CN105780918A - Anti-settling system of integrated sewage lifting pump station - Google Patents

Anti-settling system of integrated sewage lifting pump station Download PDF

Info

Publication number
CN105780918A
CN105780918A CN201610294190.1A CN201610294190A CN105780918A CN 105780918 A CN105780918 A CN 105780918A CN 201610294190 A CN201610294190 A CN 201610294190A CN 105780918 A CN105780918 A CN 105780918A
Authority
CN
China
Prior art keywords
water
straight tube
pipe
settling
outlet pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610294190.1A
Other languages
Chinese (zh)
Other versions
CN105780918B (en
Inventor
沈洪礼
陈晶
于云飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ebara Machinery China Co Ltd
Original Assignee
Ebara Machinery China Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ebara Machinery China Co Ltd filed Critical Ebara Machinery China Co Ltd
Priority to CN201610294190.1A priority Critical patent/CN105780918B/en
Publication of CN105780918A publication Critical patent/CN105780918A/en
Application granted granted Critical
Publication of CN105780918B publication Critical patent/CN105780918B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/22Adaptations of pumping plants for lifting sewage
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M5/00Engine beds, i.e. means for supporting engines or machines on foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Mechanical Engineering (AREA)
  • Sewage (AREA)

Abstract

The invention discloses an anti-settling system of an integrated sewage lifting pump station. The anti-settling system comprises a cylinder body, an anti-settling water-in mechanism and an anti-settling water-out mechanism, wherein the anti-settling water-in mechanism comprises a water-in elbow, a buffer tank and a shield; the buffer tank is provided with a tank body water inlet and a tank body water-out pipe; the tank body water-out pipe is connected with a water-in pipe through a flange; the shield is arranged on the outer side of the buffer tank and internally filled with concrete; one end of the water-in elbow is inserted into the tank body water inlet while the other end is connected with a field water-out pipe; the anti-settling water-out mechanism comprises a water-out pipe, a spring bracket and a drainage sinking well; and the water-out pipe comprises a first straight pipe, a second straight pipe and a third straight pipe sequentially connected through an elbow. In the invention, through relative sliding in the vertical direction between the water-in elbow and the buffer tank and between the water-out pipe and the drainage sinking well, the pulling or stretching at the water-in pipe and water-out pipe is prevented during the settling of the pump station, and the pump station still can work normally in a certain range of settling volume.

Description

Integrated sewage water Boosting pumping station anti-settling system
Technical field
The present invention relates to a kind of integrated sewage water Boosting pumping station anti-settling system, belong to sewage lifting draining technology field.
Background technology
Along with socioeconomic fast development, get more and more from life and the sewage discharge produced, once these sewage arbitrarily discharge, will result in the severe contamination of whole environment, in order to collect these sewage of process, sewage lifting pump station also just arises at the historic moment, and its use is also more and more extensive.
The critical pieces such as cylinder that existing most of sewage lifting pump station includes being arranged on pedestal, water inlet pipe, outlet pipe, water pump 20, service platform 19, general 0.8~the 3.8m of barrel diameter of sewage lifting pump station, highly general 3~20m, weight is big, generally it is embedded in underground, the top of cylinder can be concordant with ground, keeps and the green effect neat, attractive in appearance of surrounding, is also convenient for workmen simultaneously and finds in time and safeguard in the cylinder of pumping plant under pumping plant position;But when sewage lifting pump station is built in the foundation ditch of soft soil, long-time use ground settles unavoidably, water inlet pipe due to sewage lifting pump station, general more than DN200, directly being connected with on-the-spot outlet pipe docking, when sedimentation occurs in pedestal, cylinder, outlet pipe etc. all can sink along with pedestal, and the on-the-spot outlet pipe being connected with outlet pipe will be subject to pullling of pumping plant outlet pipe, the process of pullling may result in the damage of pumping plant water inlet pipe, causes easily occurring leakage accident.
The outlet pipe at existing gargoyle of pumping station place is horizontally arranged, the outer end of outlet pipe is directly docked with the underground blow-off line of municipal wastewater pipe network, sewage after sewage lifting pump station promotes can enter directly in the blow-off line of municipal wastewater pipe network, decline along with pedestal, pumping plant sedimentation can pull down stretches out water pipe, easily causing the damage of outlet pipe, pumping plant cylinder or even municipal wastewater pipe network, cause leakage accident, pumping plant cannot normal operation.
Summary of the invention
The present invention is directed to the deficiency that above-mentioned prior art exists, a kind of integrated sewage water Boosting pumping station anti-settling system is provided, which solves pumping plant water inlet pipe fail in tension pumping plant outlet pipe, pumping plant water inlet pipe, pumping plant cylinder and scene outlet pipe when sedimentation occurs in pumping plant that existing gargoyle of pumping station is connected with on-the-spot outlet pipe and cause the phenomenon leaked.
The technical scheme is that a kind of integrated sewage water Boosting pumping station anti-settling system, including cylinder, anti-settling water intake mechanism and anti-settling discharge mechanism, described cylinder is fixed in bottom base, and described cylinder is provided with water inlet pipe and outlet pipe;
nullDescribed anti-settling water intake mechanism includes into water bend pipe、Baffle-box and guard shield,Described baffle-box is provided with casing inlet opening and casing outlet pipe,Described casing inlet opening is arranged on the top of described baffle-box,Described casing outlet pipe and described water inlet pipe pass through Flange joint,The V-shaped structure in bottom of described baffle-box,The bottom of described baffle-box is along the axially inclined setting of described casing outlet pipe,And minimum point is in the bottom of described casing outlet pipe,Described guard shield is arranged on the outside of described baffle-box,Described guard shield is close to the side of described cylinder and is had the arc structure matched with described cylinder,The top of described guard shield is provided with the through hole for described water inlet bend pipe traverse,The bottom of described guard shield is fixing with pedestal to be connected,It is filled with concrete in described guard shield,One end of described water inlet bend pipe is inserted in described casing inlet opening through described through hole,The other end is connected with on-the-spot outlet pipe;
nullDescribed anti-settling discharge mechanism includes outlet pipe、For supporting the spring support of outlet pipe and being arranged on the drained surface of foundation ditch side,Described outlet pipe includes the first straight tube being sequentially connected with by bend pipe、Second straight tube and the 3rd straight tube,Described second straight tube is horizontally disposed with,Described first straight tube、3rd straight tube is vertically connected on the two ends of described second straight tube,Described first straight tube is vertically arranged in cylinder,Described first straight tube one end is connected with the outlet of water pump,The other end is connected with one end of described second straight tube through the top cover of cylinder by bend pipe,The other end of described second straight tube is connected with one end of described 3rd straight tube by bend pipe,The other end of described 3rd straight tube stretches to described drained surface,Described spring support is supported on the bottom of described second straight tube,Described drained surface is provided with well lid,Described well lid is provided with the well lid hole for described 3rd straight tube traverse.Spring support can adopt existing spring support, as long as the vertical displacement amount that outlet pipe settles along with pumping plant can also be able to be absorbed while undertaking outlet pipe weight.
Baffle-box is generally large, inside is adopted to be filled with concrete guard shield, not only baffle-box can be played stable supporting role, and the arc structure inside guard shield and pumping plant cylinder fit tightly, baffle-box, guard shield and pumping plant is made to form an entirety, ensureing baffle-box sedimentation Tong Bu with pumping plant, thus will not stretch the water inlet pipe of pumping plant, in this outer shield, fill concrete is also prevented from guard shield internal water accumulation;The bottom of baffle-box adopts V-structure, it may also be said to be outside arced configuration, converges to centre position bottom baffle-box for the ease of sewage and mud;And downward-sloping towards casing outlet pipe bottom baffle-box, it is simple to sewage and mud all can flow rapidly in pumping plant, it is to avoid sludgd deposition affects sewage lifting and conveying effect in baffle-box;
The outlet pipe at gargoyle of pumping station place is revised as, by the direct external below ground municipal administration blow-off line of level, the first straight tube straight up being directly connected to pump outlet, then the first straight tube connects horizontally disposed second straight tube by bend pipe, then the 3rd straight tube straight down is connected again through bend pipe, realize the water through pump outlet to rotate 180 ° vertically downward enter in drained surface through then horizontal direction flowing is last after pumping plant top cover straight up, drained surface adopts with outlet pipe and is flexibly connected, when pumping plant settles, outlet pipe can move downward along with pumping plant entirety, owing to outlet pipe and drained surface junction are vertical direction straight tubes, therefore will not there is pullling the phenomenon of outlet pipe, prevent the damage to pumping plant and sewage pipe;In addition the design of drained surface makes the sewage in drained surface that self gravitation can be leaned on naturally to be flowed in the underground blow-off line of municipal wastewater pipe network, saves the energy.
The invention has the beneficial effects as follows: in pumping plant infall process, pumping plant, baffle-box and guard shield synchronize sedimentation, and the water inlet bend pipe being connected with on-the-spot outlet pipe remains stationary as, baffle-box and water inlet bend pipe relative sliding, when the covert length extending water inlet bend pipe prevents pumping plant from settling, water inlet pipe place is pullled or is stretched, stretching into the water inlet bend pipe in baffle-box to expose along with pumping plant sedimentation, water inlet bend pipe stretches into the settling amount that the length in baffle-box allows more than pumping plant, therefore water inlet bend pipe is without departing from baffle-box;Outlet pipe vertical direction is stretched out by the top cover of cylinder, and when sedimentation occurs in pumping plant, outlet pipe can in the vertical direction relative sliding with drained surface.In a word, present configuration is simple, maintenance cost is low, and when preventing pumping plant from settling by bend pipe of intaking with the relative sliding on baffle-box, outlet pipe and drainage subsidence vertical direction, water inlet pipe, water outlet pipe part are pullled or stretched, it is ensured that pumping plant remains to normal operation within the scope of certain settling amount.
On the basis of technique scheme, the present invention can also do following improvement.
Further, the outer sheath of described water inlet bend pipe is equipped with flexible connection rubber sheath, and the top of described water inlet bend pipe is provided with ring flange, and the upper end of described flexible connection rubber sheath is connected with described ring flange.
Above-mentioned further scheme is adopted to provide the benefit that, when pumping plant settles baffle-box with the relative sliding of bend pipe of intaking, flexible connection rubber sheath linearly can be elongated along with the elongation of water inlet bend pipe, what be always ensured that flexible connection rubber sheath is internally formed closing space, it is prevented that sewage is from cushioning upper box part leakage pollution subsoil water.
Further, described casing inlet opening is provided with packing ring, described packing ring includes the inner ring and the outer ring that are connected by ring-shaped rubber cushion, described inner ring and outer ring are coaxially disposed, the bottom of described flexible connection rubber sheath is connected with described inner ring, being connected by the first sealing ring between described inner ring with described water inlet bend pipe, described outer ring is connected with the edge of described casing inlet opening.
Above-mentioned further scheme is adopted to provide the benefit that, packing ring adopts the Internal and external cycle that rubber mount connects to be made, there is certain flexibility, when banking settling such as pumping plant when pumping plant differential settlement, remain to allow water inlet bend pipe not to be stuck along axially moving up and down of bend pipe of water inlet in certain inclination angle, and the first sealing ring can adopt quality of rubber materials to be made, the elastic shrinkage of sealing ring can clamp water inlet bend pipe, it is prevented that the sewage entered in baffle-box is overflowed leakage by the top of baffle-box.
Further, it is connected by the second sealing ring between described 3rd straight tube and described well lid hole.
Above-mentioned further scheme is adopted to provide the benefit that, second sealing ring may be used without quality of rubber materials and is made, the elastic shrinkage of sealing ring can clamp the 3rd straight tube of outlet pipe, not only it is possible to prevent sewage to leak contaminated environment from drained surface, but also sewage can be avoided to produce foul smell and overflow contaminated environment.
Further, described water inlet bend pipe extend into the length in described baffle-box is 25~30cm.
Above-mentioned further scheme is adopted to provide the benefit that, pumping plant within the scope of certain settling amount without pumping plant is carried out on a large scale maintenance and safeguard, and necessarily settling amount refers to that pumping plant settling amount is within 20cm, if pumping plant settling amount exceeds 20cm, it is accomplished by pumping plant out of service, the length of water inlet bend pipe and baffle-box relative sliding is more than pumping plant settling amount, and water inlet bend pipe length in baffle-box allows settling amount to match with pumping plant, it is ensured that anti-settling water inlet system normal operation.
Further, it is provided with lacing wire in described guard shield.
Adopt above-mentioned further scheme to provide the benefit that, not only can increase the intensity of guard shield, fix its shape, and prevent guard shield stress deformation when guard shield fill concrete.
Further, described spring support includes spring, base plate, gripper shoe, portable plate and top board, described gripper shoe is fixedly installed on described base plate, described portable plate and described gripper shoe are slidably connected, described top board and described portable plate are bolted, the bottom of described bolt is provided with pressing plate, and described spring one end is connected with described base plate, and the other end is connected with the bottom of described pressing plate.
Above-mentioned further scheme is adopted to provide the benefit that, spring support is for supporting the second straight tube of pumping plant outlet pipe, can be compressed by the second straight tube of pumping plant outlet pipe when pumping plant settles, pumping plant settling amount can be judged according to the position that spring support is compressed, carrying out digital independent by being arranged on the rule on spring support side, if spring support is compressed to predeterminated position, sedimentation is serious, it is accomplished by artificially processing, in order to ensure the properly functioning of pumping plant.
Accompanying drawing explanation
Fig. 1 is the structural representation of anti-settling water intake mechanism of the present invention;
Fig. 2 is baffle-box of the present invention and water inlet elbow connecting structure schematic diagram;
Fig. 3 is that baffle-box of the present invention is connected Split type structure schematic diagram with water inlet bend pipe;
Fig. 4 is that the present invention is intake the structural representation of bend pipe;
Fig. 5 is the structural representation of flexible connection rubber sheath of the present invention;
Fig. 6 is the structural representation of packing ring of the present invention;
Fig. 7 is the perspective view of baffle-box of the present invention;
Fig. 8 is the main TV structure schematic diagram of baffle-box of the present invention;
Fig. 9 is the left view structural representation of baffle-box of the present invention;
Figure 10 is the structural representation of guard shield of the present invention;
Figure 11 is prior art pumping plant service branch structure schematic diagram;
Figure 12 is the structural representation of anti-settling discharge mechanism of the present invention;
Figure 13 is the structural representation of spring support of the present invention.
In figure, 1, cylinder;2, pedestal;3, water inlet pipe;4, outlet pipe;4-1, the first straight tube;4-2, the second straight tube;4-3, the 3rd straight tube;4-4, bend pipe;5, water inlet bend pipe;5-1, ring flange;6, baffle-box;6-1, casing outlet pipe;6-2, casing inlet opening;6-3, flange;7, guard shield;7-1, through hole;7-2, lacing wire;8, flexible connection rubber sheath;9, packing ring;9-1, inner ring;9-2, outer ring;9-3, rubber mount;10, the first sealing ring;11, the first mounting flange;12, the second mounting flange;13, the 3rd mounting flange;14, spring support;14-1, spring;14-2, base plate;14-3, gripper shoe;14-4, portable plate;14-5, top board;14-6, bolt;14-7, pressing plate;14-8, rule;15, drained surface;16, top cover;17, well lid;18, the second sealing ring;19, service platform;20, water pump.
Detailed description of the invention
Below in conjunction with example, principles of the invention and feature being described, example is served only for explaining the present invention, is not intended to limit the scope of the present invention.
As shown in Fig. 1~Figure 13, a kind of integrated sewage water Boosting pumping station anti-settling system, including cylinder 1, anti-settling water intake mechanism and anti-settling discharge mechanism, described cylinder is fixed in bottom base 2, and described cylinder is provided with water inlet pipe 3 and outlet pipe 4;
nullDescribed anti-settling water intake mechanism includes into water bend pipe 5、Baffle-box 6 and guard shield 7,Described baffle-box 6 is provided with casing inlet opening 6-2 and casing outlet pipe 6-1,Described casing inlet opening is arranged on the top of described baffle-box,Described casing outlet pipe is connected by flange 6-3 with described water inlet pipe 3,The V-shaped structure in bottom of described baffle-box 6,The bottom of described baffle-box is along the axially inclined setting of described casing outlet pipe,And minimum point is in the bottom of described casing outlet pipe,Described guard shield is arranged on the outside of described baffle-box,The side that described cylinder is close to by described guard shield 7 has the arc structure matched with described cylinder,The top of described guard shield 7 is provided with the through hole 7-1 for described water inlet bend pipe traverse,The bottom of described guard shield is fixing with pedestal 2 to be connected,It is filled with concrete in described guard shield 7,One end of described water inlet bend pipe is inserted in described casing inlet opening through described through hole,The other end is connected with on-the-spot outlet pipe;
nullDescribed anti-settling discharge mechanism includes described outlet pipe 4、For supporting the spring support 14 of outlet pipe and being arranged on the drained surface 15 of foundation ditch side,Described outlet pipe 4 includes by bend pipe 4-4 the first straight tube 4-1 being sequentially connected with、Second straight tube 4-2 and the 3rd straight tube 4-3,Described second straight tube is horizontally disposed with,Described first straight tube、3rd straight tube is vertically connected on the two ends of described second straight tube,Described first straight tube is vertically arranged in cylinder,Described first straight tube one end is connected with the outlet of water pump,The other end is connected with one end of described second straight tube through the top cover 16 of cylinder by bend pipe,The other end of described second straight tube is connected with one end of described 3rd straight tube by bend pipe,The other end of described 3rd straight tube stretches to described drained surface,Described spring support 14 is supported on the bottom of described second straight tube,Described drained surface is provided with well lid 17,Described well lid 17 is provided with the well lid hole for described 3rd straight tube traverse.The outlet pipe at gargoyle of pumping station place is revised as, by the direct external below ground municipal administration blow-off line of level, the first straight tube straight up being directly connected to pump outlet, then the first straight tube connects horizontally disposed second straight tube by bend pipe, then the 3rd straight tube straight down is connected again through bend pipe, realize the water through pump outlet to rotate 180 ° vertically downward enter in drained surface through then horizontal direction flowing is last after pumping plant top cover straight up, drained surface adopts with outlet pipe and is flexibly connected, when pumping plant settles, outlet pipe can move downward along with pumping plant entirety, owing to outlet pipe and drained surface junction are vertical direction straight tubes, therefore will not there is pullling the phenomenon of outlet pipe, prevent the damage to pumping plant and sewage pipe;In addition the design of drained surface makes the sewage in drained surface that self gravitation can be leaned on naturally to be flowed in the underground blow-off line of municipal wastewater pipe network, saves the energy.
The outer sheath of described water inlet bend pipe is equipped with flexible connection rubber sheath 8, the top of described water inlet bend pipe 5 is provided with ring flange 5-1, the upper end of described flexible connection rubber sheath 8 is connected with described ring flange 5-1, and the lower end of described flexible connection rubber sheath is connected with the edge of described casing inlet opening.When pumping plant settles baffle-box with the relative sliding of bend pipe of intaking, flexible connection rubber sheath linearly can be elongated along with the elongation of water inlet bend pipe, what be always ensured that flexible connection rubber sheath is internally formed closing space, it is prevented that sewage is from cushioning upper box part leakage pollution subsoil water.The upper end of flexible connection rubber sheath is connected by the first mounting flange 11 with ring flange.
Described casing inlet opening is provided with packing ring 9, described packing ring 9 includes the inner ring 9-1 and the outer ring 9-2 that are connected by ring-shaped rubber cushion 9-3, described inner ring and outer ring are coaxially disposed, the bottom of described flexible connection rubber sheath 8 is connected with described inner ring 9-1, being connected by the first sealing ring 10 between described inner ring with described water inlet bend pipe, described outer ring is connected with the edge of described casing inlet opening.Packing ring adopts the Internal and external cycle that rubber mount connects to be made, there is certain flexibility, when banking settling such as pumping plant when pumping plant differential settlement, remain to allow water inlet bend pipe not to be stuck along axially moving up and down of bend pipe of water inlet in certain inclination angle, and the first sealing ring can adopt quality of rubber materials to be made, the elastic shrinkage of sealing ring can clamp water inlet bend pipe, it is prevented that the sewage entered in baffle-box is overflowed leakage by the top of baffle-box.Being connected by the second mounting flange 12 between the lower end of flexible connection rubber sheath and inner ring, described outer ring is connected by the 3rd mounting flange 13 with the edge of casing inlet opening.
It is connected by the second sealing ring 18 between described 3rd straight tube and described well lid hole.Second sealing ring may be used without quality of rubber materials and is made, and the elastic shrinkage of sealing ring can clamp the 3rd straight tube of outlet pipe, is not only possible to prevent sewage to leak contaminated environment from drained surface, but also sewage can be avoided to produce foul smell and overflow contaminated environment.
It is 25~30cm that described water inlet bend pipe extend into the length in described baffle-box.Pumping plant within the scope of certain settling amount without pumping plant is carried out on a large scale maintenance and safeguard, and necessarily settling amount refers to that pumping plant settling amount is within 20cm, if pumping plant settling amount exceeds 20cm, it is accomplished by pumping plant out of service, the length of water inlet bend pipe and baffle-box relative sliding is more than pumping plant settling amount, water inlet bend pipe length in baffle-box allows settling amount to match with pumping plant, it is ensured that anti-settling water inlet system normal operation.
Lacing wire 7-2 it is provided with in described guard shield.Not only can increase the intensity of guard shield, fix its shape, and prevent guard shield stress deformation when guard shield fill concrete.
Described spring support 14 includes spring 14-1, base plate 14-2, gripper shoe 14-3, portable plate 14-4 and top board 14-5, described gripper shoe 14-3 is fixedly installed on described base plate, described portable plate and described gripper shoe are slidably connected, described top board is connected by bolt 14-6 with described portable plate, the bottom of described bolt is provided with pressing plate 14-7, described spring one end is connected with described base plate, and the other end is connected with the bottom of described pressing plate.Spring support is for supporting the second straight tube of pumping plant outlet pipe, can be compressed by the second straight tube of pumping plant outlet pipe when pumping plant settles, pumping plant settling amount can be judged according to the position that spring support is compressed, digital independent is carried out by being arranged on the rule 14-8 on spring support side, if spring support is compressed to predeterminated position, sedimentation is serious, it is necessary to artificially process, in order to ensure the properly functioning of pumping plant.
When pumping plant settles with pedestal, the outlet pipe of pumping plant, baffle-box, guard shield and pumping plant are an entirety, thus sink with pump-station integrated, and the bend pipe upper end that intakes is connected with on-the-spot outlet pipe, intake bend pipe lower end in the vertical direction and baffle-box relative sliding, the length surplus that baffle-box stayed by water inlet bend pipe is enough, guarantee not to be drawn out of into water bend pipe, ensure that sewage will not leak, and the elastic shrinkage of rubber seal can tightly be clamped into water bend pipe, it is prevented that sewage leaks from buffering upper box part;For outlet pipe, owing to the first straight tube of outlet pipe is equivalent to pumping plant be an entirety through the top cover of pumping plant vertically upward, thus can sink with pump-station integrated, drained surface remains stationary as, 3rd straight tube in the vertical direction relative sliding of the well lid of drained surface and pumping plant outlet pipe, and spring support can be compressed by the second straight tube of pumping plant outlet pipe when pumping plant settles, pumping plant settling amount can be judged according to the position that spring support is compressed, if spring support is compressed to predeterminated position, sedimentation is serious, it is accomplished by artificially processing, to ensure the properly functioning of pumping plant.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all within the spirit and principles in the present invention, any amendment of making, equivalent replacement, improvement etc., should be included within protection scope of the present invention.

Claims (7)

1. an integrated sewage water Boosting pumping station anti-settling system, it is characterised in that including cylinder, anti-settling water intake mechanism and anti-settling discharge mechanism, described cylinder is fixed in bottom base, and described cylinder is provided with water inlet pipe and outlet pipe;
nullDescribed anti-settling water intake mechanism includes into water bend pipe、Baffle-box and guard shield,Described baffle-box is provided with casing inlet opening and casing outlet pipe,Described casing inlet opening is arranged on the top of described baffle-box,Described casing outlet pipe and described water inlet pipe pass through Flange joint,The V-shaped structure in bottom of described baffle-box,The bottom of described baffle-box is along the axially inclined setting of described casing outlet pipe,And minimum point is in the bottom of described casing outlet pipe,Described guard shield is arranged on the outside of described baffle-box,Described guard shield is close to the side of described cylinder and is had the arc structure matched with described cylinder,The top of described guard shield is provided with the through hole for described water inlet bend pipe traverse,The bottom of described guard shield is fixing with pedestal to be connected,It is filled with concrete in described guard shield,One end of described water inlet bend pipe is inserted in described casing inlet opening through described through hole,The other end is connected with on-the-spot outlet pipe;
nullDescribed anti-settling discharge mechanism includes described outlet pipe、For supporting the spring support of outlet pipe and being arranged on the drained surface of foundation ditch side,Described outlet pipe includes the first straight tube being sequentially connected with by bend pipe、Second straight tube and the 3rd straight tube,Described second straight tube is horizontally disposed with,Described first straight tube、3rd straight tube is vertically connected on the two ends of described second straight tube,Described first straight tube is vertically arranged in cylinder,Described first straight tube one end is connected with the outlet of water pump,The other end is connected with one end of described second straight tube through the top cover of cylinder by bend pipe,The other end of described second straight tube is connected with one end of described 3rd straight tube by bend pipe,The other end of described 3rd straight tube stretches to described drained surface,Described spring support is supported on the bottom of described second straight tube,Described drained surface is provided with well lid,Described well lid is provided with the well lid hole for described 3rd straight tube traverse.
2. integrated sewage water Boosting pumping station anti-settling system according to claim 1, it is characterized in that, the outer sheath of described water inlet bend pipe is equipped with flexible connection rubber sheath, and the top of described water inlet bend pipe is provided with ring flange, and the upper end of described flexible connection rubber sheath is connected with described ring flange.
3. integrated sewage water Boosting pumping station anti-settling system according to claim 2, it is characterized in that, described casing inlet opening is provided with packing ring, described packing ring includes the inner ring and the outer ring that are connected by ring-shaped rubber cushion, described inner ring and outer ring are coaxially disposed, the bottom of described flexible connection rubber sheath is connected with described inner ring, is connected by the first sealing ring between described inner ring with described water inlet bend pipe, and described outer ring is connected with the edge of described casing inlet opening.
4. integrated sewage water Boosting pumping station anti-settling system according to claim 1, it is characterised in that be connected by the second sealing ring between described 3rd straight tube and described well lid hole.
5. integrated sewage water Boosting pumping station anti-settling system according to claim 1, it is characterised in that it is 25~30cm that described water inlet bend pipe extend into the length in described baffle-box.
6. integrated sewage water Boosting pumping station anti-settling system according to claim 1, it is characterised in that be provided with lacing wire in described guard shield.
7. integrated sewage water Boosting pumping station anti-settling system according to claim 1, it is characterized in that, described spring support includes spring, base plate, gripper shoe, portable plate and top board, described gripper shoe is fixedly installed on described base plate, described portable plate and described gripper shoe are slidably connected, and described top board and described portable plate are bolted, and the bottom of described bolt is provided with pressing plate, described spring one end is connected with described base plate, and the other end is connected with the bottom of described pressing plate.
CN201610294190.1A 2016-05-05 2016-05-05 Integrated sewage water Boosting pumping station anti-settling system Active CN105780918B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610294190.1A CN105780918B (en) 2016-05-05 2016-05-05 Integrated sewage water Boosting pumping station anti-settling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610294190.1A CN105780918B (en) 2016-05-05 2016-05-05 Integrated sewage water Boosting pumping station anti-settling system

Publications (2)

Publication Number Publication Date
CN105780918A true CN105780918A (en) 2016-07-20
CN105780918B CN105780918B (en) 2017-09-05

Family

ID=56400745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610294190.1A Active CN105780918B (en) 2016-05-05 2016-05-05 Integrated sewage water Boosting pumping station anti-settling system

Country Status (1)

Country Link
CN (1) CN105780918B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301500A (en) * 2017-01-13 2018-07-20 威乐(中国)水泵系统有限公司 Pump station structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10266327A (en) * 1997-03-28 1998-10-06 Kubota Corp Pump filed
DE20012753U1 (en) * 2000-07-14 2000-11-23 Ver Energiewerke Ag Device for pumping liquids containing solids out of a pit with a sump pump arranged on the bottom of the pit
CN203977568U (en) * 2014-05-13 2014-12-03 浙江汲泉泵业有限公司 A kind of installation bascule of integrated pumping plant
CN204456417U (en) * 2015-01-26 2015-07-08 天津锐创环保科技有限公司 The prefabricated pump station device of a kind of sewerage treatment
CN205189112U (en) * 2015-12-14 2016-04-27 东元环保设备(福州)有限公司 Novel take anti floating botton seat sewage to promote pump station
CN205712451U (en) * 2016-05-05 2016-11-23 荏原机械(中国)有限公司 Integrated sewage water Boosting pumping station anti-settling system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10266327A (en) * 1997-03-28 1998-10-06 Kubota Corp Pump filed
DE20012753U1 (en) * 2000-07-14 2000-11-23 Ver Energiewerke Ag Device for pumping liquids containing solids out of a pit with a sump pump arranged on the bottom of the pit
CN203977568U (en) * 2014-05-13 2014-12-03 浙江汲泉泵业有限公司 A kind of installation bascule of integrated pumping plant
CN204456417U (en) * 2015-01-26 2015-07-08 天津锐创环保科技有限公司 The prefabricated pump station device of a kind of sewerage treatment
CN205189112U (en) * 2015-12-14 2016-04-27 东元环保设备(福州)有限公司 Novel take anti floating botton seat sewage to promote pump station
CN205712451U (en) * 2016-05-05 2016-11-23 荏原机械(中国)有限公司 Integrated sewage water Boosting pumping station anti-settling system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301500A (en) * 2017-01-13 2018-07-20 威乐(中国)水泵系统有限公司 Pump station structure

Also Published As

Publication number Publication date
CN105780918B (en) 2017-09-05

Similar Documents

Publication Publication Date Title
CN205712451U (en) Integrated sewage water Boosting pumping station anti-settling system
CN205478495U (en) Submersible sewage pump is from coupling mounting bracket
JP2014074358A (en) Drainage appliance
CN105780918A (en) Anti-settling system of integrated sewage lifting pump station
CN207582496U (en) City integrated piping lane drain pipe system
JP6069779B2 (en) Multi-layer sewer pipe
JP7467228B2 (en) Piping structure
KR101516701B1 (en) A draining devices for the draining works
CN104196108A (en) Auxiliary device for connection between pipeline and inspection well seat
KR101604535B1 (en) A flowrate prevent structure of sewer pipe
CN208112188U (en) Split type hanging rack structure for underground plastics piping lane
CN110984300A (en) Anti-seepage anti-extrusion integrated pump station device
AU2011100717A4 (en) Sealing device between upper and lower biogas pool
CN109972642B (en) Bucket-type structure drainage device and installation method
CN209130315U (en) A kind of inlet seal set of double-layer seal
CN205557809U (en) Device is prevented subsiding by integration sewage lifting pump station delivery port
CN1699703A (en) Combined pipe fitting inspection well
CN208981470U (en) Plate Homofloor drainage system does not drop
CN205223996U (en) Pontoon formula flexible hose is from supplying water and drainage device in tailing storehouse
JP2016067339A (en) Water intake system
CN220394798U (en) Inspection shaft adjusting cylinder
CN106149854A (en) Prefabricated pumping plant
CN220620371U (en) Cement inspection shaft convenient to quick drainage
CN218757836U (en) Drainage pressure inspection shaft
CN219263437U (en) Orifice pipe fixing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant