CN105776533A - Box cage type moving bed improved ABR (anaerobic baffled reactor) and starting method thereof - Google Patents

Box cage type moving bed improved ABR (anaerobic baffled reactor) and starting method thereof Download PDF

Info

Publication number
CN105776533A
CN105776533A CN201610304793.5A CN201610304793A CN105776533A CN 105776533 A CN105776533 A CN 105776533A CN 201610304793 A CN201610304793 A CN 201610304793A CN 105776533 A CN105776533 A CN 105776533A
Authority
CN
China
Prior art keywords
upward flow
lattice room
baskets
boxes
moving bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610304793.5A
Other languages
Chinese (zh)
Other versions
CN105776533B (en
Inventor
刘本志
金建祥
潘梅
杨百忍
丁成
严金龙
李朝霞
朱雪晴
韩嘉豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou bud rice Intellectual Property Service Co., Ltd.
Original Assignee
Yangcheng Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangcheng Institute of Technology filed Critical Yangcheng Institute of Technology
Priority to CN201610304793.5A priority Critical patent/CN105776533B/en
Publication of CN105776533A publication Critical patent/CN105776533A/en
Application granted granted Critical
Publication of CN105776533B publication Critical patent/CN105776533B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/28Anaerobic digestion processes
    • C02F3/284Anaerobic digestion processes using anaerobic baffled reactors
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/28Anaerobic digestion processes
    • C02F3/2853Anaerobic digestion processes using anaerobic membrane bioreactors

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Microbiology (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Hydrology & Water Resources (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)
  • Biological Treatment Of Waste Water (AREA)

Abstract

The invention provides a box cage type moving bed improved ABR (anaerobic baffled reactor) and a starting method thereof. The ABR consists of 3 to 6 compartments, wherein each compartment comprises an upward flow cell chamber and a downward flow cell chamber; the volume ratio of the upward flow cell chamber to the downward flow cell chamber is (3-5):1; a box cage is arranged in each upward flow cell chamber; fillings are filled in the box cage; the top of each compartment is provided with a transmission device; the transmission device is connected with the corresponding box cage through a steel rope. The starting method is characterized in that inoculating sludge is firstly formed; then, divided-period culture and domestication are preformed according to the principle of the box cage type moving bed improved ABR. The box cage type moving bed improved ABR has the advantages that the starting time of the ABR is greatly shortened; the biological treatment efficiency of the device is improved.

Description

Box-cage type moving bed modified model ABR reactor and starting method thereof
Technical field
The invention belongs to waste water treatment process technical field, be specifically related to a kind of box-cage type moving bed modified model ABR reactor and starting method thereof.
Background technology
Anaerobic baffled reactor (ABR-AnaerobicBaffledReactor) is to arrange a series of deflection plate along water (flow) direction in the reactor, reactor is separated into the reative cell of several series connection, and each reative cell can be seen as a relatively independent up-flow sludge bed system.Waste water enters the upper and lower baffling of reactor tailing edge deflector and advances, and passes sequentially through the Sludge Bed of each reative cell, and the organic substrate in waste water is by each reative cell and is fully contacted with microorganism therein and is removed.ABR be last century early eighties developed by MeCarty and the partner thereof of Stanford university of the U.S..ABR is referred to as third generation anaerobic reactor, and not only biosolids interception capacity is strong for it, and waterpower mixing condition is good.
The startup of anaerobic reactor is often referred to newly-built system with mud (such as Sewage Plant anaerobic sludge, the digested sludge of the digester) inoculation without domestication, makes reactor reach design load and the process of organic matter removal efficiency.Owing to the generation cycle of anaerobe is long, growth rate is low, and therefore the start-up course of anaerobic reactor is long.Starting the difference of factor according to anaerobic reactor, be generally 30 ~ 100d, this seriously governs its extensive use in industrial wastewater and domestic sewage processing system.Properly functioning anaerobic baffled reactor is dependent on ascending current and ripe anaerobic sludge output bubble, makes sludge suspension promote in room upper.Sludge quantity in reactor is made to reach certain numerical value the properly functioning process waste water of ripe ability, so the startup of ABR just becomes very crucial.Anaerobic baffled reactor is commonly used for process and is difficult to biodegradable industrial wastewater, and the domestication start-up course time of reactor also can extend than processing sanitary sewage.Additionally bioreactor is in properly functioning process, once production development accident, microorganism fungus kind mortality, cause that bioreactor system collapses, so needing bioreactor to be again started up, anaerobe needs again to cultivate and domestication, needs again to wait a very long start-up course.
Affect the factor that anaerobic reactor starts a lot, including the factors such as physical dimension of the composition of pending waste water and concentration, the quantity of seed sludge and activity, environmental condition (pH value, temperature etc.), the supplementing of trace element, operating condition (COD volumetric loading, hydraulic detention time etc.) and reactor.
In recent years, follow-on ABR reactor generally all can arrange hanging filler or add floating stuffing.To add floating stuffing, the position of the mobile bed that floating stuffing is formed is generally uncontrolled.At the ABR reactor start-up initial stage, seed sludge is owing to being subject to action of gravity, it is easy to be gathered in the bottom of reactor.Floating stuffing is gathered in the top of upward flow lattice room, and seed sludge is then gathered in the bottom of upward flow lattice room, thus floating stuffing is little with the contact portion of seed sludge.If the filler proportion added is relatively big, close to 1 or more than 1, in the reactor start-up later stage, biofilm development on filler obtains comparative maturity, then filler is readily collected in the bottom of reactor upward flow lattice room, and relatively, the mud on the top of upward flow lattice room and biomembrane distribution are just seldom.In general ABR reactor, the position of filler is uncontrolled, thus filler is also uncontrolled with contacting of seed sludge.
The present invention intends making improvements in the facility structure to anaerobic baffled reactor and startup operating condition, improves the controllability of filler in ABR reactor, to shortening the startup time of reactor.
Summary of the invention
Solve the technical problem that:It is an object of the invention to provide a kind of box-cage type moving bed modified model ABR reactor and starting method thereof for overcoming the deficiencies in the prior art, this starting method can shorten the startup time of about 10%.
Technical scheme:
A kind of box-cage type moving bed modified model ABR reactor, it is made up of 3~6 compartments, each compartment includes upward flow lattice room and lower to stream lattice room, upward flow lattice room and the lower ratio to the volume of stream lattice room are 3~5:1, wherein, in upward flow lattice room, it is provided with boxes and baskets, boxes and baskets load filler, being provided with actuating device at compartment top, actuating device is connected with boxes and baskets by cable wire.
Further, described boxes and baskets are made up of rustless steel grizzly bar, for rectangular shape;The length and width of boxes and baskets is respectively less than the length and width of upward flow lattice room, is highly the 35~50% of upward flow lattice room effective depth, and the wall of boxes and baskets and upward flow lattice room is at a distance of less than 5mm.
Further, the size of mesh opening between rustless steel grizzly bar is less than the minimum dimension of filler.
Further, described filler is floating stuffing, and density is at 0.90~0.96g/cm3, filler diameter 10~25mm, material is polypropylene or polyethylene.
Further, described filler is built-in suspension ball filler, is made up of grid spherical shell and built-in carrier two parts, and housing is injection molded by high molecular polymer, and sphere is latticed, and built-in carrier material is the proportion porous material more than 1.
Further, being provided with backflow recoil tube bottom upward flow lattice room, described backflow recoil tube is perforated pipe, is set to circle shape.
The starting method of above-mentioned box-cage type moving bed modified model ABR reactor, comprises the following steps:
Step 1, takes anaerobic sludge, pumps supernatant after standing, obtains the thickened sludge that concentration is 30~45g/L, then puts into glucose, stirring in thickened sludge, stands, obtain seed sludge;
Step 2, being seeded to by step 1 gained seed sludge in above-mentioned box-cage type moving bed modified model ABR reactor, pump into the treatment sewage heated to 35 DEG C, the concentration making mud is 10~15g/L, boxes and baskets are filled filler again, and the hydraulic detention time regulated in reactor is 6~24h;At the system start-up initial stage, boxes and baskets are placed in bottom, upward flow lattice room, after upward flow lattice room bottom suspension anaerobic sludge and biomembranous amount increase, enter mid-term;System start-up mid-term, boxes and baskets are placed in the middle part of upward flow lattice room, after suspension anaerobic sludge in the middle part of upward flow lattice room and biomembranous amount increase, enter the later stage;In the system start-up later stage, boxes and baskets are placed in top, upward flow lattice room, until having started.
Further, the time in system start-up initial stage, system start-up mid-term and system start-up later stage distributes in sky, and ratio is 3:4:5,3:5:4,5:4:4 or 5:4:3.
Further, during system start-up, with water pump, part is processed water outlet interval and be back to the backflow recoil tube bottom upward flow lattice room.
Further, it is reflux every day 2 times that backflow recoil tube is back to the frequency bottom upward flow lattice room, and reflux 5 ~ 10min every time.
Principles of the invention:
The upward flow lattice room of reactor arranges boxes and baskets, boxes and baskets loads filler, actuating device is set on side, lattice room, moving up or down boxes and baskets, be formed with the moving bed of packing layer, pending waste water is entered reactor by water inlet, sequentially pass through compartment, after treatment by outlet water outlet.On the basis of tradition ABR reactor, in conjunction with moving bed biological membrane technology, and in order to make the position of moving bed and run controlled, add the actuating device on boxes and baskets and compartment top.
The upward flow lattice room of reactor adds filler, purpose seeks to extension biomembrane on filler, forms anaerobism suspended sludge and biomembrane synergy, increases sludge concentration in reactor generally, make reactor can bear higher COD and process load, improve biological treatment efficiency.
At the system start-up initial stage, boxes and baskets are placed in bottom, upward flow lattice room, make filler be fully contacted with the seed sludge in ABR, it is simple to biomembrane stable growth on filler.When Biomass gathers to a certain extent, i.e. entrance system start-up mid-term, in time boxes and baskets are moved up, it is placed in the middle part of upward flow lattice room, suspended sludge in the middle part of upward flow lattice room being fully contacted with hanging with biomembranous filler, also can have a large amount of propagation of anaerobic sludge in the middle part of upward flow lattice room, on filler, biomembrane is in suspended sludge, it is also easy to obtain growth update, keeps the biofilm biomass on filler;The system start-up later stage, suspended sludge is readily collected in upward flow lattice room, bottom, boxes and baskets are placed in top, upward flow lattice room, so, even if filler proportion is bigger, packing layer in boxes and baskets can also be made to maintain the top of upward flow lattice room, keep anaerobic sludge upper and lower more uniform distribution along lattice room of reactor upward flow lattice room, also can form generation and the cultivation of anaerobic sludge on top, upward flow lattice room.
The setting of boxes and baskets and control, making in whole Primary culture process, filler is fully contacted with seed sludge in ABR, thus serves the effect of the start-up course accelerating ABR, realize shortening the effect of startup time, and this effect is built upon on the basis of innovation of the present invention.
Between the rustless steel grizzly bar of boxes and baskets, size of mesh opening is less than the minimum dimension of filler, therefore can play the effect of support filler bottom boxes and baskets so that packing layer is completely stored in boxes and baskets, also has the effect of rectification and water distribution uniformity bottom boxes and baskets in ascending current simultaneously.The grizzly bar grid at boxes and baskets top plays the effect retaining filler, does not allow filler be lost to next compartment;Time boxes and baskets packing layer occupy to stream top, lattice room simultaneously, also suspension anaerobic sludge is had crown_interception, reduces number of dropouts, maintain high suspended sludge concentration, improve biological treatment efficiency.
During system start-up, with water pump, part being processed water outlet interval and be back to the backflow recoil tube bottom upward flow lattice room, reflux every day 2 times, reflux 5-10min every time.The backflow recoil of interval, brings the shear action of current, makes the aging biomembrane in boxes and baskets be come off, prevent filler from blocking, it is prevented that short stream simultaneously, form the hydraulics that reactor is good.
The system start-up initial stage, system start-up mid-term, the system start-up later stage time distribute in sky, ratio is that 3:4:5(processes general sanitary sewage), or 3:5:4(needs strengthening to start mid-term), or 5:4:4, or 5:4:3(processes industrial wastewater, it is necessary to the domestication of strengthening early stage).
The starting method of the present invention formed seed sludge before this, then according to the principle of box-cage type moving bed ABR reactor carries out cultivating at times, taming.Employing biotechnology is screened, tame and construct the dominant microflora of characteristic contamination of can degrading, and adopt the dominant microflora that the physisorphtion of intermittent cycle will be enlarged by the degraded characteristic contamination after cultivating to be fixed on filler, again filler is placed in boxes and baskets, form immobilized biomembrane bed, so be equivalent to before ABR reactor formally starts, first carry out the cultivation of desired microorganisms on filler and fixing, such major part solves biofilm development and fixing problem on the filler during ABR reactor formally starts, move up and down boxes and baskets, suspension anaerobic sludge is made to grow, on filler, biomembrane is tamed simultaneously, the startup time of reactor can be shortened further.
Beneficial effect:
1, compared with tradition ABR reactor, in the present invention, filler and seed sludge are fully contacted, and hang biomembrane on filler, and raise the height of boxes and baskets in time, biomembrane is also formed at portion and top in the reactor, substantially reduces the startup time of ABR, generally can shorten the startup time of about 10%.
2, the effect of support filler is not only acted as bottom boxes and baskets, in ascending current, also there is the effect of rectification and water distribution uniformity, it is possible to obtaining better hydraulics, the effect retaining filler is played at boxes and baskets top simultaneously, keep the high Biomass in upward flow lattice room, thus improve biological treatment efficiency.
3, the reactor of the present invention and method, the choosing conditions of filler is loose, and suitable fillers scope is wide, and selection is easy.
4, the waterpower recoil that backflow recoil tube brings, it is possible to promote biomembrane to update and suspended granular sludge growth, improve the biological treatment efficiency of device.
Accompanying drawing explanation
Fig. 1 is the box-cage type moving bed modified model ABR reactor facade structures schematic diagram of embodiment 1;
Fig. 2 is the box-cage type moving bed modified model ABR reactor top view of embodiment 1;
Fig. 3 is the schematic diagram that the boxes and baskets of embodiment 1 fill up filler;
Fig. 4 is the starting method schematic diagram of the box-cage type moving bed modified model ABR reactor of embodiment 1, and a is the schematic diagram that boxes and baskets are in bottom, upward flow lattice room, and b is the schematic diagram that boxes and baskets are in the middle part of upward flow lattice room, and c is the schematic diagram that boxes and baskets are in top, upward flow lattice room;
Wherein, 1 water inlet, 2 compartments, 3 times to stream lattice room, 4 upward flow lattice rooms, 5 boxes and baskets, 6 backflow recoil tubes, 7 actuating devices, 8 junction buttons, 9 effluent weirs, 10 outlets, 11 reflux pumps, 12 fillers.
Detailed description of the invention
Following example further illustrate present disclosure, but should not be construed as limitation of the present invention.Without departing from the spirit and substance of the case in the present invention, the amendment that the inventive method, step or condition are made and replacement, belong to the scope of the present invention.If not specializing, the conventional means that technological means used in embodiment is well known to those skilled in the art.
Embodiment 1
Certain sanitary sewage adopts the box-cage type moving bed modified model ABR reactor of the present invention to process, influent concentration COD≤500mg/L, pH6.5~8.5, SS≤100mg/L, NH before treatment3-N≤100mg/L, TP≤1.0mg/L.Biochemical treatment effluent index COD≤150mg/L, pH6.5~8.5, SS≤50mg/L, NH3-N≤30mg/L, TP≤1.0mg/L.
As shown in Figure 1, box-cage type moving bed modified model ABR reactor, is made up of 5 compartments, and each compartment is divided into again upward flow lattice room 4 and lower to stream lattice room 3, upward flow lattice room 4 and the lower ratio to the volume of stream lattice room 3 are 3:1, wherein, boxes and baskets 5 are set in upward flow lattice room 4, boxes and baskets 5 load filler 12, it is provided with actuating device 7 at top, upward flow lattice room 4, actuating device 7 is connected with boxes and baskets 5 by cable wire, can control boxes and baskets 5 and move up or down, be formed with the moving bed of packing layer.Being provided with backflow recoil tube 6 bottom upward flow lattice room 4, described backflow recoil tube 6 is circular perforation pipe.Process waste water and entered reactor by water inlet 1, sequentially pass through 5 compartments 2, after treatment by effluent weir 9, outlet 10 water outlet.
Boxes and baskets 5 are made up of rustless steel grizzly bar, and in rectangular shape, the length and width of boxes and baskets 5 is slightly less than the length and width of upward flow lattice room 4, be highly upward flow lattice room 4 effective depth 35%.Filling up filler 12 in described boxes and baskets 5, filler 12 adopts Kaldnes floating stuffing, and density is 0.90g/cm3, filler diameter is 15mm, and material is polypropylene.Boxes and baskets 5 top is provided with 2 junction buttons 8, and actuating device 7 is connected with boxes and baskets 5 with the junction button 8 at boxes and baskets 5 top by cable wire, and keeps the boxes and baskets fixing and level in water.For keeping the level of boxes and baskets, 2 hoist cables should pass through actuating device and together rise.
The starting method of box-cage type moving bed modified model ABR reactor:
Step 1, adopts the anaerobic sludge of sewage treatment plant, pumps supernatant, obtain the thickened sludge that concentration is 35g/L after standing, puts into glucose, stirring, stands, obtain the seed sludge in black in thickened sludge;
Step 2, is seeded in ABR reactor by gained seed sludge, and treatment sewage is first heated to 35 DEG C, then pumps in ABR reactor, and the concentration making mud is 10g/L, and boxes and baskets are filled filler, and the hydraulic detention time controlled in reactor is 6~12h;At the system start-up initial stage, system start-up mid-term, the time in system start-up later stage distributes in sky, and ratio is 3:4:5.At the system start-up initial stage, boxes and baskets are placed in bottom, upward flow lattice room, after upward flow lattice room bottom suspension anaerobic sludge and biomembranous amount increase, enter mid-term;System start-up mid-term, boxes and baskets are placed in the middle part of upward flow lattice room, after suspension anaerobic sludge in the middle part of upward flow lattice room and biomembranous amount increase, enter the later stage;In the system start-up later stage, boxes and baskets are placed in top, upward flow lattice room, until having started.
Wherein, during system start-up, with water pump, part being processed water outlet interval and be back to the backflow recoil tube bottom upward flow lattice room, reflux every day 2 times, reflux 5~10min every time.Control parameter: water inlet remains COD≤500mg/L, system start-up initial stage, and the hydraulic detention time controlled in reactor is 12h, system start-up mid-term, the hydraulic detention time controlled in reactor is 9h, the system start-up later stage, and the hydraulic detention time controlled in reactor is 6h.
System start-up total time is 36 days, and initial start stage is 9 days, and system start-up maintains 12 days mid-term, and the system start-up later stage maintains 15 days.
Comparative example 1
Certain sanitary sewage adopts common ABR reactor to process, influent concentration COD≤500mg/L, pH6.5~8.5, SS≤100mg/L, NH before treatment3-N≤100mg/L, TP≤1.0mg/L.Biochemical treatment effluent index COD≤150mg/L, pH6.5~8.5, SS≤50mg/L, NH3-N≤30mg/L, TP≤1.0mg/L.
ABR reactor, is made up of 5 compartments, and each compartment is divided into again upward flow lattice room and lower to stream lattice room, and upward flow lattice room and the lower ratio to the volume of stream lattice room are 3:1, the compartment size in concrete compartment size equivalent integers 1.The filler, the filling rate of filler that adopt are all in the same manner as in Example 1.
Starting method:
Step 1, adopts the anaerobic sludge of sewage treatment plant, pumps supernatant, obtain the thickened sludge that concentration is 35g/L after standing, puts into glucose, stirring, stands, obtain the seed sludge in black in thickened sludge;
Step 2, is seeded in ABR reactor by gained seed sludge, and treatment sewage is first heated to 35 DEG C, then pumps in ABR reactor, and the concentration making mud is 10g/L, loads filler, and the hydraulic detention time controlled in reactor is 6~12h.Water inlet remains COD≤500mg/L, and the hydraulic detention time controlled in reactor is 12h, gradually reduces hydraulic detention time to 6h.
System start-up total time is 42 days.
By embodiment 1 and comparative example 1, this it appears that the advantage that the box-cage type moving bed modified model ABR reactor in the present invention is on structure and Starting mode, the box-cage type moving bed modified model ABR reactor of the present invention is compared with general ABR reactor, in ABR compart-ment constructions and size, the each index concentration of Inlet and outlet water, filler and media-filling rate, when the parameter such as final time of staying is identical, shorten the startup time of 6 days (about 14%).
Embodiment 2
Certain Production in Chemical Plant comprehensive wastewater, processes high concentrated organic wastewater, influent concentration COD≤3000mg/L, pH6.5~8.5, SS≤100mg/L, NH before treatment3-N≤300mg/L, characteristic contamination concentration chlorobenzene class≤50mg/L.Effluent index COD≤500mg/L, pH6.5~8.5, SS≤50mg/L, NH after biochemical treatment3-N≤150mg/L, characteristic contamination concentration chlorobenzene class≤10mg/L.
Box-cage type moving bed modified model ABR reactor, it is made up of 5 compartments, each compartment is divided into again upward flow lattice room 4 and lower to stream lattice room 3, and upward flow lattice room 4 and the lower ratio to the volume of stream lattice room 3 are 3:1, wherein, upward flow lattice room 4 arranges boxes and baskets 5, loading filler in boxes and baskets 5, be provided with actuating device 7 at top, upward flow lattice room 4, actuating device 7 is connected with boxes and baskets 5 by cable wire, boxes and baskets 5 can be controlled move up or down, be formed with the moving bed of packing layer.Being provided with backflow recoil tube 6 bottom upward flow lattice room 4, described backflow recoil tube 6 is circular perforation pipe.Process waste water and entered reactor by water inlet 1, sequentially pass through 5 compartments, after treatment by effluent weir 9, outlet 10 water outlet.
Boxes and baskets 5 are made up of rustless steel grizzly bar, and in rectangular shape, the length and width of boxes and baskets 5 is slightly less than the length and width of upward flow lattice room 4, be highly upward flow lattice room 4 effective depth 35%.Filling up filler 12 in described boxes and baskets 5, filler 12 adopts Kaldnes floating stuffing, and density is 0.95g/cm3, filler diameter is 10mm, and material is polyethylene.Boxes and baskets 5 top is provided with junction button 8, and actuating device 7 is connected with boxes and baskets 5 with the junction button 8 at boxes and baskets 5 top by cable wire, and keeps the boxes and baskets fixing and level in water.For keeping the level of boxes and baskets, 2 hoist cables should pass through actuating device and together rise.
The starting method of box-cage type moving bed modified model ABR reactor:
Step 1, adopts the anaerobic sludge of sewage treatment plant, pumps supernatant, obtain the thickened sludge that concentration is 45g/L after standing, puts into glucose, stirring, stands, obtain the seed sludge in black in thickened sludge;
Step 2, is seeded in ABR reactor by gained seed sludge, and treatment sewage is first heated to 35 DEG C, then pumps in ABR reactor, and the concentration making mud is 15g/L, and boxes and baskets are filled filler, and the hydraulic detention time controlled in reactor is 12~18h;At the system start-up initial stage, system start-up mid-term, the time in system start-up later stage distributes in sky, and ratio is 5:4:4.At the system start-up initial stage, boxes and baskets are placed in bottom, upward flow lattice room, after upward flow lattice room bottom suspension anaerobic sludge and biomembranous amount increase, enter mid-term;System start-up mid-term, boxes and baskets are placed in the middle part of upward flow lattice room, after suspension anaerobic sludge in the middle part of upward flow lattice room and biomembranous amount increase, enter the later stage;In the system start-up later stage, boxes and baskets are placed in top, upward flow lattice room, until having started.
The system start-up initial stage, the hydraulic detention time controlled in reactor is 18h, influent COD is progressively upgraded to≤2000mg/L, system start-up mid-term, influent COD is progressively upgraded to≤2500mg/L, and the hydraulic detention time controlled in reactor is 15h, the system start-up later stage, influent COD is progressively upgraded to≤3000mg/L, and the hydraulic detention time controlled in reactor is 12h.
System start-up total time is 52 days, and initial start stage is 20 days, and system start-up maintains 16 days mid-term, and the system start-up later stage maintains 16 days.
Comparative example 2
Certain Production in Chemical Plant comprehensive wastewater, adopts common ABR reactor for treatment high concentrated organic wastewater, influent concentration COD≤3000mg/L, pH6.5~8.5, SS≤100mg/L, NH before treatment3-N≤300mg/L, characteristic contamination concentration chlorobenzene class≤50mg/L.Effluent index COD≤500mg/L, pH6.5~8.5, SS≤50mg/L, NH after biochemical treatment3-N≤150mg/L, characteristic contamination concentration chlorobenzene class≤10mg/L.
ABR reactor, is made up of 5 compartments, and each compartment is divided into again upward flow lattice room and lower to stream lattice room, and upward flow lattice room and the lower ratio to the volume of stream lattice room are 3:1, the compartment size in concrete compartment size equivalent integers 1.The filler adopted, the filling rate of filler is all in the same manner as in Example 2.
Starting method:
Step 1, adopts the anaerobic sludge of sewage treatment plant, pumps supernatant, obtain the thickened sludge that concentration is 45g/L after standing, puts into glucose, stirring, stands, obtain the seed sludge in black in thickened sludge;
Step 2, is seeded in ABR reactor by gained seed sludge, and treatment sewage is first heated to 35 DEG C, then pumps in ABR reactor, and the concentration making mud is 15g/L, loads filler, and the hydraulic detention time controlled in reactor is 12~18h;Influent COD is progressively upgraded to≤3000mg/L, and the hydraulic detention time controlled in reactor is 18h, gradually reduces hydraulic detention time to 12h.
System start-up total time is 60 days.
By embodiment 2 and comparative example 2, this it appears that the advantage that the box-cage type moving bed modified model ABR reactor of the present invention is on structure and Starting mode, the box-cage type moving bed modified model ABR reactor of the present invention is compared with general ABR reactor, in ABR compart-ment constructions and size, the each index concentration of Inlet and outlet water, filler and media-filling rate, when the parameter such as final time of staying is identical, shorten the startup time of 8 days (about 13%).

Claims (10)

1. box-cage type moving bed modified model ABR reactor, it is made up of 3~6 compartments (2), each compartment (2) includes upward flow lattice room (4) and lower to stream lattice room (3), upward flow lattice room (4) and the lower volumetric ratio to stream lattice room (3) are 3~5:1, it is characterized in that: in upward flow lattice room (4), be provided with boxes and baskets (5), in boxes and baskets (5), filling filler (12), is provided with actuating device (7) at compartment (2) top, and actuating device (7) is connected with boxes and baskets (5) by cable wire.
2. box-cage type moving bed modified model ABR reactor according to claim 1, it is characterised in that: described boxes and baskets (5) are made up of rustless steel grizzly bar, for rectangular shape;The length and width of boxes and baskets (5) is respectively less than the length and width of upward flow lattice room (4), is highly the 35~50% of upward flow lattice room (4) effective depth, and the wall of boxes and baskets (5) and upward flow lattice room (4) is at a distance of less than 5mm.
3. box-cage type moving bed modified model ABR reactor according to claim 2, it is characterised in that: the size of mesh opening between rustless steel grizzly bar is less than the size of filler (12).
4. box-cage type moving bed modified model ABR reactor according to claim 1, it is characterised in that: described filler (12) is floating stuffing, and density is at 0.90~0.96g/cm3, filler diameter 10~25mm, material is polypropylene or polyethylene.
5. box-cage type moving bed modified model ABR reactor according to claim 1, it is characterized in that: described filler (12) is built-in suspension ball filler, it is made up of grid spherical shell and built-in carrier two parts, housing is injection molded by high molecular polymer, sphere is latticed, and built-in carrier material is the proportion porous material more than 1.
6. box-cage type moving bed modified model ABR reactor according to claim 1, it is characterised in that: bottom, upward flow lattice room (4) is provided with backflow recoil tube (6), and described backflow recoil tube (6) is circular perforation pipe.
7. the starting method of the box-cage type moving bed modified model ABR reactor described in claim 1, it is characterised in that: comprise the following steps:
Step 1, takes anaerobic sludge, pumps supernatant after standing, obtains the thickened sludge that concentration is 30~45g/L, then puts into glucose, stirring in thickened sludge, stands, obtain seed sludge;
Step 2, being seeded to by step 1 gained seed sludge in above-mentioned box-cage type moving bed modified model ABR reactor, pump into the treatment sewage heated to 35 DEG C, the concentration making mud is 10~15g/L, boxes and baskets are filled filler again, and the hydraulic detention time regulated in reactor is 6~24h;At the system start-up initial stage, boxes and baskets are placed in bottom, upward flow lattice room, after upward flow lattice room bottom suspension anaerobic sludge and biomembranous amount increase, enter mid-term;System start-up mid-term, boxes and baskets are placed in the middle part of upward flow lattice room, after suspension anaerobic sludge in the middle part of upward flow lattice room and biomembranous amount increase, enter the later stage;In the system start-up later stage, boxes and baskets are placed in top, upward flow lattice room, until having started.
8. the starting method of box-cage type moving bed modified model ABR reactor according to claim 7, it is characterized in that: the time in system start-up initial stage, system start-up mid-term and system start-up later stage distributes in sky, and ratio is 3:4:5,3:5:4,5:4:4 or 5:4:3.
9. the starting method of box-cage type moving bed modified model ABR reactor according to claim 7, it is characterised in that: during system start-up, with pump, part is processed water outlet interval and be back to the backflow recoil tube bottom upward flow lattice room.
10. the starting method of box-cage type moving bed modified model ABR reactor according to claim 7, it is characterised in that: it is reflux every day 2 times that backflow recoil tube is back to the frequency bottom upward flow lattice room, and reflux 5 ~ 10min every time.
CN201610304793.5A 2016-05-10 2016-05-10 Box-cage type moving bed modified ABR reactors and its startup method Active CN105776533B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610304793.5A CN105776533B (en) 2016-05-10 2016-05-10 Box-cage type moving bed modified ABR reactors and its startup method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610304793.5A CN105776533B (en) 2016-05-10 2016-05-10 Box-cage type moving bed modified ABR reactors and its startup method

Publications (2)

Publication Number Publication Date
CN105776533A true CN105776533A (en) 2016-07-20
CN105776533B CN105776533B (en) 2018-06-01

Family

ID=56401705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610304793.5A Active CN105776533B (en) 2016-05-10 2016-05-10 Box-cage type moving bed modified ABR reactors and its startup method

Country Status (1)

Country Link
CN (1) CN105776533B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106186309A (en) * 2016-09-04 2016-12-07 谢永宁 A kind of polyformaldehyde wastewater treatment equipment
CN108892314A (en) * 2018-07-10 2018-11-27 浙江合众环保科技有限公司 A kind of cellulose ether wastewater treatment method
CN109081527A (en) * 2018-10-10 2018-12-25 南安市弈星机械科技有限公司 A kind of be depressured empties the rotten wastewater from pig farm processing unit of anti-sludge

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102838255A (en) * 2012-08-23 2012-12-26 辽宁工程技术大学 Cage-shaped filler type device for treating beer waste water in anaerobic-anoxic-aerobic mode and method for treating bear waste water by using device
CN202688095U (en) * 2012-06-09 2013-01-23 东华大学 Efficient bioreactor for treating printing and dyeing wastewater
CN203966434U (en) * 2014-03-14 2014-11-26 浙江天煌科技实业有限公司 A kind of pharmaceutical wastewater treatment process instructional device
CN204342606U (en) * 2014-12-03 2015-05-20 合肥宏士达环保科技有限责任公司 A kind of lavatory treatment for cow manure system
CN205710076U (en) * 2016-05-10 2016-11-23 盐城工学院 Box-cage type moving bed modified model ABR reactor

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202688095U (en) * 2012-06-09 2013-01-23 东华大学 Efficient bioreactor for treating printing and dyeing wastewater
CN102838255A (en) * 2012-08-23 2012-12-26 辽宁工程技术大学 Cage-shaped filler type device for treating beer waste water in anaerobic-anoxic-aerobic mode and method for treating bear waste water by using device
CN203966434U (en) * 2014-03-14 2014-11-26 浙江天煌科技实业有限公司 A kind of pharmaceutical wastewater treatment process instructional device
CN204342606U (en) * 2014-12-03 2015-05-20 合肥宏士达环保科技有限责任公司 A kind of lavatory treatment for cow manure system
CN205710076U (en) * 2016-05-10 2016-11-23 盐城工学院 Box-cage type moving bed modified model ABR reactor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106186309A (en) * 2016-09-04 2016-12-07 谢永宁 A kind of polyformaldehyde wastewater treatment equipment
CN108892314A (en) * 2018-07-10 2018-11-27 浙江合众环保科技有限公司 A kind of cellulose ether wastewater treatment method
CN109081527A (en) * 2018-10-10 2018-12-25 南安市弈星机械科技有限公司 A kind of be depressured empties the rotten wastewater from pig farm processing unit of anti-sludge

Also Published As

Publication number Publication date
CN105776533B (en) 2018-06-01

Similar Documents

Publication Publication Date Title
CN105776534B (en) Grated plate type moving bed modified ABR reactor and its starting method
CN103864220B (en) Multi-step water body ecological purification system and construction method thereof
CN104556411B (en) Producer and microorganism sewage water treatment process thereof are grown in the training of microorganism species mother liquor
CN201864647U (en) Underground unpowered domestic sewage and soil treatment device
CN203639230U (en) Air-lift inner circulation combined filler bioreactor
CN101786717B (en) Excess sludge reduction bioreactor with variable aeration and worm attachment oblique plate
CN105776533A (en) Box cage type moving bed improved ABR (anaerobic baffled reactor) and starting method thereof
CN104828944A (en) Integrated sewage treatment system and method for hydrolytic-aerobic granular sludge
CN103043792A (en) Method and device for cultivating anaerobic granular sludge
CN106517507A (en) Method and device for quickly starting anaerobic ammonia oxidation at normal temperature
CN205710076U (en) Box-cage type moving bed modified model ABR reactor
CN105731656A (en) Alga-rich trench system for farmland tail water treatment and treatment method
CN205740496U (en) Grated plate type moving bed modified model ABR reactor
CN105366802B (en) A kind of ecological filter device and its method for handling sewage
CN102874971B (en) Baffling anaerobic reactor and sewage treatment unit applying same
CN201842738U (en) Integrated AO sewage treatment device
CN101863596B (en) Sewage treatment system of secondary anaerobic horizontal baffling compound type artificial wetland and sewage treatment method thereof
CN103922493B (en) Water quality in-situ improving device capable of automatically switching between full-layer mixing and isothermal layer aeration
CN113371927B (en) Be adapted to small-size distributed rural domestic sewage's processing system
CN206266312U (en) Anammox device for rapidly starting under normal temperature
CN108410715A (en) A kind of lignocellulose raw material high solid methane phase system and its process
CN109020045A (en) A kind of integration distributing rural domestic sewage treating device
CN204417159U (en) A kind of Novel sewage treating pond
CN114149083A (en) Plant carbon source based novel composite artificial wetland system and application thereof
CN207158911U (en) A kind of industrial park sewage plant reactor for hydrolysis and acidification

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200213

Address after: 510530 room 1923, building 3, Ruifeng center, Kaichuang Avenue, Huangpu District, Guangzhou City, Guangdong Province

Patentee after: Guangzhou bud rice Intellectual Property Service Co., Ltd.

Address before: 224051 Yancheng City hope road, Jiangsu, No. 1

Patentee before: YANCHENG INSTITUTE OF TECHNOLOGY