- CN105759760B CN105759760B CN201610174999.0A CN201610174999A CN105759760B CN 105759760 B CN105759760 B CN 105759760B CN 201610174999 A CN201610174999 A CN 201610174999A CN 105759760 B CN105759760 B CN 105759760B
- Authority
- CN
- China
- Prior art keywords
- module
- trilogy supply
- human
- parameter
- computer interaction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P80/00—Climate change mitigation technologies for sector-wide applications
- Y02P80/10—Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
- Y02P80/15—On-site combined power, heat or cool generation or distribution, e.g. combined heat and power [CHP] supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Abstract
It is consumed the present invention relates to a kind of trilogy supply and produces dynamic state of parameters acquisition display and online evaluation system, acquisition module acquires trilogy supply energy system operation parameter in real time and consumption produces parameter and is transferred to human-computer interaction module Dynamically Announce by communication module, data deposit data storage is acquired to call for system evaluation analysis module, system evaluation analysis module obtains variable element and obtain newest trilogy supply energy resource system consumption from data storage from human-computer interaction module produces parameter progress analytical calculation, and calculated result is exported to human-computer interaction module and is displayed and store.Realize the dynamic acquisition and real-time display of the meter parameters such as trilogy supply energy resource system equipment unit body parameter, energy consumption parameter, production capacity parameter, energy loop temperature, flow, pressure;It realizes online evaluation, adjusts system running state in time, improve running efficiency of system;Variable element is modified by human-computer interaction module and assesses online evaluation result or specific time period assessment result that period available system compares other different energy sources systems.
Description
Technical field
The present invention relates to a kind of acquisition of manufacturing parameter and assessment system, in particular to a kind of trilogy supply consumption produces dynamic state of parameters and adopts
Collection display and online evaluation system.
Background technique
Cold, heat and power triple supply system is one of the important measure for adjusting China's energy consumption structure, which is a kind of development
In novel energy supply system, be typically mounted near user, be based on nearby for user's supply energy, the system such as hot and cold, electric
" temperature counterpart, cascade utilization " principle has the spies such as comprehensive energy utilization efficiency is high, transmission & distribution link is lost less, emission reduction effect is good
Point.Cold, heat and power triple supply system provides a kind of solution for the clean energy resourcies such as consumption natural gas, wind energy, solar energy or renewable energy
Certainly scheme, since the system is simple compared with conventional power plants configuration, energy utilization rate is higher, and supply energy source, emission are few nearby, both
Saved non-renewable energy service cost, and be able to achieve low or pollution-free energy supply, therefore, the system be country readjust the energy structure,
One of cut down coal-fired total quantity consumed, administer air environmental pollution technical feasibility, economy preferably solution, and establish the system
Scientific, objective efficiency evaluation system be realization system really energy-efficient key link.
Summary of the invention
The present invention be directed to the assessments of current combined supply system to mostly use post evaluation method, can not assess under operating status in real time
Combined supply system and the problem of adjust system running policy in time, co-feeding system efficiency can not be maximized, propose one kind three
Alliance consumption produces dynamic state of parameters acquisition display and online evaluation system, realizes the real-time dynamic acquisition of trilogy supply energy system operation state
Display and online evaluation improve running efficiency of system to adjust system running policy in time.
The technical solution of the present invention is as follows: a kind of trilogy supply consumption produces dynamic state of parameters acquisition display and online evaluation system, by adopting
Collect module, communication module, data storage, system evaluation analysis module and human-computer interaction module composition, acquisition module to acquire in real time
Trilogy supply energy system operation parameter and consumption produce parameter and are transferred to human-computer interaction module Dynamically Announce by communication module, deposit simultaneously
Enter data storage to call for system evaluation analysis module, system evaluation analysis module obtains variable element from human-computer interaction module and sets
Definite value and newest trilogy supply energy resource system consumption is obtained from data storage producing parameter and carry out analytical calculation, calculated result is exported
It displays and store to human-computer interaction module to data and stores.
The acquisition module includes programmable controller PLC and the data acquisition device with wireless transmission function, power generation
Body parameter, energy consumption parameter, power generation parameter and the lithium bromide chiller body parameter of machine access PLC by communication cable and are adopted
Collection;Trilogy supply energy resource system energizes loop monitoring instrument table parameter and gauge table parameter, has by communication cable access wireless
The data acquisition device of transfer function is acquired.
Communication module apolegamy USB, Ethernet, RS232/485, WIFI wireless module, in ZigBee wireless module
Any several combinations.
The data, which store data of every storage and trigger system evaluation analysis module immediately, calls the consumption of newest storage to produce
Data and the variable element being arranged by human-computer interaction module, are calculated by multiple assessment algorithm inside human-computer interaction module and obtain three
Alliance energy resource system assessment result, assessment are stored in the database server of data storage, and are shown in human-computer interaction module
Show trilogy supply assessment result, this assessment result is trilogy supply energy resource system online evaluation result;By being commented in human-computer interaction module
Estimating period setting triggering hair system evaluation analysis module calls the consumption in data storage in set period of time to produce data and by people
The variable element of machine interactive module setting, is calculated by multiple assessment algorithm inside human-computer interaction module and obtains trilogy supply energy system
System assessment result simultaneously shows trilogy supply assessment result in human-computer interaction module, this assessment result is that trilogy supply energy resource system is specific
Period assessment result.
The beneficial effects of the present invention are: trilogy supply consumption of the present invention produces dynamic state of parameters acquisition display and online evaluation system,
Realize trilogy supply energy resource system equipment unit body parameter, energy consumption parameter, production capacity parameter, energy loop temperature, flow, pressure etc.
The dynamic acquisition and real-time display of meter parameter;It realizes the comprehensive utilization of energy rate of trilogy supply energy resource system, synthesis energy saving rate, supply
The online evaluation of thermal condition amount of energy saving, cooling supply operating condition amount of energy saving improves system operation effect to adjust system running state in time
Rate;When modifying the variable elements such as environment temperature, fuel gases calorific value, power plant efficiency, device efficiency and assessment by human-computer interaction module
Between section can get trilogy supply energy resource system and compare the online evaluation result or specific time period assessment result of other different energy sources systems.
Detailed description of the invention
Fig. 1 is that trilogy supply of the present invention consumption produces dynamic state of parameters acquisition display and online evaluation system structural schematic diagram;
Fig. 2 is that trilogy supply of the present invention consumption produces acquisition module structural representation in dynamic state of parameters acquisition display and online evaluation system
Figure;
Fig. 3 is that trilogy supply of the present invention consumption produces communication network structural representation in dynamic state of parameters acquisition display and online evaluation system
Figure;
Fig. 4 is that trilogy supply of the present invention consumption produces dynamic state of parameters acquisition display and online evaluation system data information flow diagram;
Fig. 5 is that trilogy supply of the present invention consumption produces system evaluation analysis method in dynamic state of parameters acquisition display and online evaluation system
Schematic diagram.
Specific embodiment
Trilogy supply consumption production dynamic state of parameters acquisition display as shown in Figure 1 and online evaluation system structural schematic diagram, entire three
103 are stored by acquisition module 101, communication module 102, data for consumption production dynamic state of parameters acquisition display and online evaluation system, are
Analysis and assessment module 104 of uniting and human-computer interaction module 105 form.Acquisition module 101 acquires the operation of trilogy supply energy resource system correlation
Parameter and consumption produce parameter and are transferred to 105 Dynamically Announce of human-computer interaction module by communication module 102, while passing through communication module
102 103 call parameter deposit data storage for system evaluation analysis module 104, and system evaluation analysis module 104 is from man-machine friendship
Mutual module 105, which obtains variable element setting value and obtains newest trilogy supply energy resource system consumption from data storage 103, produces parameter
Analytical calculation is carried out, calculated result is exported to human-computer interaction module and is displayed and store to data storage 103.
Acquisition module structural schematic diagram as shown in Figure 2, acquisition module 101 is including programmable controller PLC 204 and has nothing
The data acquisition device 205 of line transfer function, module is expansible.Configurable DCS system, professional equipment collector etc..Generator
201 body parameter, energy consumption parameter, power generation parameter and 202 body parameter of lithium bromide chiller accesses PLC204 by communication cable
It is acquired;It is nearest by communication cable that trilogy supply energy resource system energizes 203 measuring instrument parameter of circuit and gauge table parameter
Accessing, there is the data acquisition device 205 of wireless transmission function to be acquired.Collected data are passed via communication module 102
It is defeated.
Communication network structural schematic diagram as shown in Figure 3, array generating set 201 and lithium bromide machine in trilogy supply energy resource system
The operating parameter of group 202 passes through Ethernet 303 after being acquired by PLC204 and is transmitted to human-computer interaction module 105;The trilogy supply energy
Measuring instrument 301,302 parameter of gauge table on system energy supply circuit 203 are adopted by the data nearby with wireless transmission function
Acquisition means 205 pass through wireless network 304 after acquiring and are transmitted to human-computer interaction module 105.The communication module is extensible modules,
Configurable USB, Ethernet, RS232/485, WIFI wireless module, ZigBee wireless module.
Trilogy supply consumption as shown in Figure 4 produces dynamic state of parameters acquisition display and online evaluation system data information flow diagram, number
Data storage 103 is transmitted to by communication module 102 according to after being collected, the number of data storage 103 is stored in minute grade frequency
According to library server 401;Human-computer interaction module 105 is transmitted to by communication module 102 simultaneously, is shown in operating system real-time monitoring
403 show trilogy supply energy resource system current operating conditions with Millisecond frequency dynamic.The every data of storage of data storage 103 are vertical
I.e. triggering system evaluation analysis module 104 calls the consumption of newest storage to produce data and be arranged by human-computer interaction module 105 variable
Parameter 404, is calculated by internal multiple assessment algorithm 402 and obtains trilogy supply energy resource system assessment result, and assessment is stored in data
The database server 401 of storage 103, and trilogy supply assessment result 406 is shown in human-computer interaction module 105, this assessment knot
Fruit is trilogy supply energy resource system online evaluation result;By assessing 405 triggering hair system of period setting in human-computer interaction module 105
System analysis and assessment module 104 calls the consumption in data storage 103 in set period of time to produce data and set by human-computer interaction module 105
The variable element 404 set is calculated by internal multiple assessment algorithm 402 and obtains trilogy supply energy resource system assessment result and man-machine
Trilogy supply assessment result 406 is shown in interactive module 105, this assessment result is trilogy supply energy resource system special time period assessment knot
Fruit.
System evaluation analysis method schematic diagram as shown in Figure 5, input parameter are set by data storage 103, variable element
404 and 405 composition of assessment period setting, wherein data storage 103 includes energy consumption parameter and production capacity parameter, wherein the parameter that consumes energy
For gas values and electricity consumption, production capacity parameter is generated energy, refrigerating capacity and heating capacity;Variable element setting 404 includes: environment temperature
Degree, fuel gases calorific value, power plant efficiency and device efficiency, wherein power plant efficiency and device efficiency include to compare with trilogy supply energy resource system
The production efficiency that uses of other energy resource systems;Assessing period setting 405 is inessential input parameter, is only needed to three
Setting when alliance energy resource system specific time period is assessed.Multiple assessment algorithm 402 according to the input parameter of acquisition calculate after after will
Assessment result is stored in data storage 103, and shows 406 by trilogy supply assessment result.The system evaluation analysis module has
Multiple assessment algorithm, including based on the first law of thermodynamics primary energy consumption saving rate method, based on the second law of thermodynamics
Efficiency comparative's method and equivalent performance indicator method, and new algorithm system can be introduced.
Claims (3)
1. a kind of trilogy supply consumption produces dynamic state of parameters acquisition display and online evaluation system, which is characterized in that by acquisition module, communication
Module, data storage, system evaluation analysis module and human-computer interaction module composition, acquisition module acquire trilogy supply energy system in real time
System operating parameter and consumption produce parameter and are transferred to human-computer interaction module Dynamically Announce by communication module, while being stored in data storage and supplying
System evaluation analysis module is called, and system evaluation analysis module from human-computer interaction module obtains variable element setting value and from data
Newest trilogy supply energy resource system consumption is obtained in storage and produces parameter progress analytical calculation, and calculated result is exported to human-computer interaction mould
Block is displayed and store to data and is stored;
The data store data of every storage and trigger the consumption production data that system evaluation analysis module calls newest storage immediately
And the variable element being arranged by human-computer interaction module, it is calculated by multiple assessment algorithm inside human-computer interaction module and obtains trilogy supply
Energy resource system assessment result, assessment result are stored in the database server of data storage, and are shown in human-computer interaction module
Show trilogy supply assessment result, this assessment result is trilogy supply energy resource system online evaluation result;By being commented in human-computer interaction module
Estimating period setting triggering system evaluation analysis module calls the consumption in data storage in set period of time to produce data and by man-machine
The variable element of interactive module setting, is calculated by multiple assessment algorithm inside human-computer interaction module and obtains trilogy supply energy resource system
Assessment result simultaneously shows trilogy supply assessment result in human-computer interaction module, when this assessment result is that trilogy supply energy resource system is specific
Between section assessment result.
2. trilogy supply consumption produces dynamic state of parameters acquisition display and online evaluation system according to claim 1, which is characterized in that institute
Stating acquisition module includes programmable controller PLC and the data acquisition device with wireless transmission function, the ontology ginseng of generator
Number, energy consumption parameter, power generation parameter and lithium bromide chiller body parameter access PLC by communication cable and are acquired;Trilogy supply energy
Source system energizes loop monitoring instrument table parameter and gauge table parameter, has the number of wireless transmission function by communication cable access
It is acquired according to acquisition device.
3. trilogy supply consumption produces dynamic state of parameters acquisition display and online evaluation system according to claim 1, which is characterized in that institute
State communication module apolegamy USB, Ethernet, RS232/485, WIFI wireless module, any several groups in ZigBee wireless module
It closes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610174999.0A CN105759760B (en) | 2016-03-25 | 2016-03-25 | Trilogy supply consumption produces dynamic state of parameters acquisition display and online evaluation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610174999.0A CN105759760B (en) | 2016-03-25 | 2016-03-25 | Trilogy supply consumption produces dynamic state of parameters acquisition display and online evaluation system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105759760A CN105759760A (en) | 2016-07-13 |
CN105759760B true CN105759760B (en) | 2019-03-26 |
Family
ID=56346446
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610174999.0A Active CN105759760B (en) | 2016-03-25 | 2016-03-25 | Trilogy supply consumption produces dynamic state of parameters acquisition display and online evaluation system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105759760B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111156585B (en) * | 2018-11-07 | 2021-09-07 | 国网冀北电力有限公司 | Energy flow control method and device for wind power heating system |
CN111681126B (en) * | 2020-04-21 | 2023-07-11 | 上海西派埃智能化系统有限公司 | Intelligent control system and method based on energy efficiency evaluation of water treatment lifting pump set |
CN111578985A (en) * | 2020-04-21 | 2020-08-25 | 上海西派埃智能化系统有限公司 | Online evaluation system and method for energy efficiency of water treatment lifting pump set |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008182865A (en) * | 2007-01-26 | 2008-08-07 | Tokyo Electric Power Co Inc:The | Evaluation method and program of consumer energy system |
CN102393629A (en) * | 2011-09-19 | 2012-03-28 | 华北电力大学(保定) | Energy-saving optimization method for redundant building combined cooling heat and power (CCHP) system |
CN104571068A (en) * | 2015-01-30 | 2015-04-29 | 中国华电集团科学技术研究总院有限公司 | Optimized operation control method and system of distributed energy system |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB0003570D0 (en) * | 2000-02-17 | 2000-04-05 | Combined Power Systems Ltd | Remote monitoring |
CN101813941B (en) * | 2010-04-15 | 2014-12-03 | 上海齐耀动力技术有限公司 | Energy efficiency optimizing and dispatching system for cold, heat and electricity triple supply equipment |
EP2878058B1 (en) * | 2012-07-27 | 2020-08-12 | San Diego Gas&Electric Company | System for detecting a falling electric power conductor and related methods |
CN104216358B (en) * | 2014-07-23 | 2016-10-19 | 国家电网公司 | A kind of Intelligent Community based on two-stage energy management low-carbon energy management system |
-
2016
- 2016-03-25 CN CN201610174999.0A patent/CN105759760B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008182865A (en) * | 2007-01-26 | 2008-08-07 | Tokyo Electric Power Co Inc:The | Evaluation method and program of consumer energy system |
CN102393629A (en) * | 2011-09-19 | 2012-03-28 | 华北电力大学(保定) | Energy-saving optimization method for redundant building combined cooling heat and power (CCHP) system |
CN104571068A (en) * | 2015-01-30 | 2015-04-29 | 中国华电集团科学技术研究总院有限公司 | Optimized operation control method and system of distributed energy system |
Non-Patent Citations (1)
Title |
---|
"冷热电三联供监控系统的应用";张圣保;《电工技术》;20141231(第12期);47-48 |
Also Published As
Publication number | Publication date |
---|---|
CN105759760A (en) | 2016-07-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106707778B (en) | Intelligent optimization management system for household comprehensive energy based on model predictive control | |
CN113746144B (en) | Source-grid-load real-time interaction electric carbon control method and intelligent management system thereof | |
CN106374831A (en) | Distributed photovoltaic monitoring system with power generation forecasting and monitoring method | |
CN107612017B (en) | Wind-electricity integration intelligent control system based on demand response and distributed energy storage | |
CN105759760B (en) | Trilogy supply consumption produces dynamic state of parameters acquisition display and online evaluation system | |
CN105446163B (en) | A kind of microgrid based on different energy sources type all can flow modeling method | |
CN110348606A (en) | A kind of micro- energy net random interval coordinated dispatching method considering systematic uncertainty | |
Li et al. | Optimization model for the power system scheduling with wind generation and compressed air energy storage combination | |
CN101576580A (en) | Non-invasive unitized current on-line measurement method of electric equipment | |
CN103778485A (en) | Distributed generation energy supply system and optimization method thereof | |
CN103455004B (en) | The light coal contribution degree evaluation method in the complementary power station of light coal and electric power mixing system | |
CN104866920A (en) | Method of evaluating economic benefit of cogeneration unit | |
Zezulka et al. | Experimental smart grid | |
Ma et al. | Collaborative optimization scheduling of integrated energy system considering user dissatisfaction | |
CN106934535A (en) | A kind of cold, heat and electricity triple supply coordinates control management device and method | |
CN201540482U (en) | Heat flow diagram displayer of gas-steam combined circle cogeneration system | |
CN103530509A (en) | Method for analyzing energy saving ratio evaluating cogeneration unit economy | |
Kang et al. | Implementation of condition monitoring and control system for small-scale wind turbines | |
CN115062968A (en) | Carbon emission metering and analyzing method and system for special transformer acquisition terminal | |
Wei et al. | The day-ahead optimization scheduling of CCHP energy system with multi-mode energy storages | |
CN210742736U (en) | Integrated information platform for power plant | |
CN112904749A (en) | Comprehensive energy information acquisition and monitoring system and method based on ubiquitous Internet of things | |
Sakakibara et al. | Structural optimization of a self-sustainable decentralized energy system by mathematical programming techniques | |
Gao et al. | A Review of Optimization of Microgrid Operation. Energies 2021, 14, 2842 | |
Liu et al. | Energy-reserve co-optimization for energy internet considering reserve control zone determination |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 200233 No. 103, Xuhui District, Shanghai, Caobao Road Co-patentee after: SHANGHAI XIPAI INTELLIGENT SYSTEM Co.,Ltd. Patentee after: SHANGHAI INSTITUTE OF PROCESS AUTOMATION INSTRUMENTATION Address before: 200233 No. 103, Xuhui District, Shanghai, Caobao Road Co-patentee before: SHANGHAI SIPAI AUTOMATION TECHNOLOGY ENGINEERING Co.,Ltd. Patentee before: SHANGHAI INSTITUTE OF PROCESS AUTOMATION INSTRUMENTATION |
|
CP01 | Change in the name or title of a patent holder |