CN105811424A - 一种分布式光伏逆变器和电容器组无功协调控制方法 - Google Patents

一种分布式光伏逆变器和电容器组无功协调控制方法 Download PDF

Info

Publication number
CN105811424A
CN105811424A CN201410838415.6A CN201410838415A CN105811424A CN 105811424 A CN105811424 A CN 105811424A CN 201410838415 A CN201410838415 A CN 201410838415A CN 105811424 A CN105811424 A CN 105811424A
Authority
CN
China
Prior art keywords
photovoltaic
converter
idle
control
reactive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410838415.6A
Other languages
English (en)
Other versions
CN105811424B (zh
Inventor
赵伟然
何国庆
刘纯
孙艳霞
冯凯辉
孙文文
李光辉
郝木凯
汪海蛟
李海峰
金涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong New Shuaike Energy Technology Co ltd
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, State Grid Jiangsu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410838415.6A priority Critical patent/CN105811424B/zh
Publication of CN105811424A publication Critical patent/CN105811424A/zh
Application granted granted Critical
Publication of CN105811424B publication Critical patent/CN105811424B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Landscapes

  • Control Of Electrical Variables (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明提供了一种分布式光伏逆变器和电容器组无功协调控制方法,所述方法包括上层协调控制方法和就地协调控制方法;所述上层协调控制方法包括确定电容器组和所述光伏逆变器分别承担的无功功率;所述就地协调控制方法包括根据所述上层协调控制方法下达的光伏逆变器无功出力指令、当前各光伏逆变器实发有功值和交流侧电压值修改所述无功出力指令并下发给各光伏逆变器。所述方法在不增加新的SVC/SVG等动态无功补偿设备的情况下,解决了分布式光伏接入用户配电变压器380V侧引起的用户功率因数降低问题,节省了分布式光伏建设投资。

Description

一种分布式光伏逆变器和电容器组无功协调控制方法
技术领域
本发明涉及一种分布式光伏发电无功电压协调控制技术领域的方法,具体讲涉及一种分布式光伏逆变器和电容器组无功协调控制方法。
背景技术
随着分布式光伏发电的迅速发展,工业园区因其屋顶面积大、屋顶较平整受到了分布式光伏开发商的青睐。为了节省分布式光伏升压变压器等设备投资,目前大量分布式光伏发电接入工业园区工厂等用户配变380V侧,分布式光伏接入前用户配变380V侧普遍装有自动投切电容器组以控制配变380V侧功率因数。分布式光伏只发出有功功率,抵消了配变380V侧的一部分有功负荷,造成用户功率因数降低,当电容器组容量不足导致用户进线处功率因数超标时,用户将会遭受经济处罚;光伏出力的波动性导致自动投切电容器组频繁动作,电容器组寿命大大缩短。在光伏并网点安装SVC/SVG等动态无功补偿设备可以解决分布式光伏发电接入用户配变380V侧引起的无功电压问题,但SVC/SVG等动态无功补偿设备价格较昂贵,将会增加大量投资;并且目前国家为鼓励分布式光伏发电的发展,实际操作中降低了对分布式光伏无功电压的要求,在进行分布式光伏发电接入系统设计和审查时普遍不要求分布式光伏业主配置SVC/SVG等动态无功补偿设备。
现有技术中,无功协调控制大致分为以下几方面:
1)分布式光伏发电功率预测方法方面,用于提高分布式光伏功率预测精度,使主站监测更加准确,未用于分布式光伏无功协调控制;
2)分布式光伏SVC/SVG等无功补偿装置与逆变器协调优化控制方面,稳态条件下无功调节先使用SVC/SVG无功能力,电压稳定后再调节逆变器无功,以减轻SVC/SVG无功出力和电能消耗;
3)分布式光伏自动电压控制,通过逆变器优先的策略对逆变器、SVC/SVG等设备进行控制。由于目前国内大量分布式光伏电站不配置SVC/SVG等动态无功补偿设备,以上专利的实用性存在一定不足。
综上,现有技术中的方法均未考虑光伏功率预测和光伏接入点原有的自动投切电容器组,因此,需要提供一种基于功率预测的分布式光伏逆变器和电容器组无功协调控制方法。
发明内容
为克服上述现有技术的不足,本发明提供一种基于功率预测的分布式光伏逆变器和电容器组无功协调控制方法。
实现上述目的所采用的解决方案为:
一种分布式光伏逆变器和电容器组无功协调控制方法,其改进之处在于:所述方法包括上层协调控制和就地协调控制;
所述上层协调控制包括确定电容器组和所述光伏逆变器分别承担的无功功率;
所述就地协调控制包括根据所述上层协调控制下达的光伏逆变器无功出力指令、当前各光伏逆变器实发有功值和交流侧电压值修改所述无功出力指令并下发给各光伏逆变器。
进一步的,所述上层协调控制包括以下步骤:
S01、获取用户进线处功率因数考核值;
S02、根据所述功率因数考核值、第二天负荷预测值、第二天光伏有功出力预测值,确定第二天无功需求曲线;
S03、根据所述第二天光伏有功出力预测值和光伏逆变器的无功特性,确定第二天光伏无功出力能力曲线;
S04、根据所述第二天无功功率需求曲线和所述第二天光伏无功出力能力曲线,将所述第二天无功需求曲线减去所述第二天光伏无功出力能力曲线后,进行平滑处理获得所述电容器组动作曲线,确定电容器组投入时间、投入容量、退出时间和退出容量;
S05、所述电容器组根据所述投入时间、投入容量、退出时间和退出容量,实时监测用户进线处功率因数,计算无功功率缺额,按照当前光伏逆变器所发的有功功率将无功功率缺额等比例分配给各光伏逆变器承担。
进一步的,所述就地协调控制包括以下步骤:
S11、实时接受所述上层协调控制下达的光伏逆变器无功出力指令,实时获取当前各台光伏逆变器实发有功功率值和交流输出侧的电压信息;
S12、根据所述光伏逆变器无功出力指令、所述实发有功功率值和所述交流输出侧的电压信息计算并调整所述光伏逆变器输出的无功出力指令值;
S13、实时将调整后的所述光伏逆变器的无功出力指令转换成功率因数指令,下发给各台光伏逆变器;
S13、当一个上层协调控制周期未结束时,返回执行步骤S11,当一个上层协调控制周期结束时,返回上层协调控制执行步骤S01。
进一步的,所述就地协调控制满足以下基本原则:
I、满足各光伏逆变器无功输出值不越限且交流输出侧的电压满足国标要求;
II、当光伏逆变器交流输出侧的电压较高时按一定无功-电压曲线斜率降低其无功出力,当光伏逆变器交流输出侧的电压较低时按一定无功-电压曲线斜率提高其无功出力,当光伏逆变器交流输出侧的电压在一定的区间内时保持接受的无功指令不变,实时调整逆变器无功出力指令;
III、实时计算、调整并下发逆变器无功出力指令的时间间隔短于上层协调控制下发逆变器无功出力指令的时间间隔。
与现有技术相比,本发明具有以下有益效果:
1、本发明提供的方法在不增加新的SVC/SVG等动态无功补偿设备的情况下,解决了分布式光伏接入用户配电变压器380V侧引起的用户功率因数降低问题,节省了分布式光伏建设投资。
2、本发明提供的方法充分利用光伏逆变器的无功功率调节能力,无功功率连续调节,对用户进线处功率因数控制更加准确。
3、本发明提供的方法降低用户原有电容器组动作次数,延长了电容器组寿命。
附图说明
图1为本实施例中分布式光伏逆变器无功协调控制方法流程图;
图2为本实施例中就地协调控制控制策略图。
具体实施方式
下面结合附图对本发明的具体实施方式做进一步的详细说明。
本发明提供一种分布式光伏逆变器和电容器组无功协调控制方法,该方法基于光伏发电功率预测、负荷预测计算出满足用户进线处功率因数要求的第二天无功功率需求曲线,无功功率需求曲线中变化较小的部分由电容器组承担,第二天电容器组按照无功计划投运和退出,其余无功功率缺额由光伏逆变器承担,实时监测用户进线处功率因数并根据逆变器实发有功值和交流侧电压值实时调整光伏逆变器发出的无功功率。
如图1所示,图1为本实施例中分布式光伏逆变器和电容器组无功协调控制方法流程图;基于功率预测的分布式光伏逆变器和电容器组无功协调控制方法包括上层协调控制和就地协调控制。
所述上层协调控制用于预测第二天光伏发电功率、预测第二天的负荷、计算第二天光伏无功出力能力曲线、计算满足进线处功率因数要求的无功功率需求曲线、将无功功率需求曲线分配给电容器组和光伏逆变器。
所述就地协调控制用于接受上层协调控制下达的光伏逆变器无功出力指令、根据当前各台光伏逆变器实发有功值和交流侧电压值适当修改无功出力指令并下发给各台光伏逆变器。
所述上层协调控制包括以下步骤:
S01、获取用户进线处功率因数考核值;
S02、根据所述功率因数考核值、第二天负荷预测值、第二天光伏有功出力预测值,确定第二天无功需求曲线;
S03、根据所述第二天光伏有功出力预测值和光伏逆变器的无功特性,确定第二天光伏无功出力能力曲线;
S04、根据所述第二天无功功率需求曲线和所述第二天光伏无功出力能力曲线,将所述第二天无功需求曲线减去所述第二天光伏无功出力能力曲线后,进行平滑处理获得所述电容器组动作曲线,确定电容器组投入时间、投入容量、退出时间和退出容量;
S05、所述电容器组根据所述投入时间、投入容量、退出时间和退出容量运行,实时监测用户进线处功率因数值,计算出存在的无功功率缺额,按照当前光伏逆变器所发的有功功率将无功功率缺额等比例分配给各台光伏逆变器承担。
应用中由于各类用户功率因数不同,需根据各地电网提出的用户功率因数要求确定所述用户进线处功率因数值。
所述就地协调控制包括以下步骤:
S11、实时接受所述上层协调控制下达的光伏逆变器无功出力指令,实时获取当前各台光伏逆变器实发有功值和交流输出侧的电压信息,
S12、根据所述光伏逆变器无功出力指令、所述实发有功值和所述交流输出侧的电压信息实时计算并调整光伏逆变器输出的无功指令值;
S13、实时将经过调整后的光伏逆变器无功出力指令转换成功率因数指令,下发给各台光伏逆变器;
S13、当一个上层协调控制周期未结束时,返回执行步骤S11,当一个上层协调控制周期结束时,返回上层协调控制执行步骤S01。
如图2所示,图2为本实施例中就地协调控制控制策略图;所述就地协调控制的基本原则为:在满足各台光伏逆变器无功输出值不越限且交流输出侧的电压满足国标要求的前提下,当光伏逆变器交流输出侧的电压较高时按一定Q-U曲线斜率降低其无功出力,当光伏逆变器交流输出侧的电压较低按一定Q-U曲线斜率提高其无功出力,当光伏逆变器交流输出侧的电压在一定的区间内时保持接受的无功指令不变,不断实时调整逆变器无功出力指令,就地协调控制实时计算、调整并下发逆变器无功出力指令的时间间隔短于上层协调控制下发逆变器无功出力指令的时间间隔,两者时间间隔比例可以设定和更改。
最后应当说明的是:以上实施例仅用于说明本申请的技术方案而非对其保护范围的限制,尽管参照上述实施例对本申请进行了详细的说明,所属领域的普通技术人员应当理解:本领域技术人员阅读本申请后依然可对申请的具体实施方式进行种种变更、修改或者等同替换,但这些变更、修改或者等同替换,均在申请待批的权利要求保护范围之内。

Claims (4)

1.一种分布式光伏逆变器和电容器组无功协调控制方法,其特征在于:所述方法包括上层协调控制和就地协调控制;
所述上层协调控制包括确定电容器组和所述光伏逆变器分别承担的无功功率;
所述就地协调控制包括根据所述上层协调控制下达的光伏逆变器无功出力指令、当前各光伏逆变器实发有功值和交流侧电压值修改所述无功出力指令并下发给各光伏逆变器。
2.如权利要求1所述的分布式光伏逆变器和电容器组无功协调控制方法,其特征在于:所述上层协调控制包括以下步骤:
S01、获取用户进线处功率因数考核值;
S02、根据所述功率因数考核值、第二天负荷预测值、第二天光伏有功出力预测值,确定第二天无功需求曲线;
S03、根据所述第二天光伏有功出力预测值和光伏逆变器的无功特性,确定第二天光伏无功出力能力曲线;
S04、根据所述第二天无功功率需求曲线和所述第二天光伏无功出力能力曲线,将所述第二天无功需求曲线减去所述第二天光伏无功出力能力曲线后,进行平滑处理获得所述电容器组动作曲线,确定电容器组投入时间、投入容量、退出时间和退出容量;
S05、所述电容器组根据所述投入时间、投入容量、退出时间和退出容量运行,实时监测用户进线处功率因数,计算无功功率缺额,按照当前光伏逆变器所发的有功功率将无功功率缺额等比例分配给各光伏逆变器承担。
3.如权利要求1所述的分布式光伏逆变器和电容器组无功协调控制方法,其特征在于:所述就地协调控制包括以下步骤:
S11、实时接受所述上层协调控制下达的光伏逆变器无功出力指令,实时获取当前各台光伏逆变器实发有功功率值和交流输出侧的电压信息;
S12、根据所述光伏逆变器无功出力指令、所述实发有功功率值和所述交流输出侧的电压信息计算并调整所述光伏逆变器输出的无功出力指令值;
S13、实时将调整后的所述光伏逆变器的无功出力指令转换成功率因数指令,下发给各台光伏逆变器;
S13、当一个上层协调控制周期未结束时,返回执行步骤S11,当一个上层协调控制周期结束时,返回上层协调控制执行步骤S01。
4.如权利要求1所述的分布式光伏逆变器和电容器组无功协调控制方法,其特征在于:所述就地协调控制满足以下基本原则:
I、满足各光伏逆变器无功输出值不越限且交流输出侧的电压满足国标要求;
II、当光伏逆变器交流输出侧的电压较高时按一定无功-电压曲线斜率降低其无功出力,当光伏逆变器交流输出侧的电压较低时按一定无功-电压曲线斜率提高其无功出力,当光伏逆变器交流输出侧的电压在一定的区间内时保持接受的无功指令不变,实时调整逆变器无功出力指令;
III、实时计算、调整并下发逆变器无功出力指令的时间间隔短于上层协调控制下发逆变器无功出力指令的时间间隔。
CN201410838415.6A 2014-12-29 2014-12-29 一种分布式光伏逆变器和电容器组无功协调控制方法 Active CN105811424B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410838415.6A CN105811424B (zh) 2014-12-29 2014-12-29 一种分布式光伏逆变器和电容器组无功协调控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410838415.6A CN105811424B (zh) 2014-12-29 2014-12-29 一种分布式光伏逆变器和电容器组无功协调控制方法

Publications (2)

Publication Number Publication Date
CN105811424A true CN105811424A (zh) 2016-07-27
CN105811424B CN105811424B (zh) 2019-11-01

Family

ID=56979941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410838415.6A Active CN105811424B (zh) 2014-12-29 2014-12-29 一种分布式光伏逆变器和电容器组无功协调控制方法

Country Status (1)

Country Link
CN (1) CN105811424B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110011329A (zh) * 2018-11-26 2019-07-12 国电南瑞科技股份有限公司 含分布式光伏的低压配电台区无功控制方法
CN110890758A (zh) * 2019-12-19 2020-03-17 无锡科能达自动化科技有限公司 分布式光伏电站功率因数控制模块、方法及控制系统
CN114336658A (zh) * 2021-12-13 2022-04-12 国网辽宁省电力有限公司葫芦岛供电公司 一种含分布式光伏及无功调节设备的配网无功控制方法
CN116683472A (zh) * 2023-04-28 2023-09-01 国网河北省电力有限公司电力科学研究院 无功功率补偿方法、装置、设备以及存储介质
CN116706933A (zh) * 2023-04-28 2023-09-05 国网河北省电力有限公司电力科学研究院 基于智能控制终端的无功功率补偿方法以及装置
CN116722561A (zh) * 2023-04-28 2023-09-08 国网河北省电力有限公司电力科学研究院 一种无功功率补偿系统
CN116722608A (zh) * 2023-04-28 2023-09-08 国网河北省电力有限公司电力科学研究院 一种基于光伏逆变器的无功功率补偿系统
CN116780665A (zh) * 2023-04-28 2023-09-19 国网河北省电力有限公司电力科学研究院 基于光伏逆变器与智能控制终端的无功功率补偿方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103414181A (zh) * 2013-05-16 2013-11-27 中国能源建设集团广东省电力设计研究院 一种微电网系统设计方法
CN103904661A (zh) * 2014-03-27 2014-07-02 国家电网公司 分布式光伏电站无功补偿装置与逆变器协调优化控制方法
JP2014168323A (ja) * 2013-02-28 2014-09-11 Tokyo Gas Co Ltd 給電システム、給電制御プログラムおよび給電制御方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014168323A (ja) * 2013-02-28 2014-09-11 Tokyo Gas Co Ltd 給電システム、給電制御プログラムおよび給電制御方法
CN103414181A (zh) * 2013-05-16 2013-11-27 中国能源建设集团广东省电力设计研究院 一种微电网系统设计方法
CN103904661A (zh) * 2014-03-27 2014-07-02 国家电网公司 分布式光伏电站无功补偿装置与逆变器协调优化控制方法

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110011329A (zh) * 2018-11-26 2019-07-12 国电南瑞科技股份有限公司 含分布式光伏的低压配电台区无功控制方法
CN110011329B (zh) * 2018-11-26 2022-08-16 国电南瑞科技股份有限公司 含分布式光伏的低压配电台区无功控制方法
CN110890758A (zh) * 2019-12-19 2020-03-17 无锡科能达自动化科技有限公司 分布式光伏电站功率因数控制模块、方法及控制系统
CN110890758B (zh) * 2019-12-19 2021-08-20 无锡科能达自动化科技有限公司 分布式光伏电站功率因数控制模块、方法及控制系统
CN114336658A (zh) * 2021-12-13 2022-04-12 国网辽宁省电力有限公司葫芦岛供电公司 一种含分布式光伏及无功调节设备的配网无功控制方法
CN114336658B (zh) * 2021-12-13 2023-12-22 国网辽宁省电力有限公司葫芦岛供电公司 一种含分布式光伏及无功调节设备的配网无功控制方法
CN116706933A (zh) * 2023-04-28 2023-09-05 国网河北省电力有限公司电力科学研究院 基于智能控制终端的无功功率补偿方法以及装置
CN116722561A (zh) * 2023-04-28 2023-09-08 国网河北省电力有限公司电力科学研究院 一种无功功率补偿系统
CN116722608A (zh) * 2023-04-28 2023-09-08 国网河北省电力有限公司电力科学研究院 一种基于光伏逆变器的无功功率补偿系统
CN116780665A (zh) * 2023-04-28 2023-09-19 国网河北省电力有限公司电力科学研究院 基于光伏逆变器与智能控制终端的无功功率补偿方法
CN116683472A (zh) * 2023-04-28 2023-09-01 国网河北省电力有限公司电力科学研究院 无功功率补偿方法、装置、设备以及存储介质
CN116722608B (zh) * 2023-04-28 2024-06-25 国网河北省电力有限公司电力科学研究院 一种基于光伏逆变器的无功功率补偿系统
CN116780665B (zh) * 2023-04-28 2024-07-02 国网河北省电力有限公司电力科学研究院 基于光伏逆变器与智能控制终端的无功功率补偿方法
CN116683472B (zh) * 2023-04-28 2024-07-02 国网河北省电力有限公司电力科学研究院 无功功率补偿方法、装置、设备以及存储介质
CN116722561B (zh) * 2023-04-28 2024-07-05 国网河北省电力有限公司电力科学研究院 一种无功功率补偿系统

Also Published As

Publication number Publication date
CN105811424B (zh) 2019-11-01

Similar Documents

Publication Publication Date Title
CN105811424A (zh) 一种分布式光伏逆变器和电容器组无功协调控制方法
Ji et al. A centralized-based method to determine the local voltage control strategies of distributed generator operation in active distribution networks
Han et al. Hierarchical energy management for PV/hydrogen/battery island DC microgrid
US9841778B2 (en) Use of distributed generator (DG) inverters as STATCOMs for decreasing line losses
Motalleb et al. Optimal placement and sizing of the storage supporting transmission and distribution networks
US11990753B1 (en) Use of distributed generator (DG) inverters as STATCOMs for decreasing line losses
CN104578151B (zh) 大型光伏电站并网逆变器无功与电压控制方法
Varma et al. Optimal 24-hr utilization of a PV solar system as STATCOM (PV-STATCOM) in a distribution network
CN109217297A (zh) 交直流主动配电网日前调度二阶锥模型
CN109638873A (zh) 一种分布式光伏集群优化调度方法和系统
CN104319783B (zh) 一种基于负荷预测的配电网二级协调控制系统及方法
CN109038656A (zh) 计及有功输出状态的大型光伏电站avc控制方法及系统
Tshivhase et al. A fault level-based system to control voltage and enhance power factor through an on-load tap changer and distributed generators
CN109659941A (zh) 一种交直流混合微电网自治控制方法及系统
CN103094910B (zh) 多级自动电压无功控制系统avc协调控制方法
Satsangi et al. Energy savings estimation of a distribution system in presence of intelligent volt-VAr control based on IEEE Std. 1547-2018
CN105098787B (zh) 一种基于十一宫图的配电网分布式光伏无功协调控制算法
Dou et al. A nonintrusive control strategy using voltage and reactive power for distribution systems based on PV and the nine-zone diagram
Singh et al. UPFC facts devices in power system to improve the voltage profile and enhancement of power transfer loadability
CN113452027A (zh) 一种低压柔直配电台区的能量调度系统及方法
CN106385054B (zh) 分布式光伏逆变器运行控制方法
Janiga A review of voltage control strategies for low-voltage networks with high penetration of distributed generation
CN107516901A (zh) 自动电压控制中500kV变电站之间协调电压控制方法
CN110224413A (zh) 一种输配电调节装置及其计量方法、控制方法
Karimi et al. Novel distributed active and reactive power management approach for renewable energy resource and loads in distribution network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: CHINA ELECTRIC POWER RESEARCH INSTITUTE Co.,Ltd.

Applicant after: STATE GRID JIANGSU ELECTRIC POWER Co.,Ltd.

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: China Electric Power Research Institute

Applicant before: JIANGSU ELECTRIC POWER Co.

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhao Weiran

Inventor after: Li Haifeng

Inventor after: Jin Tao

Inventor after: Zhang Jitong

Inventor after: He Guoqing

Inventor after: Liu Chun

Inventor after: Sun Yanxia

Inventor after: Feng Kaihui

Inventor after: Sun Wenwen

Inventor after: Li Guanghui

Inventor after: Hao Mukai

Inventor after: Wang Haijiao

Inventor before: Zhao Weiran

Inventor before: Li Haifeng

Inventor before: Jin Tao

Inventor before: He Guoqing

Inventor before: Liu Chun

Inventor before: Sun Yanxia

Inventor before: Feng Kaihui

Inventor before: Sun Wenwen

Inventor before: Li Guanghui

Inventor before: Hao Mukai

Inventor before: Wang Haijiao

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180227

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: CHINA ELECTRIC POWER RESEARCH INSTITUTE Co.,Ltd.

Applicant after: STATE GRID JIANGSU ELECTRIC POWER Co.,Ltd.

Applicant after: SHANDONG NEW SHUAIKE ENERGY TECHNOLOGY Co.,Ltd.

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: CHINA ELECTRIC POWER RESEARCH INSTITUTE Co.,Ltd.

Applicant before: STATE GRID JIANGSU ELECTRIC POWER Co.,Ltd.

GR01 Patent grant
GR01 Patent grant