CN105787815A - Method and system for screening N-2 fault - Google Patents

Method and system for screening N-2 fault Download PDF

Info

Publication number
CN105787815A
CN105787815A CN201610168704.9A CN201610168704A CN105787815A CN 105787815 A CN105787815 A CN 105787815A CN 201610168704 A CN201610168704 A CN 201610168704A CN 105787815 A CN105787815 A CN 105787815A
Authority
CN
China
Prior art keywords
branch road
residue
cut
overload
contribution rate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610168704.9A
Other languages
Chinese (zh)
Other versions
CN105787815B (en
Inventor
莫文雄
游大海
栾乐
陈国炎
龙呈
张峰
王刚
黄�俊
张哲�
雷超平
李光茂
许中
肖天为
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huazhong University of Science and Technology
Guangzhou Power Supply Bureau Co Ltd
Original Assignee
Huazhong University of Science and Technology
Guangzhou Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huazhong University of Science and Technology, Guangzhou Power Supply Bureau Co Ltd filed Critical Huazhong University of Science and Technology
Priority to CN201610168704.9A priority Critical patent/CN105787815B/en
Publication of CN105787815A publication Critical patent/CN105787815A/en
Application granted granted Critical
Publication of CN105787815B publication Critical patent/CN105787815B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/10Complex mathematical operations
    • G06F17/16Matrix or vector computation, e.g. matrix-matrix or matrix-vector multiplication, matrix factorization

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Mathematical Physics (AREA)
  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Mathematical Analysis (AREA)
  • Economics (AREA)
  • Computational Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Pure & Applied Mathematics (AREA)
  • Mathematical Optimization (AREA)
  • Software Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Databases & Information Systems (AREA)
  • Algebra (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Computing Systems (AREA)

Abstract

The invention relates to a method and a system for screening an N-2 fault. An active power limit value for each branch in the power grid, active power variations before and after breaking of each remaining branch for a target branch and an active power value before breaking of each remaining branch for the target branch are acquired firstly; according to the above three values, an overload contribution rate for the target branch by breaking of each remaining branch is acquired respectively; the remaining branches are grouped according to the overload contribution rates, two branches whose overload contribution rate sum is no smaller than an overload contribution rate standard value are screened according to the grouped condition, and an N-2 fault is obtained. By adopting the scheme of the invention, each possible combination of two branches does not need to be screened, grouped screening is carried out according to the grouped condition, the huge amount of computation which is difficult to calculate caused by combination explosion can be avoided, and the computation amount for power grid risk analysis is greatly reduced.

