CN105804696B - A kind of process of produced-water reinjection main line alternative expression snaking - Google Patents

A kind of process of produced-water reinjection main line alternative expression snaking Download PDF

Info

Publication number
CN105804696B
CN105804696B CN201610137976.2A CN201610137976A CN105804696B CN 105804696 B CN105804696 B CN 105804696B CN 201610137976 A CN201610137976 A CN 201610137976A CN 105804696 B CN105804696 B CN 105804696B
Authority
CN
China
Prior art keywords
pipeline
water
grade
cleaning solution
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610137976.2A
Other languages
Chinese (zh)
Other versions
CN105804696A (en
Inventor
唐海
何娟
吕栋梁
庞明越
邱志利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Petroleum University
Original Assignee
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Petroleum University filed Critical Southwest Petroleum University
Priority to CN201610137976.2A priority Critical patent/CN105804696B/en
Publication of CN105804696A publication Critical patent/CN105804696A/en
Application granted granted Critical
Publication of CN105804696B publication Critical patent/CN105804696B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/005Waste disposal systems
    • E21B41/0057Disposal of a fluid by injection into a subterranean formation
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/20Displacing by water

Abstract

The present invention discloses a kind of process of produced-water reinjection main line alternative expression snaking, comprises the following steps:A, the construct length of pipeline needed, pipeline internal diameter, pipeline volume, pipeline scaling situation, operation pressure, operational discharge capacity are collected;B, water-tank lorry, Hydraulic vehicle, hot car washing, pressure windmill are chosen;C, the pressure in pipeline is all discharged;D, by the way that windmill is pressed to blow out the water in pipeline;E, in-line injects preset liquid;F, the preset liquid in pipeline is cleaned out with clear water;G, in-line injects I grade of cleaning solution;H, and then again I grade of cleaning solution in pipeline is cleaned out with clear water;I, in-line injects II grade of cleaning solution;J, II grade of cleaning solution complete liquidation in pipeline is gone out with clear water after;K, step G to J is repeated according to pipeline scaling situation;L, in-line is blown into steel ball, is steeply risen if there is pressure, repeats step G to J, if not occurring, continues next step;M, displacement fluid clean-up line.

Description

A kind of process of produced-water reinjection main line alternative expression snaking
Technical field
The invention belongs to oil-field flooding technical field more particularly to a kind of technique sides of produced-water reinjection main line alternative expression snaking Method.
Background technology
The recovered water in oil field is the byproduct generated in oil extraction process, and crude oil is by three phase separator and settling tank Demulsification and natural subsidence effect, pure oil and recovered water are separated, and the recovered water after separation is by the elevator pump of cesspool to dirty Water pot adds the processing of the drugs such as fungicide, antisludging agent by natural subsidence and in surge tank, is carried out eventually by water injecting pump Purpose stratum is recycled into, achievees the purpose that recycling.Recovered water is mainly characterized by salinity height, and there are a certain amount of sewage to contain Oil and impurity, since the temperature of sewage operation is up to 48 DEG C, treated, and extraction water salinity variation is little, exists at the scene The problem of serious scale, water filling main line is caused to block and replace frequently, financial cost itself is high due to high pressure water injection pipeline, in addition The expenses such as related land reparation, artificial, extremely uneconomical and long construction period seriously affect being normally carried out for waterflood management work. In addition, the replacement emptying of water filling main line, makes the seriously polluted of on-site soil, environmentally friendly hidden danger is larger.
At present, due to there is mixed water injection of removing contamination in water injection technology, the dirty sample that scene is shown is a variety of mixing dirts, often The snaking technique of rule cannot effectively solve the problems, such as this, while also without a kind of snaking technique specifically for high pressure water injection main line Pin, number of patent application 201020588617.7 propose a kind of ultrasonic wave passivation on line device based on multi-purpose station sewage pipeline, But the thinking of the type is included in the electromagnetism preventing fouling used in gathering line, actual effect be it is barely satisfactory, not It can achieve the purpose that delay and solve fouling, while base operating personnel can not complete some technical things, not possess The economic value and potentiality of popularization.
The content of the invention
The technical problems to be solved by the invention are a kind of can to delay the service life of water filling main line and ensure high pressure injection The process of the produced-water reinjection main line alternative expression snaking of the normal economical operation of water main line.
Technical solution is used by the present invention solves above-mentioned technical problem:A kind of produced-water reinjection main line alternative expression snaking Process comprises the following steps:
A, the construct length of pipeline needed, pipeline internal diameter, pipeline volume, pipeline scaling situation, operation pressure, construction are collected Discharge capacity;
B, according to the above-mentioned data decimation water-tank lorry being collected into, Hydraulic vehicle, hot car washing, pressure windmill;
C, the pressure in pipeline is all discharged;
D, by the way that windmill is pressed all to purge out the water in pipeline, and water is all discharged into cesspool;
E, in-line injects 40 DEG C of preset liquid, and preset liquid in-line reacts 30 minutes;
F, the preset liquid complete liquidation in pipeline is gone out with 40 DEG C of clear water, and preset liquid and clear water is all discharged into In cesspool;
G, in-line injects 55 DEG C of I grade of cleaning solution, and reacts one hour;
H, and then again I grade of cleaning solution complete liquidation in pipeline is gone out with 55 DEG C of clear water, and by I grade of cleaning solution and clearly Water is all discharged into cesspool;
I, in-line injects 70 DEG C of II grade of cleaning solution, and reacts one hour;
J, II grade of cleaning solution complete liquidation in pipeline is gone out with 70 DEG C of clear water afterwards, and by II grade of cleaning solution and clear water All discharge into cesspool;
K, step G to J is repeated according to pipeline scaling situation;
L, in-line is blown into a steel ball more smaller than caliber after completing step K, and observes the pressure change in pipeline Situation if occurring the situation that pressure steeply rises in pipeline, repeats step G to J, if do not occur in pipeline pressure drastically on Situation about rising, then continue next step;
M, with discharge capacity it is finally 30m3/ h displacement fluids clean-up line 50 minutes.
It is further that the collection of the pipeline scaling situation comprises the following steps:
(1)According to the extraction water salinity and water type of block entirety, and the fouling account of the history of pipeline is used for reference, it is preliminary to judge Scaling type;
(2)It is 5% dilute hydrochloric acid to select volume fraction respectively again, and mass fraction is 1% silver nitrate solution and mass fraction is 1% barium chloride solution determines dirty type.
It is further that the preset liquid is Wax removing agent and the aqueous solution of demulsifier.
It is further that I grade of cleaning solution is hydrochloric acid and the aqueous solution of corrosion inhibiter.
It is further that II grade of cleaning solution is edta solution.
It is further that the displacement fluid is scale preventative aqueous solution.
It is further that the clear water in the step H and J is according to 25m3The amount of/h is run 10-15 minutes.
Beneficial effects of the present invention:Advantages of the present invention:1st, the resource of base's work unit and existing is taken full advantage of Process facility, it is workable;2nd, entire work progress, to the corrosion-free effect of pipeline;3rd, operation pressure is 7MPa or so, safe Coefficient is high, no hidden danger;4th, for sulfate and the existing situation of a variety of mixtures of carbonate, by the way of alternation response, The problem of equipment of mechanical scraper etc is not required, is reprocessed to pipeline, does not deposit failure and pipeline scratch, the time of cleaning is more It is short, it is more efficient;5th, snaking medium is divided into three phases, and prepad fluid cleans up sump oil remaining in pipeline, and displacement fluid uses anti- Dirty agent solution, plays protective effect, and guarantee is provided for the effect of snaking;6th, Trunk Line treated waste liquid is always in close Flow is closed, and dirt is precipitated as waste liquid enters cesspool, safety and environmental protection.
Description of the drawings
Fig. 1 is the process flow diagram of the embodiment of the present invention.
Shown in figure:1- import gate valves, 2- water injecting pumps, 3- outlets gate valve, 4- ball-and-seats, 5- water knockout drums, 6- pressure gauges, 7- Water filling arterial control gate valve, 8- flowmeters, 9- the second water filling arterial control gate valves, 10- come Water gate valve, 11- oil pressure gate valves, 12- Test plug, 13- pressed-on gate valves, 14- production gate valves, 15- emptying plugs, 16- emptying gate valves, 17- control gate valves, 18- casings Gate valve, 19- pressure-raising gate valves, 20- cesspools, 21- water knockout drums purging gate valve.
Specific embodiment
A kind of process of produced-water reinjection main line alternative expression snaking of the present invention, comprises the following steps:A, construction is collected The length of pipeline that needs, pipeline internal diameter, pipeline volume, pipeline scaling situation, operation pressure, operational discharge capacity;B, according to above-mentioned receipts Data decimation water-tank lorry, Hydraulic vehicle, hot car washing, the pressure windmill collected;C, the pressure in pipeline is all discharged;D, pressure is passed through Windmill all purges out the water in pipeline, and water is all discharged into cesspool;E, 40 DEG C of in-line injection is preset Liquid, and preset liquid in-line reacts 30 minutes;F, the preset liquid complete liquidation in pipeline is gone out with 40 DEG C of clear water, and Preset liquid and clear water are all discharged into cesspool;G, in-line injects 55 DEG C of I grade of cleaning solution, and reacts one hour;
H, and then again I grade of cleaning solution complete liquidation in pipeline is gone out with 55 DEG C of clear water, and by I grade of cleaning solution and clearly Water is all discharged into cesspool;I, in-line injects 70 DEG C of II grade of cleaning solution, and reacts one hour;J, it is rear with 70 DEG C Clear water goes out II grade of cleaning solution complete liquidation in pipeline, and II grade of cleaning solution and clear water are all discharged into cesspool; K, step G to J is repeated according to pipeline scaling situation;L, in-line is blown into a steel ball more smaller than caliber after completing step K, And the pressure changing in pipeline is observed, if occurring the situation that pressure steeply rises in pipeline, step G to J is repeated, if pipe Do not occur the situation that pressure steeply rises in line, then continue next step;M, with discharge capacity it is finally 30m3/ h displacement fluids rush Wash pipeline 50 minutes.
The above method uses the common instrument in construction site(Water-tank lorry, Hydraulic vehicle, hot car washing and related pressure windmill etc. Deng).At the scene, actual conditions are often the fouling that fouling is combined type, therefore single descaling agent is taken to be extremely difficult to ideal Effect, since fouling is a kind of chemical combination sediment of densification, tube wall conjugation is high, and time-consuming for the modes such as mechanical snaking, to pipe The damage of wall is big, is unfavorable for extending the service life of pipeline.Therefore, cleaning solution is divided into two-stage, the purpose of I grade of cleaning solution is that cleaning is attached It in carbonate scales such as the calcium carbonate of dirty sample outer layer of tube wall, the purpose of II grade of cleaning solution is that cleaning is attached to outside the dirty sample of tube wall The sulfate scales such as the barium sulfate of layer, progressive alternate mode of classifying gradually are removed the dirt finished on tube wall, and are repeated more Secondary, simultaneously because not chemically reacted between two-stage cleaning solution, stability is good.
The collection of the pipeline scaling situation comprises the following steps:(1)According to the extraction water salinity and water of block entirety Type, and the fouling account of the history of pipeline is used for reference, tentatively judge scaling type;(2)It is 5% dilute hydrochloric acid to select volume fraction respectively again, The barium chloride solution that mass fraction is 1% silver nitrate solution and mass fraction is 1% determines dirty type.
In order to improve scale removal effect, preferred embodiment is the preset liquid for the water-soluble of Wax removing agent and demulsifier Liquid, I grade of cleaning solution are the aqueous solution of hydrochloric acid and corrosion inhibiter, and II grade of cleaning solution is edta solution, institute Displacement fluid is stated as scale remover aqueous solution.
For rinsing well for pipeline, preferred embodiment is that the clear water in the step J and H is according to 25m3/h Amount run 10-15 minutes.
Invention is further described in detail with reference to the accompanying drawings and examples.
As shown in Figure 1, technological process:Water injecting pump 2 has import gate valve 1 and outlet gate valve 3, controls the disengaging of sewage, single Stream valve 4 ensures that waste liquid does not enter water injecting pump 2, and there are two main lines, i.e. water filling main line and reflux main line, water filling in the outlet of water knockout drum 5 Main line is made of water filling arterial control gate valve 7, the second water filling arterial control gate valve 9 and flowmeter 8, is noted sewage and is passed through main line Reach and come Water gate valve 10, oil pressure gate valve 11, test plug 12, pressed-on gate valve 13, production gate valve 14, emptying plug 15, emptying lock Valve 16, control gate valve 17, the wellhead of water injection well for covering sluice valve 18, and the main line that flows back is then to reach cesspool by pressure-raising gate valve 19 20。
Work progress:
First, Construction in Preparatory Stage.
(1)Construction parameter
Construction parameter includes following several:1st, construction water filling main line length and caliber calculate the volume of fouling pipeline;2、 Check the fouling condition of pipeline.According to the extraction water salinity and water type of block entirety, and use for reference the fouling history feelings of oil pipeline Condition, tentatively judges scaling type, selects a certain amount of volume fraction respectively as 5% dilute hydrochloric acid, and mass fraction is 1% silver nitrate solution And the barium chloride solution that mass fraction is 1%, determine dirt type.3rd, according to the region landform of pipe installation, day-to-day operation pressure feelings Condition calculates operation pressure and discharge capacity.4th, water injection technology flow is grasped, is switched in case carrying out flow.
(2)Site operation equipment selects.
The water of Reasonable Parameters is chosen according to situations such as the volume of pipeline, the thickness of fouling and type, operation pressure and discharge capacity Tank car, Hydraulic vehicle, hot car washing and related pressure windmill, operation pressure does not exceed 7MPa, therefore 400 generally for scene The Hydraulic vehicle of type and the hot car washing of routine and pressure windmill can be met the requirements, it is important to note that being related to tank car contains cleaning Liquid, tank car will carry out preservative treatment in advance.
(3)The preparation of snaking medium.
According to the volume of water filling main line, the thickness of fouling and type, determine preset liquid, I grade of cleaning solution, II grade of cleaning solution with And the concentration and volume of displacement fluid.
Secondly, the site operation stage.
The site operation stage should carry out related personnel, vehicle allocation and scene be responsible for etc. reach particular cases under into Row, main step are as follows:
(1)Stop water injecting pump 2, close import gate valve 1 and outlet gate valve 3, open Dalmatia gate valve 19, close wellhead of water injection well life Gate valve 14 is produced, pressure release is carried out, the pressure in pipeline is all discharged;
(2)It opens water filling arterial control gate valve 7, control gate valve 9, come Water gate valve 10, control gate valve 17, set sluice valve 18, Oil pressure gate valve 11, test plug 12, pressed-on gate valve 13 are closed, pressure windmill connection plug 15 starts blowing, the water in pipeline is blown To cesspool 20, until reach rational scope to pressure, the pressure in water filling pump house and the magneto-electric flow in pressure windmill, Until middle pressure windmill 0.5MPa or so, pressure gauge 6 and flowmeter 8 are 0.
(3)Substantial amounts of sump oil is usually present on the tube wall of water filling main line, it is therefore necessary to be carried out first using preset liquid Processing prevents sump oil from influencing scale removal effect.Mixed preset liquid is warmed to 40 DEG C or so using hot car washing, opens control lock Valve 9 comes Water gate valve 10, emptying gate valve 16, control gate valve 17, set sluice valve 18, connects hot car washing, passes through flowmeter 8 and hot wash Discharge capacity in vehicle judges whether pipeline is full of, and stops hot car washing, after reacting 30 minutes,
(4)Control gate valve 7 and pressure-raising gate valve 19 are opened again, are opened hot car washing, are pumped into a certain amount of mutually synthermal clear water Preset liquid in flow is driven to cesspool 20, and according to 10m3The amount of/h is run 10-15 minutes, it is ensured that the sump oil in pipeline It can obtain complete liquidation.
(5)()1. mixed I grade of cleaning solution is warmed to 55 DEG C or so using hot car washing, control gate valve 9, water are opened Gate valve 10, emptying gate valve 16, control gate valve 17, set sluice valve 18, connect hot car washing, pass through the row in flowmeter 8 and hot car washing Amount judges whether pipeline is full of, and stops hot car washing, reacts or so hour, the connector for pressing windmill is connected to water knockout drum 5 Water knockout drum purges gate valve 21, and I grade of cleaning solution in flow is replaced back to the tank car of former hot car washing, closes water knockout drum purging gate valve 21, control gate valve 7 and pressure-raising gate valve 19 are opened, hot car washing is opened, is pumped into a certain amount of mutually synthermal clear water by I in flow Grade cleaning solution is driven to cesspool 20, and according to 25m3The amount of/h is run 10-15 minutes, it is ensured that dirty sample table on water filling main line tube wall The carbonate dirt in face is sufficiently washed away.
(6)II grade of cleaning solution is warmed to 70 DEG C or so with hot car washing, control gate valve 9 is opened, comes Water gate valve 10, emptying Gate valve 16, control gate valve 17, set sluice valve 18, hot car washing is connected, pipeline is judged by the discharge capacity in flowmeter 8 and hot car washing Whether it is full of, stops hot car washing, react or so hour, the water knockout drum that the connector for pressing windmill is connected to water knockout drum 5 purges II grade of cleaning solution in flow is replaced back the tank car of former hot car washing by gate valve 21, is closed water knockout drum purging gate valve 21, is opened control Gate valve 7 and pressure-raising gate valve 19 open hot car washing, are pumped into a certain amount of mutually synthermal clear water and drive II grade of cleaning solution in flow It moves to cesspool 20, and according to 25m3The amount of/h is run 10-15 minutes, it is ensured that the sulfate on dirty sample surface on water filling main line tube wall Class dirt is sufficiently washed away.
So repeatedly, until the dirty sample on tube wall cleans out.From the point of view of the practice at scene, waterflood-transmission line is in portion Dividing oil field, general cycle 3-4 times can achieve the goal up to 0.5-2cm.
(7)The logical ball stage
Logical ball is the important means for examining scaling effect, and one steel ball more smaller than caliber is purged gate valve from water knockout drum 21 are put into, and open control gate valve 9, carry out Water gate valve 10, the water injection well plug for being vented 16 top of gate valve are laid down, from water knockout drum 5 Logical ball is purged to water injection well, pressure gauge 8 is observed, sees the situation of change of pressure, run into the situation that pressure steeply rises, it should be immediately Stop purging, after steel ball is purged, continue construction and repeat the above steps(5)、(6)If steel ball can pass through, step is carried out (8).
(8)Liquid waste processing
Hot car washing is connected, the waste liquid after construction is replaced into cesspool 20, further filtration treatment realizes useless Effective processing of liquid.
(9)Displacement fluid antiscale
Hot car washing is connected, according to above-mentioned technological process, displacement fluid is pumped into flow, while as scouring media, by remnants Dirty sample carry to cesspool 20, the discharge capacity 30m of process3/ h is run 50 minutes or so.
Finally, flow Restoration stage
Recover normal water injection technology flow, open water injecting pump 2, coordinate the addition of the daily scale preventative of website, observe pressure Situation of change, and make a record.
Above-described embodiment has the following advantages that:1st, the resource and existing technique for taking full advantage of base's work unit are set It applies, it is workable;2nd, entire work progress, to the corrosion-free effect of pipeline;3rd, operation pressure is for 7MPa or so, safety coefficient Height, no hidden danger;4th, for sulfate and the existing situation of a variety of mixtures of carbonate, by the way of alternation response, it is not required to Will mechanical scraper etc equipment, pipeline is reprocessed, does not deposit failure and the problem of pipeline scratches, the time of cleaning is shorter, It is more efficient;5th, snaking medium is divided into three phases, and prepad fluid cleans up sump oil remaining in pipeline, and displacement fluid uses scale preventative Solution plays protective effect, and guarantee is provided for the effect of snaking;6th, Trunk Line treated waste liquid is in closed stream always Journey, and dirt is precipitated as waste liquid enters cesspool, safety and environmental protection.

Claims (3)

1. a kind of process of produced-water reinjection main line alternative expression snaking, which is characterized in that comprise the following steps:
A, the length of pipeline needed of constructing, pipeline internal diameter, pipeline volume, pipeline scaling situation, operation pressure, construction row are collected Amount;
B, according to the above-mentioned data decimation water-tank lorry being collected into, Hydraulic vehicle, hot car washing, pressure windmill;
C, the pressure in pipeline is all discharged;
D, by the way that windmill is pressed all to purge out the water in pipeline, and water is all discharged into cesspool;
E, in-line injects 40 DEG C of preset liquid, and preset liquid in-line reacts 30 minutes;
F, the preset liquid complete liquidation in pipeline is gone out with 40 DEG C of clear water, and preset liquid and clear water is all discharged into sewage In pond;
G, in-line injects 55 DEG C of I grade of cleaning solution, and reacts one hour;
H, and then again I grade of cleaning solution complete liquidation in pipeline is gone out with 55 DEG C of clear water, and I grade of cleaning solution and clear water is equal All discharge into cesspool;
I, in-line injects 70 DEG C of II grade of cleaning solution, and reacts one hour;
J, II grade of cleaning solution complete liquidation in pipeline is gone out with 70 DEG C of clear water afterwards, and II grade of cleaning solution and clear water is complete Portion is discharged into cesspool;
K, step G to J is repeated according to pipeline scaling situation;
L, in-line is blown into a steel ball more smaller than caliber after completing step K, and observes the pressure changing in pipeline, If occurring the situation that pressure steeply rises in pipeline, step G to J is repeated, if not occurring what pressure steeply rose in pipeline Situation then continues next step;
M, with discharge capacity it is finally 30m3/ h displacement fluids clean-up line 50 minutes;
The preset liquid is Wax removing agent and the aqueous solution of demulsifier;
I grade of cleaning solution is hydrochloric acid and the aqueous solution of corrosion inhibiter;
II grade of cleaning solution is edta solution;
The displacement fluid is scale preventative aqueous solution.
2. the process of a kind of produced-water reinjection main line alternative expression snaking according to claim 1, which is characterized in that described The collection of pipeline scaling situation comprises the following steps:
(1)According to the extraction water salinity and water type of block entirety, and the fouling account of the history of pipeline is used for reference, tentatively judge fouling Type;
(2)It is 5% dilute hydrochloric acid to select volume fraction respectively again, and mass fraction is 1% silver nitrate solution and mass fraction is 1% Barium chloride solution determines dirty type.
3. the process of a kind of produced-water reinjection main line alternative expression snaking according to claim 2, which is characterized in that described Clear water in step H and J is according to 25m3The amount of/h is run 10-15 minutes.
CN201610137976.2A 2016-03-11 2016-03-11 A kind of process of produced-water reinjection main line alternative expression snaking Expired - Fee Related CN105804696B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610137976.2A CN105804696B (en) 2016-03-11 2016-03-11 A kind of process of produced-water reinjection main line alternative expression snaking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610137976.2A CN105804696B (en) 2016-03-11 2016-03-11 A kind of process of produced-water reinjection main line alternative expression snaking

Publications (2)

Publication Number Publication Date
CN105804696A CN105804696A (en) 2016-07-27
CN105804696B true CN105804696B (en) 2018-05-18

Family

ID=56467084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610137976.2A Expired - Fee Related CN105804696B (en) 2016-03-11 2016-03-11 A kind of process of produced-water reinjection main line alternative expression snaking

Country Status (1)

Country Link
CN (1) CN105804696B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485975A (en) * 2019-07-29 2019-11-22 西南石油大学 A kind of horizontal well acidizing large scale acidizing wormhole simulator and experimental method
CN111236900B (en) * 2020-01-08 2021-11-05 西南石油大学 Wellhead backflow system and method for oil field water injection well

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9920970D0 (en) * 1999-09-06 1999-11-10 Astec Dev Ltd Casing/pipeline cleaning tool
CN101525986B (en) * 2009-04-20 2012-03-07 中国石油天然气股份有限公司 Method for removing sulfate radical from injected water in oil field for anti-scaling
CN101671552B (en) * 2009-09-28 2012-05-16 大庆油田有限责任公司 Silicate scale clearing agent for ternary combination flooding extraction well
US9353609B2 (en) * 2010-05-04 2016-05-31 Nw24 Holdings, Llc Method and composition for remedial treatment of parafin, asphaltenes, scale and deposits in oil and gas infrastructure and subterranean formations
CN101864575B (en) * 2010-06-27 2012-02-29 金宏 Special cleaning agent for stainless steel equipment and use method thereof
CN102519301A (en) * 2011-12-09 2012-06-27 贵州开磷(集团)有限责任公司 Method for washing scales formed on tube of graphite heat exchanger
CN103820150A (en) * 2014-03-14 2014-05-28 西安石油大学 Barium sulfate and strontium sulfate descaling agent and preparation method thereof

Also Published As

Publication number Publication date
CN105804696A (en) 2016-07-27

Similar Documents

Publication Publication Date Title
CN102828734B (en) Offshore oilfield water injection well online one-step-process acidification technology
CN104445693B (en) The production unit of emulsion dedicated water is joined under a kind of mine
CN109252820A (en) A kind of method of the efficient row's of the returning coal dust of coal bed gas well
CN1831295A (en) Technology method for deblock of oil field oil-water well using biological acid
CN105804696B (en) A kind of process of produced-water reinjection main line alternative expression snaking
CN206205861U (en) One kind is for oil well operation environment-protecting clean retracting device
CN104265213A (en) Closed well washing water recycling equipment
JP6242097B2 (en) Underground drainage pump equipment
AU2011376105B2 (en) Arrangement for sand collection
CN203530040U (en) Skid-mounted multifunctional integrated oilfield water treatment device
CN110818182B (en) Environment-friendly sewage treatment plant
CN206053907U (en) A kind of water injection well chemicals dosing plant
RU126802U1 (en) MULTI-PHASE MIXTURE TRANSMISSION AND SEPARATION STATION
CN203515400U (en) Treatment system for offshore oilfield oil well acidification discharge liquor
CN212642683U (en) Sand remover
CN204182496U (en) Oil-containing mud sand washed-out sand degreasing unit
CN212270005U (en) Workover oil stain recovery processing device
CN112664154A (en) Filter and oil well blockage removing method based on filter
CN204200125U (en) A kind of closed well washing water circulation treatment facility
CN201305521Y (en) Novel wellhead treatment device with water injection well-flushing fluid
CN207437010U (en) A kind of oil-water well downhole hydraulic rotational flow flushing device
CN217652705U (en) Online cleaning device
CN111841227A (en) High-pressure fine cyclone filtering and desanding system
CN205701766U (en) Underground work devil liquor recovery tank truck inner wall automatic clearing apparatus
CN215057298U (en) Fracturing wellhead device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180518

Termination date: 20190311