CN105756334B - A kind of skyscraper the shaped steel suspension scaffolding, discharging platform amount of deflection monitoring early warning and safety device and its method for early warning - Google Patents

A kind of skyscraper the shaped steel suspension scaffolding, discharging platform amount of deflection monitoring early warning and safety device and its method for early warning Download PDF

Info

Publication number
CN105756334B
CN105756334B CN201610257883.3A CN201610257883A CN105756334B CN 105756334 B CN105756334 B CN 105756334B CN 201610257883 A CN201610257883 A CN 201610257883A CN 105756334 B CN105756334 B CN 105756334B
Authority
CN
China
Prior art keywords
alarm
discharging platform
early warning
roll
skyscraper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610257883.3A
Other languages
Chinese (zh)
Other versions
CN105756334A (en
Inventor
傅宇
都毅
刘明俊
刘宇宏
唐静
张宇
秦红
陈适
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Construction Engineering No. 7 Construction Engineering Co., Ltd.
Original Assignee
Chengdu No7 Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu No7 Construction Engineering Co Ltd filed Critical Chengdu No7 Construction Engineering Co Ltd
Priority to CN201610257883.3A priority Critical patent/CN105756334B/en
Publication of CN105756334A publication Critical patent/CN105756334A/en
Application granted granted Critical
Publication of CN105756334B publication Critical patent/CN105756334B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/18Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/166Landings, receiving platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B21/00Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
    • G01B21/32Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring the deformation in a solid

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Emergency Alarm Devices (AREA)

Abstract

The invention discloses a kind of skyscraper the shaped steel suspension scaffolding, discharging platform amount of deflection monitoring early warning and safety device, including the alarm for being fixedly mounted on the adjustable base of Cantilever Beams or discharging platform end and being arranged on adjustable base, the alarm includes the roll-over switch installed housing and be arranged in mounting shell body, alarm switch and alarm mechanism, the pin of the roll-over switch is connected by circuit with alarm switch, the alarm switch is connected by circuit with alarm mechanism, spirit level is respectively arranged with the adjustable base and installation housing.By the way that the present invention is installed on into Cantilever Beams or discharging platform end, make the roll-over switch angle changing in alarm consistent with Cantilever Beams or the change of discharging platform amount of deflection, roll-over switch triggering alarm can be touched when builder's jack or discharging platform are by load more than scheme by realizing, so as to efficiently solve the problem of high-rise, high-rise building builder's jack or the real-time security monitoring of discharging platform.

Description

A kind of skyscraper the shaped steel suspension scaffolding, discharging platform amount of deflection monitoring early warning and safety Device and its method for early warning
Technical field
The invention belongs to technical field of building construction, more particularly to a kind of skyscraper the shaped steel suspension scaffolding, discharging are put down Platform amount of deflection monitoring early warning and safety device and its method for early warning.
Background technology
Builder's jack bearing is typically used as upper falsework support body branch using overhanging type steel, rod member formula analysis frame or tripod Seat, superstructure is the three-dimensional system for having fastener to connect the steel-pipe space system OR gate formula component to be formed formation, and bearing is encorbelmented End sets oblique pull steel wire off-load, is used as the safety stock of scaffold resistance to overturning;Change overhanging type external scaffold, is to utilize building knot Structure outward flange outwardly directed cantilevered structure supports external scaffolding, and the load of scaffold is completely or partially passed into building knot Structure;The key of builder's jack is supporting structure of encorbelmenting, and he must have enough intensity, stability and rigidity, and can be by pin hand The load of frame passes to building structure.
Though builder's jack or discharging platform are more and more extensive in the application of China, its correlation computations is theoretical still endless It is kind.Framework is set because builder's jack or discharging platform belong to face, so the attention degree studied it is just not so good as permanent framework (permanent construction and structures), and builder's jack or discharging platform are actually setting up quality of materials present in use Difference, construction technical staff operate uncertain, complexity of framework layout and loads change etc. multi-party and factor so that experiment Therefore in room there is larger error in model with reality, and researcher will often do greatly to the result of study of its hypothetical model The amendment work of amount repeatedly.In addition, China's execution conditions also more fall behind for foreign countries, current construction enterprises are caused to exist Field experiment can not possibly be carried out in practice on a large scale, field experiment data acquisition is extremely limited.So construction technology people over the years Member constantly to summarize and improves builder's jack computational theory only according to the related request of site operation experience and specification.
People's Republic of China's house and office of the production safety management committee of town and country construction portion send《In October, 2015 House municipal works production safety condition of construction is circulated a notice of》National production accident 28 in October is pointed out in circular, causes 35 people dead Die;The whole nation generation house municipal works production of 1-10 months causes 69 people dead compared with major break down 17.
By taking the engineering (people of administrative staff 20) of the square meter of construction area 50,000 as an example, if occurring, suspension scaffold inclines or discharging platform covers Accident, causes dead 1 people of 1 people to sustain a severe injury.According to《People's Republic of China's safe production act》92:Occur ordinary accident, The fine of the 1 year annual income 30% in place and less than more than 200,000 50 ten thousand fine.Press simultaneously《Work safety accident is reported and investigated Processing regulations》Impose a fine the 12nd article of punishment regulations:Do not affect what accident was rescued adversely, fine of the place more than 1,000,000 below 2,000,000, the 14 units involved in the accident are dead below 3 people to causing, or more than 3 people severely injured (including acute indusqtrial poisonings) below 10 people, Or the accident of more than 3,000,000 yuan 10,000,000 yuan economic losses directly below is responsible, more than 100,000 yuan 200,000 yuan of place with Under fine.
Secondly, shut-down can also cause monthly 16.6 ten thousand element device material rental charges and 20 × monthly earnings of administration fee (Chengdu Construction industry average salary 3800)=7.6 ten thousand yuan.And immeasurable other losses.
Direct economic loss table
At present, general data is existing logical without the method for early warning that suspension scaffold or discharging platform cave in, toppled effectively is directed to It is monitored frequently with stress test method, it is specially:First have to complete the polishing of I-steel, then resistance-strain is installed Piece, then to connect instrument and equipment, gathered data, data analysis, monitoring construction logical order is to be accomplished to the work of beginning, i.e., one After the completion of could start work below, it is impossible to optimize the duration, and to reach real-time monitoring, must be requested that instrument and personnel Continuously run, and cost is higher.According to the photogrammetric technology that is used in science of bridge building or revitalize mensuration cost it is higher and Effect is not also obvious.
It is the Economic and Efficiency Analysis table using stress monitor below:
The content of the invention
It is an object of the invention to:It can be monitored there is provided one kind for above-mentioned problem and in advance to high-rise and super The builder's jack or discharging platform of high-rise unstability send alarm, are prevented effectively from builder's jack or discharging platform because degree of disturbing is deformed And cause unstability to be toppled over and cause the skyscraper the shaped steel suspension scaffolding of serious construction accident, discharging platform amount of deflection security monitoring Prior-warning device and its method for early warning.
The technical proposal of the invention is realized in this way:A kind of skyscraper the shaped steel suspension scaffolding, discharging platform amount of deflection Monitoring early warning and safety device, it is characterised in that:Including be fixedly mounted on Cantilever Beams or discharging platform end adjustable base and The alarm on adjustable base is arranged on, the tilt that the alarm includes installing housing and being arranged in mounting shell body is opened Pass, alarm switch and alarm mechanism, the pin of the roll-over switch is connected by circuit with alarm switch, described Alarm switch is connected by circuit with alarm mechanism, and level is respectively arranged with the adjustable base and installation housing Device.
Skyscraper the shaped steel suspension scaffolding of the present invention, discharging platform amount of deflection monitoring early warning and safety device, its institute It is horizontal levelling tube to state the spirit level set on adjustable base to justify the spirit level set in bubble, the mounting shell body for level.
Skyscraper the shaped steel suspension scaffolding of the present invention, discharging platform amount of deflection monitoring early warning and safety device, its institute Roll-over switch and horizontal levelling tube are stated along its axial arranged place to stretching out with builder's jack Cantilever Beams or discharging platform Direction is consistent.
Skyscraper the shaped steel suspension scaffolding of the present invention, discharging platform amount of deflection monitoring early warning and safety device, its The angle that the roll-over switch side is correspondingly arranged on for adjusting roll-over switch gradient sets disk.
Skyscraper the shaped steel suspension scaffolding of the present invention, discharging platform amount of deflection monitoring early warning and safety device, its Protecting crust is provided with above the installation housing, solar cell is provided with the protecting crust, towards the position shined upon Plate, the solar panel is connected with the power supply being provided with mounting shell body, and the power supply is connected with charging connector.
Skyscraper the shaped steel suspension scaffolding of the present invention, discharging platform amount of deflection monitoring early warning and safety device, its institute Stating alarm mechanism includes acousto-optic generator and alarm signal transmitter, and the alarm signal transmitter sends alarm signal To control terminal, the control terminal sends alarm and processing method to the receiving device of administrative staff.
Skyscraper the shaped steel suspension scaffolding of the present invention, discharging platform amount of deflection monitoring early warning and safety device, its institute Stating adjustable base includes firm banking and mounting seat, and the firm banking is connected by finely tuning angle spiral with mounting seat, described solid Determine base and be fixedly mounted on the end that Cantilever Beams choose part, the alarm is arranged in mounting seat, and the level justifies bubble It is arranged on the upper surface of mounting seat.
Skyscraper the shaped steel suspension scaffolding of the present invention, discharging platform amount of deflection monitoring early warning and safety device, its Multiple mounting holes are provided with the mounting seat, are provided with the installation housing bottom multiple convex with mounting hole corresponding matching The portion of rising, the lug boss of the installation housing passes through the mounting hole in mounting seat together with adjustable base detachable connection.
Skyscraper the shaped steel suspension scaffolding of the present invention, discharging platform amount of deflection monitoring early warning and safety device, its The lug boss bottom is provided with annular groove, and the lug boss is passed through after mounting seat and firm banking, by being arranged on firm banking Clamping structure in bottom groove is connected in the annular groove of lug boss, installation housing is linked together with adjustable base.
A kind of method for early warning of skyscraper the shaped steel suspension scaffolding, discharging platform amount of deflection monitoring early warning and safety device, its Prior-warning device is installed on to the end position of Cantilever Beams or discharging platform, it is ensured that the roll displacement direction of roll-over switch in alarm It is consistent with the direction that builder's jack Cantilever Beams or discharging platform stretch out, make roll-over switch angle changing and Cantilever Beams or unload Expect that the change of platform degree of disturbing is consistent, when Cantilever Beams, discharging platform reach by calculating and tested being deformed by load stress During the early warning value that should just obtaining, triggering roll-over switch is opened and sends alarm.
By the way that the present invention to be installed on to Cantilever Beams or the discharging platform end of builder's jack, open the tilt in alarm Close angle changing and Cantilever Beams or the change of discharging platform amount of deflection be consistent, realize when builder's jack or discharging platform by more than Roll-over switch triggering alarm can be touched during the load of scheme, so as to efficiently solve high-rise, high-rise building builder's jack Or the problem of the real-time security monitoring of discharging platform, the difficulty of construction that high-altitude monitors operation is reduced, pin hand of encorbelmenting is effectively prevent Frame or discharging platform because degree of disturbing is deformed cause unstability to be toppled over and caused by serious construction accident.The present invention is simple in construction, it is easy to Operation, and low manufacture cost.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the structural representation of alarm in the present invention.
Fig. 3 is the structural representation of adjustable base in the present invention.
Fig. 4 is adjustable base and the structural representation of alarm detachable connection in the present invention.
Marked in figure:1 is adjustable base, and 2 be alarm, and 3 is install housing, and 4 be roll-over switch, and 5 be alarm switch, 6 be that level justifies bubble, and 7 be horizontal levelling tube, and 8 be that angle sets disk, and 9 be protecting crust, and 10 be solar panel, and 11 be charging Head, 12 be acousto-optic generator, and 13 be alarm signal transmitter, and 14 be firm banking, and 15 be mounting seat, and 16 be fine setting angle spiral, 17 be mounting hole, and 18 be lug boss, and 19 be annular groove, and 20 be circuit.
Embodiment
Below in conjunction with the accompanying drawings, the present invention is described in detail.
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
As illustrated in fig. 1 and 2, a kind of skyscraper the shaped steel suspension scaffolding, discharging platform amount of deflection monitoring early warning and safety device, Including the alarm 2 for being fixedly mounted on the adjustable base 1 of Cantilever Beams or discharging platform end and being arranged on adjustable base 1, The alarm 2 includes installing housing 3 and is arranged on the roll-over switch 4 installed in housing 3, alarm switch 5 and alarm Prompting mechanism, the pin of the roll-over switch 4 is connected by circuit 20 with alarm switch 5, and the alarm switch 5 passes through line Road 20 is connected with alarm mechanism, spirit level is respectively arranged with the adjustable base 1 and installation housing 3, in this implementation In example, the spirit level set on the adjustable base 1 is that level justifies bubble 6, and the spirit level set in housing 3 of installing is horizontal stroke Levelling tube 7.
Wherein, the roll-over switch 4 and horizontal levelling tube 7 are along its axial arranged place to builder's jack Cantilever Beams or unloading The direction that material platform stretches out is consistent, is correspondingly arranged in the side of roll-over switch 4 for adjusting roll-over switch gradient Angle disk 8 is set, installation housing 3 top is provided with protecting crust 9, on the protecting crust 9, towards what is shined upon Position is provided with solar panel 10, and the solar panel 10 is connected with the power supply being provided with installation housing 3, the power supply It is connected with charging connector 11;The alarm mechanism includes acousto-optic generator 12 and alarm signal transmitter 13, the alarm Signal projector 13 sends alarm signal to control terminal, and the control terminal sends alarm and processing method to administrative staff Receiving device.
As shown in figure 3, the adjustable base 1 includes firm banking 14 and mounting seat 15, the firm banking 14 is by micro- Angle modulation spiral 16 is connected with mounting seat 15, and the firm banking 14 is fixedly mounted on the end that Cantilever Beams choose part, the report Alert device 2 is arranged in mounting seat 15, and the level circle bubble 6 is arranged on the upper surface of mounting seat 15.As shown in figure 4, described Three mounting holes 17 are provided with mounting seat 15, installation housing 3 bottom is provided with three and the corresponding matching of mounting hole 17 Lug boss 18, be provided with annular groove 19 in the bottom of lug boss 18, the lug boss 18 passes through mounting seat 15 and firm banking After 14, it is connected to by the clamping structure being arranged in the bottom groove of firm banking 14 in the annular groove 19 of lug boss 18, makes installation Housing 3 is together with the detachable connection of adjustable base 1.
The method for early warning of a kind of skyscraper the shaped steel suspension scaffolding, discharging platform amount of deflection monitoring early warning and safety device, will Prior-warning device is installed on the end position of Cantilever Beams or discharging platform, it is ensured that in alarm the roll displacement direction of roll-over switch with The direction that builder's jack Cantilever Beams or discharging platform stretch out is consistent, makes roll-over switch angle changing and Cantilever Beams or discharging The change of platform degree of disturbing is consistent, when Cantilever Beams, discharging platform are reached by calculating and experiment should being deformed by load stress During the early warning value just obtained, triggering roll-over switch is opened and sends alarm.
In actual applications, engineering site builder's jack or discharging platform erection scheme are first according to, Cantilever Beams are calculated Or the discharging platform stress load stage limit, then set alarm to trigger alarm angle value, last scene peace according to calculated value Fill the prior-warning device of the present invention.
The specific installation steps that prior-warning device of the present invention is installed at scene on builder's jack are:
1. positioning prepares
A, after outer vertical rod and protective frame are set up and finished it can carry out the installation exercise of the device.Incorporation engineering is actual, type Steel builder's jack special construction plan and ANSYS numerical simulation analysis conclusions etc. formulate the shaped steel suspension scaffolding security monitoring Scheme is to determine security monitoring position.
2. smooth, free of contamination I-steel is preferably selected in monitoring site, if I-steel surface appearance is not ideal enough, it should be polishing to It is smooth.The laying of I-steel is it is ensured that straight, position is accurate, and monitoring personnel should accurately complete the telltale mark of control point, By the roll-over switch angle of security monitoring project setting alarm to ensure the roll displacement direction of alarm with I-steel same On straight line.
3. instrument is installed
A, the firm banking of adjustable base use strong magnetic connects, after prior-warning device is installed, with nylon rope or iron wire Carry out add-on security reinforcement processing, it is ensured that it is reliably fixed to beam end of encorbelmenting with I-steel, it is ensured that without generation of falling.
B, accurately it is installed to anchor point using moving horizontally mode by adjustable base.
C, adjustable base are laid after the completion of debugging, install alarm and protecting crust.
4. instrument testing
It is a, just flat:Level circle bubble is observed, right-hand man rotates two fine setting angle spirals, and two thumb moving directions simultaneously In opposite directions, left hand thumb direction is identical with the bubble moving direction that level justifies bubble, until bubble centring point.
B, end are flat:After level justifies bubble counterweight, then fine setting angle spiral is adjusted by the horizontal level tube bubble pair in alarm In.
C, accurate adjustment solar energy receive the angle direction of alarm, it is ensured that roll-over switch angle changing becomes with shaped steel amount of deflection Change consistent.
D, setting safety rope, prevent instrument accidental falling.
5. security monitoring
During a, the installation and debugging of precaution device device, monitoring personnel should fasten seat belts at any time, it is ensured that personal security.
B, formulation real-time security monitoring scheme, arrange full-time monitoring personnel timing, fixed point, multimode (patrol, look in the distance on the spot Mirror remote monitoring etc.) real-time monitoring site situation.
1) patrol on the spot:Specified special messenger regularly goes to real-time security monitoring place to check whether the prior-warning device is in daily Whether safe condition, alarm is destroyed by live debris (concrete, flitch, steel pipe etc.), personnel.
2) telescope remote monitoring:The special circumstances such as night, rainy day, can be used the long-range monitoring alarm alarm system of telescope Whether system starts.
3) such as the situation that the construction loads such as casting concrete are uprushed, inspection and telescope remote monitoring phase on the spot are preferably used With reference to mode monitored in real time.
C, formulation the shaped steel suspension scaffolding monitoring early warning and safety system-early warning system start emergency preplan.Early warning system one Denier starts, and should stop all production activities in the shaped steel suspension scaffolding scope of operation immediately, withdraw all of the above operation people Member;The very first time notifies project manager and other administrative staff and company and the higher level department that must accordingly report, according to early warning System starts the related measure that emergency preplan is formulated, and formulates effective scheme, eliminates safe hidden trouble.
D, for the special weathers such as thunderstorm gale, national legal festivals and holidays, special safe emergency preplan should be formulated and matched somebody with somebody Standby special Emergency Response Team;Watch bill is formulated, watch time scene group member should strengthen monitoring, and phone operator on duty should keep 24 hours phones are unimpeded in case of emergency situations should go to scene the very first time.
Alarm and disposition:
Roll-over switch triggering alarm can be touched when suspension scaffold is by load more than scheme.Alarm red lamp It can flash and be simultaneously emitted by alarm signal to terminal, terminal can send alarm and processing method to administrative staff mobile phone A PP, custodian Member is handled according to emergency preplan.
Many I-steel can simultaneously be installed simultaneously, mounting process is easy, can be achieved real using the prior-warning device of the present invention Shi Zidong monitor, you can preferably to save manpower and equipment cost, can effectively play again suspension scaffold cave in, topple before early warning make With, it is to avoid there is casualties and property loss.Adjustment method of the present invention is simple, cost is low, can synchronously be installed with erection, Short time limit.
It is the Economic and Efficiency Analysis table using the present invention below:
Under being compared with existing monitoring method, the present invention is more economical convenient.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention Any modifications, equivalent substitutions and improvements made within refreshing and principle etc., should be included in the scope of the protection.

Claims (10)

1. a kind of skyscraper the shaped steel suspension scaffolding, discharging platform amount of deflection monitoring early warning and safety device, it is characterised in that:Including It is fixedly mounted on the adjustable base of Cantilever Beams or discharging platform end(1)And it is arranged on adjustable base(1)On alarm (2), the alarm(2)Including installing housing(3)And it is arranged on installation housing(3)Interior roll-over switch(4), alarm opens Close(5)And alarm mechanism, the roll-over switch(4)Pin pass through circuit(20)With alarm switch(5)Connection, institute State alarm switch(5)Pass through circuit(20)Mechanism is connected with alarm, in the adjustable base(1)With installation housing(3) On be respectively arranged with spirit level, the adjustable base(1)Including firm banking(14)And mounting seat(15), the firm banking (14)By finely tuning angle spiral(16)With mounting seat(15)Connection.
2. skyscraper the shaped steel suspension scaffolding according to claim 1, discharging platform amount of deflection monitoring early warning and safety device, It is characterized in that:The adjustable base(1)The spirit level of upper setting is that level justifies bubble(6), the installation housing(3)It is interior to set Spirit level be horizontal levelling tube(7).
3. skyscraper the shaped steel suspension scaffolding according to claim 2, discharging platform amount of deflection monitoring early warning and safety device, It is characterized in that:The roll-over switch(4)With horizontal levelling tube(7)Along its it is axial arranged place to builder's jack Cantilever Beams or The direction that discharging platform stretches out is consistent.
4. skyscraper the shaped steel suspension scaffolding according to claim 1, discharging platform amount of deflection monitoring early warning and safety device, It is characterized in that:In the roll-over switch(4)The angle that side is correspondingly arranged on for adjusting roll-over switch gradient sets disk (8).
5. skyscraper the shaped steel suspension scaffolding according to claim 1, discharging platform amount of deflection monitoring early warning and safety device, It is characterized in that:In the installation housing(3)Top is provided with protecting crust(9), in the protecting crust(9)Above, shone towards the sun The position penetrated is provided with solar panel(10), the solar panel(10)With being provided with installation housing(3)Interior power supply connects Connect, the power supply and charging connector(11)Connection.
6. skyscraper the shaped steel suspension scaffolding according to claim 1, discharging platform amount of deflection monitoring early warning and safety device, It is characterized in that:The alarm mechanism includes acousto-optic generator(12)With alarm signal transmitter(13), the alarm signal Number transmitter(13)Alarm signal is sent to control terminal, the control terminal sends alarm and processing method to administrative staff Receiving device.
7. skyscraper the shaped steel suspension scaffolding as claimed in any of claims 2 to 6, discharging platform amount of deflection are safe Monitoring early-warning device, it is characterised in that:The firm banking(14)It is fixedly mounted on the end that Cantilever Beams choose part, the report Alert device(2)Installed in mounting seat(15)On, the level justifies bubble(6)It is arranged on mounting seat(15)Upper surface.
8. skyscraper the shaped steel suspension scaffolding according to claim 7, discharging platform amount of deflection monitoring early warning and safety device, It is characterized in that:In the mounting seat(15)On be provided with multiple mounting holes(17), in the installation housing(3)Bottom is provided with Multiple and mounting hole(17)The lug boss of corresponding matching(18), the installation housing(3)Lug boss(18)Through mounting seat (15)On mounting hole(17)With adjustable base(1)Detachable connection is together.
9. skyscraper the shaped steel suspension scaffolding according to claim 8, discharging platform amount of deflection monitoring early warning and safety device, It is characterized in that:In the lug boss(18)Bottom is provided with annular groove(19), the lug boss(18)Through mounting seat(15)With Firm banking(14)Afterwards, by being arranged on firm banking(14)Clamping structure in bottom groove is connected to lug boss(18)Ring Groove(19)It is interior, make installation housing(3)With adjustable base(1)Link together.
10. a kind of skyscraper the shaped steel suspension scaffolding as in one of claimed in any of claims 1 to 9, discharging platform amount of deflection The method for early warning of monitoring early warning and safety device, it is characterised in that:Prior-warning device is installed on to the end of Cantilever Beams or discharging platform Position, it is ensured that the roll displacement direction of roll-over switch stretches out with builder's jack Cantilever Beams or discharging platform in alarm Direction is consistent, makes roll-over switch angle changing consistent with Cantilever Beams or the change of discharging platform degree of disturbing, when Cantilever Beams, discharging platform exist Deformed by load stress when reaching by calculating and testing the early warning value that should just obtaining, triggering roll-over switch opens concurrent Go out alarm.
CN201610257883.3A 2016-04-22 2016-04-22 A kind of skyscraper the shaped steel suspension scaffolding, discharging platform amount of deflection monitoring early warning and safety device and its method for early warning Active CN105756334B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610257883.3A CN105756334B (en) 2016-04-22 2016-04-22 A kind of skyscraper the shaped steel suspension scaffolding, discharging platform amount of deflection monitoring early warning and safety device and its method for early warning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610257883.3A CN105756334B (en) 2016-04-22 2016-04-22 A kind of skyscraper the shaped steel suspension scaffolding, discharging platform amount of deflection monitoring early warning and safety device and its method for early warning

Publications (2)

Publication Number Publication Date
CN105756334A CN105756334A (en) 2016-07-13
CN105756334B true CN105756334B (en) 2017-10-31

Family

ID=56325667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610257883.3A Active CN105756334B (en) 2016-04-22 2016-04-22 A kind of skyscraper the shaped steel suspension scaffolding, discharging platform amount of deflection monitoring early warning and safety device and its method for early warning

Country Status (1)

Country Link
CN (1) CN105756334B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109711014B (en) * 2018-12-14 2023-04-07 西南林业大学 Model construction method for bending deflection of wood after hydrothermal-microwave combined softening treatment
CN111552206A (en) * 2020-04-08 2020-08-18 中核华纬工程设计研究有限公司 Unloading platform equipment and system for construction site safety supervision
CN111535570A (en) * 2020-05-12 2020-08-14 上海建工一建集团有限公司 Monitoring system and method for cantilever type externally-hung protective frame
CN113624196B (en) * 2021-07-28 2023-09-22 中国十七冶集团有限公司 High-rise outer wall overhanging scaffold deformation detection device
CN116305383A (en) * 2022-08-05 2023-06-23 中建一局集团第二建筑有限公司 Safety monitoring method for construction unloading platform

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2877148B1 (en) * 1998-04-09 1999-03-31 株式会社こあ Equipment for unloading and loading heavy materials into high-rise building construction sites
CN201649654U (en) * 2010-01-04 2010-11-24 江苏江中集团有限公司 Discharging platform for high-rise building construction
CN103669893A (en) * 2013-11-30 2014-03-26 重庆诚硕科技有限公司 Discharging platform warning device
CN205591518U (en) * 2016-04-22 2016-09-21 成都市第七建筑工程公司 High -rise building shaped steel encorbelment scaffold frame, platform amount of deflection of unloading safety monitoring and forewarning device

Also Published As

Publication number Publication date
CN105756334A (en) 2016-07-13

Similar Documents

Publication Publication Date Title
CN105756334B (en) A kind of skyscraper the shaped steel suspension scaffolding, discharging platform amount of deflection monitoring early warning and safety device and its method for early warning
CN103696614B (en) Iron tower of power transmission line tilt detection and deviation correcting device
CN206709818U (en) High-supported formwork deforms real-time Automatic monitoring systems in Structural Engineering construction
CN110006674A (en) A kind of monitoring method of high form-tie assembly Instability real-time early warning
CN105003090B (en) Temporary support frame for mounting assembly type steel structure
WO2022253310A1 (en) High-altitude rotating construction method for large venue steel canopy
CN207440969U (en) Outer break of constructing under power transmission line route warns monitoring device
WO2018233336A1 (en) On-site detection method and device for three-dimensional deformation of glass curtain wall
CN109680915B (en) Scaffold with hemispherical structural surface and erection method thereof
CN205591518U (en) High -rise building shaped steel encorbelment scaffold frame, platform amount of deflection of unloading safety monitoring and forewarning device
CN104264589A (en) Real-time monitoring method for hanging basket states
CN201853321U (en) Crag and rock fall alarm system
CN203430066U (en) Closed protective platform for core tube
CN207794154U (en) A kind of device of real-time monitoring deep foundation pit slope relative displacement variation
CN203514368U (en) Side slope detection work platform
CN215373991U (en) Foundation ditch monitoring is with forcing centering to survey mound
CN212653364U (en) Ground screw height adjusting device
CN213418456U (en) Building scaffold wall connecting piece
CN203977471U (en) A kind of device for detection of foundation pile vertical compression bearing capacity
CN113006498A (en) Large-span spherical roof truss pull rod lifting construction method
CN106437024A (en) Mounting method of special-shaped large-span net rack high-altitude positioning blocks
CN220250960U (en) Deformation monitoring device for high formwork engineering construction of building engineering
CN206941438U (en) A kind of road device for monitoring city the condition of a disaster
CN106285043B (en) A method of rack installation is carried out using mobile bolt sphere support frame
CN215859416U (en) Town road foundation ditch safety device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 610051 No. 33 Shuanglin Road, Chenghua District, Chengdu City, Sichuan Province

Patentee after: Chengdu Construction Engineering No. 7 Construction Engineering Co., Ltd.

Address before: 610051 No. 33 Shuanglin Road, Chenghua District, Chengdu City, Sichuan Province

Patentee before: Chengdu No.7 Construction Engineering Co., Ltd.