CN105781058A - Arc-surface modeling decorative plate installation structure - Google Patents

Arc-surface modeling decorative plate installation structure Download PDF

Info

Publication number
CN105781058A
CN105781058A CN201610273037.0A CN201610273037A CN105781058A CN 105781058 A CN105781058 A CN 105781058A CN 201610273037 A CN201610273037 A CN 201610273037A CN 105781058 A CN105781058 A CN 105781058A
Authority
CN
China
Prior art keywords
mounting structure
cambered surface
decorative board
board mounting
serrated face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610273037.0A
Other languages
Chinese (zh)
Other versions
CN105781058B (en
Inventor
孟阳
赵晖
杨亮
李蓓
吴俊书
张茂松
于国奋
张恰洽
姚维玺
阮婧
史祥
何翌
赵郁
苏明
潘韦华
解成红
赵凝思
宣海军
侯正东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Gold Mantis Construction Decoration Co Ltd
Original Assignee
Suzhou Gold Mantis Construction Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Gold Mantis Construction Decoration Co Ltd filed Critical Suzhou Gold Mantis Construction Decoration Co Ltd
Priority to CN201610273037.0A priority Critical patent/CN105781058B/en
Publication of CN105781058A publication Critical patent/CN105781058A/en
Application granted granted Critical
Publication of CN105781058B publication Critical patent/CN105781058B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0832Separate fastening elements without load-supporting elongated furring elements between wall and covering elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses an arc-surface modeling decorative plate installation structure. The arc-surface modeling decorative plate installation structure comprises a base layer plate fixedly installed on a base rack; a surface layer installation part fixedly connected onto the base layer plate, wherein at least one clamping part is arranged on the surface layer installation part and a first saw tooth surface is arranged on a clamping surface of the clamping part; surface layer units onto which at least one connecting piece is fixedly connected, wherein a second saw tooth surface is arranged on a clamping surface of the connecting piece, the connecting piece is clamped in the clamping part and the second saw tooth surface is occluded with the first saw tooth surface. Compared with the prior art, on the premise that the installation firmness is guaranteed, the original welding installation method can be fully replaced, thus the open-fire operation on the construction site can be reduced, the potential safety hazard is eliminated, the manpower and material resources are reduced, the construction cost is reduced, the installation efficiency is effectively improved and the operation of standard productization is further facilitated.

Description

Cambered surface molding decorative board mounting structure
Technical field
The present invention relates to a kind of decoration board mounting structure, be specifically related to a kind of cambered surface molding decorative board mounting structure.
Background technology
Tradition cambered surface molding decorative plate in-site installation adopts the mode of manual welding to carry out the welded and installed at scene mostly, and stress corrosion cracking is welding point produced delayed fracture phenomenon during the effect of Tensile stress under particular etch environment.The stress corrosion cracking of stainless steel welded joint be welding point than more serious failure mode, show as the brittle break of plastic-less deformation, form stress corrosion and destroy, and stainless welding also can produce the bad hidden dangers such as intercrystalline corrosion.Therefore, for the actual installation of the many surface modelings of this arc, adopt the thin portion that welding will directly affect between cell block to connect closing in requirement.
Summary of the invention
In order to solve above-mentioned technical problem, the invention provides a kind of cambered surface molding decorative board mounting structure that can replace welded and installed mode.
In order to achieve the above object, technical scheme is as follows:
Cambered surface molding decorative board mounting structure, comprising:
Basal plate, it is fixedly installed on pedestal;
Surface layer installation portion, it is fixedly connected on basal plate, this surface layer installation portion offers at least one Access Division, the card access surface of this Access Division is provided with the first serrated face;
Surface units, it is fixedly connected with at least one connector, and the card access surface of this connector is provided with the second serrated face, and connector snaps in Access Division, and the second serrated face and the first serrated face are engaged.
The present invention by arranging the Access Division with the first serrated face and arranging the connector with the second serrated face on surface units on surface layer installation portion, then pass through the first serrated face and the interlocking of the second serrated face, surface units is fixedly mounted on basal plate and surface layer installation portion in the horizontal direction and the vertical direction, such that it is able to replace original welded and installed mode.
Therefore, the present invention is compared with prior art, original welded and installed mode can be fully replaced while ensureing firmly installing property, such that it is able to reduce the work with torches of job site, eliminate safe hidden trouble, and also save substantial amounts of man power and material to exist, while reducing construction cost, be also effectively improved installation effectiveness, be more favorable for the operation of standardized product.
Simultaneously, the connected mode of serrated face of the present invention occlusion, when running into the closing in problem of on-the-spot surface units and other materials, the closing in details of chain of command layer unit and adjacent materials can be carried out according to the up-down adjustment of sawtooth, solve the rigid adjustment problem of surface units closing in place.
On the basis of technique scheme, the present invention can also do following improvement:
As preferred scheme, above-mentioned Access Division is the cell body being opened in surface layer installation portion.
Adopt above-mentioned preferred scheme, it is possible to facilitate implementation the connection with connector.
As preferred scheme, above-mentioned cell body is the groove offered along Access Division width.
Adopt above-mentioned preferred scheme, it is possible to improve the connectivity robustness of Access Division and connector.
As preferred scheme, the cross section of above-mentioned cell body is curved, and the first serrated face is arranged on the inwall of the cambered surface of cell body.
Adopt above-mentioned preferred scheme, it is possible to improve the connectivity robustness of Access Division and connector further.
As preferred scheme, above-mentioned connector is L-shaped plate body, and by chamfered transition between its both sides, the second serrated face is arranged on this inclined-plane.
Adopt above-mentioned preferred scheme, it is possible to improve the connectivity robustness of Access Division and connector further.
As preferred scheme, above-mentioned inclined-plane is the cambered surface of indent.
Adopt above-mentioned preferred scheme, it is possible to be easy to connector and snap in Access Division.
As preferred scheme, above-mentioned connector being additionally provided with the 3rd serrated face, its inserting surface layer unit is by having in the chute of the 4th serrated face.
Adopt above-mentioned preferred scheme, it is possible to facilitate implementation the dismounting between connector and surface units, it is also possible to facilitate implementation the adjustment between connector and surface units.
As preferred scheme, above-mentioned basal plate is fixedly installed on pedestal also by the second plate body.
Adopt above-mentioned preferred scheme, it is possible to make basal plate and surface layer installation portion to be more stably mounted on pedestal.
As preferred scheme, above-mentioned bolt is fixed on pedestal through surface layer installation portion and basal plate.
Adopt above-mentioned preferred scheme, it is possible to achieve the anchoring certainly tearing formula open is installed, and it is convenient greatly to bring for the line maintenance of interior volume, it is possible to achieve regular maintenance and inspection, it is ensured that the stable operation of built-in system.
Accompanying drawing explanation
Fig. 1 is the structural representation of the cambered surface molding decorative board mounting structure of the present invention.
Fig. 2 is the cambered surface molding decorative board mounting structure of present invention structure broken away view under an angle.
Fig. 3 is the cambered surface molding decorative board mounting structure of present invention structure broken away view under another angle.
Fig. 4 is the structural representation of basal plate involved in the cambered surface molding decorative board mounting structure of the present invention, surface layer installation portion and surface units.
Fig. 5 is the connection diagram of Access Division involved in the cambered surface molding decorative board mounting structure of the present invention and connector.
Fig. 6 is the connection diagram of surface units involved in the cambered surface molding decorative board mounting structure of the present invention and connector.
Wherein, 1. basal plate 2. surface layer installation portion 3. Access Division 31. first serrated face 4. surface units 41. chute 42. the 4th serrated face 5. connector 51. second serrated face 52. inclined-plane 53. the 3rd serrated face 6. second plate body 7. bolt.
Detailed description of the invention
The preferred embodiment of the present invention is described in detail below in conjunction with accompanying drawing.
In order to reach the purpose of the present invention, as Figure 1-5, in the some of them embodiment of the cambered surface molding decorative board mounting structure of the present invention, comprising: basal plate 1, it is fixedly installed on pedestal (not shown);Surface layer installation portion 2, it is fixedly connected on basal plate 1, this surface layer installation portion 2 offers two Access Divisions 3 (this Access Division 3 it can also be provided that one or more, determine according to the size of surface layer installation portion 2), the card access surface of this Access Division 3 is provided with the first serrated face 31;Surface units 4, it is fixedly connected with two connectors 5 (quantity of connector 5 is determined according to the quantity of Access Division 3), being provided with the second serrated face 51 in the card access surface of this connector 5, connector 5 snaps in Access Division 3, and the second serrated face 51 and the first serrated face 31 are engaged.
This structure by arranging the Access Division with the first serrated face and arranging the connector with the second serrated face on surface units on surface layer installation portion, then pass through the first serrated face and the interlocking of the second serrated face, surface units is fixedly mounted on basal plate and surface layer installation portion in the horizontal direction and the vertical direction, such that it is able to replace original welded and installed mode.Therefore, this structure is compared with prior art, original welded and installed mode can be fully replaced while ensureing firmly installing property, such that it is able to reduce the work with torches of job site, eliminate safe hidden trouble, and also save substantial amounts of man power and material to exist, while reducing construction cost, be also effectively improved installation effectiveness, be more favorable for the operation of standardized product.Simultaneously, the connected mode of the serrated face occlusion that this structure adopts, when running into the closing in problem of on-the-spot surface units and other materials, the closing in details of chain of command layer unit and adjacent materials can be carried out according to the up-down adjustment of sawtooth, solve the rigid adjustment problem of surface units closing in place.
In order to optimize the implementation result of the present invention further, as shown in Figure 3-4, in other embodiments of the cambered surface molding decorative board mounting structure of the present invention, on the basis of the above, above-mentioned Access Division 3 is the cell body being opened in surface layer installation portion 2, is specifically as follows the groove offered along Access Division 3 width.Adopt the scheme of this embodiment, it is possible to achieve Access Division is firmly connected with connector.
In order to optimize the implementation result of the present invention further, as Figure 1-4, in other embodiments of the cambered surface molding decorative board mounting structure of the present invention, on the basis of the above, the cross section of above-mentioned cell body (i.e. Access Division 3) is curved, and the first serrated face 31 is arranged on the inwall of cambered surface of cell body.Adopt the scheme of this embodiment, it is possible to improve the connectivity robustness of Access Division and connector further.
In order to optimize the implementation result of the present invention further, as Figure 1-4, in other embodiments of the cambered surface molding decorative board mounting structure of the present invention, on the basis of the above, above-mentioned connector 5 is L-shaped plate body, by inclined-plane 52 transition between its both sides, the second serrated face 51 is arranged on this inclined-plane 52.Adopt the scheme of this embodiment, it is possible to improve the connectivity robustness of Access Division and connector further.
In order to optimize the implementation result of the present invention further, as shown in Figure 1-2, in other embodiments of the cambered surface molding decorative board mounting structure of the present invention, on the basis of the above, above-mentioned inclined-plane 52 is the cambered surface of indent.Adopt the scheme of this embodiment, it is possible to be easy to connector and snap in Access Division.
In order to optimize the implementation result of the present invention further, as shown in Figure 6, in other embodiments of the cambered surface molding decorative board mounting structure of the present invention, on the basis of the above, being additionally provided with the 3rd serrated face 53 on above-mentioned connector 5, its inserting surface layer unit 4 is by having in the chute 41 of the 4th serrated face 42.Adopt the scheme of this embodiment, it is possible to facilitate implementation the dismounting between connector and surface units, it is also possible to facilitate implementation the adjustment between connector and surface units.
In order to optimize the implementation result of the present invention further, as Figure 1-4, in other embodiments of the cambered surface molding decorative board mounting structure of the present invention, on the basis of the above, above-mentioned basal plate 1 is fixedly installed on pedestal also by the second plate body 6.Adopt the scheme of this embodiment, it is possible to make basal plate and surface layer installation portion to be more stably mounted on pedestal.
In order to optimize the implementation result of the present invention further, as Figure 1-4, in other embodiments of the cambered surface molding decorative board mounting structure of the present invention, on the basis of the above, above-mentioned bolt 7 is fixed on pedestal through surface layer installation portion 2 and basal plate 1.Adopt the scheme of this embodiment, it is possible to achieve the anchoring certainly tearing formula open is installed, and it is convenient greatly to bring for the line maintenance of interior volume, it is possible to achieve regular maintenance and inspection, it is ensured that the stable operation of built-in system.
Preferably processing and the construction method of above-mentioned embodiment are described below:
1) according to design drawing, surveying setting-out, Gang Jia basic unit installs the basal plate of reserving hole;
2) with bolt, surface layer installation portion and the second plate body is fixed on basal plate to fastening, fixing to connector and surface units formation is installed entirety;
3) surface units after connection is inserted in Access Division by connector;
4) check that each position connects whether to fasten, require to regulate sawtooth according to the closing in that surface units is adjacent, control to close up.
Above-described is only the preferred embodiment of the present invention, it is noted that for the person of ordinary skill of the art, without departing from the concept of the premise of the invention, it is also possible to making some deformation and improvement, these broadly fall into protection scope of the present invention.

Claims (9)

1. cambered surface molding decorative board mounting structure, it is characterised in that including:
Basal plate, it is fixedly installed on pedestal;
Surface layer installation portion, it is fixedly connected on described basal plate, described surface layer installation portion offers at least one Access Division, the card access surface of described Access Division is provided with the first serrated face;
Surface units, it is fixedly connected with at least one connector, and the card access surface of described connector is provided with the second serrated face, and described connector snaps in described Access Division, and described second serrated face and described first serrated face are engaged.
2. cambered surface molding decorative board mounting structure according to claim 1, it is characterised in that described Access Division is the cell body being opened in described surface layer installation portion.
3. cambered surface molding decorative board mounting structure according to claim 2, it is characterised in that described cell body is the groove offered along described Access Division width.
4. the cambered surface molding decorative board mounting structure according to Claims 2 or 3, it is characterised in that the cross section of described cell body is curved, and described first serrated face is arranged on the inwall of cambered surface of described cell body.
5. cambered surface molding decorative board mounting structure according to claim 1, it is characterised in that described connector is L-shaped plate body, by chamfered transition between its both sides, described second serrated face is arranged on described inclined-plane.
6. cambered surface molding decorative board mounting structure according to claim 5, it is characterised in that described inclined-plane is the cambered surface of indent.
7. the cambered surface molding decorative board mounting structure according to claim 1 or 6, it is characterised in that be additionally provided with the 3rd serrated face on described connector, it inserts described surface units by having in the chute of the 4th serrated face.
8. cambered surface molding decorative board mounting structure according to claim 1, it is characterised in that described basal plate is fixedly installed on described pedestal also by the second plate body.
9. the cambered surface molding decorative board mounting structure according to claim 1 or 8, it is characterised in that bolt is fixed on described pedestal through described surface layer installation portion and described basal plate.
CN201610273037.0A 2016-04-28 2016-04-28 Cambered surface molding decorative board mounting structure Active CN105781058B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610273037.0A CN105781058B (en) 2016-04-28 2016-04-28 Cambered surface molding decorative board mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610273037.0A CN105781058B (en) 2016-04-28 2016-04-28 Cambered surface molding decorative board mounting structure

Publications (2)

Publication Number Publication Date
CN105781058A true CN105781058A (en) 2016-07-20
CN105781058B CN105781058B (en) 2018-02-13

Family

ID=56399896

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610273037.0A Active CN105781058B (en) 2016-04-28 2016-04-28 Cambered surface molding decorative board mounting structure

Country Status (1)

Country Link
CN (1) CN105781058B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107355055A (en) * 2017-08-31 2017-11-17 苏州金螳螂建筑装饰股份有限公司 Aluminium sheet fittable slackening device and its installation method and application
CN110273522A (en) * 2018-12-25 2019-09-24 浙江亚厦装饰股份有限公司 A kind of ultra-thin cement fiber board mounting structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03257247A (en) * 1990-03-07 1991-11-15 Riken Light Metal Ind Co Ltd Curved surface sticking device
CN201794244U (en) * 2010-08-23 2011-04-13 浙江亚厦装饰股份有限公司 Dry-hanging fireproof wood veneer
CN201865283U (en) * 2010-11-26 2011-06-15 宗长亮 Detachable combined decoration plate
CN202831514U (en) * 2012-10-11 2013-03-27 中国建筑装饰集团有限公司 Adjustable wallboard hanging part
CN105089247A (en) * 2015-08-27 2015-11-25 苏州金螳螂建筑装饰股份有限公司 Vertical face special-shaped multi-curved-face arc-shaped plate installation structure and installation method thereof
CN205712913U (en) * 2016-04-28 2016-11-23 苏州金螳螂建筑装饰股份有限公司 Cambered surface molding decorative board mounting structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03257247A (en) * 1990-03-07 1991-11-15 Riken Light Metal Ind Co Ltd Curved surface sticking device
CN201794244U (en) * 2010-08-23 2011-04-13 浙江亚厦装饰股份有限公司 Dry-hanging fireproof wood veneer
CN201865283U (en) * 2010-11-26 2011-06-15 宗长亮 Detachable combined decoration plate
CN202831514U (en) * 2012-10-11 2013-03-27 中国建筑装饰集团有限公司 Adjustable wallboard hanging part
CN105089247A (en) * 2015-08-27 2015-11-25 苏州金螳螂建筑装饰股份有限公司 Vertical face special-shaped multi-curved-face arc-shaped plate installation structure and installation method thereof
CN205712913U (en) * 2016-04-28 2016-11-23 苏州金螳螂建筑装饰股份有限公司 Cambered surface molding decorative board mounting structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107355055A (en) * 2017-08-31 2017-11-17 苏州金螳螂建筑装饰股份有限公司 Aluminium sheet fittable slackening device and its installation method and application
CN110273522A (en) * 2018-12-25 2019-09-24 浙江亚厦装饰股份有限公司 A kind of ultra-thin cement fiber board mounting structure

Also Published As

Publication number Publication date
CN105781058B (en) 2018-02-13

Similar Documents

Publication Publication Date Title
CN102312541A (en) Vertical-surface stone dry-hang installing system
CN102359242A (en) Vertical-face stone dry-hanging mounting structure
CN108894372B (en) Modeling plate curtain wall assembly structure
CN111395598A (en) High-rise building scale unitized curtain wall system
CN105781058A (en) Arc-surface modeling decorative plate installation structure
CN102953473A (en) Unit curtain wall connector
CN102312540A (en) Vertical dry-hanging mounting structure of stone
CN201901964U (en) Three-dimensional adjustable and disconnectable curtain wall
CN202045477U (en) Mould mending block
CN207018627U (en) A kind of suspension and support pre-embedded device
CN205712913U (en) Cambered surface molding decorative board mounting structure
CN204059661U (en) A kind of ALC body of wall assembly
CN202148664U (en) Stone material dry-hang mounting structure of vertical surface
CN102251682B (en) Adjacent edge protection railing
CN201821009U (en) Baseplate connection strengthening rib for retractable 10kv switchgear busbar bridge box
CN206971499U (en) A kind of copper plate curtain wall system for being mounted in parallel plate
CN202148665U (en) Dry-hanging installation system for facade stones
CN205509396U (en) An I -steel gallows
CN202164779U (en) Dry-hanging installation structure for vertical faces of stone materials
CN210031989U (en) Spray branch pipe support and hanger frame mounted on clear water concrete top plate
CN203664902U (en) Production line for automatically processing T-shaped steel member
CN209457217U (en) A kind of prefabricated embedded part of Combined curtain wall
CN208023793U (en) A kind of dry-hanging piece for stone
CN205111021U (en) Welding of belted steel fishplate bar is with fixed structure of copper packing board
CN206352368U (en) A kind of roof clamp being easily installed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant