CN105826144B - A kind of Duckbill type fuse switch failure emergency treatment device - Google Patents

A kind of Duckbill type fuse switch failure emergency treatment device Download PDF

Info

Publication number
CN105826144B
CN105826144B CN201610247775.8A CN201610247775A CN105826144B CN 105826144 B CN105826144 B CN 105826144B CN 201610247775 A CN201610247775 A CN 201610247775A CN 105826144 B CN105826144 B CN 105826144B
Authority
CN
China
Prior art keywords
upper connection
connection ontology
fuse switch
spring
fixing bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610247775.8A
Other languages
Chinese (zh)
Other versions
CN105826144A (en
Inventor
舒小雨
任朝辉
张郁
白云飞
常永杰
徐亚兵
王代远
付伟
卢晓辉
王玉涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Shijiazhuang Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Shijiazhuang Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Shijiazhuang Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610247775.8A priority Critical patent/CN105826144B/en
Publication of CN105826144A publication Critical patent/CN105826144A/en
Application granted granted Critical
Publication of CN105826144B publication Critical patent/CN105826144B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01HELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
    • H01H85/00Protective devices in which the current flows through a part of fusible material and this current is interrupted by displacement of the fusible material when this current becomes excessive
    • H01H85/02Details
    • H01H85/0208Tools for inserting and removing fuses

Abstract

The present invention provides a kind of Duckbill type fuse switch failure emergency treatment device, including upper connection ontology, the fixing bolt being set on the upper connection ontology, the first spring leaf, second spring piece, the clamping plate for being symmetrically fixed on the upper connection ontology both sides by fishbolt and forming clamping space;The spring of clamping plate clamping degree can be adjusted by being provided on the fishbolt;Described first spring leaf one end is fixed on by the fixing bolt on the upper connection ontology, and the other end is used for inconsistent with duck type positioning cap;Described second spring piece one end is fixed on by the fixing bolt on the upper connection ontology, and the other end is used for inconsistent with the duck tongue of fuse switch;Its is versatile, easy for installation, and avoids the security risk of hot-line repair, ensure that and is occurring emergency processing to ensure temporary electricity in the short time when fuse switch is suitable for reading can not to be closed or connect empty sparking failure.

Description

A kind of Duckbill type fuse switch failure emergency treatment device
Technical field
The present invention relates to electric armour clamp fields, and in particular to a kind of Duckbill type fuse switch failure emergency processing dress It puts.
Background technology
Application of the fuse switch in power distribution network at present is very extensive, and due to fall insurance type specification is various, Supply producer differs, and it is diversified in specifications to often lead to fall fusion tube, can not be general;At the same time fuse switch is because of mounting process The factors such as poor, long-term running overload, the bad, outdoor environment of galvanic circle contact lead to it in actual production operation Failure generation is very frequent, therefore such failure is always one of major failure in power distribution network, and there are fault restoration difficulty Greatly, failure amount is big, the features such as being broken out in fault set, also lacks safety, specification, general emergency processing mode(Conventionally employed aluminium The mode that wiring is got through to be prohibited from using since there are very big security risks), handle generally require to spend profession completely 3-4 time hour of O&M teams and groups which results in the quite time-consuming effort of reparation of the failure in actual production, and needs a variety of The standby redundancy of type fuse.
Invention content
To solve the above problems, the present invention provides a kind of Duckbill type fuse switch failure emergency treatment device, It is versatile, it is easy for installation, and avoid the security risk of hot-line repair, ensure that occur that fuse switch is suitable for reading can not Emergency processing temporary electricity can be ensured when being closed or connect empty sparking failure in the short time.
Present invention technical solution used in order to solve the above problem is as follows:
The present invention includes upper connection ontology, the fixing bolt being set on the upper connection ontology, the first spring leaf, second Spring leaf is symmetrically fixed on the upper connection ontology both sides by fishbolt and forms the clamping plate of clamping space;The folder The spring that can adjust clamping plate clamping degree is provided on tight bolt;
Described first spring leaf one end by the fixing bolt be fixed on it is described it is upper connection ontology on, the other end be used for Duck type positioning cap is inconsistent;Described second spring piece one end is fixed on by the fixing bolt on the upper connection ontology, separately One end is used for inconsistent with the duck tongue of fuse switch.
As a further improvement on the present invention, the clamping plate is galvanized steel plain sheet.
As a further improvement on the present invention, first spring leaf and second spring piece are non-magnetic steel material spring Piece.
The present invention has the following technical effect that:
The present invention is mainly suitable for Duckbill type fuse switch, setting clamping plate is to clamp duck type positioning cap;Clamping plate Elastic adjusting is carried out by fishbolt, and then adjusts clamping degree of the both sides clamping plate to duck type positioning cap;First spring is set Piece and second spring piece, first spring leaf one end by the fixing bolt be fixed on it is described it is upper connection ontology on, the other end with Duck type positioning cap is inconsistent;Second spring piece one end is fixed on by the fixing bolt on the upper connection ontology, the other end Inconsistent with the duck tongue of fuse switch, so as to form current loop, conducting electric current is extensive so as to complete failure lash-up recovering Multiple power supply;The present invention for fuse switch failure emergency processing open it is a kind of safely, quickly, the processing mode of specification, It fundamentally solves and traditional falls severe compromise existing for failure emergency processing;Fusion tube need to be only taken during use, more Fusion tube top is changed, then replaces fuse, is closed a floodgate by insulating bar, falls fusion tube step and its safety measure phase with normal replacement Unanimously, it is simple and safe without retraining;The present invention can be common to the fuse switch of all kinds of different models, and relative to Conventional process mode can be suitable for various complex environments and weather;It can restore power transmission in very short time, treat plan of application It reprocesses or arranges to carry out charged for replacement after power failure, frequency of power cut and time can be effectively reduced, shorten repairing duration.
Description of the drawings
Attached drawing 1 is schematic structural view of the invention;
Attached drawing 2 is internal structure schematic diagram of the present invention;
Attached drawing 3 is fishbolt and spring structure schematic diagram.
In attached drawing:1- fusion tubes;2- duck type positioning caps;3- duck tongues;4- second spring pieces;5- fixing bolts;6- clamping plates;7- One spring leaf;Ontology is connected on 8- fusion tubes;9- fishbolts;10- springs.
Specific embodiment
As shown in Figs. 1-3, the present invention includes being set to the upper connection ontology 8 of 1 upper end of fuse switch fusion tube, be set to Fixing bolt 5 on the upper connection ontology 8, second spring piece 4, is symmetrically fixed on by fishbolt 9 first spring leaf 7 The clamping plate 6 of 8 both sides of the upper connection ontology;The clamping plate 6 is set to the outside of the duck type positioning cap 2 of fuse switch and folder The tight duck type positioning cap 2;The spring 10 of clamping plate clamping degree can be adjusted by being provided on the fishbolt 9;Clamping plate is set It is to clamp duck type positioning cap;Clamping plate carries out elastic adjusting by fishbolt, and then adjusts both sides clamping plate and duck type is positioned The clamping degree of cap.
Described first spring leaf, 7 one end by the fixing bolt 5 be fixed on it is described it is upper connection ontology 8 on, the other end with Duck type positioning cap 2 is inconsistent;The upper connection ontology 8 is fixed in described 4 one end of second spring piece by the fixing bolt 5 On, the duck tongue 3 of the other end and fuse switch is inconsistent;First spring leaf and second spring piece, the first spring leaf one are set End is fixed on by the fixing bolt on the upper connection ontology, and the other end and duck type positioning cap are inconsistent;Second spring piece One end is fixed on by the fixing bolt on the upper connection ontology, and the duck tongue of the other end and fuse switch is inconsistent, So as to form current loop, conducting electric current so as to complete failure lash-up recovering, replys power supply.
The clamping plate 6 is galvanized steel plain sheet.
First spring leaf 7 and second spring piece 4 are non-magnetic steel material spring leaf.
The present invention for fuse switch failure emergency processing open it is a kind of safely, quickly, the processing mode of specification, It fundamentally solves and traditional falls severe compromise existing for failure emergency processing;Fusion tube need to be only taken during use, more Fusion tube top is changed, then replaces fuse, is closed a floodgate by insulating bar, falls fusion tube step and its safety measure phase with normal replacement Unanimously, it is simple and safe without retraining;The present invention can be common to the fuse switch of all kinds of different models, and relative to Conventional process mode can be suitable for various complex environments and weather;It can restore power transmission in very short time, treat plan of application It reprocesses or arranges to carry out charged for replacement after power failure, frequency of power cut and time can be effectively reduced, shorten repairing duration.
Installation process of the present invention is as follows:
It when Duckbill type fuse switch breaks down, removes failure and falls fusion tube 1, the present invention is installed on fusion tube 1 Top;Then fusion tube 1 is installed, 7 free end of the first spring leaf is made to withstand duck type positioning cap 2 in installation process, make second spring piece 4 Free end withstand duck tongue 3, both sides clamping plate 6 is made to clamp the both sides of duck type positioning cap 2, is then closed a floodgate, that is, completed by insulating bar Installation process.
The foregoing description of the disclosed embodiments enables professional and technical personnel in the field to realize or use the present invention. A variety of modifications of these embodiments will be apparent for those skilled in the art, it is as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention The embodiments shown herein is not intended to be limited to, and is to fit to and the principles and novel features disclosed herein phase one The most wide range caused.

Claims (1)

1. a kind of Duckbill type fuse switch failure emergency treatment device, it is characterised in that:It includes connection ontology(8)、 It is set to the upper connection ontology(8)On fixing bolt(5), the first spring leaf(7), second spring piece(4), by clamping spiral shell Bolt(9)It is symmetrically fixed on the upper connection ontology(8)Both sides and the clamping plate for forming clamping space(6);The clamping plate(6)It is set to The duck type positioning cap of fuse switch(2)Outside and clamp the duck type positioning cap(2);The fishbolt(9)On set The spring of clamping plate clamping degree can be adjusted by being equipped with(10);
First spring leaf(7)One end passes through the fixing bolt(5)It is fixed on the upper connection ontology(8)On, the other end For with duck type positioning cap(2)It is inconsistent;The second spring piece(4)One end passes through the fixing bolt(5)It is fixed on described Upper connection ontology(8)On, the other end is for the duck tongue with fuse switch(3)It is inconsistent;The clamping plate(6)For galvanized steel Plate;First spring leaf(7)With second spring piece(4)For non-magnetic steel material spring leaf.
CN201610247775.8A 2016-04-20 2016-04-20 A kind of Duckbill type fuse switch failure emergency treatment device Active CN105826144B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610247775.8A CN105826144B (en) 2016-04-20 2016-04-20 A kind of Duckbill type fuse switch failure emergency treatment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610247775.8A CN105826144B (en) 2016-04-20 2016-04-20 A kind of Duckbill type fuse switch failure emergency treatment device

Publications (2)

Publication Number Publication Date
CN105826144A CN105826144A (en) 2016-08-03
CN105826144B true CN105826144B (en) 2018-06-26

Family

ID=56526207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610247775.8A Active CN105826144B (en) 2016-04-20 2016-04-20 A kind of Duckbill type fuse switch failure emergency treatment device

Country Status (1)

Country Link
CN (1) CN105826144B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109581146B (en) * 2018-11-28 2020-11-10 国网浙江省电力有限公司电力科学研究院 Method for detecting interchangeability of fuse carrier of drop-out fuse

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2191476Y (en) * 1994-03-24 1995-03-08 天津市电瓷电器厂 Composite insulation fall-type fuse
CN2720616Y (en) * 2004-08-10 2005-08-24 江苏省电力公司常州供电公司 Emergency connection device of drop-type fuse
CN101887827A (en) * 2009-05-11 2010-11-17 上海市电力公司 Fuse emergency auxiliary contact
CN203631464U (en) * 2013-12-03 2014-06-04 国家电网公司 Quick-connection type drop-out fuse assembly
CN205723401U (en) * 2016-04-20 2016-11-23 国家电网公司 A kind of Duckbill type fuse switch fault emergency treatment device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5670927A (en) * 1994-09-02 1997-09-23 Fennell; Robert B. Universal fuse holder and cut-out with built-in safety features and method
CN102592913A (en) * 2011-12-06 2012-07-18 杨福锋 Drop type fuse with automatically-turning fusion tube hanging tongue

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2191476Y (en) * 1994-03-24 1995-03-08 天津市电瓷电器厂 Composite insulation fall-type fuse
CN2720616Y (en) * 2004-08-10 2005-08-24 江苏省电力公司常州供电公司 Emergency connection device of drop-type fuse
CN101887827A (en) * 2009-05-11 2010-11-17 上海市电力公司 Fuse emergency auxiliary contact
CN203631464U (en) * 2013-12-03 2014-06-04 国家电网公司 Quick-connection type drop-out fuse assembly
CN205723401U (en) * 2016-04-20 2016-11-23 国家电网公司 A kind of Duckbill type fuse switch fault emergency treatment device

Also Published As

Publication number Publication date
CN105826144A (en) 2016-08-03

Similar Documents

Publication Publication Date Title
CN104360228B (en) Method for improving positioning of fault section of power distribution network including distributed power supply through directional elements
CN104459465B (en) A kind of Fault Section Location of Distribution Network containing distributed power source
CN109216130B (en) Fuse device
CN105826144B (en) A kind of Duckbill type fuse switch failure emergency treatment device
CN103151125B (en) For the overvoltage protector of 6kV or 10kV AC electric power systems
CN201927565U (en) Plug type high-voltage fuse protector capable of being replaced conveniently
CN205723401U (en) A kind of Duckbill type fuse switch fault emergency treatment device
CN106849345A (en) Direct current fills the replacing options of feed panel
CN106655139B (en) Surge Protector
CN205789771U (en) Just reassembling type breaker for device and the just detachable stand for this chopper
CN204216244U (en) 10 kilovolts of platform district ground connection link devices
CN209730782U (en) A kind of sealed end face high-voltage cable middle joint protective device for power supply
CN106877232A (en) A kind of powered assembly and disassembly bird-scaring unit device
CN209183491U (en) A kind of fuse switch electricity-detection grounding device
CN204332866U (en) A kind of safety device for high-voltage power equipment being provided with shell fragment
CN204179045U (en) A kind of fuse switch
CN101635221A (en) Extra-high voltage breaker and extra-high over-voltage preventing system with same
CN105304302B (en) A kind of operable type outdoor voltage transformer component of a fuse
CN105048132A (en) High voltage grounding wire apparatus
CN104600684A (en) Active arc extinguishing type three-tripping surge protection device
CN204289331U (en) One is fuse base side by side
CN204179655U (en) For the secondary direct current harmonic elimination apparatus of electromagnetic potential transformer
CN204270764U (en) A kind of self-melt lightning arrester
CN205583649U (en) PT secondary side detonation -proof device
CN207896024U (en) The anti-bird insulated protective device of high-tension line disconnecting link protection against rodents

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: No. 66, Hongqi Street, Shijiazhuang, Hebei Province

Applicant after: STATE GRID HEBEI ELECTRIC POWER Co.,Ltd. SHIJIAZHUANG POWER SUPPLY BRANCH

Applicant after: STATE GRID HEBEI ELECTRIC POWER Co.,Ltd.

Applicant after: State Grid Corporation of China

Address before: 100031 West Chang'an Avenue, Xicheng District, Xicheng District, Beijing

Applicant before: State Grid Corporation of China

Applicant before: STATE GRID HEBEI ELECTRIC POWER Co.,Ltd.

Applicant before: STATE GRID HEBEI ELECTRIC POWER Co.,Ltd. SHIJIAZHUANG POWER SUPPLY BRANCH

Address after: 100031 West Chang'an Avenue, Xicheng District, Xicheng District, Beijing

Applicant after: State Grid Corporation of China

Applicant after: STATE GRID HEBEI ELECTRIC POWER Co.,Ltd.

Applicant after: STATE GRID HEBEI ELECTRIC POWER Co.,Ltd. SHIJIAZHUANG POWER SUPPLY BRANCH

Address before: 100031 West Chang'an Avenue, Xicheng District, Xicheng District, Beijing

Applicant before: State Grid Corporation of China

Applicant before: STATE GRID HEBEI ELECTRIC POWER Co.

Applicant before: STATE GRID HEBEI SHIJIAZHUANG ELECTRIC POWER SUPPLY Co.

GR01 Patent grant
GR01 Patent grant