CN105804030A - 一种整定爆破膜启爆压力的方法 - Google Patents

一种整定爆破膜启爆压力的方法 Download PDF

Info

Publication number
CN105804030A
CN105804030A CN201610144942.6A CN201610144942A CN105804030A CN 105804030 A CN105804030 A CN 105804030A CN 201610144942 A CN201610144942 A CN 201610144942A CN 105804030 A CN105804030 A CN 105804030A
Authority
CN
China
Prior art keywords
rupture disk
opens
pressure power
detonation pressure
rupture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610144942.6A
Other languages
English (en)
Other versions
CN105804030B (zh
Inventor
陈�胜
张健
俞晓东
刘甲春
苗帝
崔伟杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201610144942.6A priority Critical patent/CN105804030B/zh
Publication of CN105804030A publication Critical patent/CN105804030A/zh
Application granted granted Critical
Publication of CN105804030B publication Critical patent/CN105804030B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B9/00Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
    • E02B9/02Water-ways
    • E02B9/06Pressure galleries or pressure conduits; Galleries specially adapted to house pressure conduits; Means specially adapted for use therewith, e.g. housings, valves, gates
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Safety Valves (AREA)

Abstract

本发明公开了一种整定爆破膜启爆压力的方法,揭示了对爆破膜启爆压力起决定性作用的三个主要因素,并定性的推导出爆破膜启爆压力的整定方法,对于设置多级爆破膜的水电站,给出了各级爆破膜启爆压力的整定原则。本发明在采用爆破膜作为水锤防护措施的水电站工程设计中可以提供理论基础,便捷的用于爆破膜的设置,而省略繁琐的过渡过程数值模拟计算,从而完善中小型水电站采用爆破膜作为水锤防护措施的设计技术体系,具有非常大的应用前景。

Description

一种整定爆破膜启爆压力的方法
技术领域
本发明涉及一种整定爆破膜启爆压力的方法,属于水利水电工程领域。
背景技术
调压室的功用是缩短压力管道或尾水管道的长度,优化增减负荷时的各种特征参数指标,对提高电站的运行安全性、供电质量有着不可忽视的作用。但调压室一般尺寸较大,造价较高,尤其地下式电站对围岩稳定和支护影响较大。有时受到地形地质条件的限制,亦难以在合适的位置建造调压井。对于中小型水电工程来说,由于其水道较长、水体惯性较大,极易发生直接水锤事故,故对于这一类中小型电站为降低工程造价,满足调保要求,采用爆破膜方案取代调压井方案(即“以膜代井”方案)具有较明显的优势,因而在国内外一些长引水管道的中小型电站上,爆破膜得到了普遍应用。爆破膜是用机械装置代替调压井的一项研究成果,其工作原理是:将一组经过严格计算、准确制造加工的金属膜片,安装在压力管道末端,作为人为给定的薄弱环节(如图1所示)。当机组突然甩负荷,水压力上升达到整定值时,膜片爆破,泄放流量,压力下降。如果泄量不够,随着导叶的继续关闭,水压力再次上升,当达到整定的爆破压力时,又有其他膜片相继爆破,泄流面积增大,使整个引水系统各部分的水压力均控制在允许值以内。由于水压力得到有效控制,导叶关闭时间可缩短,从而使机组的转速升高亦控制在允许值以内。一般情况下,爆破膜结构如图1所示,包括压力钢管1和支管2,在支管末端设置爆破膜3并用螺栓等紧固件4将爆破膜固定。
但目前爆破膜设置相关技术体系还不够完善,限制了爆破膜防护措施的应用。其中,爆破膜启爆压力的整定就是爆破膜设置技术体系中的一个薄弱环节。爆破膜的启爆压力是指作用在爆破膜孔口的测压管水头差达到了膜片的极限值而爆破的压力值,启爆压力的整定则是确定这个压力值并为厂家提供设计依据的工作。爆破膜的启爆压力是正确设置爆破膜调保措施的一个极为重要参数,但前人所作的研究中,并没有对这个问题太过重视,亦没有给出相应的整定方法或准则,大多认为爆破膜的爆破压力应小于设计规定的蜗壳压力,但仅仅凭启爆压力HB小于规定的蜗壳压力这一非常粗略的条件是不足以正确整定出启爆压力的。并且,爆破膜不能同级备用,即如果设置多片爆破膜,各爆破膜的爆破压力一致,其效果相当于设置直径更大的爆破膜,启爆后产生的负压波传至上游可能造成上游压力隧洞失事。显然,如若启爆压力整定出错,则会影响爆破膜的水锤防护效果,甚至给将来应用此项不成熟技术的电站埋下安全隐患。
发明内容
针对当前爆破膜设置技术体系中存在的理论缺陷,爆破膜启爆压力的整定这一关键性问题,本发明旨在对爆破膜启爆压力整定起决定性的几个因素进行了研究,并定性的给出启爆压力大小的整定方法,可便捷的用于爆破膜的设置,而省略繁琐的过渡过程数值模拟计算,从而完善中小型水电站采用爆破膜作为水锤防护措施的设计技术体系。
为了解决上述技术问题,本发明采用如下的技术方案:
步骤一,确定爆破膜启爆压力的主要影响因素;
步骤二,推导爆破膜启爆压力整定的计算公式;
步骤三,整定各级爆破膜启爆压力。
具体地,所述步骤一中影响爆破膜启爆压力的三个主要因素分别为:(1)升压波传至爆破膜及降压波传至机组过程中的水头损失;(2)设升压波传至爆破膜的时间t1,爆破膜爆破后产生的降压波传至机组的时间t2,在t1+t2时间内蜗壳末端的压力上升值;(3)由膜片制作工艺及误差所需留有的安全裕量。
具体地,所述步骤二中爆破膜启爆压力整定的计算公式为
H 1 = H m a x + h f 0 - 2 kL 1 a 1 - [ H ]
其中,H1为爆破膜最高一级的启爆压力;Hmax为规定的蜗壳末端最大压力;hf0为恒定状态下爆破膜至机组总的水头损失;[H]为留有的安全裕量,其取值可根据膜片制作工艺及误差而定;L1为爆破膜位置距机组的距离;a1为水锤波的波速;k为初始阶段水锤压力上升斜率。
具体地,爆破膜不能同级备用,在设置多级爆破膜时,低一级的启爆压力应比高一级的小一安全值,所述步骤三中各级爆破膜启爆压力的整定方法为
H1′=H1-a,H1″=H1′-aL
其中,a为各级启爆压力间的安全差值;H1′为第二级启爆压力;H1″为第三级启爆压力;...
上述爆破膜启爆压力的影响因素及启爆压力的整定方法推算过程如下:
根据水力学的相关知识,机组正常运行的恒定流状态下,任一时刻都有
HC=HB-hf(1)
式中,HC为阀门(或机组)节点处的测压管水头;HB为爆破膜安装节点处的测压管水头;hf为阀门(或机组)节点至爆破膜节点间的水头损失。故爆破膜启爆压力的整定首先需考虑水头损失的影响。
其次,在机组事故甩负荷后,蜗壳末端压力随着导叶的关闭急速上升,且产生的升压波源源不断的向爆破膜传去,当传至爆破膜前的测压管水头达到整定的启爆压力时,爆破膜爆破泄水降压(见图2)。因此,在升压波及降压波传播的过程中,蜗壳末端的压力上升需纳入考虑范围。
再者,考虑到爆破膜片制作工艺和材料均匀性的差别以及公式整定的误差,启爆压力的整定亦需留有一定的安全裕量。
综上所述,爆破膜的启爆压力至少由以下三因素决定:(1)升压波传至爆破膜及降压波传至机组过程中的水头损失(压力衰减忽略不计);(2)设升压波传至爆破膜的时间t1,爆破膜爆破后产生的降压波传至机组的时间t2,在t1+t2时间内蜗壳末端的压力上升值;(3)留有一定的安全裕量。因此,有
Hmax+hf=H1+ΔH+[H](2)
式中,Hmax为规定的蜗壳末端最大压力;H1为爆破膜启爆压力;[H]为留有的安全裕量,其取值可根据膜片制作工艺及误差而定;hf为非恒定状态下的水头损失,包括沿程水头损失和局部水头损失,主要是三岔管及阀门处的局部水头损失,可由恒定状态下的水头损失近似计算,设恒定状态下爆破膜至机组总的水头损失为hf0,则hf=hf0;ΔH为t1+t2时间内蜗壳末端的压力上升值,由爆破膜位置距机组的距离L1、波速a1及压力上升斜率k共同决定,故
Δ H = 2 kL 1 a 1 - - - ( 3 )
2L1/a1一般小于2s,故在此时间段内,蜗壳末端的压力上升可近似认为是直线上升的。
联立式(2)及式(3)可得
H 1 = H m a x + h f 0 - 2 kL 1 a 1 - [ H ] - - - ( 4 )
式(4)即为爆破膜启爆压力整定的近似估算公式。
另外,虽然爆破膜能够在瞬间解决管道压力过大的问题,但同时也带来了一个非常严峻的问题,由于爆破膜是瞬间启爆,类似于管道发生爆管事故,如设置不当将在管道产生直接负水锤,爆破膜虽然保护了机组附近管道系统,但对远离机组的管道,尤其是上游的压力隧洞,初始工作压力较低,一旦不能有效消除爆破膜启爆时产生的负压,就可能造成上游压力隧洞失事。故爆破膜的膜片直径不宜过大,不能同级备用,即当安装一片爆破膜能够满足要求时,不能再加装一个同样启爆压力的膜片作为备用,且不可随意增加膜片数量。在实际工程中,一般设置一片爆破膜是不够的,公式(4)实际上确定的是最高一级的爆破膜启爆压力,低一级的启爆压力应比高一级的小一安全值a,此值宜根据膜片的制造工艺确定,即
H1′=H1-a,H1″=H1′-aL(5)
有益效果:本发明对比已有技术,揭示了影响爆破膜启爆压力的三个主要因素,成功地给出了爆破膜启爆压力的整定方法。本发明在采用爆破膜作为水锤防护措施的水电站工程设计中可以提供理论基础,便捷的用于爆破膜的设置,而省略繁琐的过渡过程数值模拟计算,从而完善中小型水电站采用爆破膜作为水锤防护措施的设计技术体系,具有非常大的应用前景。
附图说明
图1为爆破膜布置简图;
图2为爆破膜启爆降压原理图;
图3为本发明实施例某实际电站输水系统布置简图;
图4为本发明实施例选定方案(膜径0.20m)蜗壳末端及各爆破膜前压力变化过程;
图5为本发明实施例不同启爆压力设置下A点水锤压力变化过程线。
图中:压力钢管1,压力支管2,爆破膜3,螺栓等紧固件4,上游水库5,上游闸门井6,上平段末7,水轮机组8,下游水库9。
具体实施方式
图3为国内某实际电站输水系统布置简图,图中依次布置有上游水库5,上游闸门井6,上平段末7,压力钢管1,压力支管2,爆破膜3,水轮机组8,下游水库9。该电站采用“一洞两机”的布置型式,基本参数为:装机容量为2×3.125MW,额定水头183.00m,额定流量2.085m3/s,额定转速1000r/min;引水管道直径1.80m,引水道长约6578.82m,支管直径0.7m,长47.6m,爆破膜支路管径0.7m,长约20.0m。上库最高水位1467.98m,正常蓄水位1467.60m;下库正常尾水位1271.23m,最低尾水位1270.68m。机组9s一段直线关闭,现采用爆破膜作为调节保证措施。根据相关设计规范,采用爆破膜时的调节保证计算控制标准为:输水管路中沿程最小压力大于2.0m;机组最大转速上升率不超过额定转速的55.0%;蜗壳最大压力控制值Hmax=255.0m。
爆破膜不动作的前提下,爆破膜前初始压力HB0=199.08m,1#(2#)机组蜗壳末端初始压力HC0=183.25m,t=4s内机组蜗壳末端压力升至HC1=283.69m,压力波从机组传至爆破膜所需时间约t1=0.6s。则
hf0=HB0-HC0=199.08-183.25=15.83m
ΔH=2(HC1-HC0)t1/t=2×(283.69-183.25)×0.6/4=30.13m
若不考虑预留裕量,则基于上述计算结果,利用式(4)便可得到爆破膜最高一级的启爆压力
H1=Hmax+hf0-ΔH-[H]=255.0+15.83-30.13=240.7m
设预留裕量[H]=0.7m,则
H1=240.7-0.7=240.0m
考虑膜片间安全值a=5.0m,则第二级,第三级…爆破压力有
H1′=H1-a=240.0-5.0=235.0mH1″=H1′-a=235.0-5.0=230.0m…
表1给出了按照传统爆破膜启爆压力设置和按照本发明设置启爆压力下的计算结果。当将4片0.2m的爆破膜启爆压力均整定为240.0m时,4片爆破膜同时启爆会产生相当大的负压波,由于隧洞A点初始压力较低,使得A点的最低压力达到-31.15m(此时水体早已汽化),从而导致隧洞失事坍塌。而若按照本发明所述方法设置,则即能保证机组处的最大压力及转速满足调保要求,也能保证整个输水管道最小压力满足要求,结果如图4~图5所示。相应计算结果说明,爆破膜不可同级备用,各级启爆压力之间应存在一差值,避免所设置的爆破膜同时启爆,产生过大的负压波,造成上游引水隧洞失事。
表1不同爆破膜启爆压力设置及关键参数计算结果
注:A点为输水系统出现最小压力的上平段末节点。
以上结合附图对本发明的实施方式做出详细说明,但本发明不局限于所描述的实施方式。对本领域的普通技术人员而言,在本发明的原理和技术思想的范围内,对这些实施方式进行多种变化、修改、替换和变形仍落入本发明的保护范围内。

Claims (5)

1.一种整定爆破膜启爆压力的方法,其特征在于包括以下步骤:
步骤一,确定爆破膜启爆压力的主要影响因素;
步骤二,推导爆破膜启爆压力整定的计算公式;
步骤三,整定各级爆破膜启爆压力。
2.根据权利要求1所述的一种整定爆破膜启爆压力的方法,其特征在于:所述步骤一中影响爆破膜启爆压力的三个主要影响因素分别为:1、升压波传至爆破膜及降压波传至机组过程中的水头损失;2、设升压波传至爆破膜的时间t1,爆破膜爆破后产生的降压波传至机组的时间t2,在t1+t2时间内蜗壳末端的压力上升值;3、由膜片制作工艺及误差所需留有的安全裕量。
3.根据权利要求1所述的一种整定爆破膜启爆压力的方法,其特征在于:所述步骤二中爆破膜启爆压力整定的计算公式为
H 1 = H m a x + h f 0 - 2 kL 1 a 1 - [ H ]
其中,H1为爆破膜最高一级的启爆压力;Hmax为规定的蜗壳末端最大压力;hf0为恒定状态下爆破膜至机组总的水头损失;[H]为留有的安全裕量,其取值根据膜片制作工艺及误差而定;L1为爆破膜位置距机组的距离;a1为水锤波的波速;k为初始阶段水锤压力上升斜率。
4.根据权利要求1所述的一种整定爆破膜启爆压力的方法,其特征在于:爆破膜不能同级备用,在设置多级爆破膜时,低一级的启爆压力应比高一级的小一安全值,此安全值宜根据膜片的制造工艺确定。
5.根据权利要求4所述的一种整定爆破膜启爆压力的方法,其特征在于:所述步骤三中各级爆破膜启爆压力的整定方法为
H1′=H1-a,H1″=H1′-aL
其中,a为各级启爆压力间的安全差值;H1′为第二级启爆压力;H1″为第三级启爆压力。
CN201610144942.6A 2016-03-14 2016-03-14 一种整定爆破膜启爆压力的方法 Active CN105804030B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610144942.6A CN105804030B (zh) 2016-03-14 2016-03-14 一种整定爆破膜启爆压力的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610144942.6A CN105804030B (zh) 2016-03-14 2016-03-14 一种整定爆破膜启爆压力的方法

Publications (2)

Publication Number Publication Date
CN105804030A true CN105804030A (zh) 2016-07-27
CN105804030B CN105804030B (zh) 2017-10-27

Family

ID=56468333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610144942.6A Active CN105804030B (zh) 2016-03-14 2016-03-14 一种整定爆破膜启爆压力的方法

Country Status (1)

Country Link
CN (1) CN105804030B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107590328A (zh) * 2017-09-01 2018-01-16 中国航空工业集团公司沈阳空气动力研究所 一种模拟进气道锤激波发生过程的爆破膜片选型计算方法
CN109443964A (zh) * 2018-10-23 2019-03-08 岭东核电有限公司 蒸汽发生器管束磨损评估方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6382233B1 (en) * 1999-06-18 2002-05-07 Yandle, Ii S. Elwood Plastic hydraulic hammer reduction system
US20120000548A1 (en) * 2009-08-27 2012-01-05 Oklahoma Safety Equipment Company, Inc. Rupture disk
CN203656302U (zh) * 2014-01-02 2014-06-18 北京同心天承环境科技有限公司 一种爆破膜
CN203718085U (zh) * 2013-12-10 2014-07-16 上海雷林工程技术有限公司 一种焊接在主排汽管道上的爆破门装置
CN104929087A (zh) * 2015-06-22 2015-09-23 西华大学 一种阻尼阻抗式调压装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6382233B1 (en) * 1999-06-18 2002-05-07 Yandle, Ii S. Elwood Plastic hydraulic hammer reduction system
US20120000548A1 (en) * 2009-08-27 2012-01-05 Oklahoma Safety Equipment Company, Inc. Rupture disk
CN203718085U (zh) * 2013-12-10 2014-07-16 上海雷林工程技术有限公司 一种焊接在主排汽管道上的爆破门装置
CN203656302U (zh) * 2014-01-02 2014-06-18 北京同心天承环境科技有限公司 一种爆破膜
CN104929087A (zh) * 2015-06-22 2015-09-23 西华大学 一种阻尼阻抗式调压装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
倪福生等: ""水电站用爆破膜取代调压塔的设计方法"", 《水利水电技术》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107590328A (zh) * 2017-09-01 2018-01-16 中国航空工业集团公司沈阳空气动力研究所 一种模拟进气道锤激波发生过程的爆破膜片选型计算方法
CN107590328B (zh) * 2017-09-01 2019-10-25 中国航空工业集团公司沈阳空气动力研究所 一种模拟进气道锤激波发生过程的爆破膜片选型计算方法
CN109443964A (zh) * 2018-10-23 2019-03-08 岭东核电有限公司 蒸汽发生器管束磨损评估方法
CN109443964B (zh) * 2018-10-23 2021-03-02 岭东核电有限公司 蒸汽发生器管束磨损评估方法

Also Published As

Publication number Publication date
CN105804030B (zh) 2017-10-27

Similar Documents

Publication Publication Date Title
JP2022132705A (ja) 改良された可逆ポンプタービン敷設
CN100368633C (zh) 船闸电能产生的方法和系统
CN106499005B (zh) 一种给水泵站反馈控制系统
CN102317616A (zh) 大气压力水力发电厂
CN202323895U (zh) 用于阶梯式水利枢纽的尾水渠结构
CN105804030A (zh) 一种整定爆破膜启爆压力的方法
Kheav et al. Transient analysis to air chamber and orifice surge tanks in a hydroelectric generating system during the successive load rejection
CN208604556U (zh) 用于特高堆石坝的多功能生态供水洞布置结构
CN111441896A (zh) 一种水电站消除水力过渡过程压力升高的系统及方法
CN106443278B (zh) 抽水蓄能电站首机首次启动试验方法
CN107419789A (zh) 尾水位较高河流的水轮发电机组的排水系统及排水方法
CN112900384A (zh) 一种适用于tbm施工的水电站引水斜井布置结构及方法
CN205134292U (zh) 高拱坝施工导流洞结构
CN206157690U (zh) 一种上水库充水及排水系统
CN103821115B (zh) 一种解决水电站无压引水隧洞出现明满流的方法
CN105736219A (zh) 一种虹吸式发电系统
CN206752427U (zh) 一种水电站地面厂房尾水出口结构及其水电站
CN210396745U (zh) 一种适于tbm施工的抽水蓄能硐室
CN212003288U (zh) 一种基于高密度介质维持压力恒定的发电系统
CN112726491A (zh) 一种复合式流量控制及能源回收系统
CN208899441U (zh) 用于水利发电工程的发电厂房布置结构
CN207092036U (zh) 一种水电站引水系统布置型式
CN113051644B (zh) 一种适用于tbm施工的水电站引水斜井开挖直径的确定方法
Berlin et al. Search for the Optimal Structural Solution of the Pressure System with the Surge Tank of the Bokang-Baling HPP
CN214695483U (zh) 一种水电站引水斜井布置结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant