CN105821797B - A kind of running water landscape water requirement estimation method suitable for mountain stream - Google Patents

A kind of running water landscape water requirement estimation method suitable for mountain stream Download PDF

Info

Publication number
CN105821797B
CN105821797B CN201610159098.4A CN201610159098A CN105821797B CN 105821797 B CN105821797 B CN 105821797B CN 201610159098 A CN201610159098 A CN 201610159098A CN 105821797 B CN105821797 B CN 105821797B
Authority
CN
China
Prior art keywords
landscape
river
quality
water
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610159098.4A
Other languages
Chinese (zh)
Other versions
CN105821797A (en
Inventor
蒋红
何涛
何月萍
姜跃良
彭金涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201610159098.4A priority Critical patent/CN105821797B/en
Publication of CN105821797A publication Critical patent/CN105821797A/en
Application granted granted Critical
Publication of CN105821797B publication Critical patent/CN105821797B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B1/00Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16ZINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
    • G16Z99/00Subject matter not provided for in other main groups of this subclass
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2219/00Indexing scheme relating to application aspects of data processing equipment or methods
    • G06F2219/10Environmental application, e.g. waste reduction, pollution control, compliance with environmental legislation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/152Water filtration

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • General Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • Civil Engineering (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Mechanical Engineering (AREA)
  • Human Resources & Organizations (AREA)
  • Structural Engineering (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of running water landscape water requirement estimation methods suitable for mountain stream, it is intended to which rationally assessment power station is the landscape flow let out under safeguarding required for river discharges.This method includes:The principal element of extraction reflection river discharges quality simultaneously chooses corresponding index;According to the index of selection, the relationship between these indexs and river discharges quality is analyzed using analytic hierarchy process (AHP), builds river discharges quality evaluation system;Classification value is carried out to the index of appraisement system, its relationship with changes in flow rate is established, and determine associated weight value, establishes river discharges Environmental Evaluation Model;The landscape quality in the case of control section or control section difference diminishing is calculated using the evaluation for landscape model of foundation, and is calculated compared with the range of decrease degree under same period natural environment;Formulating landscape according to the landscape sensitivity of control section or section needs the control standard of water, and the instream flow of the standard, the landscape water requirement recommended as at this are met according to control criterion calculation minimum.

Description

A kind of running water landscape water requirement estimation method suitable for mountain stream
Technical field
The present invention relates to the running water landscape water requirement estimation methods of mountain stream, are mountain area water channeling type power stations specifically The assessment computational methods that the landscape flow that Tao River is let out under needing is taken.
Background technology
Mountain area water channeling type power station is generated electricity by massif tunnel diversion outside river to downstream, therefore instream flow is reduced, and is made Into Tao River, water level falls in river, and water area is reduced, reduced velocity flow, and point bar is exposed;In exploitation earlier engineering, very It lets out certain flow to not accounting for retaining for former river river is caused to be dehydrated, some sections are almost dry.Therefore, it is natural River be changed into streams state or dry riverbed state to stream mode, by larger adverse effect, this is just needed river discharges It wants to let out certain flow under the stem of power station, slows down the influence of river discharges, referred to as landscape flow.
In recent years, the ecological functions in river are gradually realized and pay attention to, and certain flow is let out under water channeling type power station is primary expires Sufficient ecological functions, commonly referred to as ecological flow.Domestic and international researcher proposes definition and the computational methods of many ecological flows, But the computational methods of ecological flow are mainly proposed from the angle for maintaining river ecosystem basicly stable, the ecological flow determined therefrom that Amount not necessarily just meets river discharges demand.Since landscape has subjectivity and many uncertainties, lack all the time The landscape water requirement estimation method of scientific system, also gets the brush-off in practice.But in current a large amount of mountain area water channeling type exploitation In the process, river discharges wreck, and urgent need wants a kind of efficient operation method, and rationally assessment calculates power station to safeguard river scape The landscape flow let out under required for seeing coordinates landscape reservation and hydroelectric development economic benefit, instructs engineering practice.
Invention content
The technical problems to be solved by the invention are:Propose a kind of running water landscape water requirement meter suitable for mountain stream Calculation method, it is the landscape flow let out under safeguarding required for river discharges that rationally assessment, which calculates power station,.
The technical solution adopted by the present invention to solve the technical problems is:A kind of running water landscape suitable for mountain stream needs Water computational methods, include the following steps:
A, scale, landscape situation and its function of studying river are analyzed, according to section landscape function feature and scape Sensibility is seen, judges control section or the region of river discharges, the principal element of extraction reflection river discharges quality, and choose phase Influence or contribution situation of these factors of the index reflection answered to river discharges quality;
B, according to the index of selection, the relationship between these indexs and river discharges quality is analyzed using analytic hierarchy process (AHP), Build river discharges quality evaluation system;
C, classification value is carried out to the index of appraisement system, establishes its relationship with changes in flow rate, and determine associated weight Value, so as to establish river discharges Environmental Evaluation Model;
D, the scape in the case of control section or control section difference diminishing is calculated using the evaluation for landscape model of foundation Appearance quality, and calculate compared with the range of decrease degree under same period natural environment;
E, formulating landscape according to the landscape sensitivity of control section or section needs the control standard of water, landscape sensitivity Depending on the degree concerned according to section, landscape needs water management standard to meet landscape requirement should be not less than how many range of decrease for this section Limit value;The instream flow that minimum meets the standard is the landscape water requirement recommended at this.
Further, in step B, the river discharges quality evaluation system is divided into destination layer, system layer, state layer With four level of variable layer:
Wherein using hydraulic development section landscape quality as destination layer, it is carried out to decompose acquisition system layer:
System layer includes river indoor setting appearance quality and Riparian Zone landscape quality;
System layer decompose again and obtains state layer:
River Study of Platycladus orientalis-Robinia pseudoacacia quality includes:Mobility, continuity and water body form;Riparian Zone landscape quality includes:Bank band shape Formula and bank band color;
State layer decompose again and obtains variable layer:
Mobility specific targets are mean flow rate;Continuity specific targets include that the water surface is wide and mean depth;Water body form Specific targets include wetted perimeter rate, water transparency and water colour;Bank band forms specific targets include riverbank river shoal form and river valley is curved Curvature;Bank band color specific targets are Riparian Zone Landscape Color.
Further, in step C, when carrying out value to the index in assessment indicator system, to mean flow rate, the water surface Width, mean depth, wetted perimeter rate and water transparency these indexs use quantitative manner with reference to preset grade scale and value table Value:
In formula:biFor the value of quantitative indices, xiRepresent the real data of quantitative indices, the real data is according to survey Fixed and elevation computation obtains;ti-1For xiIndex corresponds to the lower limiting value of classification;
To water colour, Riparian Zone Landscape Color, riverbank river shoal form and river valley curvature these indexs with reference to grade scale and Index is gone to use qualitative fashion value.
Further, it in step D, calculates control section using the evaluation for landscape model of foundation or control section is different Landscape quality in the case of diminishing, specific calculation are as follows:
In formula:
MiFor landscape quality value under a certain diminishing state of i sections;
For Tao River totality landscape quality value;
rk, rks, rkstRespectively system layer, state layer and variable layer correspond to index weights, K, S, and T corresponds to index for each layer Number;
MkstFor variable layer index value;
liFor the spacing between (i-1)-th and i sections, Tao River is chosen in total N number of represents section;
L is the length of Tao River.
Further, in step D, the landscape quality is calculated compared with the range of decrease degree under same period natural environment using following formula:
Mi is landscape quality value under a certain diminishing state of i sections,Respectively i sections or the section same period natural feelings Landscape quality value under condition and when stopping.
The beneficial effects of the invention are as follows:It is the landscape stream let out under safeguarding required for river discharges that rationally assessment, which calculates power station, Amount coordinates landscape reservation and hydroelectric development economic benefit, instructs engineering practice.
Description of the drawings
Fig. 1 is running water landscape water requirement estimation method flow diagram in the present invention.
Specific embodiment
As shown in Figure 1, the running water landscape water requirement estimation method in the present invention includes the following steps:
First, scale, landscape situation and its function etc. for studying river are analyzed, according to section landscape function feature and Landscape Sensitivity, judges control section or the region of river discharges, and the principal element of extraction reflection river discharges quality is chosen and closed Influence or contribution situation, the index as possible quantification of selection, and energy of these factors of suitable index reflection to river discharges quality Achievable quantitative relationship is established with flow.
2nd, according to the index of selection, the relationship between these indexs and river discharges quality is analyzed using analytic hierarchy process (AHP), Build river discharges quality evaluation system.
3rd, according to research section river regime and the General Principle of landscape, the index of appraisement system is rationally classified Value establishes its relationship with changes in flow rate, and determines the weight value in relation to calculating, so as to establish a more complete river Model for Landscape Evaluation.
4th, using the evaluation for landscape model of foundation, in the case of calculating control section or control section difference diminishing Landscape quality is compared with the range of decrease degree under same period natural environment.Range of decrease degree can be according to same period native state and two kinds of feelings of diminishing state Landscape quality value under condition, which compares, to be obtained.
5th, with reference to evaluation for landscape method and standard, scape is formulated according to the landscape sensitivity of control section or section Seeing needs the control standard of water, and for landscape sensitivity depending on the concerned degree in section, it is this river that landscape, which needs water management standard, Section meets the limit value that landscape requirement should be not less than how many range of decrease.The instream flow that minimum meets the standard is to recommend at this Landscape water requirement.
In specific implementation, it is divided into following link:
(1) evaluation index:
Appraisement system is divided into four levels, the first level for hydraulic development section evaluation for landscape final goal- Then section landscape situation is decomposed into the sub- index that can embody this index, is decomposed again by this principle, until the bottom Single item evaluation index.It is specific at one of Tao River that hydraulic development section landscape is audience, in the range of visual experience Natural cause combine the river discharges that directly show by various forms of, it includes the senses such as people's vision, the sense of hearing, smell The various elements known.It is attributed to river Study of Platycladus orientalis-Robinia pseudoacacia feature and bank band Landscape Characteristics, form, color and its association including various components Tonality.Since Tao River landscape situation is based on being flowed naturally by river, on the basis of river continuity and mobility, water Each element such as body and bank band is able to be laid out, contacts and form river discharges, so from the side such as river key property and form component Face selective goal, divides in river and bank band two systems build hydraulic development section evaluation for landscape index system, refers to table 1。
Table 1:Hydraulic development section evaluation for landscape index system table
(2) specific targets value explanation:
All indexs of upper table are to be classified value according to the landscape quality quality that index is reflected, are classified obtaining value method packet Include qualitatively and quantitatively two kinds, quantitative includes wide flow velocity, the water surface, the depth of water, wetted perimeter rate, water transparency, qualitatively including water colour, Riparian Zone Landscape Color, riverbank river shoal form, river valley curvature.Index grading standard and rank value refer to table 2.
Table 2:Each Index grading standard of River Landscape quality and value table
1) quantitative indices:
Flow velocity, the water surface in table 2 are wide, the depth of water, wetted perimeter rate, the real data of water transparency are according to measuring and hydraulics meter It calculates and obtains.The data obtained are calculated according to grade scale, quantitative calculating are carried out by formula 1-1, so as to preferably quantify the index.
In formula:biIt is quantitative indices according to the value of 2 stage division of table, xiRepresent quantitative indices data, ti-1For xi Index corresponds to the lower limiting value of the classification of table 2.
2) qualitative description index:
For qualitative description landscape feature index, mainly it is divided from the angle of form aesthetic, form aesthetic Including landscape feature form, color and its harmony in itself.Mainly investigated in terms of river valley, Riparian Zone, river shoal three. Value is shown in Table 2.For convenience of operation, values at different levels are corresponded to as a fixed number, respectively 9,7,5,3,1, i.e., median at different levels.
(3) landscape quality calculates:
According to the characteristics of institute's analysis indexes and the accessibility of data, using analytic hierarchy process (AHP) (AHP) to each finger in table 1 Target weight is determined.Using integrated evaluating method, calculated according to weight and variable layer value with formula 1-2, obtain list A section is calculated with formula 1-3, obtains the landscape quality value of entire Tao River.
In formula:
MiLandscape quality value under a certain diminishing state of-i sections;
- Tao River totality landscape quality value;
rk, rks, rkstRespectively system layer, state layer and variable layer correspond to index weights, K, S, and T corresponds to index for each layer Number;
Mkst- variable layer index value;
liSpacing between-the (i-1)-th and i sections, Tao River is chosen in total N number of represents section;
Section distance between the length of L-Tao River, i.e. lock site and factory site.
The landscape quality value that single control section under different flow operating mode is let out under dam site is calculated according to formula 1-2, by multiple controls The landscape quality value of section processed can calculate the landscape quality value of entire Tao River according to 1-3.
(4) the landscape quality range of decrease calculates:
According to the investigation of river Landscape metrics under same period native state, the scape under same period natural environment is calculated with (3) step Appearance quality value represents section or section compared with the landscape quality range of decrease (%) under same period natural conditions with the formula 1-4 calculating same periods.
Because Cut off is not allowed to, therefore, regard river discharge as 0 when landscape quality be minimum, landscape matter The luffing of magnitude is based on this.
Mi is landscape quality value under a certain diminishing state of i sections,Respectively i sections or the section same period natural feelings Landscape quality value under condition and when stopping.The landscape quality value of entire section is weighted by multiple landscape quality values for representing section It obtains.
(5) sensibility judges to control with landscape quality range of decrease standard:
Sensibility is for weighing a concept of the public to a certain scenic spot degree of attentiveness.People's attention is more concentrated Scenic spot, sensitivity level are higher.The high section of sensitivity, people are higher to the expectation of its landscape quality, to it by shadow Loud acceptable degree is lower, conversely, the section that sensitivity is lower, people are lower to the expectation of its landscape quality, is subjected to The landscape quality range of decrease it is bigger.For mountain area hydraulic development section, generally without open the navigation or air flight, row the boat, the functional plannings such as amusement on water and Being in direct contact seldom for demand, people and water body, is mainly experienced by vision.According to landscape function Regional survey, landscape is quick Sensitivity criterion is shown in Table 3.
Table 3:The susceptibility table of mountain area hydraulic development section river discharges
Sensitivity is divided into higher, general, relatively low three kinds of situations, i.e. A, B, C three classes by table 3.For all kinds of Landscape Rivers The minimum landscape requirement of section is different, is weighed with representing section or section compared with the landscape quality range of decrease under same period natural conditions, Mountain area Tao River landscape quality control standard is obtained, is shown in Table 4.I.e. A classes landscape requires to represent section or section is natural compared with the same period The landscape quality range of decrease is not higher than 20% under situation;B classes landscape requires to represent section or section compared with landscape matter under same period natural conditions It measures the range of decrease and is not higher than 35%;The requirement of C classes landscape represents section or section and is not higher than compared with the landscape quality range of decrease under same period natural conditions 45%.
Table 4:Mountain area Tao River landscape quality control standard
(6) control section or section landscape water requirement estimation
Selected Tao River landscape control section, can be single or multiple.Different flow rate working conditions are let out under setting dam site, according to (3) the landscape quality value and landscape quality of control section or entire Tao River under different flow operating mode are calculated and is dropped with (4) step Width.Can flow-landscape quality range of decrease relation curve be drawn according to the corresponding data of different flow and the landscape quality range of decrease.
According to the curve, judge that landscape quality controls standard control with the table 4 in step (5), it is minimum that judgement meets landscape It is required that the flow value corresponding to standard is the landscape water requirement recommended, i.e., the minimum landscape flow that dam site is let out under needing.

Claims (4)

  1. A kind of 1. running water landscape water requirement estimation method suitable for mountain stream, which is characterized in that include the following steps:
    A, scale, landscape situation and its function of studying river are analyzed, it is quick according to section landscape function feature and landscape Perception judges control section or the region of river discharges, the principal element of extraction reflection river discharges quality, and chooses corresponding Influence or contribution situation of these factors of index reflection to river discharges quality;
    B, according to the index of selection, the relationship between these indexs and river discharges quality is analyzed using analytic hierarchy process (AHP), is built River discharges quality evaluation system;
    C, classification value is carried out to the index of assessment indicator system, establishes its relationship with changes in flow rate, and determine associated weight Value, so as to establish river discharges Environmental Evaluation Model;
    D, the landscape matter in the case of control section or control section difference diminishing is calculated using the evaluation for landscape model of foundation Amount, and calculate compared with the range of decrease degree under same period natural environment;
    E, formulating landscape according to the landscape sensitivity of control section or section needs the control standard of water, landscape sensitivity according to Depending on the concerned degree in section, landscape needs water management standard to meet landscape requirement for this section should be not less than the limit of how many range of decrease Value;The instream flow that minimum meets the standard is the landscape water requirement recommended at this;
    In step B, the river discharges quality evaluation system is divided into destination layer, system layer, state layer and four, variable layer Level:
    Wherein using hydraulic development section landscape quality as destination layer, it is carried out to decompose acquisition system layer:
    System layer includes river indoor setting appearance quality and Riparian Zone landscape quality;
    System layer decompose again and obtains state layer:
    River Study of Platycladus orientalis-Robinia pseudoacacia quality includes:Mobility, continuity and water body form;Riparian Zone landscape quality includes:Bank band forms and Bank band color;
    State layer decompose again and obtains variable layer:
    Mobility specific targets are mean flow rate;Continuity specific targets include that the water surface is wide and mean depth;Water body form is specific Index includes wetted perimeter rate, water transparency and water colour;Bank band forms specific targets include riverbank river shoal form and river valley curvature; Bank band color specific targets are Riparian Zone Landscape Color.
  2. 2. a kind of running water landscape water requirement estimation method suitable for mountain stream as described in claim 1, which is characterized in that In step C, when carrying out value to the index in assessment indicator system, to mean flow rate, the water surface is wide, mean depth, wetted perimeter rate With these indexs of water transparency, quantitative manner value is used with reference to preset grade scale and value table:
    In formula:biFor the value of quantitative indices, xiRepresent quantitative indices data;ti-1For xiIndex corresponds to the lower limit of classification Value;
    To water colour, Riparian Zone Landscape Color, riverbank river shoal form and these indexs of river valley curvature with reference to grade scale and value Table uses qualitative fashion value.
  3. 3. a kind of running water landscape water requirement estimation method suitable for mountain stream as claimed in claim 2, which is characterized in that In step D, the landscape in the case of control section or control section difference diminishing is calculated using the evaluation for landscape model of foundation Quality, specific calculation are as follows:
    In formula:
    MiFor landscape quality value under a certain diminishing state of i sections;
    For Tao River totality landscape quality value;
    rk, rks, rkstRespectively system layer, state layer and variable layer correspond to index weights, K, S, and T is that each layer corresponds to index Number;
    MkstFor variable layer index value;
    liFor the spacing between (i-1)-th and i sections, Tao River is chosen in total N number of represents section;
    L is the length of Tao River.
  4. 4. a kind of running water landscape water requirement estimation method suitable for mountain stream as claimed in claim 3, which is characterized in that In step D, landscape quality is calculated compared with the range of decrease degree under same period natural environment using following formula:
    MiFor landscape quality value under a certain diminishing state of i sections,Respectively under i sections or section same period natural environment With landscape quality value during cutout.
CN201610159098.4A 2016-03-21 2016-03-21 A kind of running water landscape water requirement estimation method suitable for mountain stream Active CN105821797B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610159098.4A CN105821797B (en) 2016-03-21 2016-03-21 A kind of running water landscape water requirement estimation method suitable for mountain stream

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610159098.4A CN105821797B (en) 2016-03-21 2016-03-21 A kind of running water landscape water requirement estimation method suitable for mountain stream

Publications (2)

Publication Number Publication Date
CN105821797A CN105821797A (en) 2016-08-03
CN105821797B true CN105821797B (en) 2018-06-15

Family

ID=56524735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610159098.4A Active CN105821797B (en) 2016-03-21 2016-03-21 A kind of running water landscape water requirement estimation method suitable for mountain stream

Country Status (1)

Country Link
CN (1) CN105821797B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101650762A (en) * 2009-09-03 2010-02-17 北京师范大学 Lake ecological water need analysis technology based on function setting method
CN101650761A (en) * 2009-09-03 2010-02-17 北京师范大学 Analyzing technique for urban ecological demand water
CN101833609A (en) * 2010-03-18 2010-09-15 北京师范大学 River ecological flow maintenance-orientated reservoir optimizing and dispatching method
CN104732073A (en) * 2015-03-04 2015-06-24 河海大学 Computing method for surface water and underground water coupling simulation

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4146053B2 (en) * 1999-12-13 2008-09-03 富士電機システムズ株式会社 Flow prediction method in dam or river
US7353113B2 (en) * 2004-12-07 2008-04-01 Sprague Michael C System, method and computer program product for aquatic environment assessment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101650762A (en) * 2009-09-03 2010-02-17 北京师范大学 Lake ecological water need analysis technology based on function setting method
CN101650761A (en) * 2009-09-03 2010-02-17 北京师范大学 Analyzing technique for urban ecological demand water
CN101833609A (en) * 2010-03-18 2010-09-15 北京师范大学 River ecological flow maintenance-orientated reservoir optimizing and dispatching method
CN104732073A (en) * 2015-03-04 2015-06-24 河海大学 Computing method for surface water and underground water coupling simulation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
水力开发河流景观质量评价初探;吴文佑等;《水电站设计》;20111215;第27卷(第4期);第72-76页 *

Also Published As

Publication number Publication date
CN105821797A (en) 2016-08-03

Similar Documents

Publication Publication Date Title
CN109754025B (en) In conjunction with hydrological simulation and the small reservoir parameter identification method of continuous remote sensing image non-avaible
Heng et al. Using artificial neural network to estimate sediment load in ungauged catchments of the Tonle Sap River Basin, Cambodia
Zhang et al. Stream flow simulation and verification in ungauged zones by coupling hydrological and hydrodynamic models: a case study of the Poyang Lake ungauged zone
JP2007063849A (en) Method of creating river water level prediction model, device for predicting river water level, and program for creating river water level prediction model
CN108021780A (en) A kind of mountain torrents dynamic emulation method based on random unstrctured grid model
Basheer et al. Temporal analysis of water-energy nexus indicators for hydropower generation and water pumping in the Lower Blue Nile Basin
Ma et al. Evaluation of impact of spur dike designs on enhancement of aquatic habitats in urban streams using 2D habitat numerical simulations
CN110459036A (en) A kind of mountain torrents method for early warning based on deep learning
WO2018078674A1 (en) Simulation device, simulation method, and recording medium
CN105184006B (en) A kind of the construction land selection method and device in Gentle hillside area
Kangrang et al. Active future rule curves for multi-purpose reservoir operation on the impact of climate and land use changes
CN111898250A (en) Estuary tailing branch of a river prediction method and device based on multi-source data fusion
CN102912760B (en) Lowest navigable water level generating method of downstream river of reservoir
Sun et al. Roles of reservoirs in regulating basin flood and droughts risks under climate change: Historical assessment and future projection
CN116882211B (en) Reservoir water condition forecasting simulation method and system based on digital twin
CN105821797B (en) A kind of running water landscape water requirement estimation method suitable for mountain stream
CN113689151B (en) Flood control risk assessment method for cross river downstream area by cross-river basin water diversion project
Singh et al. Prediction of littoral drift with artificial neural networks
Zhu et al. Flood forecasting methods for a semi‐arid and semi‐humid area in Northern China
Kuok et al. Particle swarm optimization for calibrating and optimizing Xinanjiang model parameters
Papalaskaris et al. Calibration of a bed load transport rate model in streams of NE Greece
Hannum et al. The use of dam environmental vulnerability index (DEVI) for assessing vulnerability of Bengawan Solo Watershed, Indonesia
Lee et al. Development of a large basin rainfall-runoff modeling system using the object-oriented hydrologic modeling system (OHyMoS)
Ali et al. Overview effect of three gorges reservoir on the changing water temperature in the Yangtze river, China
CN115657163B (en) Extension period weather element forecasting method and system based on artificial intelligent model

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant