Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610166189.0A
Other languages
Chinese (zh)
Other versions
CN105781131A (en
Inventor
宋宝玉
宋嘉成
赵佳杰
史永健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoding Micro Exhibition Polytron Technologies Inc
Original Assignee
Baoding Micro Exhibition Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoding Micro Exhibition Polytron Technologies Inc filed Critical Baoding Micro Exhibition Polytron Technologies Inc
Priority to CN201610166189.0A priority Critical patent/CN105781131B/en
Publication of CN105781131A publication Critical patent/CN105781131A/en
Application granted granted Critical
Publication of CN105781131B publication Critical patent/CN105781131B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/26Strutting means for wall parts; Supports or the like, e.g. for holding in position prefabricated walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Support system and its construction method are installed the invention discloses a kind of assembled architecture wallboard, wherein support system part includes prefabricated components, main structure body, bearing diagonal and steel wire rope.Bearing diagonal part includes telescoping rod and upper and lower bracket, the telescoping rod includes the branch of upper, middle and lower three, a connected structure is fixed at the top of upper part upper lever, an auxiliary connected structure is fixed in the bottom of lower part lower beam part, it is attached in the middle of upper lever and lower rod member by a parallel-crank mechanism, the folding degree of parallel-crank mechanism is adjustable;Upper bracket is fixed on embedded part and is articulated and connected with upper lever, and lower bracket is fixed on embedded part and is articulated and connected with lower rod member.Telescoping rod in the present invention has the regulatory function of three dimensions, can make up the installation difficulty that built-in fitting position degree deviation is brought.

Description

装配式建筑墙板安装支撑体系及其构建方法Prefabricated building wall panel installation support system and construction method thereof

技术领域technical field

本发明涉及建筑结构的辅助设备技术领域,特别涉及装配式建筑墙板安装斜支撑体系及其构建方法。The invention relates to the technical field of auxiliary equipment for building structures, in particular to a prefabricated building wall panel installation oblique support system and a construction method thereof.

背景技术Background technique

预制装配式建筑指用工厂预制的构件在工地装配而成的建筑。预制装配式建筑具有施工方便、工程进度快等优点。近年来,预制装配式的施工方式,越来越受到广泛关注与应用。Prefabricated buildings refer to buildings assembled on site with factory prefabricated components. Prefabricated buildings have the advantages of convenient construction and fast project progress. In recent years, prefabricated construction methods have received more and more attention and applications.

预制构件在装配时,不但需要对预制构件进行固定,而且需要对预制构件的垂直度进行调节。如何对预制构件进行可靠的固定和方便的调节,将会对施工的安全和效率产生重要影响。When prefabricated components are assembled, not only the prefabricated components need to be fixed, but also the verticality of the prefabricated components needs to be adjusted. How to reliably fix and conveniently adjust prefabricated components will have an important impact on the safety and efficiency of construction.

目前的安装使用简单的支撑杆进行辅助支撑,其中的支撑杆一般采用双向反丝进行配合,这种结构的支撑杆,力度主要集中在螺纹上,螺纹容易损坏,造成拆装困难。The current installation uses simple support rods for auxiliary support. The support rods generally use two-way reverse wires for cooperation. The strength of the support rods in this structure is mainly concentrated on the threads, and the threads are easily damaged, resulting in difficulty in disassembly.

发明内容Contents of the invention

本发明的目的在于提供一种装配式建筑墙板安装支撑体系及其构建方法,通过设置可调节杆件不但可以支撑固定所述预制构件,而且可以调整预制构件的垂直度,并具有安全可靠、操作简便、易于施工的优点。The purpose of the present invention is to provide a prefabricated building wall panel installation support system and its construction method. By setting adjustable rods, not only the prefabricated components can be supported and fixed, but also the verticality of the prefabricated components can be adjusted, and it is safe, reliable, The advantages of simple operation and easy construction.

本发明解决其技术问题所采用的技术方案是:The technical solution adopted by the present invention to solve its technical problems is:

装配式建筑墙板安装支撑体系,包括预制构件、结构主体、斜支撑和钢丝绳,其中,所述预制构件垂直的设置在结构主体的边沿处,其特征在于,所述斜支撑包括伸缩杆件和上、下牛腿,The prefabricated building wall panel installation support system includes prefabricated components, structural main body, diagonal supports and steel wire ropes, wherein the prefabricated components are vertically arranged at the edge of the structural main body, and it is characterized in that the diagonal supports include telescopic rods and Upper and lower corbels,

所述伸缩杆件包括上、中、下三分部,上部分为镀锌方钢管结构的上杆件,上杆件的顶部固定一插接结构Ⅰ,所述插接结构Ⅰ包括平板和插接板,所述平板焊接在上杆件的端部且与所述上杆件彼此垂直,插接板固定在平板的中部,并在插接板中部的销孔内插入金属圆销,且所述插接板的顶端为圆弧面;The telescopic rod includes upper, middle and lower parts. The upper part is an upper rod with a galvanized square steel pipe structure. A plug-in structure I is fixed on the top of the upper rod. The plug-in structure I includes a flat plate and a plug-in structure. Connecting plate, the flat plate is welded on the end of the upper bar and perpendicular to the upper bar, the plug plate is fixed in the middle of the flat plate, and a metal round pin is inserted into the pin hole in the middle of the plug plate, and the The top of the plug board is an arc surface;

下部分为镀锌方钢管结构的下杆件,所述下杆件的下部固定一个插接结构Ⅱ,所述插接结构Ⅱ与所述插接结构Ⅰ具有相同的结构;The lower part is the lower rod of the galvanized square steel pipe structure, and the lower part of the lower rod is fixed with a plug-in structure II, and the plug-in structure II has the same structure as the plug-in structure I;

上杆件和下杆件中间通过一个平行四边形机构进行连接,所述平行四边形机构包括连杆和上、下底座,所述上底座垂直固定在上杆件上,下底座垂直固定在下杆件上,并在上底座和下底座上枢接连杆,且同侧的两个连杆之间使用一个销轴来连接,并在销轴的中部开设一个丝孔,一个丝杠穿过两个销轴的丝孔,通过转动丝杠可以调节平行四边形机构的开合程度;The upper rod and the lower rod are connected through a parallelogram mechanism, the parallelogram mechanism includes a connecting rod and upper and lower bases, the upper base is vertically fixed on the upper rod, and the lower base is vertically fixed on the lower rod , and the connecting rods are pivoted on the upper base and the lower base, and a pin shaft is used to connect the two connecting rods on the same side, and a thread hole is opened in the middle of the pin shaft, and a screw goes through the two pins The thread hole of the shaft can adjust the opening and closing degree of the parallelogram mechanism by turning the screw;

上牛腿,上牛腿包括镀锌钢板、铰接侧耳和支撑关节,其中所述铰接侧耳为两个且对称设置,每一个铰接侧耳相对于竖直面倾斜角度为5至20度,并在铰接侧耳的两侧设置有支撑关节,所述支撑关节为弧形面,并在镀锌钢板上设置有至少两个螺栓孔;所述铰接侧耳中设置有一个长条孔,所述长条孔沿着与镀锌钢板表面成10至20度夹角;The upper corbel, the upper corbel includes galvanized steel plate, hinged side lugs and supporting joints, wherein the hinged side lugs are two and symmetrically arranged, each hinged side lug is inclined at an angle of 5 to 20 degrees relative to the vertical plane, and is hinged Supporting joints are provided on both sides of the side ear, and the supporting joint is an arc surface, and at least two bolt holes are provided on the galvanized steel plate; a long hole is provided in the hinged side ear, and the long hole is arranged along the It forms an angle of 10 to 20 degrees with the surface of the galvanized steel sheet;

下牛腿,所述下牛腿中具有一个铰接侧耳;a lower corbel having a hinged side ear therein;

所述上下牛腿分别与上杆件和下杆件枢接连接;The upper and lower corbels are pivotally connected to the upper rod and the lower rod respectively;

所述钢丝绳为两根,且分别设置在斜支撑两侧的结构主体和预制构件之间。There are two steel wire ropes, which are respectively arranged between the structural main body and the prefabricated component on both sides of the diagonal support.

进一步地,每一个铰接侧耳相对于竖直面倾斜角度为10度。Further, the inclination angle of each hinged side ear relative to the vertical plane is 10 degrees.

进一步地,所述长条孔沿着与镀锌钢板表面成15度夹角。Further, the elongated hole forms an angle of 15 degrees with the surface of the galvanized steel sheet.

进一步地,所述长条孔的有效长度为2厘米。Further, the effective length of the long hole is 2 cm.

装配式建筑墙板安装支撑体系的构件方法,其特征在于:步骤如下,A component method for installing a support system for a prefabricated building wall panel is characterized in that the steps are as follows,

步骤一,将埋件提前安装在结构主体与预制构件中,同时在结构主体和预制构件中还设置有钢丝绳铆接点,所述埋件中具有用于固定上、牛腿的螺栓套筒;Step 1, the embedded parts are installed in the structural main body and the prefabricated components in advance, and at the same time, steel wire rope riveting points are also arranged in the structural main body and the prefabricated components, and the embedded parts have bolt sleeves for fixing the upper and lower legs;

步骤二:将预制构件吊至结构主体的指定位置上,现场使用螺栓将上、下牛腿分别固定在预制构件和结构主体上的埋件中;Step 2: Lift the prefabricated components to the designated position of the main body of the structure, and use bolts on site to fix the upper and lower corbels respectively in the embedded parts of the prefabricated components and the main body of the structure;

步骤三:然后使用圆销将所述伸缩杆件分别与上牛腿和下牛腿进行连接,形成一体,然后通过平行四边形机构进行调节预制构件的竖直度,最后使用钢丝绳连接预制构件和结构主体并进行拉紧,Step 3: Then use round pins to connect the telescopic rods with the upper corbel and the lower corbel respectively to form a whole, then adjust the verticality of the prefabricated components through a parallelogram mechanism, and finally use steel wire ropes to connect the prefabricated components and the structure main body and tensioned,

步骤四,在相邻的预制构件之间的角柱位置进行混凝土浇筑;Step 4, pouring concrete at the corner column positions between adjacent prefabricated components;

步骤五,角柱养护硬化后,拆除伸缩杆件、上牛腿和下牛腿,完成。Step 5: After the corner columns are cured and hardened, the telescopic rods, upper corbel and lower corbel are removed to complete.

在步骤二之前,还包括一个对预制构件和结构主体中的埋件表面进行清理的步骤。Before the second step, there is also a step of cleaning the surface of the embedded parts in the prefabricated components and the structural main body.

本发明的效果在于:Effect of the present invention is:

本发明中的伸缩杆件具有三维空间的调节功能,能够弥补预埋件位置度偏差带来的安装困难问题。The telescopic rod in the present invention has the adjustment function of three-dimensional space, which can make up for the difficulty in installation caused by the positional deviation of the embedded parts.

本发明中的伸缩杆件具有两个,且对称布置,使得受力得到有效的分解,使得压力集中在螺栓上,对埋件进行剪切,避免对埋件进行过度的拉拔。There are two telescopic rods in the present invention, and they are symmetrically arranged, so that the force is effectively decomposed, the pressure is concentrated on the bolts, the embedded parts are sheared, and excessive drawing of the embedded parts is avoided.

可以实现快速的拆装,便于现场施工。Quick disassembly and assembly can be realized, which is convenient for on-site construction.

可以进行有效的重复利用,进一步地降低施工费用。Effective reuse can be carried out, further reducing construction costs.

附图说明Description of drawings

图1为本发明的示意图。Figure 1 is a schematic diagram of the present invention.

图2为主视图。Figure 2 is the main view.

图3为侧视图。Figure 3 is a side view.

图4为伸缩杆件的立体图。Fig. 4 is a perspective view of the telescopic rod.

图5为上牛腿的立体图。Fig. 5 is a perspective view of the upper corbel.

图6为上牛腿的主视图。Figure 6 is a front view of the upper corbel.

图7为上牛腿的侧视图。Figure 7 is a side view of the upper corbel.

图8为下牛腿的立体图。Fig. 8 is a perspective view of the lower corbel.

图9为牛腿与预制构件的节点图。Figure 9 is a node diagram of the corbel and prefabricated components.

图中:1预制构件,2结构主体,3埋件,31螺纹套筒,4伸缩杆件,41上杆件,411插接结构Ⅰ,4111平板,4112插接板,4113销孔,4114圆弧面,42下杆件,411’插接结构Ⅱ,43四边形机构,431连杆,432上底座,433下底座,5上牛腿,51镀锌钢板,52铰接侧耳,521长条孔,53支撑关节,6下牛腿,7钢丝绳。In the figure: 1 prefabricated component, 2 structural main body, 3 embedded parts, 31 threaded sleeve, 4 telescopic rod, 41 upper rod, 411 plug-in structure I, 4111 flat plate, 4112 plug-in plate, 4113 pin hole, 4114 circle Arc surface, 42 lower rod, 411' plug structure II, 43 quadrilateral mechanism, 431 connecting rod, 432 upper base, 433 lower base, 5 upper corbel, 51 galvanized steel plate, 52 hinged side ear, 521 long hole, 53 support joints, 6 lower corbels, 7 wire ropes.

具体实施方式detailed description

以下结合附图和具体实施例对本发明提出的一种装配式建筑预制构件安装用可调节斜支撑体系及其构件过程作进一步详细说明。根据下面的说明和权利要求书,本发明的优点和特征将更清楚。以下将由所列举之实施例结合附图,详细说明本发明的技术内容及特征。需另外说明的是,附图均采用非常简化的形式且均使用非精准的比例,仅用以方便、明晰地辅助说明本发明实施例的目的。An adjustable oblique support system for installation of prefabricated building components proposed by the present invention and its component process will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. Advantages and features of the present invention will be apparent from the following description and claims. The technical content and features of the present invention will be described in detail below by referring to the illustrated embodiments in conjunction with the accompanying drawings. It should be further noted that all the drawings are in very simplified form and use imprecise scales, and are only used to facilitate and clearly assist the purpose of illustrating the embodiments of the present invention.

请参阅图1至图9,本实施例提供了一种装配式建筑预制构件1安装用可调节斜支撑,设置于结构主体2与预制构件1之间,常用语垂直墙面之间的安装工程。Please refer to Fig. 1 to Fig. 9, this embodiment provides an adjustable oblique support for the installation of a prefabricated building component 1, which is arranged between the structural main body 2 and the prefabricated component 1, commonly used as an installation project between vertical walls .

其中,预制构件是指,墙板、窗户部分等提前在工厂预制成型的构建,需要在现场吊装作业。Among them, prefabricated components refer to the construction of wall panels, window parts, etc. that are prefabricated in the factory in advance, and need to be hoisted on site.

由于墙板等大型预制件的自重较大,且对竖直度、位置度等安装要求较高,通常吊机进行配合作业,在吊装的过程中,以及安装的过程中需要进行临时固定,固定的方式多样,目前比较主流的方式是使用斜支撑进行辅助支撑。Due to the heavy weight of large prefabricated parts such as wall panels and high installation requirements for verticality and position, usually cranes are used to cooperate with the operation, and temporary fixing and fixing are required during the hoisting process and the installation process. There are various methods, and the current mainstream method is to use oblique supports for auxiliary support.

目前的斜支撑存在的主要问题在于,调节功能有限,且支撑杆由于在调节过程中受力较大,丝扣容易损坏,所以不具备长期使用。The main problem of the current oblique support is that the adjustment function is limited, and the support rod is subjected to a large force during the adjustment process, and the screw is easily damaged, so it cannot be used for a long time.

使用本发明进行支撑,首先需要对预制构件进行定制,其中,埋件3采用镀锌钢板和钢筋结构,与现有的埋件进行比较优势在于啊,在埋件中预先设置有一个螺纹套筒31,该螺纹套筒向内部延伸,且在内部形成一个紧固结构,其中,在预制过程中,对螺纹套筒使用堵头进行封堵,形成保护结构。Using the present invention for support requires customizing the prefabricated components first. Among them, the embedded part 3 adopts galvanized steel plate and steel bar structure. Compared with the existing embedded parts, the advantage lies in that a threaded sleeve is pre-set in the embedded part. 31. The threaded sleeve extends to the inside and forms a fastening structure inside, wherein, during the prefabrication process, the threaded sleeve is blocked with a plug to form a protective structure.

堵头的结构详细的参考一下结构:For the structure of the plug, please refer to the structure in detail:

包括柔性部分和刚性部分,其中刚性部分为一个六角形螺丝帽,柔性部分为一个海绵柱,上述的海绵柱部分塞入到螺纹套筒内,对预制阶段的螺纹套筒进行防护。It includes a flexible part and a rigid part, wherein the rigid part is a hexagonal screw cap, and the flexible part is a sponge column, and the above-mentioned sponge column part is inserted into the threaded sleeve to protect the threaded sleeve in the prefabrication stage.

斜支撑由伸缩杆件和上、下牛腿三部分组成:The oblique support consists of three parts: telescopic rods and upper and lower corbels:

伸缩杆件4,该伸缩杆件包括上、中、下三分部,上部分为一个杆件,具体的,是一个方钢钢管,为便于描述,此处标记为上杆件41,上杆件的顶部通过焊接链接的方式形成一个插接结构Ⅰ411,该插接结构Ⅰ包括平板4111和插接板4112,其中上述的平板4111焊接在上杆件的端部,为矩形,且与上述的上杆件41彼此垂直,插接板4112为一钢板,焊接在平板的中部,并在插接板的中部设有一个销孔4113,销孔内固定一个金属圆销。在插接板的顶端为圆弧面4114。Telescopic rod 4, the telescopic rod includes upper, middle and lower parts, the upper part is a rod, specifically, a square steel pipe, for ease of description, here marked as the upper rod 41, the upper rod The top of the piece forms a plug-in structure I411 by means of welding links. The plug-in structure I includes a flat plate 4111 and a plug-in plate 4112, wherein the above-mentioned flat plate 4111 is welded to the end of the upper rod, which is rectangular, and is similar to the above-mentioned The upper rods 41 are perpendicular to each other, and the plug-in plate 4112 is a steel plate, which is welded in the middle of the flat plate, and is provided with a pin hole 4113 in the middle of the plug-in plate, and a metal round pin is fixed in the pin hole. The top of the plug board is an arc surface 4114 .

下部分为一个杆件,具体的,是一个方钢钢管,为便于描述,此处标记为下杆件42,下杆件42的底部通过焊接链接的方式形成一个插接结构Ⅱ411’,该插接结构Ⅱ包括平板和插接板,其中上述的平板焊接在下杆件的端部,且与上述的下杆件彼此垂直,插接板为一钢板,焊接在平板的中部,并在插接板的中部设有一个销孔,销孔内固定一个金属圆销。在插接板的顶端为圆弧面。The lower part is a rod, specifically, a square steel pipe, which is marked as the lower rod 42 here for the convenience of description, and the bottom of the lower rod 42 forms a plug-in structure II 411' by means of welding links. Connection structure II includes a flat plate and a plug-in plate, wherein the above-mentioned flat plate is welded on the end of the lower bar and is perpendicular to the above-mentioned lower bar. The plug-in plate is a steel plate, welded on the middle of the flat plate, and The middle part is provided with a pin hole, and a metal round pin is fixed in the pin hole. The top of the plug board is an arc surface.

上杆件和下杆件,中间通过一个平行四边形机构43进行连接,具体地,该平行四边形机构包括四个连杆431和上、下底座(432、433),上底座432垂直焊接在上杆件41上,下底座433垂直焊接在下杆件上,并在上底座和下底座上分别通过圆销枢接一个连杆,且同侧的两个连杆之间使用一个销轴来连接,并在销轴的中部开设一个丝孔,一个丝杠穿过两个销轴的丝孔,并在丝杠的端部设置有把手或者摇把,用于驱动,通过调节丝杠可以调节平行四边形机构的开合程度。The upper rod and the lower rod are connected in the middle by a parallelogram mechanism 43, specifically, the parallelogram mechanism includes four connecting rods 431 and upper and lower bases (432, 433), and the upper base 432 is welded vertically on the upper rod On the part 41, the lower base 433 is welded vertically on the lower bar, and a connecting rod is pivotally connected by a round pin on the upper base and the lower base respectively, and a pin shaft is used between the two connecting rods on the same side to connect, and A screw hole is set in the middle of the pin shaft, a lead screw passes through the screw holes of the two pin shafts, and a handle or crank is provided at the end of the lead screw for driving, and the parallelogram mechanism can be adjusted by adjusting the lead screw degree of opening and closing.

上牛腿5,上牛腿包括镀锌钢板51、铰接侧耳52和支撑关节53,其中上述的铰接侧耳52为两个,且对称设置,每一个铰接侧耳52相对于竖直面倾斜角度为10度,并在铰接侧耳的两侧设置有支撑关节53,其中上述的支撑关节为弧形面,参考图5,用于和上述的插接板进行配合。并在镀锌钢板51上设置有至少两个螺栓孔。The upper corbel 5, the upper corbel includes a galvanized steel plate 51, hinged side ears 52 and support joints 53, wherein the above-mentioned hinged side ears 52 are two, and are symmetrically arranged, and each hinged side ear 52 is inclined at an angle of 10 relative to the vertical plane. degree, and support joints 53 are provided on both sides of the hinged side ears, wherein the above-mentioned support joints are arc-shaped surfaces, referring to FIG. 5, and are used to cooperate with the above-mentioned plug board. And at least two bolt holes are arranged on the galvanized steel sheet 51 .

上述的支撑关节位于镀锌钢板和铰接侧耳之间的过渡位置,具有两个作用,一是,提高铰接侧耳52的整体抗折弯强度,二是与插接结构中的弧形面形成配合。The above-mentioned supporting joint is located at the transition position between the galvanized steel plate and the hinged side ear, and has two functions, one is to improve the overall bending resistance of the hinged side ear 52, and the other is to cooperate with the arc surface in the plug-in structure.

在上述的铰接侧耳52中设置有一个长条孔521,该长条孔521沿着与镀锌钢板表面成15度夹角进行设置,使得伸缩杆件相对于上牛腿具有一个活动空间,该空间大约在2厘米之内,尤其是,在伸缩杆件上的插接板与支撑关节之间形成关节配合,避免圆销过渡承载受力而变形。A long hole 521 is arranged in the above-mentioned hinged side ear 52, and the long hole 521 is arranged along an angle of 15 degrees with the surface of the galvanized steel plate, so that the telescopic rod has a movable space relative to the upper corbel. The space is within about 2 centimeters. In particular, a joint fit is formed between the plug plate on the telescopic rod and the supporting joint, so as to avoid deformation of the round pin due to excessive bearing force.

上牛腿中两个铰接侧耳52之间形成对称结构,使得受力状态下,装配式墙板的受力点主要集中在上牛腿之内部,降低上牛腿对墙板的作用力。A symmetrical structure is formed between the two hinged side lugs 52 in the upper corbel, so that under the stressed state, the force points of the assembled wall panel are mainly concentrated inside the upper corbel, reducing the force of the upper corbel on the wall panel.

下牛腿6,结构与上述的上牛腿结构类似,不同之处在于,下牛腿中仅仅具有一个铰接侧耳,且上述的下牛腿中的镀锌钢板具有一个向侧面倾斜的斜度。该斜度,根据空间几何原理确定。The structure of the lower corbel 6 is similar to that of the above-mentioned upper corbel, except that the lower corbel only has one hinged side ear, and the galvanized steel plate in the above-mentioned lower corbel has a slope inclined to the side. The slope is determined according to the principle of space geometry.

上述的上牛腿和下牛腿通过螺栓固定在埋件上,使用完毕后可以进行拆卸,并进行重复利用。The above-mentioned upper corbel and lower corbel are fixed on the embedded parts by bolts, and can be disassembled and reused after use.

在上述预制构件1和结构主体2中还分别设置有钢丝绳铆接点,配合钢丝绳7进行锁紧,保证位置不发生移动。Steel wire rope riveting points are respectively arranged in the above-mentioned prefabricated component 1 and the structural main body 2, which are locked with the steel wire rope 7 to ensure that the position does not move.

本结构综合考虑了预制墙板的抗压性能抗压性能的等综合信息,下面就其结构进行详细的描述:This structure comprehensively considers the comprehensive information such as the compressive performance and compressive performance of prefabricated wall panels. The following is a detailed description of its structure:

请继续参阅1至图8,本实施例还提供了一种如上所述的装配式建筑预制构件1安装用可调节斜支撑的使用方法,步骤如下:Please continue to refer to Figures 1 to 8, this embodiment also provides a method for using the adjustable oblique support for the installation of the prefabricated building component 1 as described above, the steps are as follows:

步骤一:首先,将埋件提前安装在结构主体2与预制构件1中,同时在结构主体和预制构件中还设置有钢丝绳铆接点。Step 1: First, the embedded parts are installed in the structural main body 2 and the prefabricated component 1 in advance, and at the same time, steel wire rope riveting points are also set in the structural main body and the prefabricated component.

步骤二:将预制构件1吊至结构主体2的指定位置上,通常吊装状态下,难以保证预制构件1始终处于竖直状态,因此本发明的优点就在于可以在预制构建具有一定倾斜角度的状态下完成吊装,具体地,现场清理后并使用螺栓将上、下牛腿分别固定在预制构件和结构主体上的埋件中,上述的上牛腿可进行拆装,降低施工成本,且综合利用的埋件作为工艺结构,用完后拆下牛腿,不影响埋件的其他功能。Step 2: Hoist the prefabricated component 1 to the designated position of the structural main body 2. Usually, it is difficult to ensure that the prefabricated component 1 is always in a vertical state in the hoisting state. The hoisting is completed at the bottom. Specifically, after the site is cleaned up, bolts are used to fix the upper and lower corbels respectively in the embedded parts of the prefabricated components and the structural main body. The above-mentioned upper corbels can be disassembled to reduce construction costs and comprehensively utilize The embedded parts are used as a process structure, and the corbels are removed after use without affecting other functions of the embedded parts.

步骤三:然后使用圆销将上述的伸缩杆件分别与上牛腿和下牛腿进行连接,形成一体,然后通过平行四边形机构进行调节预制构件的竖直度,最后使用钢丝绳进行锁紧即可,形成一体后即可进行角柱的浇筑。Step 3: Then use round pins to connect the above-mentioned telescopic rods with the upper corbel and the lower corbel respectively to form a whole, then adjust the verticality of the prefabricated components through the parallelogram mechanism, and finally use the wire rope to lock it. , After forming a whole, the pouring of the corner column can be carried out.

步骤四,角柱养护硬化后,拆除伸缩杆件、上牛腿和下牛腿,即可。Step 4: After the corner columns are cured and hardened, remove the telescopic rods, the upper corbel and the lower corbel.

拆除后,伸缩杆件、上牛腿和下牛腿可以重复使用,降低安装成本。After dismantling, the telescopic rods, upper corbel and lower corbel can be reused, reducing installation costs.

综上所述,本发明具有如下有益效果:In summary, the present invention has the following beneficial effects:

一、本发明装配式建筑预制构件安装用可调节斜支撑,包括:一可调节长度的伸缩杆件和分别固定于所述结构主体与预制构件上的牛腿;通过平行四边形机构可以快速且方便的调节伸缩杆的长度,进而调节预制构件的竖直度,安装速度快,具有自锁功能,可以有效提高施工效率。更优的是,该装配式建筑预制构件安装用可调节斜支撑中的所有构建可方便拆卸,便于重复使用,能够降低工程造价。1. The adjustable oblique support for the installation of prefabricated building components of the present invention includes: a telescopic rod with adjustable length and corbels respectively fixed on the main body of the structure and the prefabricated components; the parallelogram mechanism can quickly and conveniently The length of the telescopic rod can be accurately adjusted, and then the verticality of the prefabricated components can be adjusted. The installation speed is fast, and it has a self-locking function, which can effectively improve the construction efficiency. More preferably, all the structures in the adjustable oblique support for installation of prefabricated building components can be easily disassembled and reused, which can reduce the project cost.

二、受力更好,由于两个伸缩杆件对称设置,对预制构件形成可靠的支撑,进一步地提高了其整体稳定性能。2. The force is better, because the two telescopic rods are arranged symmetrically, forming reliable support for the prefabricated component, and further improving its overall stability.

三、本发明装配式建筑预制构件安装,配合钢丝绳进行锁紧,可以确保浇灌过程中的安全性,从而预制构件发生位移,保证连接可靠性,进一步提高施工安全性。3. The prefabricated components of the prefabricated building of the present invention are installed and locked with the steel wire rope, which can ensure the safety during the pouring process, so that the prefabricated components are displaced, ensuring the reliability of the connection, and further improving the construction safety.

上述描述仅是对本发明较佳实施例的描述,并非对本发明范围的任何限定,本发明领域的普通技术人员根据上述揭示内容做的任何变更、修饰,均属于权利要求书的保护范围。The above description is only a description of the preferred embodiments of the present invention, and does not limit the scope of the present invention. Any changes and modifications made by those of ordinary skill in the field of the present invention based on the above disclosures shall fall within the protection scope of the claims.

Claims (6)

1.装配式建筑墙板安装支撑体系,包括预制构件(1)、结构主体(2)、斜支撑和钢丝绳,其中,所述预制构件垂直的设置在结构主体的边沿处,其特征在于,所述斜支撑包括伸缩杆件和上、下牛腿,1. The prefabricated building wall panel installation support system includes prefabricated components (1), structural main body (2), oblique supports and steel wire ropes, wherein the prefabricated components are vertically arranged on the edge of the structural main body, and it is characterized in that the The oblique supports include telescopic rods and upper and lower corbels, 所述伸缩杆件(4)包括上、中、下三分部,上部分为镀锌方钢管结构的上杆件(41),上杆件的顶部固定一插接结构Ⅰ(411),所述插接结构Ⅰ包括平板(4111)和插接板(4112),所述平板(4111)焊接在上杆件的端部且与所述上杆件(41)彼此垂直,插接板(4112)固定在平板的中部,并在插接板中部的销孔(4113)内插入金属圆销,且所述插接板的顶端为圆弧面(4114);The telescopic rod (4) includes upper, middle and lower parts, the upper part is an upper rod (41) of galvanized square steel pipe structure, and a plug-in structure I (411) is fixed on the top of the upper rod. The plug-in structure I includes a flat plate (4111) and a plug-in board (4112). The flat board (4111) is welded to the end of the upper rod and is perpendicular to the upper rod (41). ) is fixed in the middle of the flat plate, and a metal round pin is inserted into the pin hole (4113) in the middle of the plug board, and the top of the plug board is an arc surface (4114); 下部分为镀锌方钢管结构的下杆件(42),所述下杆件(42)的下部固定一个插接结构Ⅱ(411’),所述插接结构Ⅱ与所述插接结构Ⅰ具有相同的结构;The lower part is the lower rod (42) of the galvanized square steel pipe structure, the lower part of the lower rod (42) is fixed with a plug-in structure II (411'), and the plug-in structure II and the plug-in structure I have the same structure; 上杆件和下杆件中间通过一个平行四边形机构(43)进行连接,所述平行四边形机构包括连杆(431)和上、下底座(432、433),所述上底座(432)垂直固定在上杆件(41)上,下底座(433)垂直固定在下杆件上,并在上底座和下底座上枢接连杆,且同侧的两个连杆之间使用一个销轴来连接,并在销轴的中部开设一个丝孔,一个丝杠穿过两个销轴的丝孔,通过转动丝杠可以调节平行四边形机构的开合程度;The upper rod and the lower rod are connected through a parallelogram mechanism (43), the parallelogram mechanism includes a connecting rod (431) and upper and lower bases (432, 433), and the upper base (432) is vertically fixed On the upper rod (41), the lower base (433) is vertically fixed on the lower rod, and the connecting rods are pivoted on the upper base and the lower base, and a pin is used to connect the two connecting rods on the same side , and set a thread hole in the middle of the pin shaft, a lead screw passes through the thread holes of the two pin shafts, and the opening and closing degree of the parallelogram mechanism can be adjusted by turning the lead screw; 上牛腿(5),上牛腿包括镀锌钢板(51)、铰接侧耳(52)和支撑关节(53),其中所述铰接侧耳(52)为两个且对称设置,每一个铰接侧耳(52)相对于竖直面倾斜角度为5至20度,并在铰接侧耳的两侧设置有支撑关节(53),所述支撑关节为弧形面,并在镀锌钢板(51)上设置有至少两个螺栓孔;所述铰接侧耳(52)中设置有一个长条孔(521),所述长条孔(521)沿着与镀锌钢板表面成10至20度夹角;The upper corbel (5), the upper corbel includes galvanized steel plate (51), hinged side ears (52) and support joints (53), wherein the hinged side ears (52) are two and symmetrically arranged, each hinged side ear ( 52) The inclination angle relative to the vertical plane is 5 to 20 degrees, and support joints (53) are provided on both sides of the hinged side ears. At least two bolt holes; a long hole (521) is provided in the hinged side ear (52), and the long hole (521) forms an angle of 10 to 20 degrees with the surface of the galvanized steel sheet; 下牛腿(6),所述下牛腿中具有一个铰接侧耳;a lower corbel (6) having a hinged side ear in said lower corbel; 所述上、下牛腿分别与上杆件和下杆件枢接连接;The upper and lower corbels are pivotally connected to the upper rod and the lower rod respectively; 所述钢丝绳为两根,且分别设置在斜支撑两侧的结构主体和预制构件之间。There are two steel wire ropes, which are respectively arranged between the structural main body and the prefabricated component on both sides of the diagonal support. 2.根据权利要求1所述的装配式建筑墙板安装支撑体系,其特征在于,每一个铰接侧耳(52)相对于竖直面倾斜角度为10度。2. The prefabricated building wall panel installation support system according to claim 1, characterized in that each hinged side ear (52) is inclined at an angle of 10 degrees relative to the vertical plane. 3.根据权利要求1所述的装配式建筑墙板安装支撑体系,其特征在于,所述长条孔(521)沿着与镀锌钢板表面成15度夹角。3. The prefabricated building wall panel installation support system according to claim 1, characterized in that, the long hole (521) forms an angle of 15 degrees with the surface of the galvanized steel plate along the line. 4.根据权利要求1所述的装配式建筑墙板安装支撑体系,其特征在于,所述长条孔的有效长度为2厘米。4. The prefabricated building wall panel installation support system according to claim 1, characterized in that, the effective length of the long hole is 2 cm. 5.权利要求1至4中任意一项所述的装配式建筑墙板安装支撑体系的构建方法,其特征在于:步骤如下,5. The construction method of the prefabricated building wall panel installation support system described in any one of claims 1 to 4, characterized in that: the steps are as follows, 步骤一,将埋件提前安装在结构主体(2)与预制构件(1)中,同时在结构主体和预制构件中还设置有钢丝绳铆接点,所述埋件中具有用于固定上、下牛腿的螺栓套筒;Step 1, the embedded parts are installed in the structural main body (2) and the prefabricated component (1) in advance, and at the same time, steel wire rope riveting points are also set in the structural main body and the prefabricated component, and the embedded parts have the function of fixing the upper and lower cattle Bolt sockets for legs; 步骤二:将预制构件(1)吊至结构主体(2)的指定位置上,现场使用螺栓将上、下牛腿分别固定在预制构件和结构主体上的埋件中;Step 2: hoist the prefabricated component (1) to the designated position of the structural main body (2), and use bolts on site to fix the upper and lower corbels respectively in the embedded parts of the prefabricated component and the structural main body; 步骤三:然后使用圆销将所述伸缩杆件分别与上牛腿和下牛腿进行连接,形成一体,然后通过平行四边形机构进行调节预制构件的竖直度,最后使用钢丝绳连接预制构件和结构主体并进行拉紧,Step 3: Then use round pins to connect the telescopic rods with the upper corbel and the lower corbel respectively to form a whole, then adjust the verticality of the prefabricated components through a parallelogram mechanism, and finally use steel wire ropes to connect the prefabricated components and the structure main body and tensioned, 步骤四,在相邻的预制构件之间的角柱位置进行混凝土浇筑;Step 4, pouring concrete at the corner column positions between adjacent prefabricated components; 步骤五,角柱养护硬化后,拆除伸缩杆件、上牛腿和下牛腿,完成。Step 5: After the corner columns are cured and hardened, the telescopic rods, the upper corbel and the lower corbel are removed to complete. 6.根据权利要求5所述的构建方法,其特征在于,在步骤二之前,还包括一个对预制构件和结构主体中的埋件表面进行清理的步骤。6. The construction method according to claim 5, characterized in that, before the second step, it also includes a step of cleaning the surface of the prefabricated components and the embedded parts in the structural main body.
CN201610166189.0A 2016-03-22 2016-03-22 Assembled architecture wallboard installs support system and its construction method Expired - Fee Related CN105781131B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610166189.0A CN105781131B (en) 2016-03-22 2016-03-22 Assembled architecture wallboard installs support system and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610166189.0A CN105781131B (en) 2016-03-22 2016-03-22 Assembled architecture wallboard installs support system and its construction method

Publications (2)

Publication Number Publication Date
CN105781131A CN105781131A (en) 2016-07-20
CN105781131B true CN105781131B (en) 2017-11-07

Family

ID=56390640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610166189.0A Expired - Fee Related CN105781131B (en) 2016-03-22 2016-03-22 Assembled architecture wallboard installs support system and its construction method

Country Status (1)

Country Link
CN (1) CN105781131B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914822B (en) * 2019-04-15 2021-01-15 南通建诚混凝土有限公司 Sliding chute structure of device is built towards assembled building wallboard
CN113047666A (en) * 2021-04-09 2021-06-29 西安建筑科技大学 Limiting device is supported in installation of assembled PC wall
CN114045982B (en) * 2021-10-19 2023-02-28 青岛海川建设集团有限公司 Assembly type precast beam and cast-in-place structure multiple anti-seepage structure and construction method thereof
CN114412206B (en) * 2021-12-20 2023-07-07 江西方远建工集团有限公司 Assembled building based on BIM technique

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3798856A (en) * 1972-05-24 1974-03-26 W Gloskowski Tilt-up wall panel brace assembly
SU838072A1 (en) * 1978-12-22 1981-06-15 Дмитровский Домостроительный Комбинатглавмособлстроя Jig for erecting lift shafts
US6854222B2 (en) * 2002-01-03 2005-02-15 Rens Hansort Adjustable support brace and mounting shoe
CN201567803U (en) * 2009-12-09 2010-09-01 重庆大学 Temporary support device for hoisting construction of steel structure
CN202520009U (en) * 2012-01-09 2012-11-07 唐旭恒 Rough and fine adjustable support rod
CN204960353U (en) * 2015-09-17 2016-01-13 长沙远大住宅工业集团有限公司 Take bearing diagonal subassembly of drag hook

Also Published As

Publication number Publication date
CN105781131A (en) 2016-07-20

Similar Documents

Publication Publication Date Title
CN105781131B (en) Assembled architecture wallboard installs support system and its construction method
CN108343163A (en) Steel column butt joint adjusts fixing device and method
CN102561669A (en) Cantilever scaffold and construction method thereof
CN108678423A (en) Vertical conversion bearing structure is demolishd in reverse direction of reinforced concrete structure
CN105781100A (en) Template component for sidewall of subway station
CN114508231B (en) Quick combination construction method for I-steel component
CN204590555U (en) Assembling elevator hoistway construction platform
CN206352391U (en) Socket joint type key slot type Quick Release support system
CN108560895A (en) A kind of adjustable type elevator shaft operating platform and its erection method
CN112696012A (en) Wall column template device capable of being spliced
CN110259087B (en) Scaffold support structure and scaffold support system
CN109098428B (en) Elevator shaft construction platform
CN208815879U (en) An elevator derrick
CN207260376U (en) The connection mode of new steel framed building wall
CN207714742U (en) A quick-detachable concrete plane formwork installation support device
CN203347205U (en) Overhung scaffold
CN115030062A (en) A new type of suspension casting construction bracket for the 0# block of the through-core screw half-hoop
CN105804417A (en) Sway brace for installation of assembly type building wallboard and using method thereof
CN219241313U (en) Outer wall square steel joist
CN115321338A (en) Hoisting and positioning structure for PC laminated slab and construction method
CN108729678A (en) A kind of connection structure and method hung, pacify integrated detachable steel framed building wall
CN209244243U (en) A kind of fixed device of fashioned iron sizing tripod for builder's jack
CN210340110U (en) Two T board hoisting structure of large-span assembled
CN220036212U (en) Elevator shaft safety protection platform
CN221741957U (en) Elevator well scaffold system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Song Baoyu

Inventor after: Song Jiacheng

Inventor after: Zhao Jiajie

Inventor after: Shi Yongjian

Inventor before: Chen Huafeng

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170929

Address after: 071051, No. 16, No. 1609-1611, block A, Zhongguancun innovation center, 1799 Chaoyang North Street, Hebei, Baoding, Baoding

Applicant after: Baoding micro exhibition Polytron Technologies Inc

Address before: 250014 Shandong City, Ji'nan province Lixia District, Lin Road, No. 9, Fu Fu Garden, building 4, unit 39, 602

Applicant before: JINAN LUFANGZHIHE INFORMATION TECHNOLOGY CO., LTD.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171107

Termination date: 20210322