CN105757341B - A kind of integrated paving system of new four nodes J-type reel - Google Patents

A kind of integrated paving system of new four nodes J-type reel Download PDF

Info

Publication number
CN105757341B
CN105757341B CN201610300898.3A CN201610300898A CN105757341B CN 105757341 B CN105757341 B CN 105757341B CN 201610300898 A CN201610300898 A CN 201610300898A CN 105757341 B CN105757341 B CN 105757341B
Authority
CN
China
Prior art keywords
laying
hydraulic cylinder
reel
tower
hinged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610300898.3A
Other languages
Chinese (zh)
Other versions
CN105757341A (en
Inventor
康庄
张殿航
孙丽萍
翟云贺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Tianhong Heavy Industry Technology Co.,Ltd.
Original Assignee
Harbin Engineering University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Engineering University filed Critical Harbin Engineering University
Priority to CN201610300898.3A priority Critical patent/CN105757341B/en
Publication of CN105757341A publication Critical patent/CN105757341A/en
Application granted granted Critical
Publication of CN105757341B publication Critical patent/CN105757341B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water
    • F16L1/16Laying or reclaiming pipes on or under water on the bottom
    • F16L1/18Laying or reclaiming pipes on or under water on the bottom the pipes being S- or J-shaped and under tension during laying
    • F16L1/19Laying or reclaiming pipes on or under water on the bottom the pipes being S- or J-shaped and under tension during laying the pipes being J-shaped

Abstract

The present invention provides a kind of new four nodes J-type reel integrated paving system, main to include laying tower, reel, laying tower angular adjustment system, straightening system, pipe laying transmission system and the key equipment of pipe laying.Laying tower angular adjustment system includes A cabinet frames, angle demodulator, hydraulic cylinder, angle demodulator connecting shaft;Straightening system includes calibration wheel, straightener and aligning roller;Pipe laying pipeline transmission system includes horizontal transmission system, loading arm, elevator;Pipe laying key equipment includes stretcher, mobile platform.The present invention can complete sizes under the various depth of waters, various material, multiple diameter pipe laying work, equipment can not only be reduced and use total amount, and switching paving mode in good time can be needed according to actual laying, in the case of stress suffered by pipeline is reduced, improve pipe laying quality and efficiency, economy is improved, with very strong synthetic job ability.

Description

A kind of new four nodes J-type-integrated paving system of reel
Technical field
The present invention relates to a kind of paving system, more particularly to a kind of new four nodes J-type-integrated paving system of reel.
Background technology
In recent years, being continuously increased with exploitation of offshore oil and gas activity, pipelines in deep sea laying technology is in each challenge Constantly bring forth new ideas, develop rapidly.According to existing actual piping work experience, pipe laying method mainly has following four:S types are spread If, J-type laying, reel laying and towed laying.
S types laying practical application example it is more, but S types laying it is very big by water depth effect, with the depth of water increase, it is necessary to Longer stinger and Geng Gao tension force, can cause loss of stability, increase operating risk;J-type laying ensure that pipeline exists Suffered stress is smaller in process of deployment, but laying tower height degree is general in 80-135m on pipe laying barge in engineering at present, and stability is One problem, and laying speed is slower:Typical case's laying speed is 1~1.5 km/day;Reel laying has higher laying Efficiency, can effectively reduce the Jobs on the sea time, reduce marine operating cost, but reel laying is to the property of pipeline material It can require higher, and there is angle in the aligning direction of the straightening system of reel laying at present with gravity direction, circumferentially should be also easy to produce Become;Requirement of the towed laying to each side is relatively low, operate it is more convenient, but its lay ability, can pipe laying limited length, shadow Ring its application.
Consider the problem run into current process of deployment and the advantage and disadvantage of various paving modes, design a kind of herein Have the integrated pipe laying system of low clearance that J-type laying and reel are laid concurrently, sizes under the various depth of waters can be completed, a variety of Material, multiple diameter pipe laying work, can not only reduce equipment and use total amount, and can be needed in good time according to actual laying Switch paving mode, in the case of stress suffered by pipeline is reduced, improve pipe laying quality and efficiency, improve economy.
The content of the invention
The invention aims to consider the applicability and laying efficiency of various paving modes, and provide a kind of new The node J-type of the type four-integrated paving system of reel.
The object of the present invention is achieved like this:Including laying tower, laying tower angular adjustment system, pipeline section transmission system and Relevant device is laid, the laying tower is hingedly mounted in deck in ship structure, the both sides in laying tower centre position are respectively arranged with angle Adjuster connecting shaft is spent, the laying tower angular adjustment system, which there are two sets and often covered, all includes the A words in deck in ship structure Frame, the cylinder main body structure being hinged with A cabinet frames upper end, two hydraulic regulations for being symmetrically mounted on cylinder main body structure two ends Mechanism, while the intermediate plate, the two hydraulic pressure cards being uniformly arranged on intermediate plate that are connected with two hydraulic regulator output ends The angle demodulator in corresponding angle demodulator connecting shaft is pressed from both sides and is hingedly mounted on, the end of the angle demodulator is set There is the hole clipping of a row and hydraulic pressure hooking engagement, pipeline section transmission system includes horizontal transmission system, loading arm and elevator, the water Flat transmission system is arranged in deck in ship structure, and loading arm is hingedly mounted in deck in ship structure, loading arm top be evenly arranged with to Few three fixtures, each fixture is connected by linking rotating shaft with loading arm, and hanger is additionally provided with loading arm, lays relevant device Including stretcher, centralizer, welding station and mobile platform, the elevator includes being arranged in two one slide rails on the inside of laying tower Two sliding blocks, two elevator hangers be connected with outside winch, elevator hydraulic cylinder and elevator shape gripper jaw, two Elevator hanger is connected with corresponding two sliding blocks respectively, and elevator sizing gripper jaw is arranged between two sliding blocks, elevator The end of sizing gripper jaw is provided with and treated to be provided with control on the pipe tie clip tool that pipe laying Lu Guanling coordinates, elevator sizing gripper jaw Tubulation tie clip has the elevator hydraulic cylinder of folding, it is characterised in that:Also include being arranged on the reel system on the right side of laying tower and a left side The straightening system of side, the reel system include being wound be hinged with the reel of pipeline, the central shaft of reel upper support bar and Lower support bar, the end of upper support bar is hinged on laying tower, and the end of lower support bar is hinged with lower support bar swivel plate, lower branch The end of strut swivel plate is hinged on laying tower, is also hinged on the laying tower between upper support bar in lower support bar swivel plate Reel hydraulic cylinder is installed, the output end of reel hydraulic cylinder and the central shaft of reel are connected;The straightening system include calibration wheel, Straightener and aligning roller, one end of the central shaft and gusseted plate of the calibration wheel are hinged, the second end of gusseted plate It is hinged with laying tower, calibration wheel hydraulic cylinder, the output end and gusseted plate of calibration wheel hydraulic cylinder is additionally provided with laying tower 3rd end is hinged, and aligning roller includes the first caterpillar belt structure, the first adjustment hydraulic cylinder and the second adjustment hydraulic cylinder, the first adjustment liquid The cylinder barrel of cylinder pressure and the second adjustment hydraulic cylinder is respectively articulated with laying tower, the first adjustment hydraulic cylinder and the second adjustment hydraulic pressure The output end of cylinder is connected with the first caterpillar belt structure respectively, and straightener includes being hinged with the second caterpillar belt structure, the second caterpillar belt structure Upper hydraulic cylinder, the output end of upper hydraulic cylinder is connected with laying tower, and lower hydraulic cylinder, lower hydraulic cylinder are also hinged with the second caterpillar belt structure Output end be connected with the first caterpillar belt structure, and it is described calibration wheel be located at laying tower outside, the straightener and aligning roller Opposite that is setting up and down and being taken turns positioned at calibration, pipeline is stretched between calibration wheel, straightener and aligning roller through reel system.
Compared with prior art, the beneficial effects of the invention are as follows:The present invention is that one kind can realize two kinds of pavings of J-type and reel If integrated pipe laying system, by being integrated to related installation apparatus, sizes under the various depth of waters can be completed, many Material, multiple diameter pipe laying work are planted, equipment can not only be reduced and use total amount, and can need to fit according to actual laying When switch paving mode, reducing suffered by pipeline in the case of stress, improving pipe laying quality and efficiency, improving economy, tool There is very strong synthetic job ability.
Generally according to exploitation oil gas actual conditions, it is necessary to polytype, multiple use, multiple diameter pipeline be laid, by J-type It is rationally integrated with two kinds of pipe laying modes of reel, it can not only retain respective paving mode advantage, lack while making up single type Point, improves compatibility and economy.
Break through single paving mode limitation:(a) polytype, purposes pipe laying work can be completed, not by pipeline material Matter is limited, and can lay hard tube can lay flexible pipe and umbilical cables etc. again.Two kinds of paving modes are combined, are not increasing pipe laying barge number Under amount and device category service condition, paving mode can be switched in good time as needed, it is ensured that laying efficiency simultaneously, improves economical Property, save installation cost;(b) different size pipe laying work can be completed, are not limited by diameter, while as needed in good time Switch paving mode, improve economy.It is 2 inches to 18 inch conduits to lay diameter range, is saved using pipe crimping paving mode Cost;18 inches of diameter range is laid to 32 inch conduits, installation quality is ensured using J-type paving mode;(c) it is not only suitable for shallow Water operation, is also applied for deep water and ultra-deep-water operation, breaches single paving mode and is limited by the depth of water and economy.By two kinds Paving mode is combined, when the depth of water changes with laying length residing for the pipeline of laying, it may be desired to switch paving mode (J-type in good time Laying considers from economy point, is mainly adapted to deep water and ultra-deep-water operation, and reel laying considers from economy point, mainly Suitable for shallow water), operating efficiency is improved, installation cost is saved.
Optimize single paving mode transaction capabilities:(a) reel laying Pipe installing quality and efficiency are improved.Pipeline is from reel During upper debatching, pipeline remains tangent state with laying tower decentralization path, and aligns direction for vertical direction, is in gravity On same position, aligning efficiency is improved, while avoid pipeline section from aligning generation circumferential deformation on conventional bevel direction, Reduce influence of the bending to ultimate strength and fatigue behaviour;(b) equipment integration is carried out, equipment is reduced and uses total amount (such as stern support Pipe support etc.), saving equipment, which is individually arranged, to be taken up space;(c) reel is arranged vertically, mobility strong, and laying speed is fast;(d) tension force It is more prone to control.No matter using J-type laying or reel laying, equal over entry when pipeline departs from pipe laying barge, press close to " from So " state, in linear elastic range, reduces the free span of pipeline, is welded than the overwhelming majority of S-shaped state stress small (e) under water Connecing work can complete in the controllable environment of land workshop, it is ensured that welding quality.
Improve pipe laying speed.(a) when J-type is laid, centering and preheating about need 2 minutes, pipeline welding before pipeline welding Time is about needed 12 minutes, and Non-Destructive Testing is about needed 5 minutes, and application is about needed 3 minutes, and elevator lowering velocity is about 12.2m/min.Therefore When the designed integrated paving system of four nodes is laid using J-type, theory laying speed is:
24 × 60 ÷ { (2+12+5+3)+(12.2 × 4 ÷ 12.2) } × 12.2 × 4=2702.8m/d
Speed 1.5km/d improved efficiencies 80.2% are laid compared to typical J-type
(b) laid using reel, pipeline can continuous laying, the marine laying time is short, it is ensured that the rapidity of pipe laying, Lay advantage of lower cost.Typical reel laying speed may be up to 1 km hour, average about 600 meters per hours, compared to typical J-type Lay speed 1.5km/d improved efficiencies 860%
Deethanizer design height 52m is laid, tower height is relatively small, under the premise of laying efficiency is ensured, improve stability, reduction is made Industry risk.Laying tower height degree is general in 80-135m on pipe laying barge in current engineering, compared to reduction more than 35%.
Pipeline is directly promoted to installation tower top layer by loading arm, is removed pipeline lift facility from, is reduced during pipe not Necessary process, makes the transmission of pipeline section simple and easy to apply.It is cost-effective, mitigate weight, improve operating efficiency.Laying tower angle can be achieved Degree is smoothly adjusted between 70 ° to 110 °, can meet the laying requirement of different water depth and caliber, reduce pipeline section top by Power.Welder is arranged in same working position with the cannot-harm-detection device, if welding detection is off quality, can in time handle, subtract Few unnecessary process, it is to avoid influence laying efficiency.Do not move pipeline welding, detection and coating procedure, position, it is ensured that installation quality Meet index.In laying bottom of towe end increase suspension platform, the installation of the key equipments such as PLET, PLEM is realized, it is ensured that laying operation Laying efficiency is also improved while security.
Brief description of the drawings
Fig. 1 is the structural representation in the main view direction of the present invention;
Fig. 2 is the structural representation (right apparent direction) of the side-looking direction of the present invention;
Fig. 3 is the straightening system schematic diagram of the present invention;
Fig. 4 is the structural representation of the reel system of the present invention;
Fig. 5 is that the support bar of the present invention rotates the enlarged diagram of plate part;
Fig. 6 is the internal structure schematic diagram (left view direction) of the laying tower upper end of the present invention;
Fig. 7 is the structural representation (left view direction) of the straightening system of the present invention;
Fig. 8 is the structural representation of the elevator of the present invention;
Fig. 9 is the structural representation of the A cabinet frames of the present invention;
The angle demodulator that Figure 10 is the present invention faces direction schematic diagram;
Figure 11 is the overlook direction schematic diagram of the angle demodulator of the present invention.
In figure:Lay tower 1, A cabinet frames 2, angle demodulator 3, hydraulic cylinder 4, angle demodulator connecting shaft 5, horizontal transmission system System 6, loading arm 7, straightener 8, elevator 9, aligning roller 10, reel 11, straightening system 12, stretcher 13, mobile platform 14, Calibration wheel 15, reel cylindrical 16, roll support bar 17, drum center axle 18, reel upper support bar 19, reel lower support bar 20, Reel lower support bar swivel plate 21, reel hydraulic cylinder 22, calibration wheel supporting plate 23, calibration wheel hydraulic cylinder 24, hydraulic pressure on straightener Hydraulic cylinder 26, aligning roller adjustment hydraulic cylinder 1, aligning roller adjustment hydraulic cylinder 2 28, elevator are hung under cylinder 25, straightener Ear 29, sizing gripper jaw 30, elevator hydraulic cylinder 31, pipe neck 32, sliding block 33.
Embodiment
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings.
With reference to Fig. 1 to Figure 11, a kind of new four nodes J-type-integrated paving system of reel of the invention mainly includes laying Tower 1, reel 11, laying tower angular adjustment system, straightening system 12, pipe laying transmission system and the key of pipe laying are set It is standby.Laying tower angular adjustment system includes A cabinet frames 2, angle demodulator 3, hydraulic cylinder 4, angle demodulator connecting shaft 5;Aligning system System 12 includes calibration wheel 15, straightener 8 and aligning roller 10;Pipe laying pipeline transmission system includes horizontal transmission system 6, dress Load arm 7, elevator 9;Pipe laying key equipment includes stretcher 13, mobile platform 14.
1 high 52 meter of described laying tower, can meet the laying operation of 4 node pipeline sections, and top is the high body structures of 2m, Inwall is provided with enough armatures, and armature is according to the different T profiles and angle steel respectively from different model of position, casing knot It is used for setting winch in structure.Described laying tower global design is stable truss structure, is respectively arranged on the left side and the right side four chis Diagonal brace is respectively equipped between very little larger main stay tube, main stay tube, intensity requirement can be both met, the weight of structure can be mitigated again Amount, main function is the other relevant devices of support and fixed J-type laying.On the basis of truss structure, substructure surrounding The body structure of closing is welded into using steel plate, the center of gravity of laying tower can have both been reduced, increases stability again, while can also make For equipment room, for depositing power equipment, hydraulic test and elevator etc..Moon pool is offered on the hull of laying tower lower end. Lay two ends in the middle part of tower and be provided with angle demodulator connecting shaft 5, paving is easy in bottom and pipe laying boat deck using the connected mode being hinged If the regulation of laying tower angle during pipe laying is realized in the rotation of tower.
Described A cabinet frames 2 are fixed on the deck of hull, for supporting fixed angle adjuster 3 and hydraulic cylinder 4, comprehensive Consider the requirement of weight and intensity, body design is steel plate structure, the enough armatures of internal reasonable Arrangement, specifically lead Body is welded by steel plate, and internal face arranges enough armatures, and armature selects different model respectively according to the different of position T profile and angle steel, can meet intensity requirement can mitigate architecture quality again, and upper end is provided with a manhole, for realizing With the connection of hydraulic cylinder.
The described upper design of angle demodulator 3 is truss structure, top and the angle demodulator connecting shaft 5 on laying tower Connection, can be rotated about;Bottom is designed as body structure, and both sides are left multiple equidistant, rectangle hole clippings of equidimension, used To be connected with the clip on hydraulic cylinder.By with hydraulic cylinder coordinative role, realize laying tower angle regulation.
Described hydraulic cylinder 4 is the connecting elements between angle demodulator 3 and A cabinet frames 2, for control angle demodulator with Relative position and angle between A cabinet frames.Described hydraulic cylinder mainly includes hydraulic pressure clip, hydraulic regulator and body junction Structure, by the connection of hole clipping on hydraulic pressure clip and angle demodulator, realizes that the bottom of angle demodulator is fixed;Hydraulic regulator For adjusting the height of clip, cylinder main body is hinged with it by the manhole on the A cabinet frames.Pass through connection The change of hole clipping position and hydraulic cylinder relative to A cabinet frames rotation, to adjust the angle of laying tower.
Described horizontal transmission system 6 is made up of multiple rollers, effect be in J-type process of deployment pipeline section to be laid in hull On horizontal transmission, in the fixture that pipeline section is sent to the loading arm 7 for being in horizontal level.
Described loading arm 7 is hinged on the deck of hull, effect be J-type laying when by pipeline section from horizontal level rotate to Vertical position, considers the requirement of weight and intensity, and agent structure is welded by steel plate, inside arrangement armature, strengthens Material is according to the different T profiles and angle steel respectively from different model of position, and can meet intensity requirement can mitigate structure weight again Amount.The hydraulically operated fixture that can be pivoted is disposed with thereon, for clamping pipeline section and pipeline section being transported into pre- layout path.Two Side is provided with hanger, is connected respectively with the cable wire of winch, and side winch plays driving effect, is realized and loaded by the folding and unfolding of hoist line The rotation of arm, the winch of opposite side plays control action, it is ensured that the stabilization of rotation, is realized and loaded by the folding and unfolding of both sides hoist line Arm smoothly rotates.Loading arm lower end is connected close to lay on the deck at tower by way of being hinged, the effect of loading arm It is that the pipeline section for sending horizontal roller is clamped, rotates to vertical position, afterwards under the driving of hydraulic motor, fixture is around even Switch through axle and realize rotation, pipeline section to be laid is transported on pre- layout path, is that pipe laying next step operation is prepared.
Described elevator 9 includes two sliding blocks 33 being arranged in two one slide rails on the inside of laying tower and outside winch Two elevator hangers 29, elevator hydraulic cylinder 31 and the elevator sizing gripper jaw 30 of connection, two elevator hanger difference It is connected with corresponding two sliding blocks, elevator sizing gripper jaw is arranged between two sliding blocks, the end of elevator sizing gripper jaw Portion is provided with and treated to be provided with the tool folding of control pipe tie clip on the pipe tie clip tool that pipe laying Lu Guanling coordinates, elevator sizing gripper jaw Elevator hydraulic cylinder.The main function of elevator 9 is to provide top tension force for pipeline.
Described reel system is mainly made up of reel, spoke steel construction, support system and stair, and main function is to twine The pipeline being wound on reel provides Gravity support and skeletal support, and under reasonable spacing, realizes that pipeline is moved back by rotating drum Volume smoothly decentralization.Spoke steel construction is arranged symmetrically support bar 17 and constituted by reel cylindrical 16 with scattered, and reel is cylindrical predominantly to be twined Skeletal support is provided around superincumbent pipeline;All support bars are connected with being arranged in the central shaft 18 in the cylindrical center of circle, with support System provides support to be cylindrical with pipeline that is being wrapped on cylindrical jointly.Support system include upper support bar 19, lower support bar 20, Lower support bar swivel plate 21 and hydraulic cylinder 22, upper support bar 19, lower support bar 20 and the one end of hydraulic cylinder 22 are hinged the center of meeting at Axle 18, upper support bar 19 and the other end of hydraulic cylinder 22 with laying tower main body different height at be hinged, the other end of lower support bar 20 with Lower support bar swivel plate 21 is hinged, and the other end of lower support bar swivel plate 21 is hinged with laying tower main body.Stair major function is side Just repair apparatus and maintenance.Reel system is located at laying top of tower right-hand member, and its position is fixed by support system, by adjusting hydraulic pressure The piston length of cylinder 22, lower support bar swivel plate 21 is rotated, and central shaft 18 occurs with laying tower main body level with vertical direction displacement Change, realize that roll position is finely tuned.
Described straightening system is made up of calibration wheel 15, straightener 8 and aligning roller 10, and whole system is former using three moments of flexure Manage and align the pipeline with curvature of debatching, be that pipeline decentralization is prepared.
Described calibration wheel 15 is mainly made up of spoke steel construction, support system and stair, and main function is same straightener 8 Coordinate aligning pipeline with aligning roller 10.Spoke steel construction by it is cylindrical with it is scattered be arranged symmetrically support bar group into, it is cylindrical predominantly Align crooked pipeline and fulcrum is provided;All support bars are connected with being arranged in the central shaft in the cylindrical center of circle, common with support system For cylindrical offer support.Support system includes supporting plate 23 and hydraulic cylinder 24, and supporting plate side is hinged with central shaft, side and Laying tower main body is hinged, and side is hinged with hydraulic cylinder 24, and by adjusting the piston length of hydraulic cylinder 24, supporting plate 23 drives central shaft Rotate, realize calibration 15 position adjustments of wheel.Stair major function is for convenience of repair apparatus and maintenance.
Described straightener 8 is by caterpillar belt structure and adjustment structure composition, and main function is with calibration wheel 15 and aligning roller 10 coordinate aligning pipeline.Caterpillar belt structure is transferred and rotated with pipeline, and reduction friction is while increase and pipe contact area, it is ensured that pipe Road stress.Adjust structure include upper hydraulic cylinder 25 and lower hydraulic cylinder 26, the upper two ends of hydraulic cylinder 25 respectively with straightener 8 and lay tower It is hinged, lower one end of hydraulic cylinder 26 and straightener 8 are hinged, one end and aligning roller 10 are hinged, and by changing piston length, are realized and are rectified The straight position adjustment of device 8.
Described aligning roller 10 is by caterpillar belt structure and adjustment structure composition, and main function is with calibration wheel 15 and straightener 8 coordinate aligning pipeline.Caterpillar belt structure is transferred and rotated with pipeline, and reduction friction is while increase and pipe contact area, it is ensured that pipe Road stress.Adjusting structure includes lower hydraulic cylinder 26, adjustment hydraulic cylinder 1 and adjustment hydraulic cylinder 2 28, adjusts the He of hydraulic cylinder 1 Adjustment hydraulic cylinder 2 28 two ends are hinged with aligning roller 10 and laying tower respectively, by changing piston length, realize aligning roller 10 position adjustments.
Described stretcher 13, certain tractive force is provided for pipeline, it is ensured that the stability of pipeline debatching, while to pipeline Clamping action is played, makes pipeline steady decentralization at the uniform velocity during pipe laying.
Described mobile platform 14 is located at the moon pool of pylon bottom, in J-type process of deployment, can clamp water Pipeline section.The centering for having laid pipeline and upper tubular section can also be realized by the movement of platform, while can aid in completing Key equipment such as duct end PLET, PLEM's enters water and welding.When initiating terminal duct end PLET, PLEM are installed, remove flat Platform, duct end can enter water directly below by moon pool, be then moved back to platform, clamp the pipeline section being connected with duct end, it Enter the normal laying stage of pipeline afterwards;After end to be laid, mobile platform clamps the pipeline laid, complete at welding station Into the connection of pipeline and duct end, mobile platform is removed, duct end is transferred, the installation of clearing end duct end is completed.
The course of work of the present invention is as follows:
Before pipeline starts laying, the angle that tower according to different sea situations, can be laid by adjusting meets laying pipe The requirement of road curvature, and then reduce the stress on laying pipeline top, it is ensured that pipelaying work is smoothed out.During angular adjustment, in A Under the support of cabinet frame 2, change the hole clipping of hydraulic pressure clip clamping, realize the movable of angle demodulator 3, angle demodulator movement While, top occurs relative with the junction of laying tower angle demodulator connecting shaft 5 and hydraulic cylinder 4 with the junction of A cabinet frames 2 Rotate, and then change the relative angle of laying tower.
When being laid using J-type, the pipeline section required for J-type laying is processed on land first, then by transporting shipping It is sent near pipe laying barge, the pipeline section processed is hung to pipeline section storage area by the crane on pipe laying barge.In pipeline section process of deployment, Pipeline section to be laid is hoisted to by horizontal transmission system 6 by the loop wheel machine on pipe laying barge, now loading arm 7 is in horizontality, and Hydraulically operated fixture thereon and the horizontal roller of horizontal transmission system are in same horizontal line, by horizontal roller by pipe to be laid Section is delivered in the fixture of loading arm 7.Clamp, by the folding and unfolding of connection winch cable wire on loading arm 7, complete loading arm 7 by Level is to vertical rotation.
After loading arm 7 is in vertical state, the fixture on loading arm 7 is under fluid motor-driven, around connection rotating shaft On rotation, the pre- layout path that pipeline section is transported to laying tower 1, lifting is opened in the grip alignment with laying tower top end elevator 9 The fixture of machine 9, is slowly transferred by winch at elevator 9 to the first layer pipe neck on pipeline section top, fixed elevator 9, steps up folder Tool.Unclamp the fixture of loading arm 7 and rotate loading arm 7 to the outside of laying tower 1.
PLET is connected before laying is started, water is put under entirety by the present invention with a segment pipe in advance, is put down using mobile Platform 14 is clamped above the pipeline section connected with PLET, is waited and being welded with formal laying first paragraph pipe end centering.Work as first paragraph After the elevated machine 9 of pipeline section of laying is clamped, the inside centralizer at decentralization laying tower top end, clamping of the upper end pipeline section in elevator 9 Under it is fixed, by adjusting the position of mobile platform 14, complete upper end pipeline section and the centering of oral siphon section, after the completion of centering, Welded by welding station, and do Non-Destructive Testing and coating treatment, after the completion of, water will be put under pipeline section by elevator 9, it Afterwards by mobile platform 10 and the related common fixed -piping of tensioning apparatus, and by elevator 9 liters go back to the top of laying towers 1, now the Two pipeline sections pass through loading arm 7 and are transported to the top of laying tower 1, and continuation is rotated pipeline section to pre- layout path by loading arm 7 On, carry out the connection of next segment pipe.
Treat after the completion of pipeline section laying, pressed from both sides pipeline section by the mobile platform 14 and related tensioning apparatus of laying the bottom of tower 1 Firmly, then the end for terminating duct end and pipeline section is welded by welding station, and seabed is transferred to by winch, completed The laying of whole pipeline.
When using reel laying, pipeline to be laid is prefabricated on the coast to be completed, went forward side by side calculating and rational operation Pipeline is wrapped on reel.The reel of pipeline is wound by land transport to pipe laying barge, is then mounted on pipe laying barge.Just Often during laying, pipeline sequentially passes through straightener 8, calibration wheel 15, the aligning roller in straightening system 12 from debatching on reel 11 10, straightened again in the presence of reverse bending moment, eventually pass stretcher 13 and transfer to marine, the laying of the whole pipeline of completion.
The present invention relates to the new four nodes J-type-integrated paving system of reel of one kind, have J-type laying concurrently and reel lays work( Can, by being integrated to related installation apparatus, sizes under the various depth of waters, various material, multiple diameter pipe can be completed Road laying work, can not only reduce equipment and use total amount, and can need switching paving mode in good time according to actual laying, Reduce in the case of stress suffered by pipeline, improve pipe laying quality and efficiency, economy is improved, with very strong synthetic job energy Power.
The invention mainly comprises laying tower, reel, laying tower angular adjustment system, straightening system, pipe laying transmission system System and the key equipment of pipe laying.Described laying tower is the infrastructure device for carrying out pipe laying, for supporting, fixes and connects Connect the other structures and equipment of pipe laying;The main body of described reel system is spoke architecture, can be provided for the pipeline of winding Gravity is supported and skeletal support;Described laying tower angular adjustment system includes A cabinet frames, angle demodulator, hydraulic cylinder and is connected to Between hull and laying tower, it is possible to achieve laying tower freely adjusting in the range of certain angle;Described straightening system includes Calibration wheel, straightener and aligning roller, for controlling and aligning pipeline;Described pipe laying pipeline transmission system includes level Transmission system, loading arm, elevator, for transmission of the pipeline section on pipe laying barge and laying tower;Described pipe laying key is set It is standby to include stretcher, mobile platform, the transmission effect of pipeline section is played in process of deployment.

Claims (1)

1. a kind of new four nodes J-type-integrated paving system of reel, including laying tower, laying tower angular adjustment system, pipeline section are passed System and laying relevant device are sent, the laying tower is hingedly mounted in deck in ship structure, the both sides difference in laying tower centre position Angle demodulator connecting shaft is provided with, the laying tower angular adjustment system, which there are two sets and often covered, all to be included being arranged on deck in ship structure On A cabinet frames, be hinged with A cabinet frames upper end cylinder main body structure, be symmetrically mounted on two of cylinder main body structure two ends Hydraulic regulator, while be connected with two hydraulic regulator output ends intermediate plate, be uniformly arranged on intermediate plate two Individual hydraulic pressure clip and the angle demodulator being hingedly mounted in corresponding angle demodulator connecting shaft, the angle demodulator End is provided with the hole clipping of a row and hydraulic pressure hooking engagement, and pipeline section transmission system includes horizontal transmission system, loading arm and lifting Machine, the horizontal transmission system is arranged in deck in ship structure, and loading arm is hingedly mounted in deck in ship structure, and loading arm top is uniform At least three fixtures are provided with, each fixture is connected by linking rotating shaft with loading arm, hanger is additionally provided with loading arm, laid Relevant device includes stretcher, centralizer, welding station and mobile platform, and the elevator includes being arranged on two on the inside of laying tower Two sliding blocks in one slide rail, two elevator hangers, elevator hydraulic cylinder and the elevator shaping clamp being connected with outside winch Hold pawl, two elevator hangers are connected with corresponding two sliding blocks respectively, elevator sizing gripper jaw be arranged on two sliding blocks it Between, the end of elevator sizing gripper jaw is provided with and treated the pipe tie clip tool that pipe laying Lu Guanling coordinates, elevator sizing gripper jaw On be provided with control pipe tie clip have folding elevator hydraulic cylinder, it is characterised in that:Also include being arranged on the volume on the right side of laying tower Cartridge system and the straightening system in left side, the reel system include being hinged with the reel for being wound with pipeline, the central shaft of reel Upper support bar and lower support bar, the end of upper support bar are hinged on laying tower, and the end of lower support bar is hinged with lower support bar Swivel plate, the end of lower support bar swivel plate is hinged on laying tower, the paving between lower support bar swivel plate and upper support bar Reel hydraulic cylinder is installed if being also hinged on tower, the output end of reel hydraulic cylinder and the central shaft of reel are connected;The aligning system System includes calibration wheel, straightener and aligning roller, and one end of the central shaft and gusseted plate of the calibration wheel is hinged, triangle branch Second end of fagging with laying tower be hinged, laying tower on be additionally provided with calibration wheel hydraulic cylinder, calibration wheel hydraulic cylinder output end with 3rd end of gusseted plate is hinged, and aligning roller includes the first caterpillar belt structure, the first adjustment hydraulic cylinder and the second adjustment hydraulic pressure The cylinder barrel of cylinder, the first adjustment hydraulic cylinder and the second adjustment hydraulic cylinder is respectively articulated with laying tower, the first adjustment hydraulic cylinder Connected respectively with the first caterpillar belt structure with the output end of the second adjustment hydraulic cylinder, straightener includes the second caterpillar belt structure, second carries out Hydraulic cylinder is hinged with band structure, the output end of upper hydraulic cylinder is connected with laying tower, is also hinged with down on the second caterpillar belt structure Hydraulic cylinder, the output end of lower hydraulic cylinder is connected with the first caterpillar belt structure, and the calibration wheel is located at the outside of laying tower, described to rectify Straight device and aligning roller are setting up and down and positioned at the opposite of calibration wheel, pipeline through reel system stretch to calibration wheel, straightener and Between aligning roller.
CN201610300898.3A 2016-05-09 2016-05-09 A kind of integrated paving system of new four nodes J-type reel Active CN105757341B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610300898.3A CN105757341B (en) 2016-05-09 2016-05-09 A kind of integrated paving system of new four nodes J-type reel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610300898.3A CN105757341B (en) 2016-05-09 2016-05-09 A kind of integrated paving system of new four nodes J-type reel

Publications (2)

Publication Number Publication Date
CN105757341A CN105757341A (en) 2016-07-13
CN105757341B true CN105757341B (en) 2017-10-03

Family

ID=56322742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610300898.3A Active CN105757341B (en) 2016-05-09 2016-05-09 A kind of integrated paving system of new four nodes J-type reel

Country Status (1)

Country Link
CN (1) CN105757341B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115163922B (en) * 2022-04-15 2023-09-19 广东海洋大学 J-shaped pipe laying ship

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2792990B1 (en) * 1999-04-30 2001-06-08 Coflexip LARGE DEPTH RIGID CONDUCTOR VESSEL
EP1250546B1 (en) * 1999-11-29 2004-09-01 IHC Gusto Engineering B.V. Pipe lay system with tension compensator
US8905676B2 (en) * 2010-12-28 2014-12-09 Itrec B.V. Marine pipeline installation system and methods
EP2951478B1 (en) * 2013-02-01 2019-09-11 Itrec B.V. Marine pipeline installation system and method
CN205716012U (en) * 2016-05-09 2016-11-23 哈尔滨工程大学 A kind of novel four node J-types-integrated paving system of reel

Also Published As

Publication number Publication date
CN105757341A (en) 2016-07-13

Similar Documents

Publication Publication Date Title
CN104956133B (en) Installation system and method for marine pipeline
US5533834A (en) Pipelay stinger
US6352388B1 (en) Marine pipelay system
CN105042184B (en) A kind of light-duty binode pipeline J-type paving system
AU665572B2 (en) Reel pipelaying vessel with inclined conditioning ramp including endless conveyor radius control
US20160265691A1 (en) Marine pipeline installation system and methods
NO339368B1 (en) Manrint plumbing system and procedure
US3524326A (en) Method and means for neutralizing swell during submarine pipeline laying operations
US3775987A (en) Method and apparatus for laying a submergible elongate structure
EP3137801A1 (en) Marine reel lay method pipeline installation vessel and methods
WO2004085898A1 (en) Apparatus and methods for laying of elongate articles from a vessel
US3608321A (en) Apparatus and method for laying pipeline underwater
US4051687A (en) Pipeline laying method
CN105757341B (en) A kind of integrated paving system of new four nodes J-type reel
CN105605315B (en) A kind of three node pipes neck formula J-type paving system
CN205716012U (en) A kind of novel four node J-types-integrated paving system of reel
CN105757340B (en) A kind of quick paving system of deep water J-type
US4073156A (en) Method and apparatus for laying a submergible elongate structure
CN107606307A (en) A kind of pipeline section transport, contra-aperture device and method
CN2381861Y (en) Pipeline laying apparatus at shallow seabed
CN112204287B (en) Marine pipeline laying vessel and method for laying pipeline by J-shaped pipeline laying method
CN205578897U (en) Deep water J type is system of laying fast
EP2715198B1 (en) Pipe-laying system for laying pipes in water, vessel provided therewith and method therefor
CN106461121A (en) Pipe installation system for J-pipe laying, offshore pipelaying system and method of treating a pipe or fitting
CN205001657U (en) Light -duty binode pipeline J type system of laying

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230505

Address after: No. 001 Tianhong Road, Lizhuang New Area, Lizhuang Town, Fengqiu County, Xinxiang City, Henan Province, 453000

Patentee after: Henan Tianhong Heavy Industry Technology Co.,Ltd.

Address before: 150001 Intellectual Property Office, Harbin Engineering University science and technology office, 145 Nantong Avenue, Nangang District, Harbin, Heilongjiang

Patentee before: HARBIN ENGINEERING University

TR01 Transfer of patent right