A kind of provincial power grid device topology distribution construction method Download PDFInfo
- Publication number
- CN105808850B CN105808850B CN201610132720.2A CN201610132720A CN105808850B CN 105808850 B CN105808850 B CN 105808850B CN 201610132720 A CN201610132720 A CN 201610132720A CN 105808850 B CN105808850 B CN 105808850B
- Authority
- CN
- China
- Prior art keywords
- topological structure
- province
- plant stand
- straightening
- tune
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/18—Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Mathematical Analysis (AREA)
- Computational Mathematics (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention discloses a kind of provincial power grid device topology distribution construction methods, including the following steps: (1) province is constructed to province's adjusting system and each districted dispatch system respectively and adjusts topological structure and various regions tune topological structure, and is stored in simulator information in a manner of node serial number;(2) according to voltage class, topological structure and various regions tune topological structure is adjusted to split respectively province using transformer as boundary;(3) judge whether whole plant stands construct completion, if turning to step (4) without if;(4) judge whether current plant stand is province's straightening category plant stand, if it is completes the building of current plant stand topological structure and turns to step (3);If not successively high-pressure side topological structure, mesolow side topological structure is adjusted with obtaining by ground tune, then completes the building of current plant stand topological structure and turn to step (3).The present invention with realizing province in integral system topological structure of electric rapid build, save human and material resources, improve operation efficiency.
Description
Technical field
The present invention relates to provincial power grid device topology distribution construction method a kind of in electric power scheduling automatization system,
Belong to electric power network technique field.
Background technique
Topological structure of electric is the precious resources of electric system, and many problems in electric system have with topological structure of electric
Closely connection, the design feature of power network topology can provide convenience for the processing of many problems and practical application.With province
Interdepending between ground tune power grid is higher and higher with degree of coupling, realizes that saving ground integration operation and power grid is uniformly coordinated control
It is extremely urgent, and the analysis of the electrical island towards the whole network, static security analysis etc. rely on the application of topological structure of electric, Neng Gouwei
Integration operation provides reliable guarantee and important Informational support, this just mentions the device topology established in network-wide basis
Urgent demand is gone out.
The most common building mode of grid equipment topological structure is to assign independent " node serial number " to the terminal of equipment.Root
Equipment can be divided into " single-ended equipment ", " two-end device " and " multi-terminal devices ", generally by the terminal number for including according to device model
Ground, single-ended equipment include bus, grounding switch, arrester, shunt capacitance/reactor etc., and two-end device includes breaker, isolation
Switch, route, two winding transformer, series capacitance/reactor etc., multi-terminal devices include three-circuit transformer, direct-flow inverter etc.;If
The node serial number of two arrangement terminals is identical, then it represents that the two equipment are connected directly in topological structure.
Country's dispatch automated system is mostly integrated system at present, during topological structure of electric building, is used
Primary connection figure mode corresponding with physical device model generates node serial number.Firstly, in the drawing process of primary connection figure,
Graphic editor forms and distributes " the initial point number " of each terminal, combines power plant and substation's information belonging to current Graphics later, currently sets
Standby voltage class information generates the final node serial number of terminal and saves into model information, opens up to complete grid equipment
Flutter the building of structure.However, going deep into the smart grid process of integration, saving ground integral system gradually becomes more universal
Power network dispatching system framework mode, in such systems, save adjust plant stand, adjust plant stand there is significant portion of coincidence, together
Equipment in one plant stand is repeated there is also a large amount of.According to the mode of existing central system, saves and harmonically adjust model used
Respectively maintenance, needs to establish a set of region within the jurisdiction electric network model and station wiring diagram respectively, interconnects mechanism based on existing province
And technical support, it is difficult to realize on-demand dynamically shared, in synchronous and network-wide basis the topological structure building for saving ground model, this
Point not only causes a large amount of repetition and safeguards that wasting manpower and material resources, each functional application dispatched with also preventing province is from obtaining enough
Information, topological structure process can not get rid of the dependence to network, at the same there is no to electric network composition originally " layering and zoning "
Feature is efficiently used, and interact, formed an integrated bulk power grid bottleneck with further enhancing province is become.
Summary of the invention
In view of the deficienciess of the prior art, it is an object of the present invention to provide a kind of provincial power grid device topology distributions
Construction method, with realizing province in integral system topological structure of electric rapid build, solve large scale electric network topology knot
Structure model replication problem common when constructing, saves human and material resources, improves operation efficiency.
To achieve the goals above, the present invention is to realize by the following technical solutions:
A kind of provincial power grid device topology distribution construction method of the invention, including the following steps:
(1) province's adjusting system and each districted dispatch system modeled respectively, drawn, generate node serial number, to construct province's tune
The province of topological structure and various regions tune topological structure, building adjusts topological structure and various regions tune topological structure in a manner of node serial number
It is stored in simulator information;
(2) according to voltage class, using transformer as boundary to save adjust topological structure and various regions tune topological structure respectively into
Row is split, and obtains province's straightening category device model topological structure and ground straightening category device model high-pressure side topological structure and ground straightening category
Device model mesolow side topological structure;
(3) according to remaining plant stand quantity, judge whether whole plant stands construct completion, if building is completed, provincial power grid
Topology constructing terminates;If being constructed without completion, step (4) are turned to;
(4) according to plant stand affiliated area, judge whether current plant stand is province's straightening category plant stand, saved if it is by saving to adjust to obtain
Straightening category device model topological structure then completes the building of current plant stand topological structure and turns to step (3);
If not successively ground straightening category device model high-pressure side topological structure is obtained by ground tune, ground straightening is obtained by ground tune
Belong to device model mesolow side topological structure, then completes the building of current plant stand topological structure and turn to step (3).
In step (1), the generation method of the node serial number is as follows:
Nd=zone number x1012+ plant stand number x106+ voltage class number x103+ initial point number;
Wherein, zone number, plant stand number, voltage class number are the intrinsic informations after model foundation, and initial point number is
After drawing station wiring diagram, according to the position of device type, equipment in the graphic, as unit of connection terminal, since 1 gradually
It arranges backward.
In step (2), the method for the fractionation is as follows:
Classify to armamentarium according to voltage class, it is assumed that with the voltage class of transformer medium voltage side be split boundary
Limit, then the armamentarium (including transformer winding) for being higher than this voltage class is equal to for constituting high-pressure side topological structure
Or it is used to constitute mesolow side topological structure lower than the armamentarium of this voltage class.
The present invention by save adjust, adjust and the equipment of self maintained is modeled respectively, generate node serial number, later with transformation
The node serial number that ground tune is safeguarded is collected province and adjusted by device as boundary, transfers in the unified power network topology building of row saving;The present invention
With can solve province integrated, model center or save ground isomorphism system in the whole network prototype network topology rapid build the problem of, energy
Enough accomplish to save resource, improve efficiency;Due to introducing zone number during generating local topology, can ensure
It is not in the repetition of node serial number in overall topology after merging;And the boundary of distributed topology is to pass through transformation
What device was linked, further ensure that the overall topology connection relationship after merging is complete, there is no breakpoints.
Detailed description of the invention
Fig. 1 is the composition figure of provincial power grid device topology;
Fig. 2 is provincial power grid device topology distribution construction method work flow diagram.
Specific embodiment
To be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, below with reference to
Specific embodiment, the present invention is further explained.
Provincial power grid device topology distribution construction method of the invention, comprising the following steps:
1. province's adjusting system, each districted dispatch system model respectively, draw, generate node serial number, local power network topology knot is formed
Structure.The logic rules that node serial number generates are carried out with perfect, the number generation factor of the Adding Area number as highest weighting, area
Field Number is that the whole network is unique:
Origin node number generating algorithm:
Nd=plant stand number x106+ voltage class number x103+ initial point number
Node serial number generating algorithm after the weight of Adding Area:
Nd=zone number x1012+ plant stand number x106+ voltage class number x103+ initial point number
It is formed after the topological structure of electric of part, the topological structure of electric of various regions tune is adjusted and independently opened up in which can satisfy
Flutter the demand of analysis.
2. topological structure is split according to voltage class using transformer as boundary.In the distribution of topological structure
In building process, specially treated is carried out to transformer: establishing the corresponding relationship between " transformer --- transformer winding ", is generating
When node serial number, node serial number distribution is carried out using " winding " as unit.Pass through high, medium and low three side of transformer (or high and low two
Side) winding, form the topology connection between different voltages grade.In saving ground integral system, using transformer as boundary, respectively will
The local topology formed in step 1 is split, and the topological structure of three high-pressure side, medium voltage side, low-pressure side parts is obtained.
3. the local topology after pair fractionation cooperates with merging with carrying out province, complete electric network model topology knot is ultimately formed
Structure.In saving ground integral system, straightening category device model is saved by saving and adjusts aspect maintenance, ground straightening category device model, according to electricity
Grade layering maintenance is pressed, the voltage class for layering can be set according to actual conditions (mostly using 220kV as layering voltage etc.
Grade), under normal circumstances, voltage levels part (220kV above section) adjusts aspect maintenance, low-voltage-grade part by saving
(220kV and following part) in terms of ground tune by safeguarding.According to this feature, its opening up directly under device model is obtained by saving to adjust first
Structure is flutterred, and then adjusts the high-pressure side topological structure (220kV above section) for obtaining ground straightening category device model by saving, then by ground
Adjust obtain its directly under in device model, low-pressure side topological structure (220kV and following part), by above-mentioned three parts topological structure
It merges, to complete the building of provincial power grid device topology.Due to drawing during generating local topology
Zone number is entered, has been not in the repetition of node serial number in the overall topology after can ensureing merging;And distribution is opened up
The boundary for flutterring structure is linked by transformer, has further ensured that the overall topology connection relationship after merging is complete
It is whole, be not present breakpoint.
Referring to Fig. 1, save the topological structure adjusted and generated, comprising save armamentarium that straightening belongs to, straightening category plant stand high pressure
Side apparatus (generally 220kV above section) and high voltage side of transformer are around group information;The topological structure that ground tune generates is adjusted comprising ground
Directly under in plant stand, in low pressure side apparatus (generally 220kV and following part) and transformer, low-pressure side is around group information.
Referring to fig. 2, provincial power grid device topology distribution construction method of the invention specifically includes following step
It is rapid:
Firstly, saving reconciliation various regions tune independently completes topological structure building;
Secondly, the topology information of building is stored in simulator information in a manner of node serial number, according to voltage
Grade splits it using transformer as boundary, obtain province and district height, in, three side topological structure of bottom;
Later, on the basis of saving mode transfer type, plant stands whole in system are traversed, and classify and handled:
Straightening category plant stand is saved, whole topological structures, the topological structure as current plant stand are obtained in saving adjusting system.
Straightening category plant stand in ground obtains the high pressure side section (220kV above section) of topological structure, on ground in saving adjusting system
It is obtained in adjusting system in topological structure, low-pressure side part (220kV and following part), the two carries out cutting merging, is formed current
The final topology structure of plant stand.
Finally, after completing whole plant stand circulations, the topological structure of provincial power grid, which constructs, to be completed.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention.The technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this
The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes
Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its
Equivalent thereof.
Claims (2)
1. a kind of provincial power grid device topology distribution construction method, which is characterized in that including the following steps:
(1) province's adjusting system and each districted dispatch system modeled respectively, drawn, generate node serial number, to construct province's tune topology
The province of structure and various regions tune topological structure, building adjusts topological structure and various regions tune topological structure to store in a manner of node serial number
In simulator information;
(2) according to voltage class, topological structure and various regions tune topological structure is adjusted to tear open respectively province using transformer as boundary
Point, obtain province's straightening category device model topological structure and ground straightening category device model high-pressure side topological structure and ground straightening category equipment
Model mesolow side topological structure;
(3) according to remaining plant stand quantity, judge whether whole plant stands construct completion, if building is completed, provincial power grid topology
Building terminates;If being constructed without completion, step (4) are turned to;
(4) according to plant stand affiliated area, judge whether current plant stand is province's straightening category plant stand, save straightening if it is by saving to adjust to obtain
Belong to device model topological structure, then completes the building of current plant stand topological structure and turn to step (3);
If not successively ground straightening category device model high-pressure side topological structure is obtained by ground tune, ground straightening category is obtained by ground tune and is set
Standby model mesolow side topological structure, then complete the building of current plant stand topological structure and turn to step (3);
In step (1), the generation method of the node serial number is as follows:
Nd=zone number x1012+ plant stand number x 106+ voltage class number x 103+ initial point number;
Wherein, zone number, plant stand number, voltage class number are the intrinsic informations after model foundation, and initial point number is to draw
After station wiring diagram, according to the position of device type, equipment in the graphic, as unit of connection terminal, since 1 gradually backward
Arrangement.
2. provincial power grid device topology distribution construction method according to claim 1, which is characterized in that step
(2) in, the method for the fractionation is as follows:
Classify to armamentarium according to voltage class, it is assumed that with the voltage class of transformer medium voltage side to split boundary, that
The armamentarium for being higher than this voltage class is used to constitute high-pressure side topological structure, complete equal to or less than this voltage class
Portion's equipment is for constituting mesolow side topological structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610132720.2A CN105808850B (en) | 2016-03-09 | 2016-03-09 | A kind of provincial power grid device topology distribution construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610132720.2A CN105808850B (en) | 2016-03-09 | 2016-03-09 | A kind of provincial power grid device topology distribution construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105808850A CN105808850A (en) | 2016-07-27 |
CN105808850B true CN105808850B (en) | 2018-12-04 |
Family
ID=56467951
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610132720.2A Active CN105808850B (en) | 2016-03-09 | 2016-03-09 | A kind of provincial power grid device topology distribution construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105808850B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106570782A (en) * | 2016-10-26 | 2017-04-19 | 国家电网公司 | Power grid equipment topology data partitioned storage method and system |
CN114881809A (en) * | 2022-05-18 | 2022-08-09 | 广东电网有限责任公司 | Topological graph analysis method and device |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103066594A (en) * | 2012-12-20 | 2013-04-24 | 河南省电力公司 | Power grid risk pre-controlling method based on province power grid topology and city power grid topology and county power grid topology |
CN104810829A (en) * | 2015-05-26 | 2015-07-29 | 中国电力科学研究院 | Network structure simplification processing method for power distribution network reconstruction |
-
2016
- 2016-03-09 CN CN201610132720.2A patent/CN105808850B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103066594A (en) * | 2012-12-20 | 2013-04-24 | 河南省电力公司 | Power grid risk pre-controlling method based on province power grid topology and city power grid topology and county power grid topology |
CN104810829A (en) * | 2015-05-26 | 2015-07-29 | 中国电力科学研究院 | Network structure simplification processing method for power distribution network reconstruction |
Non-Patent Citations (2)
Title |
---|
"变电设备管理及电网拓扑分析研究";蒋超;《科技风》;20100430(第8期);正文第240页第3节 * |
"省地电网协同运行策略与实践";汤伟等;《中国电力》;20151231;第48卷(第12期);正文第154-160页第0,1,4节,图1,8 * |
Also Published As
Publication number | Publication date |
---|---|
CN105808850A (en) | 2016-07-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107069814B (en) | The Fuzzy Chance Constrained Programming method and system that distribution distributed generation resource capacity is layouted | |
CN105117518A (en) | Automatic drawing method and system for power distribution feeder single-line diagram of radiation connection mode | |
CN103903192B (en) | A kind of method for building up in power distribution network powering mode storehouse | |
CN106712079A (en) | New energy absorption capacity calculation method for regional power grid | |
CN105512472A (en) | Large-scale wind power base power influx system topology composition layered optimization design and optimization design method thereof | |
CN103997125A (en) | Energy-saving optimization dispatching system of multi-source power distribution network | |
CN104318326A (en) | Net rack optimizing model for improving renewable energy source acceptance ability | |
CN103093391A (en) | City power distribution network arranging method | |
CN104348158A (en) | Automatic generation method for coordinated control area in region-county integrated automatic voltage control | |
CN104123427A (en) | Regional distributed photovoltaic power generation system modeling method based on IEC61850 standard | |
CN105808850B (en) | A kind of provincial power grid device topology distribution construction method | |
CN108629499A (en) | A kind of power distribution network photovoltaic plant addressing constant volume method based on second order cone theazy | |
CN104134162B (en) | A kind of battalion auxiliary tone full electric network modeling method of integrated distributed power supply | |
CN104143119A (en) | Multi-scale layering honeycomb power transmission network and planning method thereof | |
CN103944166A (en) | Single transformer substation power supply mode set based regional power grid reconstruction method | |
CN205753445U (en) | On same soil, wind-solar complementary type generates electricity by way of merging two or more grid systems application apparatus | |
CN109671344A (en) | A kind of topological structure for direct current transmission and distribution constructional dynamic simulation experimental system | |
CN104134161A (en) | Power distribution network feeder line segment equivalent reduction method | |
CN203406614U (en) | Voltage reactive power control system of small hydropower concentrated area | |
Liang et al. | Engineering simulation analysis and demonstration application of multi-terminal DC distribution system | |
CN107134769B (en) | Power grid model boundary planning method | |
CN105048469B (en) | Photovoltaic generation multistage collects the automatic generation method of Grid model | |
CN214755551U (en) | New energy power generation grid-connected system | |
CN106451525A (en) | Application method and device for wind-solar complementary grid-connected generation on same piece of land | |
CN104993517B (en) | A kind of high reliability distribution network system of the power supply containing new energy |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |