, in the above method provided in an embodiment of the present invention, this method further include: obtain The total number of users activated in PTN access ring;According to the total number of users activated in PTN access ring, calculated using preset formula The demand volume total amount of the PTN access ring;When the demand volume total amount for determining the PTN access ring is greater than the PTN access ring When the flow total amount threshold value currently supported, dilatation is carried out to the PTN access ring, to increase the stream that the PTN access ring is supported Measure total amount.
In the above method provided in an embodiment of the present invention, according to the total number of users activated in PTN access ring, PTN is calculated The demand volume total amount of access ring, when the demand volume total amount for determining PTN access ring is greater than the stream that the PTN access ring is currently supported When measuring total amount threshold value, dilatation is carried out to PTN access ring, to increase the flow total amount of PTN access ring support, realization connects according to PTN Enter the demand volume total amount of the total number of users prediction PTN access ring activated in ring, so as to carry out in advance to PTN access ring Dilatation optimizes PTN network, and avoid the occurrence of PTN access ring is greater than what PTN access ring was currently supported using flow total amount The case where flow total amount threshold value.
In a kind of possible embodiment, in the above method provided in an embodiment of the present invention, when in the PTN access ring When total number of users of activation is less than five preset thresholds, the preset formula are as follows: G1=A × N1 × N1;When the PTN is accessed When the total number of users activated in ring is greater than or equal to five preset thresholds, the preset formula are as follows: G1=N2+B × N1;Its In, N1 is the total number of users activated in the PTN access ring, and N2 is the 5th preset threshold, and G1 is the need of PTN access ring Flow total amount is sought, A is the positive number less than 1, and B is the positive number less than 0.2.
In a kind of possible embodiment, in the above method provided in an embodiment of the present invention, obtains in PTN access ring and swash Total number of users living, specifically includes: obtaining the excited user number of the PTN access ring middle ring Node base station and chain Node base station Amount;The excited user number amount of link point base stations all in the PTN access ring and chain Node base station is summed, the PTN is obtained The total number of users activated in access ring.
A kind of device by base station access Packet Transport Network PTN access ring provided in an embodiment of the present invention, comprising: obtain single Member, for obtaining the network performance index of each base station in preset range;Processing unit is connected to the acquiring unit, is used for When the network performance index for determining first base station and the second base station in the preset range meets preset condition, by described One base station and second base station are accessed in same PTN access ring.
In above-mentioned apparatus provided in an embodiment of the present invention, the network performance index of each base station is obtained, default item will be met The first base station of part and the second base station are accessed in same PTN access ring, such as: by the first base station of network flow busy period complementation It accesses in same PTN access ring with the second base station, thus the limited bandwidth resources of reasonable utilization, and only obtains in the prior art The network performance index of each base station is taken, network performance index is not further processed to adjust each base station access PTN access ring is compared, and when accessing base station in PTN access ring, is considered the network performance index of base station, will be met preset condition First base station and the second base station access in same PTN access ring, improve network bandwidth utilization factor.
In a kind of possible embodiment, in above-mentioned apparatus provided in an embodiment of the present invention, the acquiring unit is specific For: the flow curve in preset range in each base station preset time is obtained, the flow curve is for describing each base station The corresponding relationship at each moment in data traffic and preset time;The network performance of each base station is determined according to the flow curve Index.
In a kind of possible embodiment, in above-mentioned apparatus provided in an embodiment of the present invention, the network performance index, It include: data traffic summation, first time period and second time period;Wherein, the first time period is particular flow rate curve In the peak flow corresponding period, the second time period be the particular flow rate curve in flow valley it is corresponding when Between section, the particular flow rate curve be the flow curve in data traffic be greater than the first preset threshold part.
In a kind of possible embodiment, in above-mentioned apparatus provided in an embodiment of the present invention, the preset condition includes Following two condition: condition one: the sum of bandwidth availability ratio of the first base station and second base station is less than the second default threshold Value;Condition two: overlapping time section between the first time period of the first base station and the second time period of second base station Length is greater than the second time period of third predetermined threshold value and/or the first base station and the first time period of second base station Between overlapping time section length be greater than the 4th preset threshold.
In a kind of possible embodiment, in above-mentioned apparatus provided in an embodiment of the present invention, the processing unit is by institute It states first base station and second base station to access in same PTN access ring, specifically include: when determining the first base station and described When second base station is the link point base stations in different PTN access rings, the processing unit is by the first base station cutover described in In PTN access ring where second base station or by the PTN access ring where second base station cutover to the first base station In;When determining that the first base station is the link point base stations in PTN access ring, second base station is the chain in PTN access ring When Node base station, the processing unit will be in the PTN access ring where second base station cutover to the first base station;When true When the fixed first base station and second base station are the chain Node base station of PTN access ring, the processing unit is by described the One base station and second base station are accessed in same PTN access ring.
In a kind of possible embodiment, in above-mentioned apparatus provided in an embodiment of the present invention, the acquiring unit is also used In the total number of users activated in acquisition PTN access ring;The processing unit is also used to total according to what is activated in PTN access ring Number of users calculates the demand volume total amount of the PTN access ring using preset formula;And when the determining PTN access ring Demand volume total amount be greater than the PTN access ring currently support flow total amount threshold value when, the PTN access ring is expanded Hold, to increase the flow total amount that the PTN access ring is supported.
In above-mentioned apparatus provided in an embodiment of the present invention, according to the total number of users activated in PTN access ring, PTN is calculated The demand volume total amount of access ring, when the demand volume total amount for determining PTN access ring is greater than the stream that the PTN access ring is currently supported When measuring total amount threshold value, dilatation is carried out to PTN access ring, to increase the flow total amount of PTN access ring support, realization connects according to PTN Enter the demand volume total amount of the total number of users prediction PTN access ring activated in ring, so as to carry out in advance to PTN access ring Dilatation optimizes PTN network, and avoid the occurrence of PTN access ring is greater than what PTN access ring was currently supported using flow total amount The case where flow total amount threshold value.
In a kind of possible embodiment, in above-mentioned apparatus provided in an embodiment of the present invention, when in the PTN access ring When total number of users of activation is less than five preset thresholds, the preset formula are as follows: G1=A × N1 × N1;When the PTN is accessed When the total number of users activated in ring is greater than or equal to five preset thresholds, the preset formula are as follows: G1=N2+B × N1;Its In, N1 is the total number of users activated in the PTN access ring, and N2 is the 5th preset threshold, and G1 is the need of PTN access ring Flow total amount is sought, A is the positive number less than 1, and B is the positive number less than 0.2.
In a kind of possible embodiment, in above-mentioned apparatus provided in an embodiment of the present invention, the acquiring unit is specific For: obtain the excited user number amount of the PTN access ring middle ring Node base station and chain Node base station;By the PTN access ring In the excited user number amount of all link point base stations and chain Node base station summation, obtain the total use activated in the PTN access ring Amount amount.
Detailed description of the invention
Fig. 1 is a kind of process of method that base station is accessed to Packet Transport Network PTN access ring provided in an embodiment of the present invention Schematic diagram;
Fig. 2 is the schematic diagram of the flow curve of first base station provided in an embodiment of the present invention and the second base station;
Fig. 3 is a kind of structure of device that base station is accessed to Packet Transport Network PTN access ring provided in an embodiment of the present invention Schematic diagram.
Specific embodiment
With reference to the accompanying drawing, to provided in an embodiment of the present invention a kind of by base station access Packet Transport Network PTN access ring The specific embodiment of method and device is described in detail.
A kind of method by base station access Packet Transport Network PTN access ring provided in an embodiment of the present invention, as shown in Figure 1, This method comprises:
Step 102, the network performance index of each base station in preset range is obtained;
Step 104, when the network performance index for determining first base station and the second base station in preset range meets default item When part, first base station and the second base station are accessed in same PTN access ring.
In method provided in an embodiment of the present invention, the network performance index of each base station is obtained, preset condition will be met First base station and the second base station are accessed in same PTN access ring, such as: by the first base station of network flow busy period complementation and the Two base stations are accessed in same PTN access ring, so that the limited bandwidth resources of reasonable utilization, only obtain each in the prior art The network performance index of a base station is not further processed network performance index to adjust the PTN of each base station access and connect Enter ring to compare, when accessing base station in PTN access ring, consider the network performance index of base station, the of preset condition will be met One base station and the second base station are accessed in same PTN access ring, and network bandwidth utilization factor is improved.
It is worth noting that the network performance index of each base station in preset range is obtained, in the preset range When first base station and the second base station meet preset condition, first base station and the second base station are accessed into same PTN access ring, wherein Preset range can be set according to actual geographic position, such as: preset range can be the circle that 10 kms (KM) is radius Domain, it is worth noting that, the embodiment of the present invention according to the network performance index of acquisition, by meet preset condition first base station and Second base station is accessed in same PTN access ring, still, if first base station and the second base station are apart from each other, i.e., first base station and/or First base station and the second base station within a preset range, are not then accessed same PTN access ring, certainly will influence the first base by the second base station It stands or the other parameters of the second base station.
In a kind of possible embodiment, in method provided in an embodiment of the present invention, each base in preset range is obtained The network performance index stood, specifically includes: obtaining the flow curve in preset range in each base station preset time, the flow is bent Line is used to describe the corresponding relationship at each moment in the data traffic and preset time of each base station;It is determined according to flow curve every The network performance index of a base station.
When it is implemented, acquiring each base station first in the data traffic at each moment, the flow of the base station is then generated Then curve determines the network performance index of each base station according to flow curve, certainly, in another embodiment of the invention, The network performance index of each base station can also be directly acquired by specific measuring tool (such as: network management tool).
As more specific embodiment, as shown in Figure 2, comprising: the flow curve 202 of first base station and the second base station Flow curve 204, horizontal axis indicate the time, and the longitudinal axis indicates data traffic, wherein flow curve 202 is for describing first base station The corresponding relationship of flow total amount and each moment can then determine the network performance index of first base station according to flow curve 202; Flow curve 204 is used to describe the flow total amount of the second base station and the corresponding relationship at each moment, can be according to flow curve 204 Determine the network performance index of the second base station.
Preferably, network performance index, comprising: data traffic summation, first time period and second time period;Wherein, First time period is the peak flow corresponding period in particular flow rate curve, and second time period is in particular flow rate curve Flow valley corresponding period, particular flow rate curve are the part that data traffic is greater than the first preset threshold in flow curve.
It is worth noting that particular flow rate curve is the part that data traffic is greater than the first preset threshold in flow curve, That is, particular flow rate curve is the busy period in flow curve, wherein the first preset threshold can freely be set, can also be with System default value is taken, such as: the first preset threshold are as follows: 600 Mbytes (MB).First time period is to flow in particular flow rate curve The peak value corresponding period is measured, the peak flow corresponding period is in particular flow rate curve using the peak flow moment as midpoint The period of preset range, such as: the peak flow moment is 10:00, and preset range is 20 minutes, then when peak flow is corresponding Between section be 9:40-10:20.Similarly, the flow valley corresponding period is during to be in particular flow rate curve be with the flow valley moment The period of point preset range, certainly, it will be apparent to a skilled person that peak flow and flow valley are opposite Concept, when any moment in flow curve flow total amount value be greater than its preset range in other moment flow total amount value When, the moment corresponding flow total amount is peak flow;When the flow total amount value of any moment in flow curve is default less than it In range when the flow total amount value at other moment, the moment corresponding flow total amount is flow valley.
When it is implemented, when network performance index includes: data traffic summation, first time period and second time period When, it is illustrated by taking first base station as an example, it is first that all moment are corresponding after getting the flow curve 202 of first base station The summation of data traffic total amount, obtain the data traffic summation of first base station, then determining particular flow rate curve, (namely flow is bent In line 202 be greater than the first preset threshold part) in peak value moment and the valley moment, further determine that the first of first base station The second time period of period and first base station.
In a kind of possible embodiment, in method provided in an embodiment of the present invention, preset condition includes following two Condition:
Condition one: the sum of bandwidth availability ratio of first base station and the second base station is less than the second preset threshold.
Second preset threshold can be set according to the bandwidth availability ratio threshold value of PTN access ring, as more preferably Embodiment, the second preset threshold be 0.5.When it is implemented, the sum of bandwidth availability ratio of first base station and the second base station can be with It is calculated by the first preset formula, the first preset formula are as follows:
(GA+GB)/(T × W), when the second preset threshold takes 0.5, then condition one are as follows:
(GA+GB)/(T × W) < 0.5, wherein GAFor the data traffic summation of first base station, GBFor the data of the second base station Flow summation, T are the length namely the corresponding time span of flow curve of preset time, and W is preconfigured PTN access ring Bandwidth, such as: 1000MB.
In another embodiment of the present invention, it in same PTN access ring can also be accessed in first base station and the second base station Afterwards, the bandwidth availability ratio thresholding for calculating the PTN access ring guarantees that the bandwidth availability ratio of the PTN access ring meets system requirements.
Condition two: the length of overlapping time section between the first time period of first base station and the second time period of the second base station Greater than overlapping time between the first time period of the second time period and the second base station of third predetermined threshold value and/or first base station The length of section is greater than the 4th preset threshold.
The length of overlapping time section is greater than the between the first time period of first base station and the second time period of the second base station When three preset thresholds, show the length of overlapping time section between the time to peak section of first base station and the valley period of the second base station Degree is greater than third predetermined threshold value, then may indicate that there are busy period complementations between first base station and the flow curve of the second base station; Similarly, when the length of overlapping time section between the second time period of first base station and the first time period of the second base station is greater than the 4th Preset threshold shows that there are busy period complementations between first base station and the flow curve of the second base station, then by first base station and the When two base stations are accessed in same PTN access ring, the second base station of resource provision flow when the first base station flow free time makes when busy Resource provision first base station flow when with, the second base station flow free time uses when busy, realizes busy between different base station Idle is complementary, and the limited resource of reasonable utilization improves network bandwidth utilization factor.Wherein, third predetermined threshold value and the 4th pre- If threshold value may be the same or different, system default value can also be used by user configuration, such as: third presets threshold Value is 20 minutes, and the 4th preset threshold is 30 minutes.
As more specific embodiment, the first time period of first base station is 8:40-9:20, the second base station second when Between section be 8:42-9:22, then between the first time period of first base station and the second time period of the second base station overlapping time section be 8:42-9:20, the length of overlapping time section are 38 minutes, are greater than 20 minutes due to 38 minutes, then first base station and the second base station Network performance index meet condition two, certainly, it will be apparent to a skilled person that if the second time of first base station The length of overlapping time section is greater than the 4th preset threshold between section and the first time period of the second base station, also can show that the first base It stands and the network performance index of the second base station meets condition two.Highly preferred embodiment are as follows: the first time period of first base station When the length of overlapping time section is greater than the second of third predetermined threshold value and first base station between the second time period of the second base station Between between section and the first time period of the second base station overlapping time section length be greater than the 4th preset threshold meet simultaneously.
In another embodiment of the invention, can also pass through and utilize following formula: the first time period of first base station and Length/first base station first time period of overlapping time section and the second second time of base station between second base station second time period The total length of section calculates the identical rate of busy period between first base station and the second base station, when identical rate is greater than or equal to threshold value, Such as: threshold value 0.8 shows that first base station and the second base station busy period are complementary, the network performance of first base station and the second base station Index meets condition two, such as: the first time period of first base station is 8:40-9:20, and the second time period of the second base station is 8: 42-9:22, then overlapping time section is 8:42-9 between the first time period of first base station and the second time period of the second base station: 20, the length of overlapping time section is 38 minutes, and the first time period of first base station and the second time period of the second base station is total Length is 8:40-9:22, and total length is 42 minutes, then the identical rate of busy period is 38/42 between first base station and the second base station =0.9, since 0.9 greater than 0.8, the network performance index of first base station and the second base station meets condition two.
When the network performance index of first base station and the second base station meets condition one and condition two simultaneously, by first base station It is accessed in same PTN access ring with the second base station, bandwidth availability ratio is less than the second preset threshold and first base station and the second base station Busy period resource between there is complementation, thus the limited Internet resources of reasonable utilization, improve network bandwidth utilization factor.
In a kind of possible embodiment, in method provided in an embodiment of the present invention, by first base station and the second base station It accesses in same PTN access ring, specifically includes: when determining that first base station and the second base station are the link in different PTN access rings It, will be in the PTN access ring where first base station cutover to the second base station or by the second base station cutover to the first base when point base stations In PTN access ring where standing;When determining that first base station is the link point base stations in PTN access ring, the second base station is PTN access It, will be in the PTN access ring where the second base station cutover to first base station when chain Node base station in ring;When determine first base station and When second base station is the chain Node base station of PTN access ring, first base station and the second base station are accessed in same PTN access ring.
When it is implemented, first base station and the second base station, it may be possible to PTN access ring middle ring Node base station, it may be possible to which PTN connects Enter the chain Node base station in ring, be also possible to the base station being not in PTN access ring, therefore, when first base station and the second base station When in for link point base stations in same PTN access ring, then without reconnecting;When first base station and the second base station are difference It, then will be in the PTN access ring where first base station cutover to the second base station or by when link point base stations in PTN access ring In PTN access ring where two base station cutovers to first base station;When first base station is the link point base stations in PTN access ring, the It, will be in the PTN access ring where the second base station cutover to first base station when two base stations are the chain Node base station in PTN access ring; It is when first base station and the second base station are the chain Node base station of PTN access ring, first base station and the access of the second base station is same In PTN access ring.
Certainly, it should be noted that mentions in the embodiment of the present invention accesses same PTN for first base station and the second base station In access ring, first base station and the second base station can be accessed in existing PTN access ring, also i.e. by first base station and the second base Access of standing is not up in the PYN access ring of the access base station upper limit, first base station and the second base station can also be formed new PTN and connect Enter ring.
In a kind of possible embodiment, in method provided in an embodiment of the present invention, this method further include: obtain PTN The total number of users activated in access ring;According to the total number of users activated in PTN access ring, PTN is calculated using preset formula The demand volume total amount of access ring;When the demand volume total amount for determining PTN access ring is greater than the stream that the PTN access ring is currently supported When measuring total amount threshold value, dilatation is carried out to PTN access ring, to increase the flow total amount of PTN access ring support.
In the above method provided in an embodiment of the present invention, according to the total number of users activated in PTN access ring, PTN is calculated The demand volume total amount of access ring, when the demand volume total amount for determining PTN access ring is greater than the stream that the PTN access ring is currently supported When measuring total amount threshold value, dilatation is carried out to PTN access ring, to increase the flow total amount of PTN access ring support, realization connects according to PTN Enter the demand volume total amount of the total number of users prediction PTN access ring activated in ring, so as to carry out in advance to PTN access ring Dilatation optimizes PTN network, and avoid the occurrence of PTN access ring is greater than what PTN access ring was currently supported using flow total amount The case where flow total amount threshold value.
It is total when what is activated in PTN access ring in method provided in an embodiment of the present invention in a kind of possible embodiment When number of users is less than five preset thresholds, preset formula are as follows: G1=A × N1 × N1;As the total user activated in PTN access ring When quantity is greater than or equal to five preset thresholds, preset formula are as follows: G1=N2+B × N1;Wherein, N1 is to activate in PTN access ring Total number of users, N2 is the 5th preset threshold, and G1 is the demand volume total amount of PTN access ring, and A is positive number less than 1, and B is Positive number less than 0.2.
When it is implemented, the 5th preset threshold can be set according to the peak load number of users of PTN access ring, make For more preferred embodiment, the 5th preset threshold is equal to peak load number of users × 0.8 of PTN access ring.
In a kind of possible embodiment, in the above method provided in an embodiment of the present invention, obtains in PTN access ring and swash Total number of users living, specifically includes: obtaining the excited user number of the PTN access ring middle ring Node base station and chain Node base station Amount;The excited user number amount of link point base stations all in the PTN access ring and chain Node base station is summed, the PTN is obtained The total number of users activated in access ring.
It can be by the link in PTN access ring when it is implemented, obtaining the total number of users activated in PTN access ring The excited user number amount of point base stations and chain Node base station sums to obtain, and certainly, the activation of link point base stations and chain Node base station is used Amount amount can be measured by network management tool and be reported.
A kind of device by base station access Packet Transport Network PTN access ring provided in an embodiment of the present invention, as shown in figure 3, It include: acquiring unit 302, for obtaining the network performance index of each base station in preset range;Processing unit 304, is connected to Acquiring unit 302, for meeting in advance when the network performance index for determining first base station and the second base station in the preset range If when condition, the first base station and second base station are accessed in same PTN access ring.
In device provided in an embodiment of the present invention, the network performance index of each base station is obtained, preset condition will be met First base station and the second base station are accessed in same PTN access ring, such as: by the first base station of network flow busy period complementation and the Two base stations are accessed in same PTN access ring, so that the limited bandwidth resources of reasonable utilization, only obtain each in the prior art The network performance index of a base station is not further processed network performance index to adjust the PTN of each base station access and connect Enter ring to compare, when accessing base station in PTN access ring, consider the network performance index of base station, the of preset condition will be met One base station and the second base station are accessed in same PTN access ring, and network bandwidth utilization factor is improved.
In a kind of possible embodiment, in device provided in an embodiment of the present invention, acquiring unit 302 is specifically used for: The flow curve in preset range in each base station preset time is obtained, which is used to describe the data flow of each base station The corresponding relationship of amount and each moment in preset time;The network performance index of each base station is determined according to the flow curve.
In a kind of possible embodiment, in device provided in an embodiment of the present invention, the network performance index, packet It includes: data traffic summation, first time period and second time period;Wherein, the first time period is in particular flow rate curve The peak flow corresponding period, the second time period be the particular flow rate curve in the flow valley corresponding time Section, the particular flow rate curve are the part that data traffic is greater than the first preset threshold in the flow curve.
In a kind of possible embodiment, in device provided in an embodiment of the present invention, the preset condition includes following Two conditions: condition one: the sum of bandwidth availability ratio of the first base station and second base station is less than the second preset threshold;Item Part two: the length of overlapping time section is big between the first time period of the first base station and the second time period of second base station The weight between the first time period of the second time period and second base station of third predetermined threshold value and/or the first base station The length of folded period is greater than the 4th preset threshold.
In a kind of possible embodiment, in device provided in an embodiment of the present invention, processing unit 304 is by described first Base station and second base station are accessed in same PTN access ring, are specifically included: when determining the first base station and second base When standing as link point base stations in different PTN access rings, processing unit 304 is by the first base station cutover to second base station Or it will be in the PTN access ring where second base station cutover to the first base station in the PTN access ring at place;Work as determination The first base station is the link point base stations in PTN access ring, and second base station is the chain Node base station in PTN access ring When, processing unit 304 will be in the PTN access ring where second base station cutover to the first base station;When determining described When one base station and second base station are the chain Node base station of PTN access ring, processing unit 304 is by the first base station and institute The second base station is stated to access in same PTN access ring.
In a kind of possible embodiment, in device provided in an embodiment of the present invention, acquiring unit 302 is also used to, and is obtained Take the total number of users activated in PTN access ring;The processing unit is also used to according to the total number of users activated in PTN access ring Amount, the demand volume total amount of the PTN access ring is calculated using preset formula;And when the demand for determining the PTN access ring When flow total amount is greater than the flow total amount threshold value that the PTN access ring is currently supported, dilatation is carried out to the PTN access ring, to increase The flow total amount for adding the PTN access ring to support.
In device provided in an embodiment of the present invention, according to the total number of users activated in PTN access ring, PTN access is calculated The demand volume total amount of ring, when the demand volume total amount for determining PTN access ring is total greater than the flow that the PTN access ring is currently supported When measuring threshold value, dilatation is carried out to PTN access ring, to increase the flow total amount of PTN access ring support, is realized according to PTN access ring The demand volume total amount of total number of users prediction PTN access ring of middle activation, so as to expand in advance PTN access ring Hold, PTN network is optimized, avoid the occurrence of PTN access ring is greater than the stream that PTN access ring is currently supported using flow total amount The case where measuring total amount threshold value.
In a kind of possible embodiment, in device provided in an embodiment of the present invention, activated when in the PTN access ring Total number of users less than five preset thresholds when, the preset formula are as follows: G1=A × N1 × N1;When in the PTN access ring When total number of users of activation is greater than or equal to five preset thresholds, the preset formula are as follows: G1=N2+B × N1;Wherein, N1 For the total number of users activated in the PTN access ring, N2 is the 5th preset threshold, and G1 is the flow of requirement of PTN access ring Total amount is measured, A is the positive number less than 1, and B is the positive number less than 0.2.
In a kind of possible embodiment, in device provided in an embodiment of the present invention, acquiring unit 302 is specifically used for: Obtain the excited user number amount of the PTN access ring middle ring Node base station and chain Node base station;To own in the PTN access ring The summation of the excited user number amount of link point base stations and chain Node base station, obtains the total number of users activated in the PTN access ring.
Device provided in an embodiment of the present invention can integrate in the server of network side, can also be used as individual management Server, wherein acquiring unit 302 can use receiver or signal receiver, and processing unit 304 can be handled using CPU Device etc..
In conclusion it is provided in an embodiment of the present invention it is a kind of by base station access Packet Transport Network PTN access ring method and Device obtains the network performance index of each base station, and the first base station for meeting preset condition and the second base station are accessed same PTN In access ring, such as: the first base station of network flow busy period complementation and the second base station are accessed in same PTN access ring, from And the limited bandwidth resources of reasonable utilization, improve network bandwidth utilization factor.
It should be understood by those skilled in the art that, the embodiment of the present invention can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the present invention Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the present invention, which can be used in one or more, The shape for the computer program product implemented in usable storage medium (including but not limited to magnetic disk storage and optical memory etc.) Formula.
The present invention be referring to according to the method for the embodiment of the present invention, the process of equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to include these modifications and variations.

Claims (10)

1. a kind of method by base station access Packet Transport Network PTN access ring, which is characterized in that this method comprises:
Obtain the network performance index of each base station in preset range;
When the network performance index for determining first base station and the second base station in the preset range meets preset condition, by institute It states first base station and second base station is accessed in same PTN access ring;
Wherein, the network performance index for obtaining each base station in preset range, specifically includes:
The flow curve in preset range in each base station preset time is obtained, which is used to describe the number of each base station According to the corresponding relationship at each moment in flow and preset time;
The network performance index of each base station is determined according to the flow curve;
The network performance index, comprising:
Data traffic summation, first time period and second time period;Wherein, the first time period is in particular flow rate curve The peak flow corresponding period, the second time period be the particular flow rate curve in the flow valley corresponding time Section, the particular flow rate curve are the part that data traffic is greater than the first preset threshold in the flow curve;
The preset condition includes following two condition:
Condition one: the sum of bandwidth availability ratio of the first base station and second base station is less than the second preset threshold;
Condition two: overlapping time section between the first time period of the first base station and the second time period of second base station Length is greater than the second time period of third predetermined threshold value and/or the first base station and the first time period of second base station Between overlapping time section length be greater than the 4th preset threshold.
2. the method according to claim 1, wherein the first base station and second base station access is same In PTN access ring, specifically include:
When determining the first base station and second base station is the link point base stations in different PTN access rings, by described the In PTN access ring where one base station cutover to second base station or by second base station cutover to the first base station In the PTN access ring at place;
When determining that the first base station is the link point base stations in PTN access ring, second base station is the chain in PTN access ring It, will be in the PTN access ring where second base station cutover to the first base station when Node base station;
When determining that the first base station and second base station are the chain Node base station of PTN access ring, by first base It stands and second base station is accessed in same PTN access ring.
3. the method according to claim 1, wherein this method further include:
Obtain the total number of users activated in PTN access ring;
According to the total number of users activated in PTN access ring, the demand volume for calculating the PTN access ring using preset formula is total Amount;
When the demand volume total amount for determining the PTN access ring is greater than the flow total amount threshold value that the PTN access ring is currently supported, Dilatation is carried out to the PTN access ring, to increase the flow total amount that the PTN access ring is supported.
4. according to the method described in claim 3, it is characterized in that,
When the total number of users activated in the PTN access ring is less than five preset thresholds, the preset formula are as follows: G1=A ×N1×N1;
When the total number of users activated in the PTN access ring is greater than or equal to five preset thresholds, the preset formula are as follows: G1=N2+B × N1;
Wherein, N1 is the total number of users activated in the PTN access ring, and N2 is the 5th preset threshold, and G1 is PTN access The demand volume total amount of ring, A are the positive number less than 1, and B is the positive number less than 0.2.
5. according to the method described in claim 3, it is characterized in that, obtaining the total number of users activated in PTN access ring, specifically Include:
Obtain the excited user number amount of the PTN access ring middle ring Node base station and chain Node base station;
The excited user number amount of link point base stations all in the PTN access ring and chain Node base station is summed, the PTN is obtained The total number of users activated in access ring.
6. a kind of device by base station access Packet Transport Network PTN access ring characterized by comprising
Acquiring unit, for obtaining the network performance index of each base station in preset range;
Processing unit is connected to the acquiring unit, for working as the first base station and the second base station that determine in the preset range Network performance index when meeting preset condition, the first base station and second base station are accessed in same PTN access ring;
Wherein, the acquiring unit is specifically used for:
The flow curve in preset range in each base station preset time is obtained, which is used to describe the number of each base station According to the corresponding relationship at each moment in flow and preset time;
The network performance index of each base station is determined according to the flow curve;
The network performance index, comprising:
Data traffic summation, first time period and second time period;Wherein, the first time period is in particular flow rate curve The peak flow corresponding period, the second time period be the particular flow rate curve in the flow valley corresponding time Section, the particular flow rate curve are the part that data traffic is greater than the first preset threshold in the flow curve;
The preset condition includes following two condition:
Condition one: the sum of bandwidth availability ratio of the first base station and second base station is less than the second preset threshold;
Condition two: overlapping time section between the first time period of the first base station and the second time period of second base station Length is greater than the second time period of third predetermined threshold value and/or the first base station and the first time period of second base station Between overlapping time section length be greater than the 4th preset threshold.
7. device according to claim 6, which is characterized in that the processing unit is by the first base station and described second Base station is accessed in same PTN access ring, is specifically included:
When determining the first base station and second base station is the link point base stations in different PTN access rings, the processing Unit will arrive in the PTN access ring where the first base station cutover to second base station or by second base station cutover In PTN access ring where the first base station;
When determining that the first base station is the link point base stations in PTN access ring, second base station is the chain in PTN access ring When Node base station, the processing unit will be in the PTN access ring where second base station cutover to the first base station;
When determining that the first base station and second base station are the chain Node base station of PTN access ring, the processing unit The first base station and second base station are accessed in same PTN access ring.
8. device according to claim 6, which is characterized in that the acquiring unit is also used to, and is obtained in PTN access ring and is swashed Total number of users living;
The processing unit is also used to according to the total number of users activated in PTN access ring, calculates the PTN using preset formula The demand volume total amount of access ring;And when the demand volume total amount for determining the PTN access ring is current greater than the PTN access ring When the flow total amount threshold value of support, dilatation is carried out to the PTN access ring, it is total to increase the flow that the PTN access ring is supported Amount.
9. device according to claim 8, which is characterized in that
When the total number of users activated in the PTN access ring is less than five preset thresholds, the preset formula are as follows: G1=A ×N1×N1;
When the total number of users activated in the PTN access ring is greater than or equal to five preset thresholds, the preset formula are as follows: G1=N2+B × N1;
Wherein, N1 is the total number of users activated in the PTN access ring, and N2 is the 5th preset threshold, and G1 is PTN access The demand volume total amount of ring, A are the positive number less than 1, and B is the positive number less than 0.2.
10. device according to claim 9, which is characterized in that the acquiring unit is specifically used for:
Obtain the excited user number amount of the PTN access ring middle ring Node base station and chain Node base station;
The excited user number amount of link point base stations all in the PTN access ring and chain Node base station is summed, the PTN is obtained The total number of users activated in access ring.
CN201510003393.6A 2015-01-04 2015-01-04 A kind of method and device by base station access Packet Transport Network access ring Active CN105828341B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510003393.6A CN105828341B (en) 2015-01-04 2015-01-04 A kind of method and device by base station access Packet Transport Network access ring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510003393.6A CN105828341B (en) 2015-01-04 2015-01-04 A kind of method and device by base station access Packet Transport Network access ring

Publications (2)

Publication Number Publication Date
CN105828341A CN105828341A (en) 2016-08-03
CN105828341B true CN105828341B (en) 2019-05-31

Family

ID=56513519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510003393.6A Active CN105828341B (en) 2015-01-04 2015-01-04 A kind of method and device by base station access Packet Transport Network access ring

Country Status (1)

Country Link
CN (1) CN105828341B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108271198B (en) * 2016-12-30 2020-11-17 华为技术有限公司 Flow simulation method and device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101742514A (en) * 2009-08-27 2010-06-16 大连海事大学 Networking mode
CN102469014A (en) * 2010-11-16 2012-05-23 中国移动通信集团公司 Networking method for packet transport network (PTN) access node equipment chain and relevant equipment
CN104254081A (en) * 2013-06-29 2014-12-31 华为技术有限公司 Intensive networking method and terminal device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101742514A (en) * 2009-08-27 2010-06-16 大连海事大学 Networking mode
CN102469014A (en) * 2010-11-16 2012-05-23 中国移动通信集团公司 Networking method for packet transport network (PTN) access node equipment chain and relevant equipment
CN104254081A (en) * 2013-06-29 2014-12-31 华为技术有限公司 Intensive networking method and terminal device

Also Published As

Publication number Publication date
CN105828341A (en) 2016-08-03

Similar Documents

Publication Publication Date Title
CN110233860B (en) Load balancing method, device and system
CN105515915A (en) Node detection method, device, route selection method, device and network system
US20200092181A1 (en) Providing network traffic endpoint recommendation based on network traffic data analysis
US10142252B2 (en) Server intelligence for network speed testing control
CN104410993B (en) A kind of flux monitoring method, device, terminal and system
Hassani et al. Context-aware recruitment scheme for opportunistic mobile crowdsensing
KR102068918B1 (en) Router address type identification method and device
CN108377201A (en) Network Abnormal cognitive method, device, equipment and computer readable storage medium
CN107707378B (en) A kind of CDN covering scheme generation method and device
CN108293200B (en) Device throughput determination
CN111629046B (en) Edge computing cooperation method, edge computing equipment and terminal
CN106559803A (en) A kind of base station construction appraisal procedure and device
CN114095956B (en) Network optimization method, device and storage medium
CN107707612B (en) Method and device for evaluating resource utilization rate of load balancing cluster
CN110198332A (en) Dispatching method, device and the storage medium of content delivery network node
CN107306200B (en) Network fault early warning method and gateway for network fault early warning
CN104022951A (en) Building method and system for network service path
CN105142164B (en) The data filling method and apparatus of node to be estimated
CN109617758A (en) Meshed network quality calculation method and device, server, computer storage medium
CN105471938B (en) Server load management method and device
CN110198267A (en) A kind of traffic scheduling method, system and server
CN104883705B (en) A kind of the problem of data service is complained localization method and device
CN105828341B (en) A kind of method and device by base station access Packet Transport Network access ring
CN105991708A (en) Selection method of application server, apparatus and system thereof
CN113300914A (en) Network quality monitoring method, device, system, electronic equipment and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant