CN105755190B - The device that a kind of hot steel slag quickly cools down - Google Patents

The device that a kind of hot steel slag quickly cools down Download PDF

Info

Publication number
CN105755190B
CN105755190B CN201610303403.2A CN201610303403A CN105755190B CN 105755190 B CN105755190 B CN 105755190B CN 201610303403 A CN201610303403 A CN 201610303403A CN 105755190 B CN105755190 B CN 105755190B
Authority
CN
China
Prior art keywords
slag
water
vexed
collecting gutter
hot steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610303403.2A
Other languages
Chinese (zh)
Other versions
CN105755190A (en
Inventor
郑久凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Hasike Energy Saving Technology Co Ltd
Original Assignee
Zhejiang Hasike Energy Saving Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Hasike Energy Saving Technology Co Ltd filed Critical Zhejiang Hasike Energy Saving Technology Co Ltd
Priority to CN201610303403.2A priority Critical patent/CN105755190B/en
Publication of CN105755190A publication Critical patent/CN105755190A/en
Application granted granted Critical
Publication of CN105755190B publication Critical patent/CN105755190B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B3/00General features in the manufacture of pig-iron
    • C21B3/04Recovery of by-products, e.g. slag
    • C21B3/06Treatment of liquid slag
    • C21B3/08Cooling slag
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Furnace Details (AREA)
  • Gasification And Melting Of Waste (AREA)

Abstract

The invention discloses the device that a kind of hot steel slag quickly cools down, including vexed slag bath (1), the sidepiece of vexed slag bath (1) is provided with small sump (2), bottom in vexed slag bath (1) is provided with collecting gutter (3), collecting gutter (3) is connected by water return pipeline (4) with small sump (2), the top of the collecting gutter (3) is less than the bottom of vexed slag bath (1), and the bottom of small sump (2) is less than the bottom of collecting gutter (3).The present invention, which has, builds that less input, and water-saving efficient, operation cost is relatively low, the characteristics of job safety and preferable slag separating effect.

Description

The device that a kind of hot steel slag quickly cools down
Technical field
The present invention relates to steelmaking technical field, device that particularly a kind of hot steel slag quickly cools down.
Background technology
Preprocess method in pretreatment of slag part has:Hot application method, heat vexed method, drum process, autoclave method and wind quenching method It is exactly hot application method and the vexed method of heat Deng, the preprocess method being generally used now.Hot application method, it is exactly briefly hot application place On hot melt slag, the method by fetching water, be allowed to quick cooling and part efflorescence, but because floor space is larger, and adopt With open work, the problem of airborne dust and high alkalinity water pollution can be produced.The vexed method of heat is the pretreatment of slag work just having the nearly more than ten years Skill;Because the vexed method operation of heat is carried out in workshop, pollution of the dust to the external world is greatly reduced, vexed slag bath has closed circuit plumbing System, it also avoid the pollution of high alkalinity water.
As depicted in figs. 1 and 2, the vexed slag system in 4,000,000 tons of steel/years of a set of matching, there is 6 vexed slag baths (1 '), each vexed Slag bath (1 ') has a collecting gutter (2 '), and the drainage pipeline (3 ') that collecting gutter (2 ') shares with 6 vexed slag baths (1 ') is connected, and arranges Waterpipe (3 ') and it is connected with one big sump (4 '), vexed slag bath (1 '), drainage pipeline (3 ') and big sump (4 ') are Reinforced concrete structure.It is very big to build input more than 30,000,000 for expense needed for such 6 vexed slag baths and its auxiliary facility.
6 vexed slag baths of the above carry out rebasing, dress slag, fetch water, vexed slag and slag tap successively, so recycle;The job stream Cheng Caiyong is fetched water from above, and the vapor that water becomes 100 DEG C is drained, while takes away the heat of slag, hot gas below early stage of fetching water On gush, water oozes under being not easy, and to the middle and later periods, it is most of ooze under water after and flows away in vain;While fetching water again backwater, fetch water Amount is typically in hundreds of tons of even upper kilotons, and backwater amount also at hundreds of tons, at 1.2 tons or so fetch water by the water of slag consumption per ton The vexed slag used time 20 is more than hour, time-consuming and water wasting;In cyclic process, for slag cooling velocity faster, primary slag is often turned over, also Hot slag turn over excavator and dialled, it is released substantial amounts of heat so that operation cost is higher.
The existing vexed method of heat is fetched water, the method sprayed using all standing, melting more than 1,000 degrees Celsius of (highest in slag bath 1600 DEG C) slag, be all poured onto less than 100 degrees Celsius without red slags with water.Fetch water process, especially to the middle and later periods, have 2/ More than 3 water carries the ash content and DDGS in more slag, flows to big sump by collecting gutter, drainage pipeline, bottom of pond is such as Fruit has ponding, and hot slag, which is sprinkled into, to live water cover, cause the no small blast of power.Due to the backwater amount in system described above Larger, containing the ash content that largely deposits in the water returned, the ash content that is carried in backwater easily blocks water return pipeline, and water return pipeline Cleaning work can increase the operation cost of system again.During hot slag is fetched water in pond, can emerge substantial amounts of steam, Influence the operation of other slag baths in workshop;Close the lid when fetching water, fuel gas is accumulated certain in pond in the gap of slag After amount, it can be lighted by following warm sludge and the very big blast of power occurs, danger coefficient is higher.
Therefore, the cooling of hot steel slag at present, exist construction input it is larger, water consumption is larger, operation cost it is higher and danger The problem of dangerous coefficient is larger.
The content of the invention
It is an object of the present invention to provide the device that a kind of hot steel slag quickly cools down, and it has construction, and less input, section Water is efficient, and operation cost is relatively low, the characteristics of job safety and preferable slag separating effect.
Technical scheme:The device that a kind of hot steel slag quickly cools down, including vexed slag bath, the sidepiece of vexed slag bath are set There is a small sump, the bottom in vexed slag bath is provided with collecting gutter, and collecting gutter is connected by water return pipeline with small sump;It is described to catchment The top of ditch is less than the bottom of vexed slag bath, and the bottom of small sump is less than the bottom of collecting gutter.
In the device that foregoing hot steel slag quickly cools down, small sump one end of the water return pipeline is provided with water discharging valve And feed pipe.
In the device that foregoing hot steel slag quickly cools down, the top of the vexed slag bath is provided with lid, and lid is provided with cigarette Cylinder connector.
In the device that foregoing hot steel slag quickly cools down, ventilating opening is additionally provided with the lid, through ventilation at ventilating opening Pipe is connected with air-introduced machine.
In the device that foregoing hot steel slag quickly cools down, the bottom of the small sump is connected with through drainpipe draws water Pump.
In the device that foregoing hot steel slag quickly cools down, the inwall of the vexed slag bath is provided with inner steel lining.
In the device that foregoing hot steel slag quickly cools down, the collecting gutter is provided with iron double-edged fine-toothed comb.
In the device that foregoing hot steel slag quickly cools down, the collecting gutter is arranged on the centre of vexed slag bath bottom.
In the device that foregoing hot steel slag quickly cools down, described water discharging valve includes cross bar, and cross bar is arranged on water supply Guan Shang, one end of cross bar are provided with weight, and the other end of cross bar is hinged with pull bar, and the end of pull bar is hinged with valve catch, valve Catch is located at the discharge outlet of water return pipeline.
In the device that foregoing hot steel slag quickly cools down, the water return pipeline tilts between collecting gutter and small sump Set, one end of water return pipeline is arranged on the bottom of collecting gutter, and one end that water return pipeline is connected with collecting gutter is higher than catchments with small One end of well connection.
Compared with prior art, more small sumps in vexed slag bath of the invention, and lacked in traditional vexed slag bath Drainage pipeline is built with sump two is beaten so that building cost reduces more than 2/3, uses the vexed slag bath in 6 present invention And its total cost of auxiliary facility has within 10,000,000 and builds the characteristics of less input.The present invention is used from vexed slag bath bottom Portion fetches water to be cooled down to hot steel slag, the water not flowed away when fetching water, after water becomes 100 DEG C of vapor, most of water Steam will also pass through from hot melt slag, continue to heat up, decompose, and this process can take away more heats in slag, on the water surface After being raised to more than the top of the slag, whole pond slag by boiling water boiling, is advantageous to the efflorescence of slag, and the vexed slag process used time of fetching water is few, few with water, The characteristics of with water-saving efficient.After hot steel slag being injected in the vexed slag bath of the present invention, it is only necessary to simple smooth, nothing is done to hot steel slag Cost power and turn over and dial, while during being fetched water under, the water surface slowly rises, and slag will not be washed away and caused in water containing a large amount of Ash content, last backwater amount is also seldom, and water return pipeline be used to supply water simultaneously and backwater, each backwater are deposited on interior a small amount of ashes Point, rinsed well when can be fetched water by next time again, be substantially not present the problem of water return pipeline blocks, without clearing up water return pipeline, tool There is the characteristics of operation cost is relatively low.Vapor caused by being fetched water under the present invention continuously can up emit, being produced in slag Fuel gas dilute and extrude away, due to being watered not from above, above with the presence of heating red slag before completion of fetching water so that dilute Releasing inadequate thoroughly fuel gas, upon emerging, will be burnt by red slag point above, nowhere accumulate, thoroughly solve flammable The danger of gas burst, there is the characteristics of job safety.The vexed slag bath of the present invention has the process of boiling water slag, and steel can be caused by boiling slag Slag breaks up more preferable, while the slag boiled, close to 100 DEG C, easily moisture evaporation is dried after now slag is dug out, Bu Huiyin Slag overly moist and influence follow-up magnetic separation, there is the characteristics of preferable to the separating effect of slag iron in slag.Fetched water under the present invention Structure, blast, and the gas temperature discharged are not only avoid, significantly larger than using the gas temperature for discharge of above fetching water so that Recovery in slag cooling procedure to waste heat is possibly realized.
In addition, the collecting gutter in the present invention is arranged on the centre position of vexed slag bath bottom, there is the characteristics of conveniently fetching water;Collection Iron double-edged fine-toothed comb on ditch can block slag and only allow water to flow away;Water return pipeline is tilted between collecting gutter and small sump and set Put, facilitate the water in collecting gutter to be smoothly discharged into small sump;Because backwater amount is smaller, thus it is smaller using the power of suction pump, The power of suction pump is only that the vexed big sump of slag bath of tradition draws water less than the 1/5 of pump power;The present invention water discharging valve by weight, Cross bar, pull bar and valve catch are formed, it is only necessary to by controlling the action of weight can control valve catch, have user Just, the characteristics of simple in construction.Therefore, less input with construction by the present invention, and water-saving efficient, operation cost is relatively low, job safety With slag separating effect it is preferable the characteristics of.
Brief description of the drawings
Fig. 1 is the structure top view of the vexed slag system in 4,000,000 tons of steel/years in the prior art;
Fig. 2 is the structure right view of vexed slag bath in the prior art;
Fig. 3 is the structure top view of the vexed slag bath of the present invention;
Fig. 4 is the structure right view of the vexed slag bath of the present invention;
Fig. 5 is the flow chart of the vexed slag technique of the present invention.
Mark in accompanying drawing for:The vexed slag baths of 1-, the small sumps of 2-, 3- collecting gutters, 4- water return pipelines, 5- water discharging valves, 6- Feed pipe, 7- drainpipes, 8- suction pumps, 9- lids, 10- ventilating openings, 11- chimney connectors, 12- ventilation ducts, 13- air-introduced machines, 14- inner steel linings, 15- iron double-edged fine-toothed combs, 16- cross bars, 17- weights, 18- pull bars, 19- valve catch, 1 '-vexed slag bath, 2 '-catchment Ditch, 3 '-drainage pipeline, 4 '-big sump.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples, but be not intended as to the present invention limit according to According to.
Embodiment.Enter exemplified by the vexed slag bath of pretreatment of slag of the independent backwater built up below from applicant in Tangshan Row explanation, the length of vexed slag bath is 6m, width 6m, depth 5.5m;The depth of vexed slag bath underdrain ditch is 6m, small to catchment The depth of well is 10m.
The device that a kind of hot steel slag quickly cools down, form as shown in Figure 3 and Figure 4, including vexed slag bath 1, the side of vexed slag bath 1 Portion is provided with small sump 2, and the bottom in vexed slag bath 1 is provided with collecting gutter 3, and collecting gutter 3 is connected by water return pipeline 4 and small sump 2 It is logical;The top of the collecting gutter 3 is less than the bottom of vexed slag bath 1, and the bottom of small sump 2 is less than the bottom of collecting gutter 3.Described time One end of small sump 2 of waterpipe 4 is provided with water discharging valve 5 and feed pipe 6.The top of the vexed slag bath 1 is provided with lid 9, lid 9 It is provided with chimney connector 11.It is additionally provided with ventilating opening 10 on the lid 9, air-introduced machine is connected with through ventilation duct 12 at ventilating opening 10 13.The bottom of the small sump 2 is connected with suction pump through drainpipe 7.The inwall of the vexed slag bath 1 is provided with inner steel lining 14.The collecting gutter 3 is provided with iron double-edged fine-toothed comb 15.The collecting gutter 3 is arranged on the centre of the vexed bottom of slag bath 1.Described draining valve Door 5 includes cross bar 16, and cross bar 16 is arranged on feed pipe 6, and one end of cross bar 16 is provided with weight 17, and the other end of cross bar 17 is hinged There is pull bar 18, the end of pull bar 18 is hinged with valve catch 19, and valve catch 19 is located at the discharge outlet of water return pipeline 4.It is described Water return pipeline 4 is obliquely installed between collecting gutter 3 and small sump 2, and one end of water return pipeline 4 is arranged on the bottom of collecting gutter 3, One end that water return pipeline 4 is connected with collecting gutter 3 is higher than the one end being connected with small sump 2.
Wherein, the thickness of inner steel lining is 220mm.The initial temperature for heating slag is 1000~1600 DEG C.
The application method of the present invention is as shown in figure 5, comprise the following steps:
1st, it is rebasing:
(a) with suction pump by the thorough Hui Jing of ponding in vexed slag bath;
(b) with dry converter slag or hot melt slag, the bottom of pond of whole vexed slag bath is not left blank scarce whole place mats.
2nd, slag is filled:
Before folding falls the first tank hot slag, live vexed slag bath bottom situation is confirmed, there are ponding or wet slag in such as vexed slag bath bottom, it is necessary to Using converter slag or heat the scattered slag place mat again of slag.
Hot steel slag is poured into vexed slag bath, the dress quantity of slag is 110~170m3, and it is 120~130m3 preferably to fill the quantity of slag;Often to Vexed slag bath introversion is finished down a hot steel slag, will be to the hot steel slag stirring in vexed slag bath once;It is right after slag is completed to fill Covered on vexed slag bath, the lid of vexed slag bath is provided with chimney connector, for connecting chimney, facilitates and is arranged outside steam;The lid of vexed slag bath Son is provided with ventilating opening, air-introduced machine is connected with through ventilation duct at ventilating opening, for accelerating discharge of steam;Set on the inwall of vexed slag bath There is inner steel lining, inner steel lining is provided with fixed bolt hole, and after hot steel slag fills vexed slag bath, the highest face of hot steel slag must not More than the fixed bolt hole on inner steel lining.
3rd, fetch water:
The upper cover buckle of vexed slag bath is good;The chimney connector of upper lid and chimney are tightly connected.Water discharging valve is closed, is opened Water supply valve, feed pipe are fetched water from vexed slag bath bottom, not backwater during fetching water, until making whole vexed slag bath.Make whole It is 1.2~1.8 hours the time required to vexed slag bath, preferably 1.5~1.8 hours, water consumption was 80~90 tons, preferably 80~85 Ton.
4th, slag is boiled:
After making water in vexed slag bath, the amount of fetching water being turned down, keeping in vexed slag bath full-water level all the time, boiling is carried out to slag, if The emission behaviour and pool inner water amount of steam are undesirable, reopen water supply valve again, water and slag temperature in regulating reservoir Degree, to meeting the requirements.The time of fetching water of small water, water consumption was 40~50 tons, excellent for 6~7 hours, preferably 6.5~7 hours Elect 45~50 tons as.
5th, cut off the water vexed slag:
When in vexed slag bath there is no being arranged outside steam, now pond internal water accumulation can still proceed with holding fluidized state, and stopping is beaten Water, into vexed scoriform state of cutting off the water;Normal vexed slag phenomenon is that vapor is all arranged outside chimney, the lid ventilating opening on vexed slag bath Place, have in wind direction pond and flow, at vexed slag initial stage of fetching water, the discharge that air-introduced machine accelerates steam can be started.
Vexed scoriform state keeps dropping to less than 90 DEG C stoppings to hot steel slag temperature, stops at preferably 80~85 DEG C;It is total to use Water is below 0.4 ton/ton slag;It is 9~12 hours from the total time that terminates to vexed slag of starting to fetch water, preferably 10.5~11.5 Hour.
Wherein it is to the runoff investigation process for stopping fetching water from starting to fetch water:When just starting, ensureing the vexed normal work of slag bath In the state of work, water is first given to maximum, then according to the ponding situation in vexed slag bath, water is progressively turned down, keeps vexed slag All the time full-water level in pond, when in vexed slag bath there is no arranging outside steam, stop fetching water.
6th, slag tap:
(a) draining;Water supply valve is closed, opens water discharging valve, starts suction pump, the ponding in vexed slag bath is sent into water storage Pond, backwater amount is below 50 tons;
(b) uncap;Open the lid of vexed slag bath;
(c) slag tap;The slag in vexed slag bath is transferred in conveying equipment with excavating equipment, completes a working cycles.
More small sumps in the vexed slag bath of the present invention, and lacked the drainage pipeline in traditional vexed slag bath and beaten and catchmented Two buildings of well so that building cost reduces more than 2/3, uses the total of the vexed slag bath and its auxiliary facility in 6 present invention Expense has within 10,000,000 and builds the characteristics of less input.The present invention fetches water come to hot steel using from vexed slag bath bottom Slag is cooled down, the water not flowed away when fetching water, and after water becomes 100 DEG C of vapor, most of vapor will also be from hot melt steel Passed through in slag, continue to heat up, decompose, this process can take away more heats in slag, whole after the water surface rises to more than the top of the slag Pond slag by boiling water boiling, is advantageous to the efflorescence of slag, and the vexed slag process used time of fetching water is few, few with water, has the spy of water-saving efficient Point.After hot steel slag being injected in the vexed slag bath of the present invention, it is only necessary to hot steel slag is done simple smooth, dialled without laborious turn over, simultaneously During being fetched water under, the water surface slowly rises, and slag will not be washed away and to contain a large amount of ash contents, last backwater amount in water Also seldom, water return pipeline be used to supply water simultaneously and backwater, each backwater are deposited on interior a small amount of ash contents, can fetched water next time again When rinse well, be substantially not present the problem of water return pipeline blocks, without clearing up water return pipeline, there is the relatively low spy of operation cost Point.Vapor caused by being fetched water under the present invention continuously can up be emitted, and caused fuel gas in slag is diluted and squeezed Extrusion is gone, due to being watered not from above, above with the presence of the red slag of hot melt before completion of fetching water so that the inadequate thoroughly combustible gas of dilution Body will be burnt by red slag point above upon emerging, nowhere accumulate, thoroughly solve the danger of flammable gas explosion, tool There is the characteristics of job safety.The vexed slag bath of the present invention has the process of boiling water slag, and boiling slag can cause slag to break up more preferable, simultaneously The slag boiled is close to 100 DEG C, and easily moisture evaporation is dried after now slag is dug out, and will not be influenceed because of slag overly moist follow-up Magnetic separation, there is the characteristics of preferable to the separating effect of slag iron in slag.The lower water fetching structure of the present invention, not only avoid quick-fried Gas temperature that is fried, and discharging, significantly larger than using the gas temperature for discharge of above fetching water so as to remaining in slag cooling procedure The recovery of heat is possibly realized.
In addition, the collecting gutter in the present invention is arranged on the centre position of vexed slag bath bottom, there is the characteristics of conveniently fetching water;Collection Iron double-edged fine-toothed comb on ditch can block slag and only allow water to flow away;Water return pipeline is tilted between collecting gutter and small sump and set Put, facilitate the water in collecting gutter to be smoothly discharged into small sump;Because backwater amount is smaller, thus it is smaller using the power of suction pump, The power of suction pump is only that the vexed big sump of slag bath of tradition draws water less than the 1/5 of pump power;The present invention water discharging valve by weight, Cross bar, pull bar and valve catch are formed, it is only necessary to by controlling the action of weight can control valve catch, have user Just, the characteristics of simple in construction.Therefore, less input with construction by the present invention, and water-saving efficient, operation cost is relatively low, job safety With slag separating effect it is preferable the characteristics of.
Hot slag is sprinkled lives to explode in the place for having ponding water cover, and inexplosive reason of being fetched water below hot slag It is:Blast is within the extremely short time, discharges big energy, produces high temperature, and releases a large amount of gases, in the medium of surrounding The chemical reaction of high pressure is produced, there is extremely strong destructiveness;Hot slag is sprinkled in the place for having ponding, and water is covered suddenly, hot melt Slag fall with water intimate contact, oneself enough heat energy, almost (very short time) is transmitted to following water simultaneously, and water becomes simultaneously Steam expansion (state change), then an explosion occurred;When being fetched water under and, during water surface rising approaches hot slag, water meeting Quilt priority (rather than simultaneously) boiling vaporization is baked, water be able to not can be easy to pass through heat with hot slag intimate contact, caused vapor Slag is discharged.Described hot slag is hot steel slag.

Claims (9)

  1. A kind of 1. device that hot steel slag quickly cools down, it is characterised in that:Including vexed slag bath (1), the sidepiece of vexed slag bath (1) is provided with Small sump (2), the bottom in vexed slag bath (1) are provided with collecting gutter (3), and collecting gutter (3) passes through water return pipeline (4) and small sump (2) connect;The top of the collecting gutter (3) is less than the bottom of vexed slag bath (1), and the bottom of small sump (2) is less than collecting gutter (3) Bottom;Small sump (2) one end of the water return pipeline (4) is provided with water discharging valve (5) and feed pipe (6);The present apparatus uses Fetched water from vexed slag bath bottom to be cooled down to hot steel slag.
  2. 2. the device that hot steel slag according to claim 1 quickly cools down, it is characterised in that:The top of the vexed slag bath (1) Portion is provided with lid (9), and lid (9) is provided with chimney connector (11).
  3. 3. the device that hot steel slag according to claim 2 quickly cools down, it is characterised in that:Also set on the lid (9) There is ventilating opening (10), ventilating opening (10) place is connected with air-introduced machine (13) through ventilation duct (12).
  4. 4. the device that hot steel slag according to claim 1 quickly cools down, it is characterised in that:The small sump (2) Bottom is connected with suction pump (8) through drainpipe (7).
  5. 5. the device that hot steel slag according to claim 1 quickly cools down, it is characterised in that:The vexed slag bath (1) it is interior Wall is provided with inner steel lining (14).
  6. 6. the device that hot steel slag according to claim 1 quickly cools down, it is characterised in that:Set on the collecting gutter (3) There is iron double-edged fine-toothed comb (15).
  7. 7. the device that hot steel slag according to claim 1 quickly cools down, it is characterised in that:The collecting gutter (3) is set In the centre of vexed slag bath (1) bottom.
  8. 8. the device that hot steel slag according to claim 1 quickly cools down, it is characterised in that:Described water discharging valve (5) Including cross bar (16), cross bar (16) is arranged on feed pipe (6), and one end of cross bar (16) is provided with weight (17), cross bar (16) The other end is hinged with pull bar (18), and the end of pull bar (18) is hinged with valve catch (19), and valve catch (19) is located at return pipe At the discharge outlet in road (4).
  9. 9. the device that hot steel slag according to any one of claim 1 to 8 quickly cools down, it is characterised in that:Described time Waterpipe (4) is obliquely installed between collecting gutter (3) and small sump (2), and one end of water return pipeline (4) is arranged on collecting gutter (3) bottom, one end that water return pipeline (4) is connected with collecting gutter (3) are higher than the one end being connected with small sump (2).
CN201610303403.2A 2016-05-09 2016-05-09 The device that a kind of hot steel slag quickly cools down Active CN105755190B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610303403.2A CN105755190B (en) 2016-05-09 2016-05-09 The device that a kind of hot steel slag quickly cools down

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610303403.2A CN105755190B (en) 2016-05-09 2016-05-09 The device that a kind of hot steel slag quickly cools down

Publications (2)

Publication Number Publication Date
CN105755190A CN105755190A (en) 2016-07-13
CN105755190B true CN105755190B (en) 2018-01-30

Family

ID=56322708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610303403.2A Active CN105755190B (en) 2016-05-09 2016-05-09 The device that a kind of hot steel slag quickly cools down

Country Status (1)

Country Link
CN (1) CN105755190B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112680554B (en) * 2020-12-09 2022-08-19 凉山瑞京环保资源开发有限公司 Method for improving hot stuffiness efficiency of steel slag and hot stuffiness device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001088206A1 (en) * 2000-05-19 2001-11-22 Oksoo Oh Method for recovering useful metal from slag generated in steel-making process while treating the slag
CN101698892A (en) * 2009-11-09 2010-04-28 广东省韶关钢铁集团有限公司 Hot stuffy processing device for steel slag
CN203741355U (en) * 2014-03-19 2014-07-30 武钢集团昆明钢铁股份有限公司 Circulating water cooling system capable of quickly cooling slag
CN104818356A (en) * 2015-05-14 2015-08-05 新兴铸管股份有限公司 Slag-disintegrating pool for steelmaking
CN205774611U (en) * 2016-05-09 2016-12-07 浙江哈斯科节能技术有限公司 The equipment that hot steel slag quickly cools down

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001088206A1 (en) * 2000-05-19 2001-11-22 Oksoo Oh Method for recovering useful metal from slag generated in steel-making process while treating the slag
CN101698892A (en) * 2009-11-09 2010-04-28 广东省韶关钢铁集团有限公司 Hot stuffy processing device for steel slag
CN203741355U (en) * 2014-03-19 2014-07-30 武钢集团昆明钢铁股份有限公司 Circulating water cooling system capable of quickly cooling slag
CN104818356A (en) * 2015-05-14 2015-08-05 新兴铸管股份有限公司 Slag-disintegrating pool for steelmaking
CN205774611U (en) * 2016-05-09 2016-12-07 浙江哈斯科节能技术有限公司 The equipment that hot steel slag quickly cools down

Also Published As

Publication number Publication date
CN105755190A (en) 2016-07-13

Similar Documents

Publication Publication Date Title
CN106119448B (en) A kind of method that hot steel slag quickly cools down
CN207829026U (en) A kind of basement waterproofing structure
CN205635660U (en) Metallurgical liquid high temperature sludge shrend processing system
CN207159250U (en) Filter blast furnace grain slag processing system in a kind of hydrocone type bottom
CN105755190B (en) The device that a kind of hot steel slag quickly cools down
CN109011933A (en) A kind of yellow phosphorus furnace slag water quenching sealing method and device
FI75360C (en) Ways to dewater a cake of biomass.
CN209652178U (en) A kind of water granulated slag system
CN205774611U (en) The equipment that hot steel slag quickly cools down
CN1177063C (en) Blast furnace slag treating system
CN204494455U (en) A kind of drawing-in type combustion furnace chimney gives up fume treatment facility
CN207206709U (en) Steam recycling device
CN207887476U (en) A kind of blanking degasification structure of waterproof roll production line
CN205635737U (en) Arrangement structure in slow cooling district of smelting slag
CN205939143U (en) Drainage type gas nozzle
CN104588577B (en) The water removal device of a kind of moisture wax liquid and process thereof
CN107474867A (en) A kind of bitumen flue gas environmental protection reduction treatment apparatus
CN208328456U (en) One kind being used for socks, insole cleaning device
CN206970214U (en) The refined retracting device of low-grade lean phosphorus mud
CN217520266U (en) Automatic blowing device of bellows branch pipe under sintering technology micro-negative pressure
CN208828500U (en) A kind of automatic water removing device for oil storage tank with flusher
CN204874141U (en) Recovery regeneration system of solid waste separation water
CN208466778U (en) A kind of small flushing cinder grid slagging device of cleaning
CN108060278A (en) A kind of granulation tower water quenching granulating system
FI75359B (en) FOERFARANDE VID TORVBRYTNING.

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant