CN105761597A - Interactive tunnel roof separation observation experiment teaching device and control method thereof - Google Patents

Interactive tunnel roof separation observation experiment teaching device and control method thereof Download PDF

Info

Publication number
CN105761597A
CN105761597A CN201610302563.5A CN201610302563A CN105761597A CN 105761597 A CN105761597 A CN 105761597A CN 201610302563 A CN201610302563 A CN 201610302563A CN 105761597 A CN105761597 A CN 105761597A
Authority
CN
China
Prior art keywords
roof
top board
roadway
roof separation
separation indicator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610302563.5A
Other languages
Chinese (zh)
Other versions
CN105761597B (en
Inventor
周蕊
习丹阳
徐剑坤
李赞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201610302563.5A priority Critical patent/CN105761597B/en
Publication of CN105761597A publication Critical patent/CN105761597A/en
Application granted granted Critical
Publication of CN105761597B publication Critical patent/CN105761597B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B25/00Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B25/00Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
    • G09B25/04Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes of buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Image Processing (AREA)
  • Length Measuring Devices By Optical Means (AREA)

Abstract

The invention provides an interactive tunnel roof separation observation experiment teaching device and a control method thereof.The experiment teaching device comprises a master control computer, a servo control mechanism, a tunnel model, a roof separation instrument and a machine vision system.The servo control mechanism is connected with the tunnel model, the roof separation instrument is connected to a roof of the tunnel model, the machine vision system and the roof separation instrument are correspondingly installed, an output of the machine vision system is connected with the master control computer, and an output of the master control computer is connected with the servo control mechanism.A student can install the roof separation instrument by himself/herself and control the movement of the roof by himself/herself, and a function of learning, reading and analyzing readings of the roof separation instrument can be achieved.The interactive tunnel roof separation observation experiment teaching device and the control method thereof are obtained by establishing a physical model in which the machine vision system capable of identifying distance change and a physical experiment device controlled by a servo motor are combined, and finally the purpose of improving an experiment teaching effect is achieved.

Description

A kind of interactive roadway roof absciss layer observation experiment instructional device and control method thereof
Technical field
The present invention relates to the experimental teaching unit of a kind of roadway roof absciss layer observation and control method, particularly a kind of interactive roadway roof absciss layer observation experiment instructional device and control method thereof.
Background technology
It is one of most basic teaching means of engineering science along experimental teaching, teaching plays vital effect.According to mining engineering correlated curriculum, student needs the structure to coal mine down-hole tunnel and the change in digging thereof to have to recognize intuitively, and the instruction on classroom is difficult to make student understand thoroughly, and visits on the spot to underground coal mine and be subject to many limitations.Therefore, it is particularly important in the content of courses of laboratory.
According to current teaching practice, the content of courses of mine pressure actual measurement instrument and meter is mainly visited with student, teacher's explanation is illustrated as master, and student's hands-on is not strong.To this, the how teaching method of such a is passive, demonstration explanation property, be changed into a kind of on one's own initiative, the learning method of autonomous operation, improve the teaching efficiency of experimental teaching, be always up the problem that educator particularly pays close attention to.
Summary of the invention
The invention aims to provide a kind of interactive roadway roof absciss layer observation experiment instructional device and control method thereof, solve the actual measurement instrument and meter teaching of current mine pressure, the problem that student's hands-on is not strong.
The object of the present invention is achieved like this: experimental teaching unit includes: main control computer, servo-control mechanism, Roadway model, roof separation indicator and Vision Builder for Automated Inspection;Servo-control mechanism is connected to the top of Roadway model, Roadway model top board is connected to roof separation indicator, Vision Builder for Automated Inspection is corresponding with roof separation indicator installs, and the output of Vision Builder for Automated Inspection is connected with main control computer, and the output of main control computer is connected with servo-control mechanism.
Described servo control mechanism has servomotor, and servomotor is connected with the movable panel of Roadway model, controls the movable panel motion of Roadway model.
Deep top board and two movable panels of superficial part top board are had inside described Roadway model, two mounting of roof plates are on top board moving guide rail, Roadway model is the model of a wooden roadway surrounding rock, Roadway model reduces making by actual ratio, the satisfied indoor that may be installed of its size, and allow personnel can enter internal observation;
Described roof separation indicator has two scales and pointer, is provided with observation monument point on two scales and pointer, it is simple to Vision Builder for Automated Inspection observation identifies.
Described Vision Builder for Automated Inspection has video camera, and video camera, with specific frequency collection image, calculates the reading of roof separation indicator, incoming main control computer by the range data of each index point.
The outfan of described main control computer is connected with the input of servo-control mechanism, and controls servo-control mechanism, and the input of main control computer receives the readings of the real-time update that Vision Builder for Automated Inspection outfan provides.
Control method: when main control computer input top board moves initial, moved with initial velocity by servo-control mechanism controlroof, the roof separation indicator reading returned with reference to Vision Builder for Automated Inspection afterwards, recycling servo-control mechanism adjusts acceleration, top board is made to do uniformly retarded motion within each adjustment cycle, finally accurately complete top board shift action, it is ensured that the reading of roof separation indicator is consistent with the numerical value of input;
Specifically comprise the following steps that
(1) deep top board within scaled wooden Roadway model, two movable top boards of superficial part top board, two movable panels are arranged on top board moving guide rail;Deep top board, two movable top boards of superficial part top board are respectively mounted roof separation indicator;
(2) on two scales of roof separation indicator and pointer, it is provided with observation monument point, it is simple to Vision Builder for Automated Inspection observation identifies;
(3) video camera in Vision Builder for Automated Inspection is by the frequency collection image set, and is calculated the reading of roof separation indicator, incoming main control computer by the range data of each index point of roof separation indicator;
(4) main control computer receives the readings of the real-time update provided by Vision Builder for Automated Inspection, and controls servo control mechanism according to the readings of real-time update, completes top board shift action.
One scale of described roof separation indicator arranges two index points, total range is equally divided into 3 parts, successively scale index point is set to from 0 scale direction a little 1, point 2, the distance of pointer index point with point 1, point 2 is set to L1、L2If total range is 3L, and reading is X;If L1< L and L2< L, then X=L-L1/L;If L1< L and L2< L, then X=L+L1/L;If L1> L and L2< L, then X=2L+L2/L。
Described main control computer receives data, one group of roof separation indicator reading of record per second, including deep basic point and superficial part basic point, calculates top board and also needs to the distance S of movementN, acceleration AN=2SN/N2, do uniformly retarded motion, keep current motion state 1 second, N is reduced 1, it is judged that the value of N, if N > 1, the Vision Builder for Automated Inspection data returned assignment S againN, recalculate and assignment acceleration AN, do uniformly retarded motion, keep current motion state 1 second, N is reduced 1, then judges the value of N;As N=1, top board shift action completes.
Beneficial effect, owing to have employed such scheme, when main control computer input top board moves initial, moved with certain initial velocity by servo-control mechanism controlroof, afterwards with reference to the roof separation indicator reading of the return of Vision Builder for Automated Inspection, recycling servo-control mechanism adjusts acceleration, makes top board do uniformly retarded motion within each adjustment cycle, finally accurately complete top board shift action, it is ensured that the reading of roof separation indicator is consistent with the numerical value of input.Solve the actual measurement instrument and meter teaching of current mine pressure, the problem that student's hands-on is not strong, reach the purpose of the present invention.
Advantage: can realizing student resource and install roof separation indicator, Autonomous Control top board moves, study is read and analyzes the function of roof separation indicator reading.Vision Builder for Automated Inspection and servo-controlled physics facility are combined, obtains instructional device and the control method thereof of a kind of interactive roadway roof absciss layer observation experiment, it is possible to increase experiment teaching effect.
Accompanying drawing illustrates:
Fig. 1 is the structure chart of the present invention.
Fig. 2 is each several part control planning figure of roof delamination observation experiment instructional device.
Fig. 3 is the flow chart of the roof delamination observation experiment instructional device control method of the present invention.
In figure: 1-Roadway model, 2-top board moving guide rail, 3-superficial part top board, 4-deep top board, 5-servo-control mechanism, 6-roof separation indicator, 7-Vision Builder for Automated Inspection, 8-main control computer.
Detailed description of the invention
Experimental teaching unit includes: main control computer 8, servo-control mechanism 5, Roadway model 1, roof separation indicator 6 and Vision Builder for Automated Inspection 7;Servo-control mechanism 5 is connected to the top of Roadway model 1, Roadway model top board is connected to roof separation indicator 6, Vision Builder for Automated Inspection 7 and the corresponding installation of roof separation indicator 6, the output of Vision Builder for Automated Inspection 7 is connected with main control computer 8, and the output of main control computer 8 is connected with servo-control mechanism 5.
Described servo-control mechanism has servomotor, and servomotor is connected with the movable panel of Roadway model, controls the movable panel motion of Roadway model.
Deep top board 4 and 3 two movable panels of superficial part top board are had inside described Roadway model, two mounting of roof plates are on top board moving guide rail 2, Roadway model is the model of a wooden roadway surrounding rock, Roadway model reduces making by actual ratio, the satisfied indoor that may be installed of its size, and allow personnel can enter internal observation;
Described roof separation indicator has two scales and pointer, is provided with observation monument point on two scales and pointer, it is simple to Vision Builder for Automated Inspection observation identifies.
Described Vision Builder for Automated Inspection has video camera, and video camera, with specific frequency collection image, calculates the reading of roof separation indicator, incoming main control computer by the range data of each index point.
The outfan of described main control computer is connected with the input of servo-control mechanism, and controls servo-control mechanism, and the input of main control computer receives the readings of the real-time update that Vision Builder for Automated Inspection outfan provides.
Control method: when main control computer input top board moves initial, moved with initial velocity by servo-control mechanism controlroof, the roof separation indicator reading returned with reference to Vision Builder for Automated Inspection afterwards, recycling servo-control mechanism adjusts acceleration, top board is made to do uniformly retarded motion within each adjustment cycle, finally accurately complete top board shift action, it is ensured that the reading of roof separation indicator is consistent with the numerical value of input;
Specifically comprise the following steps that
(1) deep top board within scaled wooden Roadway model, two movable top boards of superficial part top board, two movable panels are arranged on top board moving guide rail 2;Deep top board, two movable top boards of superficial part top board are respectively mounted roof separation indicator;
(2) on two scales of roof separation indicator and pointer, it is provided with observation monument point, it is simple to Vision Builder for Automated Inspection observation identifies;
(3) video camera in Vision Builder for Automated Inspection is by the frequency collection image set, and is calculated the reading of roof separation indicator, incoming main control computer by the range data of each index point of roof separation indicator;
(4) main control computer receives the readings of the real-time update provided by Vision Builder for Automated Inspection, and controls servo control mechanism according to the readings of real-time update, completes top board shift action.
One scale of described roof separation indicator arranges two index points, total range is equally divided into 3 parts, successively scale index point is set to from 0 scale direction a little 1, point 2, the distance of pointer index point with point 1, point 2 is set to L1、L2If total range is 3L, and reading is X.If L1< L and L2< L, then X=L-L1/L;If L1< L and L2< L, then X=L+L1/L;If L1> L and L2< L, then X=2L+L2/L。
Described main control computer receives data, one group of roof separation indicator reading of record per second, including deep basic point and superficial part basic point, calculates top board and also needs to the distance S of movementN, acceleration AN=2SN/N2, do uniformly retarded motion, keep current motion state 1 second, N is reduced 1, it is judged that the value of N, if N > 1, the Vision Builder for Automated Inspection data returned assignment S againN, recalculate and assignment acceleration AN, do uniformly retarded motion, keep current motion state 1 second, N is reduced 1, then judges the value of N;As N=1, top board shift action completes.Further illustrate in conjunction with an experimental implementation example
Embodiment 1: have two movable top boards deep, shallow inside Roadway model, is overlapped servomotor by two and is controlled by change speed gear box driven gear so that it is can move up and down in the vertical direction.
The mounting of roof plate of Roadway model has roof separation indicator, and its deep basic point anchor and superficial part basic point anchor are respectively inserted in the circular cross section groove of two movable panels deep, shallow.
Two scales of roof separation indicator respectively arrange 2 scale observation monument points, whole ranges are equally divided into three parts, pointer observation monument point is set on the movable pointer of reading, it is simple to Vision Builder for Automated Inspection observation identifies.
Fixing erection video camera, towards monitored tunnel section, probe primary optical axis is perpendicular to tested scale place plane, and is connected with power supply, communication system and main control computer, shows the image of monitored roadway roof absciss layer instrument scale.
Vision Builder for Automated Inspection reads the positional information of each index point, thus obtaining the distance of pointer index point and each scale index point.
Vision Builder for Automated Inspection is drawn the reading of roof separation indicator by the distance size between index point and ratio.
During operation, roof separation indicator is installed in Roadway model by teacher ' s guidance by student, inputs the top board movement value S of setting in main control computerN, set movement time N.
Main control computer controls servo control mechanism, makes top board towards target direction with initial velocity V=2SN/ N, acceleration AN=2SN/N2Start mobile.Translational speed is gradually reduced, until shift action completes.
Student is reading on roof separation indicator, and with the numerical comparatives set, whether reference count is accurate.

Claims (9)

1. an interactive roadway roof absciss layer observation experiment instructional device, is characterized in that: experimental teaching unit includes: main control computer, servo-control mechanism, Roadway model, roof separation indicator and Vision Builder for Automated Inspection;Servo-control mechanism is connected to the top of Roadway model, Roadway model top board is connected to roof separation indicator, Vision Builder for Automated Inspection is corresponding with roof separation indicator installs, and the output of Vision Builder for Automated Inspection is connected with main control computer, and the output of main control computer is connected with servo-control mechanism.
2. the interactive roadway roof absciss layer observation experiment instructional device of one according to claim 1, is characterized in that: described servo control mechanism has servomotor, and servomotor is connected with the movable panel of Roadway model, controls the movable panel motion of Roadway model.
3. the interactive roadway roof absciss layer observation experiment instructional device of one according to claim 1, it is characterized in that: inside described Roadway model, have deep top board and two movable panels of superficial part top board, two mounting of roof plates are on top board moving guide rail, Roadway model is the model of a wooden roadway surrounding rock, Roadway model reduces making by actual ratio, the satisfied indoor that may be installed of its size, and allow personnel can enter internal observation.
4. the interactive roadway roof absciss layer observation experiment instructional device of one according to claim 1, it is characterized in that: described roof separation indicator has two scales and pointer, two scales and pointer are provided with observation monument point, it is simple to Vision Builder for Automated Inspection observation identifies.
5. the interactive roadway roof absciss layer observation experiment instructional device of one according to claim 1, it is characterized in that: described Vision Builder for Automated Inspection has video camera, video camera is with specific frequency collection image, the reading of roof separation indicator, incoming main control computer is calculated by the range data of each index point.
6. the interactive roadway roof absciss layer observation experiment instructional device of one according to claim 1, it is characterized in that: the outfan of described main control computer is connected with the input of servo control mechanism, and controlling servo control mechanism, the input of main control computer receives the readings of the real-time update that Vision Builder for Automated Inspection outfan provides.
7. the control method of a kind of interactive roadway roof absciss layer observation experiment instructional device described in claim 1, it is characterized in that: control method: when main control computer input top board moves initial, moved with initial velocity by servo-control mechanism controlroof, the roof separation indicator reading returned with reference to Vision Builder for Automated Inspection afterwards, recycling servo-control mechanism adjusts acceleration, top board is made to do uniformly retarded motion within each adjustment cycle, finally accurately complete top board shift action, it is ensured that the reading of roof separation indicator is consistent with the numerical value of input;
Specifically comprise the following steps that
(1) deep top board within scaled wooden Roadway model, two movable top boards of superficial part top board, two movable panels are arranged on top board moving guide rail;Deep top board, two movable top boards of superficial part top board are respectively mounted roof separation indicator;
(2) on two scales of roof separation indicator and pointer, it is provided with observation monument point, it is simple to Vision Builder for Automated Inspection observation identifies;
(3) video camera in Vision Builder for Automated Inspection is by the frequency collection image set, and is calculated the reading of roof separation indicator, incoming main control computer by the range data of each index point of roof separation indicator;
(4) main control computer receives the readings of the real-time update provided by Vision Builder for Automated Inspection, and controls servo control mechanism according to the readings of real-time update, completes top board shift action.
8. the control method of a kind of interactive roadway roof absciss layer observation experiment instructional device according to claim 7, it is characterized in that: a scale of described roof separation indicator arranges two index points, total range is equally divided into 3 parts, successively scale index point is set to from 0 scale direction a little 1, point 2, the distance of pointer index point with point 1, point 2 is set to L1、L2If total range is 3L, and reading is X;If L1< L and L2< L, then X=L-L1/L;If L1< L and L2< L, then X=L+L1/L;If L1> L and L2< L, then X=2L+L2/L。
9. the control method of a kind of interactive roadway roof absciss layer observation experiment instructional device according to claim 7, it is characterized in that: described main control computer receives data, one group of roof separation indicator reading of record per second, including deep basic point and superficial part basic point, calculate top board and also need to the distance S of movementN, acceleration AN=2SN/N2, do uniformly retarded motion, keep current motion state 1 second, N is reduced 1, it is judged that the value of N, if N > 1, the Vision Builder for Automated Inspection data returned assignment S againN, recalculate and assignment acceleration AN, do uniformly retarded motion, keep current motion state 1 second, N is reduced 1, then judges the value of N;As N=1, top board shift action completes.
CN201610302563.5A 2016-05-09 2016-05-09 A kind of interactive roadway roof absciss layer observation experiment instructional device and its control method Expired - Fee Related CN105761597B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610302563.5A CN105761597B (en) 2016-05-09 2016-05-09 A kind of interactive roadway roof absciss layer observation experiment instructional device and its control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610302563.5A CN105761597B (en) 2016-05-09 2016-05-09 A kind of interactive roadway roof absciss layer observation experiment instructional device and its control method

Publications (2)

Publication Number Publication Date
CN105761597A true CN105761597A (en) 2016-07-13
CN105761597B CN105761597B (en) 2018-04-13

Family

ID=56323794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610302563.5A Expired - Fee Related CN105761597B (en) 2016-05-09 2016-05-09 A kind of interactive roadway roof absciss layer observation experiment instructional device and its control method

Country Status (1)

Country Link
CN (1) CN105761597B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0952427A2 (en) * 1998-04-24 1999-10-27 Inco Limited Automated guided apparatus
CN202441437U (en) * 2012-02-04 2012-09-19 黑龙江科技学院 Pre-warning safety detector of top plate
CN103321681A (en) * 2012-12-31 2013-09-25 尤洛卡矿业安全工程股份有限公司 Monitoring and pre-warning method and system for coal mine roadway roof collapse disaster
CN103510986A (en) * 2013-10-25 2014-01-15 中国矿业大学 Tunnel roof separation dynamic monitoring system based on fiber bragg grating and early-warning method thereof
CN105096722A (en) * 2015-09-09 2015-11-25 中国矿业大学 Teaching device of roof separation observation of tunnel and usage method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0952427A2 (en) * 1998-04-24 1999-10-27 Inco Limited Automated guided apparatus
CN202441437U (en) * 2012-02-04 2012-09-19 黑龙江科技学院 Pre-warning safety detector of top plate
CN103321681A (en) * 2012-12-31 2013-09-25 尤洛卡矿业安全工程股份有限公司 Monitoring and pre-warning method and system for coal mine roadway roof collapse disaster
CN103510986A (en) * 2013-10-25 2014-01-15 中国矿业大学 Tunnel roof separation dynamic monitoring system based on fiber bragg grating and early-warning method thereof
CN105096722A (en) * 2015-09-09 2015-11-25 中国矿业大学 Teaching device of roof separation observation of tunnel and usage method

Also Published As

Publication number Publication date
CN105761597B (en) 2018-04-13

Similar Documents

Publication Publication Date Title
Enikov et al. Mechatronic aeropendulum: demonstration of linear and nonlinear feedback control principles with matlab/simulink real-time windows target
CN102869519A (en) Board describing or showing reality in four dimensions, universal plotter and scientific measurement and learning tool
CN203786291U (en) Test system for vehicle-mounted reversal radar
CN102855673B (en) The recording method of driving training information, device and driving training information recorder
CN102778226B (en) Calibration method for waist line of underground long-distance tunnel
CN102997901B (en) Orbital photography measurement system for simulating aerial photography measurement
CN103674068A (en) Laser tracker based transfer alignment verification method
CN114004103A (en) Collaborative operation test platform capable of supporting basic research of digital twin fully mechanized coal mining face
CN104634496A (en) Measuring device and method for electromagnetic force or electromagnetic torque
CN105761597A (en) Interactive tunnel roof separation observation experiment teaching device and control method thereof
CN114387844A (en) Teaching platform based on automatic driving virtual-real fusion testing technology
CN103778846A (en) Novel mechanical principle experiment assessment platform
CN203772308U (en) Apparatus for automatically measuring multiple indoor environment fields synchronously
RU180371U1 (en) Two-target flat target assembly with two-stage target simulators
CN205067049U (en) Model angle of attack mechanism
CN202974278U (en) Orbit photography measuring system capable of simulating aerial photogrammetry
CN203232588U (en) Horizontal parabolic motion analysis meter
RU184323U1 (en) Dynamic target imitation node with two-stage dovorot device
CN103106683B (en) The construction method of three-dimensional visual simulation pilot instrument based on Google Earth
CN102204815B (en) Human body mechanical impedance measuring device and measuring method thereof
CN206849290U (en) A kind of history yearbook apparatus for demonstrating
CN202676280U (en) Automatic test system for anechoic room
CN117746715A (en) Simulation control system of programmable unmanned aerial vehicle
CN102799736A (en) Three-dimensional motion visual simulation method for aircraft
CN106023765A (en) Top board separation layer demonstration apparatus and demonstration method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Xu Jiankun

Inventor after: Zhou Rui

Inventor after: Xi Danyang

Inventor after: Li Zan

Inventor before: Zhou Rui

Inventor before: Xi Danyang

Inventor before: Xu Jiankun

Inventor before: Li Zan

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180413