Description

The screening technique of N-2 fault and system
Technical field
The present invention relates to power grid security risk field, particularly relate to screening technique and the system of N-2 fault.
Background technology
Along with new forms of energy and the introducing of electricity market, and the load sharply increased, the safe operation face of electrical network Face bigger challenge.Owing to multiple failure has considerable influence to the safe operation of electrical network, relevant departments are Through having formulated corresponding rules and regulation, it is desirable to when the more much higher heavy fault of electrical network probability of happening, should ensure that , the most there is not the phenomenons such as branch road overload, cutting load in electrical network properly functioning.But, despite accordingly Code, but it is to be resolved to still suffer from many problems on technology realizes.One of them important problem is When multiple failure is analyzed, the multiple forecast failure enormous amount caused due to multiple shot array, formed and be difficult to process Data computation burden, considerably limit the power grid security risk analysis of real-time online.Therefore, modern electric System is badly in need of a multiple failure screening technique fast and efficiently, establishes base for online power grid risk analysis Plinth.
At present, the screening of excessive risk fault is studied by existing many scholars.Generally speaking, substantially may be used To be divided into two classes, a class is to concentrate from the suitable forecast accident of the probability that breaks down that to filter out consequence degree higher Fault, two classes are to concentrate from the forecast accident that consequence degree is suitable to filter out the fault that probability of happening is higher.According to Characterize the difference of index of damage sequence degree, first kind method can be divided into again dynamic security index method and quiet State safety index method.Mostly these methods are to investigate each forecast accident respectively, then general by simplify Rate computational methods or simply spend index, filter out fault.Its common problem is due to multiple shot array, treats Investigation forecast accident enormous amount, the method for calculating probability simplified despite the use of or degree index, but its efficiency It is still the lowest, it is impossible to meet the online evaluation of power grid security risk.
Summary of the invention
Based on this, it is necessary to excessive for data computation burden in existing Contingency screening method, inefficient Problem, it is provided that the screening technique of a kind of N-2 fault and system.
The screening technique of a kind of N-2 fault, comprises the following steps:
Obtain the active power limiting value of Targeted Tributary in electrical network;
Obtain Targeted Tributary each active power variable quantity remained before and after branch road cut-offs respectively and target in electrical network Branch road active power value before each residue branch road cut-offs respectively;
According to active power limiting value, each meritorious power variation and the active power value of each Targeted Tributary, point Do not obtain each residue branch breaking overload contribution rate to Targeted Tributary;
According to default overload contribution rate is interval, each residue branch road is grouped, it is thus achieved that residue branch road group;
In the residue branch road group more than or equal to the first overload contribution rate boundary value preset, filter out mesh The overload contribution rate sum of mark branch road is more than or equal to two first residues of the overload contribution rate standard value preset Two first residue branch roads are cut-off simultaneously are considered as N-2 fault by branch road;
One article the is filtered out in the residue branch road group more than or equal to the second overload contribution rate boundary value preset Two residue branch roads, screen in the residue branch road group less than or equal to the 3rd overload contribution rate boundary value preset Go out one article of the 3rd residue branch road, make the second residue branch road that overload contribution rate and the 3rd residue of Targeted Tributary to be propped up Targeted Tributary is transshipped contribution rate sum more than or equal to the overload contribution rate standard value preset by road;By second Residue branch road and the 3rd residue branch road cut-off simultaneously and are considered as N-2 fault.
A kind of screening system of N-2 fault, including with lower unit:
First acquiring unit, for obtaining the active power limiting value of Targeted Tributary in electrical network;
Second acquisition unit, respectively remains having before and after branch road cut-offs respectively for obtaining Targeted Tributary in electrical network Merit power variation and Targeted Tributary active power value before each residue branch road cut-offs respectively;
3rd acquiring unit, for propping up according to active power limiting value, each meritorious power variation and each target The active power value on road, obtains each residue branch breaking overload contribution rate to Targeted Tributary respectively;
Packet screening unit, for being grouped each residue branch road according to the overload contribution rate preset is interval, it is thus achieved that Residue branch road group;In the residue branch road group more than or equal to the first overload contribution rate boundary value preset, sieve Select and Targeted Tributary is transshipped contribution rate sum more than or equal to two of overload contribution rate standard value preset Residue branch road, two residue branch roads cut-off simultaneously and are considered as N-2 fault;More than or equal to the second mistake preset Carry in the residue branch road group of contribution rate boundary value and filter out the first residue branch road, less than or equal to the preset The residue branch road group of three overload contribution rate boundary values filters out the second residue branch road, makes the first residue branch road pair The overload contribution rate of Targeted Tributary and the second residue branch road to the overload contribution rate sum of Targeted Tributary more than or etc. In default overload contribution rate standard value;First residue branch road and the second residue branch road cut-off simultaneously and are considered as N-2 Fault.
According to the scheme of the invention described above, it is first to obtain the active power limiting value of each bar branch road in electrical network, Targeted Tributary active power variable quantity before and after each residue branch road cut-offs respectively and Targeted Tributary prop up in each residue Road cut-off respectively before active power value, obtain each residue branch breaking respectively to target according to these three data The overload contribution rate of branch road;Further according to overload contribution rate, each residue branch road is grouped, according to packet situation Filter out overload contribution rate sum and be not less than two branch roads of overload contribution rate standard value, obtain N-2 fault. Due to the build-in attribute of electrical network, the overload contribution rate of major part branch road is the least, the only mistake of fraction branch road Carry contribution rate bigger, therefore use the solution of the present invention to enter without two branch combinations possible to each Row filter, but screen according to packet situation, thus what being difficult to of avoiding that multiple shot array causes calculated Huge amount of calculation, is greatly reduced the amount of calculation that power grid risk is analyzed.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet of the screening technique of N-2 fault in one of them embodiment;
Fig. 2 is the overload contribution rate distribution map of a network system in one of them embodiment;
Fig. 3 is the overload contribution rate distribution map of a network system in one of them embodiment;
Fig. 4 is the structural representation of the screening system of N-2 fault in one of them embodiment.
Detailed description of the invention
For making the purpose of the present invention, technical scheme and advantage clearer, below in conjunction with accompanying drawing and enforcement Example, is described in further detail the present invention.Should be appreciated that detailed description of the invention described herein Only in order to explain the present invention, do not limit protection scope of the present invention.
Shown in Figure 1, for the embodiment of screening technique of the N-2 fault of the present invention.In this embodiment The screening technique of N-2 fault, comprises the following steps:
Step S101: obtain the active power limiting value of Targeted Tributary in electrical network;
Step S102: obtain Targeted Tributary each active power remained before and after branch road cut-offs respectively in electrical network and become Change amount and Targeted Tributary active power value before each residue branch road cut-offs respectively;
Step S103: meritorious according to active power limiting value, each meritorious power variation and each Targeted Tributary Performance number, obtains each residue branch breaking overload contribution rate to Targeted Tributary respectively;
Step S104: according to default overload contribution rate is interval, each residue branch road is grouped, it is thus achieved that residue branch road Group;In the residue branch road group more than or equal to the first overload contribution rate boundary value preset, filter out mesh The overload contribution rate sum of mark branch road is more than or equal to two first residues of the overload contribution rate standard value preset Two first residue branch roads are cut-off simultaneously are considered as N-2 fault by branch road;
Step S105: sieve in the residue branch road group more than or equal to the second overload contribution rate boundary value preset Select one second residue branch road, propping up less than or equal to the residue of the 3rd overload contribution rate boundary value preset Lu Zuzhong filters out one article of the 3rd residue branch road, make the second residue branch road to the overload contribution rate of Targeted Tributary and Targeted Tributary is transshipped contribution rate sum more than or equal to the overload contribution rate standard preset by the 3rd residue branch road Value;Second residue branch road and the 3rd residue branch road are cut-off simultaneously and be considered as N-2 fault.
In the present embodiment, first obtaining the active power limiting value of each bar branch road in electrical network, Targeted Tributary is respectively Remain the active power variable quantity before and after branch road cut-offs respectively and Targeted Tributary before each residue branch road cut-offs respectively Active power value, obtain the overload tribute to Targeted Tributary of each residue branch breaking respectively according to these three data Offer rate;Further according to overload contribution rate, each residue branch road is grouped, filters out two according to packet situation The binary combination on road, obtains N-2 fault.Due to the build-in attribute of electrical network, the overload contribution of major part branch road Rate is the least, and the only overload contribution rate of fraction branch road is bigger, therefore use the solution of the present invention without The binary combination that each is possible is screened, but screens according to packet situation, thus avoid The huge amount of calculation that what multiple shot array caused be difficult to calculates, is greatly reduced the amount of calculation that power grid risk is analyzed.
Preferably, overload contribution rate interval, the first overload contribution rate boundary value, the second overload contribution rate boundary Value, the 3rd overload contribution rate boundary value and overload contribution rate standard value are default, can be according to actual needs It is adjusted.
In a specific embodiment, according toObtain each residue branch breaking to target The overload contribution rate of branch road, in formula, Cα, βRepresent that branch road β cut-offs the overload contribution rate to branch road α, Δ fα,βTable Show that branch road β cut-offs the active power variable quantity of before and after branch road α, fαRepresent that branch road β cut-offs the meritorious of front branch road α Performance number, fαlimitRepresent the active power limiting value of branch road α.
When power system is properly functioning, branch breaking can cause system load flow to redistribute, consequently, it is possible to draw Play some branch road overload.In order to another branch road overload is made the size contributed by a certain branch breaking of quantization signifying, Overload contribution rate is used to characterize.The definition of overload contribution rate is that branch road β cut-offs before and after's branch road α active power Variable quantity cut-off the ratio of active power margin of front branch road α with branch road β, active power margin refers to that branch road α's is meritorious Power threshold and branch road β cut-off the difference of the active power of front branch road α.
Wherein in an embodiment, before and after obtaining Targeted Tributary each residue branch road cut-offfing respectively in electrical network The step of active power variable quantity comprises the following steps:
Obtain each residue branch road respectively and Targeted Tributary is cut-off distribution factor;
Obtain the active power value before cut-offfing of each residue branch road respectively;
According to respectively cut-offfing distribution factor and each active power value before cut-offfing remaining branch road, obtain target Branch road active power variable quantity before and after each residue branch road cut-offs respectively.
In the present embodiment, it is not necessary to special detection Targeted Tributary gaining merit before and after each residue branch road cut-offs respectively Power variation, can cut-off distribution factor by each residue branch road and respectively remain branch road Targeted Tributary The active power value before cut-offfing to calculate acquisition, convenient.
In a specific embodiment, according toObtain Targeted Tributary at each residue branch breaking Active power variable quantity front and back, in formula, dα, βRepresent that branch road α is cut-off distribution factor, f by branch road ββTable Show branch road β cut-off before active power value, Δ fα,βRepresent that branch road β cut-offs the active power change of before and after branch road α Change amount.The sensitivity to other branch breaking of branch breaking distribution factor (LODF) Branch Power Flow, its energy Change and characterize the impact on other Branch Power Flow of a certain branch breaking.
Wherein in an embodiment, obtain each residue branch road and Targeted Tributary is cut-off the step of distribution factor Comprise the following steps:
Obtain the power transfer distribution factor of the Targeted Tributary when each residue branch road occurs power to shift respectively, with And the power transfer distribution factor of self when respectively residue branch road occurs power to shift respectively;
Power transfer distribution factor according to each Targeted Tributary and the power transfer distribution factor of each residue branch road, Obtain each residue branch road and Targeted Tributary is cut-off distribution factor.
In the present embodiment, Targeted Tributary is cut-off distribution factor by each residue branch road respectively by each residue branch road When there is power transfer, the power transfer distribution factor of each Targeted Tributary and the power transfer point of each residue branch road The cloth factor determines.In electrical network, it is easily obtained power transfer distribution factor, is also easy for obtaining each residue and props up Targeted Tributary is cut-off distribution factor by road.
In a specific embodiment, according toObtain each residue branch road to Targeted Tributary Cut-off distribution factor, in formula, dα, βRepresent that branch road α is cut-off distribution factor, p by branch road βα, βRepresent and propping up There is the power transfer distribution factor of branch road α, p during power transfer in road ββ, βRepresenting occurs power to turn at branch road β The power transfer distribution factor of self during shifting.Generally, pβ, β≠ 1, work as pβ, βWhen=1, dα, βNothing Definition, now represents that electrical network splits into two systems because branch road β cut-offs.
In another specific embodiment, according toObtain the power of each Targeted Tributary Transfer distribution factor;
In formula, pα, βRepresent the power transfer distribution factor of the branch road α when branch road β occurs power transfer, x α Represent the reactance of branch road α, eαRepresenting row vector, its element is at the start node of branch road α and terminal node pair That answers is classified as 1 and-1, and remaining is 0, and B represents the susceptance matrix of all branch roads,Represent column vector, its yuan The plain behavior 1 and-1 corresponding with terminal node at the start node of branch road β, remaining is 0;
According toObtain the power transfer distribution factor of each residue branch road;
In formula, pβ, βRepresent the power transfer distribution factor of self, x when branch road β occurs power transferβRepresent The reactance of branch road β, eβRepresenting row vector, its element is corresponding with terminal node at the start node of branch road β Being classified as 1 and-1, remaining is 0.
Distribution factor is the electric system state quantity linear approximation to the sensitivity that node injecting power changes, In the present invention, except branch breaking distribution factor, further relate to power transfer distribution factor.Power transfer distribution The factor (PTDF) is the sensitivity that power between bus nodes is shifted by Branch Power Flow, and it can quantization signifying mother Between line node power transfer amount on a certain branch road trend affect size.Its definition can use following mathematics public Formula represents:
Wherein, alpha represents that branch road, the Latin alphabet i and j represent bus nodes, T(i,j)Represent from joint Point i injects active power T, extracts power T, Δ f out from node jαRepresent that the active power on branch road α is at power Transfer T(i,j)Variable quantity before and after generation.It addition, when node i is connected by branch road β with node j, pα,(i,j)Can It is written as pα,β
Power transfer factor can be calculated by equation below:
p α ( i , j ) = 1 x α e α B - 1 e ( i , j ) T
Wherein, xαRepresent the reactance of branch road α, eαBeing row vector, its element is at the start node of branch road α and end What only node was corresponding is classified as 1 and-1, and remaining is 0, and B represents the susceptance matrix of all branch roads, e(i,j)Represent row Vector, its element is respectively 1 and-1 at the i-th row and jth row, and remaining is 0.
In a preferred embodiment, for an electrical network with N bar branch road, its overload contribution rate can To form the Matrix C of a N × N, its Elements C (α, β)=cα,β.Matrix C can obtain as follows.
(1) PTDF matrix is calculated
PTDF=X-1·φ·B-1·φT
(2) LODF matrix is calculated
LODF=PTDF (E diag (PTDF))-1
(3) branch power nargin matrix is calculated
MARGIN=LIMIT-PF
(4) computation overload contribution rate matrix
C=LODF.* (ONES PFT)./(MARGIN·ONEST)
Wherein, symbol " " representing matrix multiplication, the product of respective element in " .* " representing matrix, even X=Y.*Z, Then (((i, j), the division of respective element in " ./" representing matrix, " diag " represents nondiagonal element X for i, j) × Z for i, j)=Y Element zero setting obtains diagonal matrix, and PTDF is that power shifts distribution factor matrix, PTDF (α, β)=pα,β, X is One diagonal matrix, its element is the reactance of branch road, and φ is node branch road incidence matrix, and B is all branch roads Susceptance matrix, LODF is branch breaking distribution factor matrix, LODF (α, β)=dα,β, E is unit matrix, LIMIT and PF is column vector, and its element represents branch power limiting value and branch road active power value respectively, ONES be element be the column vector of 1.
As a example by two actual electric power saving systems, its overload contribution rate is calculated, and statistical analysis, knot Fruit is as shown in Figure 2 and Figure 3.In figure, abscissa is subinterval numbering, and subinterval is by transshipping contribution rate Interval (0,1) be divided into what 200 subintervals number consecutively 1 to 200 were formed, ordinate is each The frequency of branch road in subinterval.In figure, scatter diagram is formed with above-mentioned horizontal stroke, ordinate, and curve is to scatterplot The nonlinear fitting of figure.It will be seen that branch road overload contribution rate has long-tail characteristic distributions, i.e. major part The overload contribution rate on road is the least, and only fraction is bigger.This feature is to be dilute by electrical network admittance matrix Dredge what this electrical network build-in attribute of matrix caused.It practice, overload contribution rate is that long-tail is distributed this most just Feature, result in the N-2 Contingency screening strategy that the present invention announced and has the highest efficiency.
Packet based on overload contribution rate, refers to for a certain bar branch road, according to other branch road mistake to this branch road Carry the size of contribution rate, other branch road is grouped.Illustrate as a example by branch road i below.
Other branch road is C to the overload contribution rate of branch road ii=C (i :)=(ci,1,ci,2..., ci,k,…,ci,n-1), wherein C (i :) represents the i-th all row of row of overload contribution rate matrix.According to following rule, other branch road is grouped: O={k | ci,k>=1}, A={k | 0.8≤ci,k< 1}, B={k | 0.5≤ci,k< 0.8}, C={k | 0.1≤ci,k< 0.5}, D={k | 0.01≤ci,k< 0.1}, E={k | 0.005≤ci,k<0.01}.Group O is by transshipping contribution rate more than or equal to 1 Branch road forms, and according to the definition of overload contribution rate, in them, any one cut-offs and all can cause branch road i mistake Carrying, these branch roads form serious N-1 fault.When power system meets N-1 check, group O is empty set, Do not comprise any branch road.Branch road in group A to the overload contribution rate of branch road i between 0.8 and 1, other The implication of group can be analogized.
For convenience, following two definition are given:
Definition 1: Class1 mistake, refers to that catastrophe failure being treated as in screening process is noncritical failure.
Definition 2: type 2 mistake, refers to that noncritical failure being treated as in screening process is catastrophe failure.
When certain two branch road cut-offs and causes power flow transfer simultaneously, if causing other branch road to transship, then this two Bar cut-offs branch road one serious N-2 fault of composition;When certain two branch road cut-offs and causes power flow transfer simultaneously, If not resulting in other branch road overload, then these two are cut-off branch road one non-serious N-2 fault of composition.Should refer to Going out, in serious N-2 fault, any one branch breaking will not cause other branch road to transship.If in system Be implicitly present in the N-1 that other branch road can be caused to transship, then these N-1 branch roads should individually take out and process, N-2 is not formed, because any one the branch combinations in they and remaining all can cause other to pass by with other branch road Carrying, the overload contribution rate of these N-1 branch roads is more than or equal to 1.
According to the definition of overload contribution rate, for branch road i, if ignore two cut-off between branch road influence each other, And there are two branch road j and branch road k so that ci,j+ci,k>=1, wherein ci,j< 1, ci,k< 1, then and if only if props up Road j and branch road k cut-offs simultaneously and branch road i can be caused to transship, and branch road j and branch road k forms a serious N-2 event Barrier.But, ignore completely two cut-off between branch road influence each other and can increase the frequency of Class1 mistake, And this is irrational, because the frequency reducing Class1 mistake should be the primary and foremost purpose of Contingency screening.Separately On the one hand, due to two cut-off between branch road influence each other more complicated, it is difficult to by simple mode will It quantifies.Therefore, considering the factor in terms of above-mentioned two, the present invention is to influencing each other between two branch roads Give qualitative consideration, i.e. work as ci,j+ci,k>=0.85, wherein ci,j< 1, ci,k< when 1, just by branch road j and branch road K cut-offs simultaneously and is considered as serious N-2 fault.
Based on above-mentioned thinking, the serious N-2 source of failure that branch road i transships can be caused in following several ways: (1) The N-2 that in group ABC=A ∪ B ∪ C, any two branch roads are formed;Article (2) one, branch road is from organizing AB=A ∪ B, another branch road is from organizing D, the N-2 of formation;Article (3) one, branch road is from group A, branch road from Group E, the N-2 of formation.
When specifically applying, can arrange overload contribution rate standard value is 0.85, the first overload contribution rate boundary value It is 0.1, is being group ABC, sieve more than or equal to the residue branch road group of the first overload contribution rate boundary value preset Select Targeted Tributary is transshipped contribution rate sum more than or equal to 0.85 two residue branch roads, two residues Branch road cut-offs simultaneously and is considered as serious N-2 fault;Can also arrange the second overload contribution rate boundary value is 0.5, the Three overload contribution rate boundary values are 0.1, and corresponding residue branch road group is group ABDE, according to Targeted Tributary The overload contribution rate sum condition more than or equal to 0.85, is divided into two kinds of situations: one is a residue branch road Screening from group AB, another residue branch road screens from group D, and two residue branch roads cut-off simultaneously and are considered as Serious N-2 fault;Another kind is that a residue branch road screens from group A, and another residue branch road is from group E Middle screening, two residue branch roads cut-off simultaneously and are considered as serious N-2 fault.
For each branch road, find the serious N-2 fault that this branch road can be caused to transship, and add serious N-2 Failure collection.Finally remove duplicate keys, obtain final serious N-2 failure collection.
In network system, not all multiple failure all can cause the more serious consequence of ratio, therefore, All of anticipation multiple failure need not be carried out detailed analysis.On the other hand, in Contingency screening method Under help, it can be carried out detailed analysis by calculating the fault being used for screening in resource set and formulates Corresponding counter-measure, thus it is greatly reduced the amount of calculation that power grid risk is analyzed.
It is the inherent characteristics that long-tail is distributed this electrical network that the present invention takes full advantage of overload contribution rate between branch road, root According to the size of overload contribution rate, respective branch is grouped, then filters out overload contribution rate sum the least In two branch roads of overload contribution rate standard value, obtain serious N-2 fault.This method avoid and investigate respectively Each forecast failure, has the highest screening efficiency, lays a good foundation for online power grid risk assessment.
According to the screening technique of above-mentioned N-2 fault, the present invention also provides for the screening system of a kind of N-2 fault, Embodiment with regard to the screening system of the N-2 fault of the present invention is described in detail below.
Shown in Figure 4, for the embodiment of screening system of the N-2 fault of the present invention.In this embodiment The screening system of N-2 fault includes the first acquiring unit 201, second acquisition unit 202, the 3rd acquiring unit 203, it is grouped screening unit 204;
First acquiring unit 201, for obtaining the active power limiting value of Targeted Tributary in electrical network;
Second acquisition unit 202, before and after obtaining Targeted Tributary each residue branch road cut-off respectively in electrical network Active power variable quantity and Targeted Tributary active power value before each residue branch road cut-offs respectively;
3rd acquiring unit 203, for according to active power limiting value, each meritorious power variation and each target The active power value of branch road, obtains each residue branch breaking overload contribution rate to Targeted Tributary respectively;
Packet screening unit 204, for being grouped each residue branch road according to the overload contribution rate preset is interval, obtains Branch road group must be remained;In the residue branch road group more than or equal to the first overload contribution rate boundary value preset, Filter out and Targeted Tributary is transshipped contribution rate sum more than or equal to the two of the overload contribution rate standard value preset Two residue branch roads are cut-off simultaneously are considered as N-2 fault by bar residue branch road;More than or equal to the preset The residue branch road group of two overload contribution rate boundary values filters out the first residue branch road, less than or equal to presetting The 3rd overload contribution rate boundary value residue branch road group in filter out the second residue branch road, make the first residue prop up Road Targeted Tributary is transshipped contribution rate and second residue branch road the overload contribution rate sum of Targeted Tributary is more than Or equal to the overload contribution rate standard value preset;First residue branch road and the second residue branch road are cut-off simultaneously and regard For N-2 fault.
Wherein in an embodiment, second acquisition unit 202 obtains each residue branch road respectively to Targeted Tributary Cut-off distribution factor, do not obtain the active power value before cut-offfing of each residue branch road, according to respectively cut-offfing point Active power value before the cloth factor and each residue branch breaking, obtains Targeted Tributary at each residue branch road respectively Active power variable quantity before and after cut-offfing.
Wherein in an embodiment, second acquisition unit 202 obtains, at each residue branch road, power occurs respectively The power transfer distribution factor of Targeted Tributary during transfer, and when each residue branch road occurs power to shift respectively certainly The power transfer distribution factor of body, shifts distribution factor and each residue branch road according to the power of each Targeted Tributary Power transfer distribution factor, obtains each residue branch road and Targeted Tributary is cut-off distribution factor.
The screening system of the N-2 fault of the present invention and the screening technique one_to_one corresponding of the N-2 fault of the present invention, Above-mentioned N-2 fault screening technique embodiment illustrate technical characteristic and beneficial effect be all applicable to In the embodiment of the screening system of N-2 fault.
Each technical characteristic of embodiment described above can combine arbitrarily, for making description succinct, the most right The all possible combination of each technical characteristic in above-described embodiment is all described, but, if these skills There is not contradiction in the combination of art feature, is all considered to be the scope that this specification is recorded.
Embodiment described above only have expressed the several embodiments of the present invention, and it describes more concrete and detailed, But can not therefore be construed as limiting the scope of the patent.It should be pointed out that, for this area For those of ordinary skill, without departing from the inventive concept of the premise, it is also possible to make some deformation and change Entering, these broadly fall into protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be with appended power Profit requires to be as the criterion.

Claims (10)

1. the screening technique of a N-2 fault, it is characterised in that comprise the following steps:
Obtain the active power limiting value of Targeted Tributary in electrical network;
Obtain each active power change remained before and after branch road cut-offs respectively in described electrical network of described Targeted Tributary Amount and described Targeted Tributary active power value before each described residue branch road cut-offs respectively;
According to having of described active power limiting value, each described active power variable quantity and each described Targeted Tributary Merit performance number, obtains each described residue branch breaking overload contribution rate to described Targeted Tributary respectively;
According to default overload contribution rate is interval, each described residue branch road is grouped, it is thus achieved that residue branch road group;
In the residue branch road group more than or equal to the first overload contribution rate boundary value preset, filter out institute The overload contribution rate sum stating Targeted Tributary is more than or equal to two first of the overload contribution rate standard value preset Described two described first residue branch roads are cut-off simultaneously are considered as N-2 fault by residue branch road;
One article the is filtered out in the residue branch road group more than or equal to the second overload contribution rate boundary value preset Two residue branch roads, screen in the residue branch road group less than or equal to the 3rd overload contribution rate boundary value preset Go out one article of the 3rd residue branch road, make described second residue branch road to the overload contribution rate of described Targeted Tributary and institute State the 3rd residue branch road and described Targeted Tributary is transshipped contribution rate sum more than or equal to described default overload Contribution rate standard value;Described second residue branch road and described 3rd residue branch road are cut-off simultaneously and be considered as N-2 event Barrier.
The screening technique of N-2 fault the most according to claim 1, it is characterised in that obtain described mesh The step of mark branch road active power variable quantity before and after each residue branch road cut-offs respectively in described electrical network include with Lower step:
Obtain each described residue branch road respectively and described Targeted Tributary is cut-off distribution factor;
Obtain the active power value before cut-offfing of each described residue branch road respectively;
Distribution factor and the active power value before cut-offfing of each described residue branch road is cut-off according to each, Obtain described Targeted Tributary active power variable quantity before and after each described residue branch road cut-offs respectively.
The screening technique of N-2 fault the most according to claim 2, it is characterised in that obtain each described The step that described Targeted Tributary is cut-off distribution factor by residue branch road comprises the following steps:
Obtain the power transfer distribution that power described Targeted Tributary when shifting occurs respectively at each described residue branch road The factor, and the power transfer distribution factor of self when each described residue branch road occurs power to shift respectively;
Power transfer distribution factor according to each described Targeted Tributary and the power transfer point of each described residue branch road The cloth factor, obtains each described residue branch road and described Targeted Tributary is cut-off distribution factor.
The screening technique of N-2 fault the most according to claim 3, it is characterised in that:
According toObtain the power transfer distribution factor of each described Targeted Tributary;
In formula, pα, βRepresent the power transfer distribution factor of the branch road α when branch road β occurs power transfer, xα Represent the reactance of branch road α, eαRepresenting row vector, its element is at the start node of branch road α and terminal node pair That answers is classified as 1 and-1, and remaining is 0, and B represents the susceptance matrix of all branch roads,Represent column vector, its yuan The plain behavior 1 and-1 corresponding with terminal node at the start node of branch road β, remaining is 0;
According toObtain the power transfer distribution factor of each described residue branch road;
In formula, pβ, βRepresent the power transfer distribution factor of self, x when branch road β occurs power transferβRepresent The reactance of branch road β, eβRepresenting row vector, its element is corresponding with terminal node at the start node of branch road β Being classified as 1 and-1, remaining is 0.
The screening technique of N-2 fault the most according to claim 3, it is characterised in that:
According toObtain each described residue branch road and described Targeted Tributary cut-off distribution factor, In formula, dα, βRepresent that branch road α is cut-off distribution factor, p by branch road βα, βRepresenting occurs power to turn at branch road β The power transfer distribution factor of branch road α, p during shiftingβ, βRepresent the power of self when branch road β occurs power transfer Transfer distribution factor.
The screening technique of N-2 fault the most according to claim 2, it is characterised in that:
According toObtain described Targeted Tributary active power before and after each described residue branch breaking Variable quantity, in formula, dα, βRepresent that branch road α is cut-off distribution factor, f by branch road ββBefore representing that branch road β cut-offs Active power value, Δ fα,βRepresent that branch road β cut-offs the active power variable quantity of before and after branch road α.
The screening technique of N-2 fault the most according to claim 1, it is characterised in that:
According toObtain each described residue branch breaking the overload of described Targeted Tributary is contributed Rate, in formula, cα, βRepresent that branch road β cut-offs the overload contribution rate to branch road α, Δ fα,βBefore representing that branch road β cut-offs The active power variable quantity of rear branch road α, fαRepresent that branch road β cut-offs the active power value of front branch road α, fαlimit Represent the active power limiting value of branch road α.
8. the screening system of a N-2 fault, it is characterised in that include with lower unit:
First acquiring unit, for obtaining the active power limiting value of Targeted Tributary in electrical network;
Second acquisition unit, is used for obtaining described Targeted Tributary each residue branch road in described electrical network and cut-offs respectively Active power variable quantity front and back and described Targeted Tributary wattful power before each described residue branch road cut-offs respectively Rate value;
3rd acquiring unit, for according to described active power limiting value, each described active power variable quantity and The active power value of each described Targeted Tributary, obtains each described residue branch breaking respectively to described Targeted Tributary Overload contribution rate;
Packet screening unit, for each described residue branch road being grouped according to the overload contribution rate preset is interval, Obtain residue branch road group;In the residue branch road group more than or equal to the first overload contribution rate boundary value preset, Filter out and described Targeted Tributary is transshipped contribution rate sum more than or equal to the overload contribution rate standard value preset Two described residue branch roads, described two described residue branch roads are cut-off simultaneously and are considered as N-2 fault;Greatly In or equal to preset second overload contribution rate boundary value residue branch road group in filter out the first residue branch road, In the residue branch road group less than or equal to the 3rd overload contribution rate boundary value preset, filter out the second residue prop up Road, makes described first residue branch road that the overload contribution rate and described second of described Targeted Tributary is remained branch road pair The overload contribution rate sum of described Targeted Tributary is more than or equal to described default overload contribution rate standard value;Will Described first residue branch road and described second residue branch road cut-off simultaneously and are considered as N-2 fault.
The screening system of N-2 fault the most according to claim 8, it is characterised in that described second obtains Take unit to obtain each described residue branch road respectively described Targeted Tributary is cut-off distribution factor, do not obtain each institute State the active power value before cut-offfing of residue branch road, according to cut-offfing distribution factor and each described surplus described in each Active power value before remaining branch breaking, obtains described Targeted Tributary before each described residue branch road cut-offs respectively After active power variable quantity.
The screening system of N-2 fault the most according to claim 9, it is characterised in that described second Acquiring unit obtains and occurs the power of power described Targeted Tributary when shifting to shift respectively at each described residue branch road Distribution factor, and the power transfer distribution factor of self when each described residue branch road occurs power to shift respectively, According to each described Targeted Tributary power transfer distribution factor and each described residue branch road power transfer distribution because of Son, obtains each described residue branch road and described Targeted Tributary is cut-off distribution factor.
CN201610168704.9A 2016-03-22 2016-03-22 N-2 fault screening method and system Active CN105787815B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610168704.9A CN105787815B (en) 2016-03-22 2016-03-22 N-2 fault screening method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610168704.9A CN105787815B (en) 2016-03-22 2016-03-22 N-2 fault screening method and system

Publications (2)

Publication Number Publication Date
CN105787815A true CN105787815A (en) 2016-07-20
CN105787815B CN105787815B (en) 2020-01-07

Family

ID=56391688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610168704.9A Active CN105787815B (en) 2016-03-22 2016-03-22 N-2 fault screening method and system

Country Status (1)

Country Link
CN (1) CN105787815B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106451463A (en) * 2016-11-09 2017-02-22 广东电网有限责任公司珠海供电局 A method and apparatus for analyzing a thermal-stable section in a ring network system
CN109167356A (en) * 2018-10-16 2019-01-08 云南电网有限责任公司 A kind of N-2 Contingency screening method
CN109541361A (en) * 2018-12-28 2019-03-29 深圳供电局有限公司 A kind of public affairs low pressure side branch's load heavy duty prior-warning device and method
CN110794263A (en) * 2019-12-17 2020-02-14 国网新疆电力有限公司昌吉供电公司 Method for positioning fault section of power distribution network line with distributed power supply
CN112688314A (en) * 2020-12-16 2021-04-20 国网河南省电力公司漯河供电公司 Method for calculating static safety analysis of N-1 of power system based on PMU (phasor measurement Unit) measured data

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101013812A (en) * 2007-02-07 2007-08-08 浙江大学 Method for configuring PMU taking regard of high risk cascading failure path

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101013812A (en) * 2007-02-07 2007-08-08 浙江大学 Method for configuring PMU taking regard of high risk cascading failure path

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106451463A (en) * 2016-11-09 2017-02-22 广东电网有限责任公司珠海供电局 A method and apparatus for analyzing a thermal-stable section in a ring network system
CN106451463B (en) * 2016-11-09 2019-03-29 广东电网有限责任公司珠海供电局 The method and apparatus of the steady section of heat in a kind of analysis loop network system
CN109167356A (en) * 2018-10-16 2019-01-08 云南电网有限责任公司 A kind of N-2 Contingency screening method
CN109167356B (en) * 2018-10-16 2022-03-18 云南电网有限责任公司 N-2 fault screening method
CN109541361A (en) * 2018-12-28 2019-03-29 深圳供电局有限公司 A kind of public affairs low pressure side branch's load heavy duty prior-warning device and method
CN110794263A (en) * 2019-12-17 2020-02-14 国网新疆电力有限公司昌吉供电公司 Method for positioning fault section of power distribution network line with distributed power supply
CN112688314A (en) * 2020-12-16 2021-04-20 国网河南省电力公司漯河供电公司 Method for calculating static safety analysis of N-1 of power system based on PMU (phasor measurement Unit) measured data
CN112688314B (en) * 2020-12-16 2023-10-27 国网河南省电力公司漯河供电公司 PMU-based method for calculating N-1 static security analysis

Also Published As

Publication number Publication date
CN105787815B (en) 2020-01-07

Similar Documents

Publication Publication Date Title
CN105787815A (en) Method and system for screening N-2 fault
Dabachi et al. Energy consumption, energy price, energy intensity environmental degradation, and economic growth nexus in African OPEC countries: evidence from simultaneous equations models
CN101291062B (en) Analysis method of DC power flow in dynamic topology electric network
CN103985066A (en) Method for evaluating power system static risk based on hybrid power flow
CN107871216A (en) A kind of recognition methods of power distribution network fragility node
CN103985065A (en) Method for evaluating electric power system risk based on fault pre-scanning
CN105528645A (en) Frangibility prediction method for large power grid
CN104992266A (en) Method of determining power grid node importance degree and system thereof
CN105354675A (en) Key transmission section identification-based cascading failure analysis method for alternating current/direct current power network
CN104092210A (en) Online static security analysis method with N-2 opening rapid scanning function
US20220083655A1 (en) Chip security analysis method based on petri net
CN105205571A (en) Risk-considered urban power network operation security assessment method
CN112329376B (en) Monte Carlo simulation-based substation system shock resistance toughness quantitative evaluation method
CN107947151A (en) A kind of recognition methods of electric system key node
CN103823837A (en) Key transmission section searching method based on fuzzy clustering and shortest path
CN106780134A (en) The determination method and system of the wind power generating algorithm apoplexy electricity condition number upper limit
CN102570450A (en) Static reliability assessment method for complex power grid
CN106655201A (en) Security domain-based safe optimization and control method for electric power thermal stability
CN108182511A (en) It is a kind of based on Demand Side Response reserve value assessment method of the sum of ranks than method
CN106684917A (en) Positional dynamic optimization and allowed capacity calculating method and system for distributed power supplies
CN103400213A (en) Backbone net rack survivability assessment method based on LDA (Linear Discriminant Analysis) and PCA (Principal Component Analysis)
CN105024645A (en) Matrix evolution-based photovoltaic array fault location method
CN104950205A (en) Quantitative analysis method for effect of AC (alternating current) system failure on DC (direct current) line
CN104867063A (en) Power grid multiple major failure recognition method based on a linear weighting method
CN105427200A (en) Power plant fault diagnosis method based on fuzzy theory and data fusion

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant